B.08.03 Amendment 0002, MCSF Blount Island FY21.pdf
PDF 5 MB Posted
- Attached to
- Marine Corps Support Facility – Blount Island, Maintenance Dredging 38-Foot Project Duval County, Florida
- Solicitation number
- W912EP21B0005
About this file
This invitation for bid outlines a solicitation for maintenance dredging services at the Marine Corps Support Facility - Blount Island in Duval County, Florida. The project requires dredging from Station 0+00 to Station 56+09.1 to a depth of 38 feet MLLW plus two feet of allowable overdraft, with dredged material to be placed at the Dayson Island Disposal Area. Additional work includes bird and turbidity monitoring, standby time, and a partnering regroup. The NAICS code is 237990 and the magnitude of construction is estimated between $1,000,000 and $5,000,000. Bids are due by July 7, 2021. This is a small business set-aside acquisition encouraging participation from all responsible offerors. Offerors must register as interested vendors on SAM.gov to receive any amendments.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Marine Corps Support Facility - Blount Island, Maintenance Dredging 38-Foot Project Duval County, Florida
1. See SF 30 Continuation Sheet for Amendment Dteails.
2. Receipt of Bids remains unchanged (07 JUL 2021)
All other conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EP21B0005
X 9B. DATED (SEE ITEM 11)
07-Jun-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jun-2021
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SF 30 CONTINUATION SHEET
Marine Corps Support Facility - Blount Island, Maintenance Dredging 38-Foot Project, Duval County, Florida
W912EP21B0005 2 Amendment 0002
SUMMARY OF CHANGES
1. SPECIFICATIONS:
Text changes have been updated with additions noted by underlined text (green in PDF) and deletions noted by line/cross-outs (red in PDF). These text changes pertain only to changes made by this amendment.
DELETE FAR Clause 52.211-12 LIQUIDATED DAMAGES-CONSTRUCTION (SEP 2000) in Section 00700 and REPLACE with the attached revised FAR Clause 52.211-12 LIQUIDATED DAMAGES- CONSTRUCTION (SEP 2000) in Section 00700.
DELETE Section 00010A and REPLACE with the attached revised Section 00010A.
2. DRAWINGS:
DELETE Sheet ID G-01 and REPLACE with the attached revised Sheet ID G-01.
DELETE Sheet ID G-02 and REPLACE with the attached revised Sheet ID G-02.
DELETE Sheet ID G-03 and REPLACE with the attached revised Sheet ID G-03.
DELETE Sheet ID C-01 and REPLACE with the attached revised Sheet ID C-01.
DELETE Sheet ID C-02 and REPLACE with the attached revised Sheet ID C-02.
DELETE Sheet ID C-03 and REPLACE with the attached revised Sheet ID C-03.
DELETE Sheet ID C-04 and REPLACE with the attached revised Sheet ID C-04.
(End of Summary of Changes)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,586 $1,570 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the
Termination clause.
(End of clause)
W912EP21B0005 1 Amendment 0002
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
MARINE CORPS SUPPORT FACILITY - BLOUNT ISLAND
MAINTENANCE DREDGING, 38-FOOT PROJECT
DUVAL COUNTY, FLORIDA
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0001 MOBILIZATION AND DEMOBILIZATION JOB $_______________
0002 EXCAVATION, UNCLASSIFIED
STATION 0+00 TO STATION 56+09.1 220,000
(ESTIMATED QUANTITIES, SEE NOTE 1) 150,000 CUBIC YARD $___________ $_______________
0003 TURBIDITY AND DISPOSAL MONITORING JOB $_______________
0004 MARINE ANIMAL OBSERVER
(MECHANICAL DREDGING ONLY) JOB $_______________
0005 BIRD MONITORING JOB $_______________
0006 STANDBY TIME (SEE NOTE 3) 24 HOUR $___________ $_______________
0007 PARTNERING REGROUP 1 EACH $___________ $_______________
TOTAL BID (LINE ITEMS 0001 THROUGH 0007) $_______________
NOTES: (1) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR BETWEEN THE DATES OF SURVEYS SHOWN ON THE DRAWINGS AND ACTUAL DREDGING. THE CONTRACTOR SHALL NOT PERFORM WORK IN EXCESS OF THE TOTAL ESTIMATED QUANTITY GIVEN FOR EACH LINE ITEM WITHOUT PRIOR APPROVAL OF THE CONTRACTING OFFICER. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AT LEAST ONE WEEK PRIOR TO THE ANTICIPATED DATE THAT THE ESTIMATED QUANTITY
MAY BE EXCEEDED.
(2) OFFERS MUST PRICE ALL ITEMS. SEE SECTION 00100 INSTRUCTIONS TO OFFERORS.
(3) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION AT THE DIRECTION OF THE CONTRACTING OFFICER. STANDBY TIME SHALL BE UTILIZED ONLY DUE TO ENDANGERED SPECIES CONCERNS, DIFFERING SITE CONDITIONS, SECURITY OPERATIONS OR OTHER CONDITIONS AS DETERMINED BY THE CONTRACTING OFFICER. REQUIREMENTS FOR WORK STOPPAGES, DELAYS OR OTHER IMPACTS ASSOCIATED WITH COMPLIANCE WITH SECTION 01 57 20 ENVIRONMENTAL PROTECTION ARE NOT PAID FOR UNDER THIS LINE ITEM. STANDBY TIME IS NOT AFFORDED FOR DELAYS CAUSED BY ADVERSE WEATHER CONDITIONS. PAYMENT WILL ONLY BE MADE FOR ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING
OFFICER. SEE SECTION 01 22 00 MEASUREMENT AND PAYMENT.
W912EP21B0005 00010A-1 Amendment 0002
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10 11 12
H
J
13 14
K
L
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S pw:\\PWINT-CPC.EIS.DS.USACE.ARMY.MIL:CESAJ - Jacksonville District\Documents\Navigation Projects\Marine Corps Terminal\USMC Terminal MD FY21\080 - Plans\01 General\Cover and Sheet Index
/1
/2
D R
A W
IN
G D
A T
E
F
IL
E N
A M
E
A N
S I E
X X
X X
X X -X
X -X -X
X X
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J E
C T
D U
V A
L C
O U
N T
Y F
L O
R
ID
A H T
R O
C H
E
V
B O
G
IN
A
W
R E
IL
L Y
M
A R
IN
E C
O R
P S S
U P
P O
R T F
A C
IL
IT
Y B
L O
U N
T I S
L A
D of Engineers
US Army Corps
SOLICITATION NO.:
GENERAL
SHEET INDEX
G-01
G-02
COVER AND SHEET INDEX
G-03
G-04
C-01
C-02
C-03
C-04
C-05
CIVIL
SHEET TITLESHEET ID
G-01
G E
N E
R
ABBREVIATIONS AND SYMBOLOLOGY
PROJECT OVERVIEW
DREDGING PLAN - STA. 00+00 TO STA. 27+00
(D/A-D)
DISPOSAL AREA
DAYSON ISLAND
ISLAND
BLOUNT
S T A T E O F F L O R I D A
A T L A N T I C O C E A N
D U V A L C O U N T Y
IN
T R
A C
O A S T
A L
W A
T E
R W
A Y
E N T R A N C E C H A N N E L
S T J O H N S R I V E R
S T J O H N S
E R
R I V
IN
T E R S T A T E
IN
T E R S T A T E
HECKSCHER DRIVE
HECKSCHER DRIVE
NOT TO SCALE
MAINTENANCE DREDGING
BLOUNT ISLAND
MARINE CORPS SUPPORT FACILITY
C O
V E
R A
N D S
H E
E T I
N D
E X
DREDGING PLAN - STA. 27+00 TO STA. 56+09.1
C-06
DREDGING CROSS SECTIONS
DREDGING CROSS SECTIONS
DISPOSAL PLAN - DAYSON ISLAND
DISPOSAL CROSS SECTIONS - DAYSON ISLAND
-M
C T -G
I0 P
L N .d g n
CHANNEL AND SURVEY CONTROL DATA
38-FOOT PROJECT
MAINTENANCE DREDGING
MARINE CORPS SUPPORT FACILITY - BLOUNT ISLAND
DUVAL COUNTY, FLORIDA
JACKSONVILLE DISTRICT
N
W912EP21B0005
A J
U N
R E
V
IS
E D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T
A
A
A
A
A
G E
N E
R A
L
G-02
I
CB-JH99-22 IDENTIFIER
GS-JH99-22 IDENTIFIER
VB-JH99-22 IDENTIFIER
CORE BORING
GRAB SAMPLE
VIBRACORE BORING
LIGHTED BEACON
GREEN DAYBEACON
RED DAYBEACON
CAN BUOY
NUN BUOY
PROJECT DEPTH
NO WAKE
SIGN
RED LIGHTED BUOY / GREEN LIGHTED BUOY
PROJECT CHANNEL
ELEVATION AND LOCATION49.5
PIPELINE ROUTE
CONTROL MONUMENT
HORIZONTAL AND VERTICAL
UPLAND DISPOSAL AREA
IN THE DIRECTION OF ARROW
MONUMENT FALLS OFF THE PAGE
CONTROL POINT
VERTICAL / TIDAL CALIBRATION
GRASS OR MARSH AREA
PID AF31
CHANNEL PI POINTS
CHANNEL LIMITS
DREDGING AREA
OBJECT REFERENCED
VIEWING PLANE
CUTTING PLANE LINE
MATERIAL SYMBOL KEY
REFERENCE SYMBOL KEY
TERMS AND ABBREVIATIONS
IDENTIFICATION
S-56 S-56
GENERAL SYMBOLOGY
LEGEND - NAVIGATION
LEGEND - GEOTECHNICAL BORINGS
LEGEND - AIDS TO NAVIGATION
SHOWN
DRAWING WHERE
DISCIPLINE DESIGNATOR
SURVEY NOTES - CHANNEL
SURVEY NOTES - UPLAND DISPOSAL
400'0 200'20' 40'0
SECTION NAME
TITLE
DRAWING WHERE SHOWN
GRAPHIC SCALE
CROSS SECTIONC
C-16
HORIZONTALVERTICAL
-M
C T -G
I0 s y m b o ls .d g n
A B
B R
E V
IA
T
IO
N S A
N D S
Y M
B O
L O
G Y
EXISTING CONCRETE
RIPRAP
CF CHAIN LINK FENCE
CONCRETE SILL
C - CIVIL
G - GENERAL
OFW
FENCE BUOY
EXISITNG GRADE
SIDE SLOPE
FULL CROSS SECTION
DRAWING AREA - CROSS SECTION PROFILE
SENSITIVE STRUCTURES
COASTLINE
THE JACKSONVILLE HARBOR CHANNEL LIMIT LINE IS THE EASTERN LIMIT OF PROJECT.7.
SYMBOLS SHOWN ON THIS SHEET.
ABBREVIATIONS MAY APPEAR IN THIS SET OF DRAWINGS TO INDICATE SPECIFIC CONDITIONS IN LIEU OF
CONDITIONS ON THIS SET OF DRAWINGS TO THE EXTENT APPLICABLE. ADDITIONAL LEGENDS AND/OR
6. THE LEGENDS ON THIS SHEET ARE COMPOSED OF STANDARD SYMBOLS AND ARE PERTINENT TO THE
DATED 2020).
IS FOR GENERAL INFORMATION ONLY AND IS NOT TO BE USED FOR MEASUREMENTS (AERIAL IMAGERY
PERFORMANCE OF CONSTRUCTION OF THIS PROJECT. THE AERIAL IMAGERY SHOWN ON THESE DRAWINGS
FOR VERIFYING THE LOCATION OF ALL SUCH FEATURES THAT ARE NECESSARY FOR OR AFFECT THE
INFORMATION ONLY AND WERE NOT PHYSICALLY LOCATED BY SURVEY. THE CONTRACTOR IS RESPONSIBLE
5. UNLESS OTHERWISE INDICATED, ALL PLANIMETRIC FEATURES DEPICTED ON THESE DRAWINGS ARE FOR
CENTERLINE.
SURVEY FEET. UNLESS OTHERWISE INDICATED, ALL STATIONS REFER TO DISTANCE ALONG THE CHANNEL
4. UNLESS OTHERWISE INDICATED, ALL POSITIONS, STATIONING AND ELEVATIONS ARE IN THE UNITS OF U.S.
REFERENCED DATUM ARE ASSIGNED THE PLUS SYMBOL (+).
BENCHMARKS TO BE EMPLOYED TO CONDUCT, OR REPRODUCE, A SURVEY. ALL ELEVATIONS SHOWN ABOVE
THE APPLICABLE PROJECT KTD FILE NAME AND TIDAL CALIBRATION/VERIFICATION STATIONS, OR
NOT TO BE USED FOR AN ENTIRE PROJECT. REFER TO SURVEY NOTES ACCOMPANYING THESE PLANS FOR
(NAVD88) VARIES ALONG THE EXTENTS OF A PROJECT; A SINGLE VALUE FROM A PUBLISHED TIDE GAUGE IS
INFORMATION. THE RELATIONSHIP BETWEEN MLLW AND THE NORTH AMERICAN VERTICAL DATUM OF 1988
TIDAL DATUM (KTD) MODEL, BASED ON NOAA’S VDATUM PROGRAM AND PUBLISHED NOAA TIDE GAUGE (MLLW) TIDAL DATUM, 1983-2001 EPOCH. MLLW IS REALIZED DURING SURVEY OPERATIONS VIA A KINEMATIC
3. UNLESS OTHERWISE INDICATED, ALL ELEVATIONS ARE REFERENCED TO THE MEAN LOWER LOW WATER
ADJUSTMENT OF THE NORTH AMERICAN DATUM OF 1983 (NAD83(2011)).
COORDINATE SYSTEM OF 1983, FLORIDA EAST ZONE (0901), AND ARE REFERENCED TO THE 2011
2. UNLESS OTHERWISE INDICATED, ALL HORIZONTAL POSITIONS ARE SHOWN IN THE STATE PLANE
PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
THE INITIALS OR SIGNATURES AND REGISTRATION DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE
1. THIS PROJECT WAS DESIGNED BY THE JACKSONVILLE DISTRICT OF THE U.S. ARMY CORPS OF ENGINEERS.
UNITED STATES MARINE CORPS
UNITED STATES ARMY CORPS OF ENGINEERS
TYPICAL
STATION
RANGE
POINT OF INTERSECTION
OUTSTANDING FLORIDA WATERS
NOT TO SCALE
NUMBER
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
NORTH AMERICAN DATUM OF 1983
NORTH AMERICAN VERTICAL DATUM OF 1988
MEAN LOWER LOW WATER
ELEVATION
DISPOSAL AREA - DAYSON ISLAND
CUBIC YARD
BOULEVARD
USMC
USACE
TYP
STA
RGE
PI
OFW
N.T.S.
NO
NOAA
NAD83
NAVD88
MLLW
EL / ELEV
D/A-D
CY
BLVD
D D
200'0 100'
N
NORTH INDICATOR
GRAPHIC SCALE
TITLE
DRAWING AREA - PLAN
PLAN VIEW
SURVEY NOTES - CHANNEL (SIDE SLOPES ONLY)
GENERAL NOTES
NOV 2013.
FOLLOWED DURING THIS SURVEY IN ACCORDANCE WITH USACE EM 1110-2-1003, HYDROGRAPHIC SURVEYING, 30
10. SURVEY ACCURACY STANDARDS, QUALITY CONTROL, AND QUALITY ASSURANCE REQUIREMENTS WERE
TIME. THIS DATA IS NOT TO BE USED FOR NAVIGATION PURPOSES.
DATES INDICATED ABOVE AND CAN ONLY BE CONSIDERED AS INDICATING THE GENERAL CONDITIONS AT THAT
9. THE INFORMATION DEPICTED ON THESE DRAWINGS REPRESENTS THE RESULTS OF SURVEYS MADE ON THE
BERTH 1 & 2 13 NOV 2020SB WELLS
LOCATION DATE SURVEY VESSEL
TRANSDUCER OPERATING AT 550KHZ.
8. VERTICAL MEASUREMENTS WERE MADE USING EDGETECH 6205 COMBINED MULTIBEAM AND SIDESCAN SONAR
TIDE STAFF SET FROM “NOS 872-0221, FULTON”
REFERENCE BASE LOCATED AT “USACE BIMT ARP”(OPUS PID: BBGM25)
REFERENCE BASE LOCATION:
7. THIS SURVEY WAS PERFORMED USING REAL-TIME KINEMATIC GPS POSITIONING WITH THE FOLLOWING
6. ALL STATIONING REFERS TO THE CENTERLINE OF THE CHANNEL.
FLORIDA AND REFERENCED TO NORTH AMERICAN DATUM OF 1983 (2011).
5. PLANE COORDINATES ARE BASED ON THE TRANSVERSE MERCATOR PROJECTION FOR THE EAST ZONE OF
4. ALL ELEVATIONS ARE BELOW THE CHART DATUM UNLESS PRECEDED BY A (+) SIGN.
FLAGLER_20191202.KTD”.
UTILIZING A HYPACK KINEMATIC TIDAL DATUM (KTD) MODEL, TITLED “CAMDENGA-NASSAU-DUVAL-STJOHNS-
3. TIDAL REDUCTIONS WERE OBTAINED USING REAL-TIME KINEMATIC (RTK) GPS AND REFERENCED TO MLLW
NOAA TIDAL STATION 872-0221, FULTON, ST. JOHNS RIVER
THE TIDE GAGE SITES SPECIFIED BELOW:
MODEL WAS USED AND CALIBRATED TO THE PUBLISHED MLLW HEIGHTS OF THE BENCH MARKS ASSOCIATED WITH
1983-2001, AS REPORTED BY THE NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA). NOAA’S VDATUM
2. DEPTHS DEPICTED BY THIS SURVEY ARE REFERENCED TO MEAN LOWER LOW WATER (MLLW), TIDAL EPOCH
1. REFER TO SURVEY NO. 20-273.
AS INDICATING THE GENERAL CONDITIONS AT THAT TIME.
THE SURVEYS MADE ON THE DATES INDICATED ABOVE AND CAN ONLY BE CONSIDERED
9. THE INFORMATION DEPICTED ON THESE DRAWINGS REPRESENTS THE RESULT OF
THE BEGINNING, PERIODICALLY IN BETWEEN, AND AT THE END OF EACH RTK SESSION.
8. QUALITY CONTROL CHECKS WERE PERFORMED AT MONUMENT CONTROL POINTS AT
INTERVALS, SEPARATED BY A MINIMUM OF SIX (6) HOURS.
UTILIZING RTK (REAL TIME KINEMATIC) GPS, BY OBSERVING 180 EPOCHS AT TWO
INFORMATION. SURVTECH ESTABLISHED TEMPORARY CONTROL ON THE BERM
CANOPY, THE SOKKIA 330R TOTAL STATION WAS UTILIZED TO COLLECT TOPOGRAPHIC
CANOPY USING THE RTK (REAL TIME KINEMATIC) GPS. IN AREAS WHERE THERE WAS
3”INSTRUMENT. TOPOGRAPHIC INFORMATION WAS COLLECTED IN AREAS WITHOUT
GPS BOARDS), DUAL FREQUENCY SYSTEMS, AND AS NEEDED, A SOKKIA 330R
7. THE TOPOGRAPHIC DATA WAS COLLECTED UTILIZING A CHAMPION TKO (TRIMBLE R-8
A BOUNDARY SURVEY OF PARCEL B DAYSON SPOIL SITE.
LEVEE, TOPOGRAPHIC DATA ON A 100-FOOT GRID OVER THE IMPOUNDMENT AREA AND
6. THE WORK CONSISTED OF CROSS SECTIONS AT 100-FOOT INTERVAL OVER THE
FEET.
5. ALL POSITIONS AND ELEVATIONS ARE EXPRESSED IN THE UNITS OF U.S. SURVEY
(NAVD88).
4. ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988
EAST ZONE.
1983, REALIZATION OF 2011, NAD83(2011), STATE PLANE COORDINATE SYSTEM, FLORIDA
3. HORIZONTAL COORDINATES ARE REFERENCED TO THE NORTH AMERICAN DATUM OF
AND DECEMBER 20, 2018.
2. SURVEY WAS PERFORMED BY SURVTECH SOLUTIONS, INC., BETWEEN NOVEMBER 16
1. USACE DATABASE SURVEY NO. 18-272.
EXISITNG GRADE / BOTTOM
A
USACE EM 1110-2-1003, HYDROGRAPHIC SURVEYING, 30 NOV 2013.
REQUIREMENTS WERE FOLLOWED DURING THIS SURVEY IN ACCORDANCE WITH
12. SURVEY ACCURACY STANDARDS, QUALITY CONTROL, AND QUALITY ASSURANCE
IS NOT TO BE USED FOR NAVIGATION.
INDICATING THE GENERAL CONDITIONS EXISTING AT THAT TIME.THIS CHART
SURVEYS MADE ON THE DATES INDICATED AND CAN ONLY BE CONSIDERED AS
11. THE INFORMATION DEPICTED ON THESE MAPS REPRESENTS THE RESULTS OF
10. NAVAIDS WERE LOCATED DURING THIS SURVEY.
28 MAY 2021 LEAD LINE SOUNDINGS SURVEY CREW
SB-36 10 MAY 2021 STA12+00 TO STA 38+00 & 36+00 TO 56+09
SB-36 3 MAY 2021 STA 0+00 TO STA 16+00
VESSEL DATE OF SURVEY AREA
ARE SHOWN IN LOW FREQUENCY (28 KHZ).
STA 38+00 - 57+00 ARE SHOWN IN HIGH FREQUENCY. DEPTHS INSIDE SECURITY GATE
T20P MULTIBEAM OPERATING AT 400 KHZ. DEPTHS OUTSIDE THE SECURITY GATE,
WITH A DUAL-FREQUENCY (28/200KHZ) SINGLE-BEAM TRANSDUCER AND A RESON
9. VERTICAL MEASUREMENTS WERE MADE USING A ROSS MODEL 835C SMARTSOUNDER
(OPUS PID: BC2397)
TIDE STAFF SET AT ST. JOHNS COMMUNITY CENTER BOAT RAMP FROM NOS BM "0211K 1984"
REFERENCE BASE LOCATED AT "USACE BIMT ARP" (OPUS PID: BBGM25)
WITH THE FOLLOWING REFERENCE BASE LOCATION:
8. THIS SURVEY WAS PERFORMED USING REAL-TIME KINEMATIC GPS POSITIONING
7. ALL STATIONING REFERS TO THE CENTERLINE OF THE CHANNEL.
1983.
THE EAST ZONE OF FLORIDA AND REFERENCED TO THE NORTH AMERICAN DATUM OF
6. PLANE COORDINATES ARE BASED ON THE TRANSVERSE MERCATOR PROJECTION FOR
5. ALL ELEVATIONS ARE BELOW THE CHART DATUM UNLESS PRECEDED BY A (+) SIGN.
NOAA TIDAL STATION "872-0221", FULTON, ST. JOHNS RIVER
GAGE SITES SPECIFIED BELOW:
PUBLISHED MLLW HEIGHTS OF THE BENCHMARKS ASSOCIATED WITH THE TIDE
AND UTILIZING THE KTD FILE REFERENCED ABOVE, AND CALIBRATED TO THE
4. TIDAL REDUCTIONS WERE OBTAINED USING REAL-TIME KINEMATIC (RTK) GPS
"CAMDENGA-NASSAU-DUVAL-STJOHNS-FLAGLER_01FEB2011.KTD".
MODEL USED FOR THIS SURVEY IS:
EDITS THERETO. DO NOT USE VDATUM IN PLACE OF THE KTD FILE. THE KTD
EQUIVALENT TO THE VDATUM MODELBECAUSE OF POSSIBLE ADDITIONS OR
BEING A COMBINATION OF THOSE TWO SOURCES CANNOT BE CONSIDERED
GENERATE A HYPACK KINEMATIC TIDE DATUM (KTD) MODEL. THIS KTD MODEL,
3. NOAA'S VDATUM MODEL, AND PUBLISHED TIDE STATION DATA WERE USED TO
ADMINISTRATION (NOAA).
1983-2001, AS PUBLISHED BY THE NATIONAL OCEANIC AND ATMOSPHERIC
2. DEPTHS DEPICTED BY THIS SURVEY ARE REFERENCED TO MLLW, TIDAL EPOCH
1. REFER TO SURVEY NO. 21-165.
J U
N
R E
V
IS
E D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T
A
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10 11 12
H
J
13 14
K
L
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S pw:\\PWINT-CPC.EIS.DS.USACE.ARMY.MIL:CESAJ - Jacksonville District\Documents\Navigation Projects\Marine Corps Terminal\USMC Terminal MD FY21\080 - Plans\01 General\Abbreviations and Symbols
/1
/2
D R
A W
IN
G D
A T
E
F
IL
E N
A M
E
A N
S I E
X X
X X
X X -X
X -X -X
X
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J E
C T
D U
V A
L C
O U
N T
Y F
L O
R
ID
A H T
R O
C H
E
V
B O
G
IN
A
W
R E
IL
R
IN
E C
O R
P S S
U P
P O
R T F
A C
IL
IT
Y B
L O
U N
T I S
L A
GULF OF MEXICO
LAKE
OKEECHOBEE
ALABAMA
GEORGIA
TALLAHASSEE
PENSACOLA
JACKSONVILLE
ORLANDO
FT MYERS
MIAMI
TAMPA
KEY WESTN.T.S.
LOCATION MAP
OF WORK
LOCATION
CANAVERAL
ST LUCIE
ST AUGUSTINE
GAINESVILLE
FLORIDA
OCEAN
ATLANTIC
BEACH
WEST PALM
FT. LUDERDALE
N
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10 11 12
H
J
13 14
K
L
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S pw:\\PWINT-CPC.EIS.DS.USACE.ARMY.MIL:CESAJ - Jacksonville District\Documents\Navigation Projects\Marine Corps Terminal\USMC Terminal MD FY21\080 - Plans\01 General\Project Overview
/1
/2
D R
A W
IN
G D
A T
E
F
IL
E N
A M
E
A N
S I E
X X
X X
X X -X
X -X -X
X
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J E
C T
D U
V A
L C
O U
N T
Y F
L O
R
ID
A H T
R O
C H
E
V
B O
G
IN
A
W
R E
IL
R
IN
E C
O R
P S S
U P
P O
R T F
A C
IL
IT
Y B
L O
U N
T I S
L A
G-03
G E
N E
R A
L
P R
O J E
C T O
V E
R V
IE
W
C L A P B
O A
R D C
R E E
K
DAMES P
OINT - F
ULTON C
UTOFF
HECKSCHER DR. (CR. 105)
HECKSCHER DR. (CR. 105
B R
O W
N 'S C
R E E
K
CEDAR POINT CREEK
S T. J O H N S R I V E R
O L D S T. J O H N S R I V E R
S T.
J O
H N S R
I V E R
B L O U N T I S L A N D
L I T T L E M A R S H I S L A N D
B L O
U N T
IS
L A
N D B
L V
D
B L
O U
N T I S
L A
N D
M A
R
IN
E C
O R
P S S
U P P
O R
T F
A C
IL
IT
Y
P R O J E C
T L I M I T S
J A X P O
R T C O
N T A I N
E R T E
R M I N A
L
DISCHARGE
PIPELINE
(S E
E S
H E
E T . C
-0
A P P
R O
X
IM
A T E D
R E
D G
E P
IP
E L
IN
E R
O U
T E
(S E
E S
H E
E T . C
-0
A P P
R O
X
IM
A T E D
R E
D G
E P
IP
E L
IN
E R
O U
T E
INSTALLATION MANAGEMENT OFFICE (IMO)
LOCATION OF WEIRS
DEPTH
REQUIRED
VOLUME TO
VOLUME
TOTAL
ESTIMATED DREDGING QUANTITIES IN CUBIC YARDS (CY)
STATIONING
DREDGE AREA
DEPTH
REQUIRED
OVERDEPTH
ALLOWABLE
VOLUME IN 2'
150,000
APPROXIMATE SHORELINE APPROXIMATE SHORELINE
APPROXIMATE S
HORELINE
APPRO
XIM
ATE SHO
RELINE
APPRO
XIM
ATE SHO
RELINE
0+00 TO 56+09.10 38' 53,000
N
600' 1200'0
S T
A
S T
A .1
OUTSTANDING FLORIDA WATERS - (OFW)
LIMITS OF TIMUCUAN ECOLOGICAL AND HISTORIC PRESERVE
PRESERVE OUTSTANDING FLORIDA WATERS - (OFW)
LIMITS OF TIMUCUAN ECOLOGICAL AND HISTORIC
PRESERVE OUTSTANDING FLORIDA WATERS - (OFW)
LIMITS OF NASSAU RIVER ST JOHNS RIVER MARSHES AQUATIC
-M
C T -G
I0 o v e rv ie w .d g n
PROJECT OVERVIEW
CALYPSO ISLAND
(D/A-D)
DISPOSAL AREA
DAYSON ISLAND
TOP OF EXISTING DIKE
D A V E R
A W
LS
B
LV
D
97,000
A
A R
E V
IS
E D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T
J U
N
0.
0.
0.
0 3
9.
9.
9.
8.
8.
8.
8.
8.
8.
8.
8.
8.
8.
7.
7.
7.
6.
6.
6.
6.
6.
6.
6.
5.
5.
5.
4.
4.
4.
4.
4.
4.
1 3
3.
3.
3.
2.
2.
2.
1.
1.
1.
1.
1.
1.
1.
1.
0.
9 3
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
3 3
0.
0.
0.
0.
0.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
8.
8.
8.
8.
8.
6 2
8.
8.
8.
8.
8.
7.
7.
7.
7.
7.
7.
7.
7.
7.
7.
7.
7.
7.
7.
6.
6.
8 2
6.
6.
6.
5.
5.
5.
5.
5.
5.
5.
5.
5.
4.
4.
7 2
4.
4.
4.
3.
3.
3.
3.
3.
6 2
3.
3.
3.
3.
3.
3.
3.
2.
2.
2.
4 2
2.
2.
2.
1.
1.
1.
1.
1.
0.
0.
0.
0.
0.
0.
0.
0.
9.
9.
9.
9.
9.
9.
9.
8.
8.
7 1
8.
8.
8.
8.
7.
7.
7.
7.
7.
6.
6.
6.
6.
6.
6.
6.
5.
5.
5.
5.
5.
5.
5.
5.
4.
4.
7 1
4.
4.
4.
4.
4.
3 1
4.
4.
3.
3.
3.
3.
3.
3.
3.
3.
3.
2 1
3.
3.
3.
3.
3.
2.
2.
2.
2.
2.
2.
2.
3 1
2.
2.
2.
2.
1.
1.
1.
1.
1.
1.
1.
1.
1.
3 1
1.
1.
1.
1.
0.
0.
0.
0.
0.
0.
0.
0.
0.
.9
.8
.8
.7
.7
.7
.7
.7
.6 9
.6
.6
.4
.4
.3 9
.3
.3
.3
.3 9
.2
.2
.2
.1
.0
.9
.8
.8
.7
.7
.6
.6
.6
.4
.2 8
.1
.0
.0
.0
.9
.8
.7 .6
.6
.6
.6
.6
.5
.5
.4
.4
.3
.3
.3
.2 7
.1 .0
.9
.7 6
.7 6 .7
.6
.4
.4
.4
.4
.3
.3
.3
.3
.3
.3
.2
.2
.2
.2
.2
.2
.2
.2
.2
.1
.1
.1
.1
.1
.1
.1
.1
.1 6
.1
.1
.1
.1
.1
.1
.1
.1
.1
.0 6
.0 .0
.0
.0
.0
.0 .0
.0
.0 6
.0 .0
.0
.0
.0 6
.0 6 .0
.0 6
.0
.0
.0
.0
.0
.0
.0
.0 6
.0 6 .0
.0
.0
.0
.0 6
.0 6 .0
.0
.0 6
.0 .0
.0
.0
.0
.0
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10 11 12
H
J
13 14
K
L
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S pw:\\PWINT-CPC.EIS.DS.USACE.ARMY.MIL:CESAJ - Jacksonville District\Documents\Navigation Projects\Marine Corps Terminal\USMC Terminal MD FY21\080 - Plans\05 Civil\Dredging Plan
/1
/2
D R
A W
IN
G D
A T
E
F
IL
E N
A M
E
A N
S I E
X X
X X
X X -X
X -X -X
X
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J E
C T
D U
V A
L C
O U
N T
Y F
L O
R
ID
A H T
R O
C H
E
V
B O
G
IN
A
W
R E
IL
R
IN
E C
O R
P S S
U P
P O
R T F
A C
IL
IT
Y B
L O
U N
T I S
L A
C B -B
IM
C -2
C B -B
IM
C -2
C B -B
IM
C -2
C B -B
IM
C -2
C B -B
IM
C -2
C B -B
IM
C -2
C B -B
IM
C -2
C B -B
IM
C -2
C B -B
IM
C -0
G S -B
IM
C -3
C B -B
IM
C -0
G S -B
IM
C -1
V B -B
IM
C -1
C B -B
IM
C -0
C B -B
IM
C -0
C B -B
IM
C -0
G S -B
IM
C -2
C B -B
IM
C -0
C B -B
IM
C -0
V B -B
IM
C -2
C B -B
IM
C -0
G S -B
IM
C -5
G S -B
IM
C -4
C B -B
IM
C -0
C B -B
IM
C T -0
C B -B
IM
C T -0
C B -B
IM
C T -0
C B -B
IM
C T -0
A
C-03
A
C-03
B
C-03
C
C-03
C
C-03
B
C-03
D
C-04
D
C-04
E
C-04
E
C-04
40.6
39.7
36.5
51.8
51.6 51.4
51.4
51.2
51.0 50.9
50.8
50.7
50.7
50.7
50.7
50.7
50.6
50.5
50.5
50.5
50.4
50.2
50.0
49.9
49.9
49.7
49.7
49.7
49.4
49.0
48.1
48.0
47.9
47.9
47.8
47.8
47.8
47.8 47.8
47.8
47.8
47.8
47.8
47.7
47.7
47.7 47.7
47.6
47.6
47.6
47.6
47.6
47.5
47.5
47.5
47.5
47.4 47.4
47.3
47.3
47.2
47.1
45.7 45.0
44.9
44.9
44.7
44.4 44.2 44.1
44.0
43.8
43.8
43.8
43.6 43.4
43.2
43.1
43.1 43.0
43.0
43.0
42.9
42.9
42.8
42.8
42.8
42.7
42.7
42.7
42.7
42.6 42.6
42.6
42.6
42.6
42.6
42.6 42.6
42.6
42.6
42.5
42.5
42.5
42.5
42.5
42.5
42.5 42.5
42.5
42.4
42.4
42.4
42.4
42.4
42.4
42.4
42.4
42.3
42.3
42.3
42.3
42.3
42.3
42.3
42.3
42.3
42.3
42.3
42.3
42.2 42.2
42.2
42.2
42.2
42.2
42.2
42.2
42.2
42.2
42.2 42.2
42.2
42.2 42.1
42.1
42.1
42.1
42.1 42.1
42.1
42.1
42.1
42.1
42.1
42.1
42.1
42.1
42.1
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
41.9
41.9
41.9
41.9
41.9
41.9
41.9
41.9
41.9
41.9
41.9
41.9
41.9
41.9
41.9
41.9
41.9
41.9
41.8
41.8
41.8
41.8
41.8
41.8
41.8
41.8
41.8
41.8
41.8
41.8 41.8
41.8
41.8
41.8
41.8
41.8
41.8 41.8
41.8
41.8
41.8
41.8
41.7 41.7
41.7
41.7
41.7
41.7
41.7
41.7
41.7
41.7
41.7 41.7
41.7
41.7
41.7
41.7
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.5
41.5
41.5
41.5
41.5
41.5
41.5
41.5
41.5 41.5
41.5
41.5
41.5
41.5
41.5
41.5
41.5
41.5
41.5
41.5
41.5
41.5
41.5
41.5
41.5
41.5
41.4
41.4
41.4
41.4 41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.3
41.3
41.3
41.3
41.3
41.3
41.3
41.3
41.3
41.3
41.3
41.3
41.3 41.3
41.3
41.3
41.2
41.2
41.2
41.2
41.2
41.2
41.2
41.2
41.2
41.2
41.2
41.2
41.2
41.2
41.2
41.2 41.1
41.1
41.1
41.1
41.1
41.1
41.1
41.1
41.1
41.1
41.1
41.1
41.1
41.1
41.1
41.1 41.1
41.1
41.1
41.1
41.0
41.0
41.0
41.0
41.0
41.0
41.0
41.0
41.0
41.0
41.0
41.0
41.0
41.0
41.0
41.0
41.0
41.0
40.9 40.9
40.9
40.9
40.9
40.9
40.9
40.9
40.9
40.9
40.9
40.9
40.9
40.9
40.9
40.9
40.9
40.8
40.8
40.8
40.8 40.8
40.8
40.8
40.8
40.8
40.8
40.8
40.8
40.8
40.8
40.8
40.8
40.7
40.7
40.7 40.7
40.7 40.7
40.7
40.7
40.7
40.7
40.7 40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.6
40.6
40.6
40.6
40.6
40.6
40.6
40.6
40.6
40.6
40.6
40.6
40.6
40.6
40.6
40.6
40.6
40.6
40.6
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5 40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.4 40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4 40.4
40.4
40.3
40.3
40.3
40.3 40.3
40.3
40.3
40.3 40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3 40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.2
40.2
40.2
40.2
40.2
40.2
40.2 40.2
40.2
40.2
40.2 40.2
40.2
40.2
40.2
40.2 40.2
40.2
40.2
40.2
40.2
40.2
40.2
40.2
40.2
40.2
40.2
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1 40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1 40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0 40.0
40.0
40.0
40.0
40.0 40.0 40.0
40.0
40.0
40.0
40.0 40.0
40.0
40.0
40.0 40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0 40.0
40.0
40.0
40.0 40.0
40.0
40.0
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9 39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8 39.8
39.8
39.8
39.8
39.8 39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.7
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6 39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.5
39.5 39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5 39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.4
39.4
39.4
39.4
39.4
39.4
39.4
39.4
39.4 39.4
39.4
39.4
39.4
39.4
39.4
39.4
39.4 39.4
39.4
39.4
39.4
39.4
39.3
39.3
39.3
39.3 39.3
39.3
39.3
39.3
39.3
39.3
39.3
39.3
39.3
39.3
39.3
39.2
39.2
39.2
39.2
39.2
39.2
39.2
39.2
39.2
39.2
39.2
39.1
39.1
39.1
39.1
39.1 39.1
39.1
39.1
39.1
39.1
39.1
39.1
39.0
39.0
39.0
39.0
39.0
39.0
38.9
38.9 38.9
38.9
38.8
38.8
38.8
38.8 38.8 38.8
38.8
38.7 38.5
38.5
38.4
38.4
38.3
38.3
38.1
38.1
37.3
37.3 37.2
37.0
37.0
37.0
36.9
36.8 36.8
36.6
36.6
36.4
36.4
36.1
36.1
35.9 35.9
35.7
35.7
35.6 35.6
35.6
35.6
35.5 35.4 35.3
35.3 35.2
35.0
34.8
34.6
34.6 34.3
34.2
34.2
34.1 33.9
33.6
33.5
33.5
33.4 33.3
33.2 33.2
33.0 32.7
32.5
32.5
32.3
32.2
32.1 32.0
32.0
31.7 31.7
31.6
31.4
31.4
31.4
31.2
31.2
30.8
30.7
30.6 30.5 30.5
30.3
30.3
30.1
30.1
29.7
29.5
29.4
29.0
29.0
28.9
28.9
28.7
28.6
28.3
28.3
28.2
28.2
28.1
27.9 27.6
27.6 27.1
26.7
26.7 26.5
26.4
26.2
25.7 24.8
24.7
24.7
24.7 24.3
24.2
23.7 23.5
23.4
23.3
23.3
11.4
22.5
22.3 21.8
21.4
21.4 21.2
21.2
21.1
21.1
21.0
20.9
20.8
20.6
20.5
20.4
20.1
20.0 20.0
19.8
19.7 19.7
19.4
19.3
19.1 19.1
18.8
18.7
18.7
18.4
18.3 18.2
18.2
18.1
18.1 17.9
17.8
17.8
17.7 17.4
17.4 17.3 17.2
17.0
16.9 16.8
16.5
16.5
16.5 16.5
16.4
16.2
16.2 16.1
16.0
16.0
15.7 15.7 15.6
15.5
15.1
15.1
15.1
15.0
15.0
15.0 14.9
14.9 14.8
14.6
14.5 14.4
14.4 14.3
14.2
14.2 13.8
13.7 13.7
13.7
13.5 13.4
13.3
13.3 13.3
13.2
13.2
13.2 13.1
13.1
13.0
13.0 12.8
12.8
12.7
12.6 12.6
12.5
12.3
12.3
12.3
12.3
12.1
12.1 11.9
11.9
11.6 11.6
11.6
11.6 11.4 11.3
11.3
11.3
11.2
11.2 11.1
11.1 11.0
10.9
10.7
10.6
10.4
10.4
10.3
9.9
9.99.8
9.8
9.8 9.8
9.5
9.4
9.3
9.2
9.2 9.2
9.0
9.0
9.0
8.9
8.9 8.88.7
8.6
8.6 8.5
8.4 8.4
8.4
8.3 8.2
8.1
8.1
8.17.8 7.8
7.7
7.6 7.5
7.5
7.5
7.5 7.5 7.2
7.2
7.2
7.1
7.1 7.1
7.0 7.0 6.9
6.9
6.8
6.6
6.5
6.3
6.3
6.2 6.2
6.2
6.1
6.0
5.9
5.8
5.8
5.7
5.7
5.7
5.6
5.6
5.5
5.5 5.3 5.1
5.0
5.0
5.0 4.9
4.8 4.8
4.8 4.8
4.7
4.5
4.54.4 4.3 4.3
4.3
4.2
4.2
4.2 4.1
3.9
3.9 3.8
3.8 3.7
3.6
3.6
3.5 3.5
3.5 3.3
3.2
3.1 3.1
3.0
3.0
3.0 3.0
2.9
2.9
2.7
2.7
2.6
2.6
2.5
2.4 2.1
1.9
1.9
1.7
RGE. 707.5
RGE. 500
RGE. 292.5
RGE. 795.0
RGE 500
RGE. 222.5
R
IP
R
A P
PIERHEAD WAY
S L
IP
W A
Y D
R
IV
E
C-01
N
-M
C T -C
N P
L N .d g n
C
IV
IL
Y= 2, 4, Y= 2, 3, Y= 2, 4, X ,0
X ,5
X ,0
X ,5
X ,0
Y= 2, 6, Y= 2, 6, Y= 2, 5, Y= 2, 7, Y= 2, 5, X ,5
X ,0
M A
T C
H L
IN
H
E E
T C
-0
T
A
Y= 2, 5, X ,5
X ,0
X ,5
2 FOOT ALLOWABLE OVERDEPTH
38-FOOT REQUIRED DEPTH PLUS
D R
E D
G
IN
G P
L A
N
S T
A T
O S
T A
S T
A
S T
A
S T
A
L
IM
IT
S O
F P
R O J E
C T
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A .3
PIERHEAD WAY
RGE 718.25
RGE 281.75
SHEET GENERAL NOTES
100' 200'0
DREDGE PLAN
S T
A
O F F S
E T
S E
E N
O T
E
O F F S
E T
S E
E N
O T
E
O F F S
E T
S E
E N
O T
E
O F F S
E T
S E
E N
O T
E
O F F S
E T
S E
E N
O T
E
O F F S
E T
S E
E N
O T
E
O F F S
E T
S E
E N
O T
E
O F F S
E T
S E
E N
O T
E
O F F S
E T
S E
E N
O T
E
B E R T H 2
B E R T H 1
B E R T H 3
E X
IS
T
IN
G P
IE
R
E X
IS
T
IN
G P
IE
R
M O
O R
IN
G D
O L P
H
IN
M O
O R
IN
G D
O L P
H
IN
F A
C E O
F E
X
IS
T
IN
G B
E R
T H
F A
C E O
F E
X
IS
T
IN
G B
E R
T H
E X
IS
T
IN
G P
IE
R B
E R
T H
R E
T A
IN
IN
G W
A L L
R E
T A
IN
IN
G W
A L L
B E
R T
H M
O O
R
IN
G D
O L P
H
IN
A P
P R
O X
IM
A T
E S
H O
R E
L
IN
E
A P
P R
O X
IM
A T
E S
H O
R E
L
B E R T H 5
SEE NOTE 2
SENSITIVE STRUCTURES
SEE NOTE 2
SENSITIVE STRUCTURES
SEE NOTE 2
STRUCTURES
SENSITIVE
SEE NOTE 2
STRUCTURES
SENSITIVE
SEE NOTE 2
SENSITIVE STRUCTURES
SEE NOTE 2
SENSITIVE STRUCTURES
B E R T H 4
TOP ELEV. 47' MLLW
32.6'W x 426.5'L
EXISTING SUBMERGED REINFORCED CONCRETE SILL
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
B A C K R I V E R
B L O U N T I S L A N D C H A N N E L
M A R I N E C O R P S S U P P O R T F A C I L I T Y
M O
O R
IN
G D
O L P
H
IN
NECESSARY TO ENSURE THE SETBACK DISTANCE.
PRIOR TO DREDGING AND ADJUST THE DREDGING LIMITS AS
3. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL STRUCTURES
STRUCTURES" FOR OVER-DREDGING RESTRICTIONS.
2. SEE SPECIFICATION SECTION 35 20 23 PARAGRAPH TITLED "SENSITIVE
REGARDING DREDGING ADJACENT TO STRUCTURES.
"ADJACENT PROPERTY AND STRUCTURES" FOR INSTRUCTIONS
1. SEE SPECIFICATION SECTION 35 20 23 PARAGRAPH TITLED
A
A
R E
V
IS
E D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T
J U
N
40.9 40.9
40.7
40.6 40.5
40.5
40.4
40.4
40.4
40.4 40.4
40.4
40.3 40.3
40.2
40.2
40.2
40.1
40.1
40.1 40.1
40.0
40.0 40.0
40.0
40.0
40.0
40.0
40.0
40.0 40.0
40.0 39.9
39.9
39.9
39.9
39.9
39.9
39.9 39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8 39.8
39.8
39.8
39.8
39.8
39.8
39.7
39.7
39.7
39.7
39.7
39.7 39.7
39.7 39.7
39.7
39.7
39.7
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.6 39.6
39.6 39.6
39.6 39.6
39.6
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5 39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.4
39.4
39.4 39.4
39.4
39.4
39.4
39.4
39.4
39.4
39.4
39.4 39.4
39.4
39.4
39.4
39.4
39.4
39.4
39.4
39.4
39.4
39.4
39.3
39.3
39.3
39.3
39.3 39.3
39.3 39.3
39.3
39.3
39.3
39.3
39.3
39.3
39.3
39.3
39.3
39.3
39.3
39.3
39.3 39.3
39.2
39.2
39.2
39.2
39.2
39.2
39.2
39.2
39.2
39.2
39.2
39.2
39.2
39.2
39.2
39.2
39.2 39.2
39.2
39.2 39.2
39.2
39.1 39.1
39.1
39.1
39.1
39.1
39.1 39.1
39.1
39.1
39.1
39.1
39.1
39.1
39.1 39.1
39.1
39.1
39.1
39.1
39.0
39.0
39.0
39.0
39.0
39.0
39.0
39.0
39.0
39.0
39.0 39.0
39.0
39.0
39.0
39.0
39.0
39.0
39.0
39.0
39.0
39.0
39.0
39.0
38.9
38.9
38.9
38.9
38.9
38.9
38.9
38.9
38.9
38.9
38.9 38.9
38.9 38.9
38.8
38.8 38.8
38.8
38.8 38.8
38.8
38.8 38.8
38.8
38.8
38.8
38.8
38.8
38.8
38.8
38.8 38.8
38.8
38.8
38.7 38.7
38.7
38.7
38.7
38.7
38.7
38.7
38.7
38.6
38.6
38.6
38.6
38.6
38.6
38.6
38.6
38.5
38.5
38.5
38.5
38.5
38.5
38.5
38.5 38.5
38.5
38.5
38.5
38.5
38.5
38.5
38.5
38.5
38.4
38.4 38.4
38.4
38.4
38.4
38.4
38.4
38.4
38.4
38.4
38.4
38.4
38.3
38.3
38.3
38.3
38.3
38.3
38.3
38.3
38.2
38.2
38.1
38.1 38.1 38.1
38.1
38.1 38.0
38.0
38.0
38.0
38.0
37.9
37.9
37.9 37.8
37.8
37.5
37.2 37.0
37.0
36.8
36.6 36.4
36.4 35.9
35.8
35.5 35.2
35.0
34.7
34.6
34.2
33.7
33.6
33.5 32.7
32.5 32.1
31.7
31.3 31.1
30.6
30.5
30.4
30.3
30.3 29.9
29.1 28.4
27.7 27.7
27.3 26.1
26.0
25.6 25.6 25.2 24.8
24.7
24.2
23.7
23.6 23.5
23.2
23.1
23.0
22.8
22.4 22.3 21.1
21.0
20.7
20.5
20.4
19.8
19.6 19.4 19.1 18.9
18.1
18.1
18.0 17.6
17.5
17.5
17.5 17.4 17.2
17.0
16.7 16.4
16.2
16.2
16.1
16.0
15.9
15.9 15.9
15.7
15.7 15.5
15.4 15.4
15.3 15.3
15.3
15.2 15.1
15.0 14.9
14.8
14.7
14.6
14.5
14.3
14.3 14.3
14.3 14.1 14.0
13.9
13.8 13.8
13.6 13.6
13.5 13.5
13.4
13.3 13.3
13.3
13.2
13.2
13.1
13.0
13.0
12.9
12.8
12.8
12.7
12.7
12.6
12.6
12.5 12.4
12.3
12.1
11.9 11.9
11.9
11.9
11.8
11.7
11.6
11.6
11.5
11.5
11.5
11.4
11.4
11.4
11.3
11.3 11.3
11.3 11.3
11.2
11.2
11.1 11.0
11.0
10.9
10.9
10.8
10.7 10.7
10.7
10.7
10.7
10.6
10.6
10.5
10.4 10.4
10.4
10.4
10.3
10.2
10.2
10.1
10.1
10.0
10.0 9.9
9.9
9.8 9.8
9.8
9.7
9.7
9.6
9.5
9.4
9.4
9.3
9.3
9.2 9.2
9.1
9.1
9.0 9.0
8.8
8.6
8.6
8.6
8.6
8.58.4 8.3
8.3 8.3
8.1
8.0 8.07.9
7.9
7.8
7.8
7.8
7.7
7.7
7.7
7.7
7.5
7.4
7.3
7.2
7.2
7.1
7.1
7.0
6.9
6.9 6.9
6.7
6.6 6.6
6.6
6.6 6.56.4
6.4
6.3
6.1 6.1
6.0
5.9
5.9
5.9
5.8
5.7 5.7 5.6
5.6
5.6 5.6
5.6
5.5
5.5 5.4
5.4
5.3
5.3
5.0
5.0
4.9
4.8 4.8
4.8
4.8
4.8
4.7
4.6
4.5
4.4 4.4
4.4
4.3
4.3
4.2
4.2
4.0
3.9 3.9
3.9
3.9
3.9
3.8
3.7
3.6
3.5
3.5
3.4
3.4
3.4
3.4
3.3
3.2
3.2
3.1
3.1
3.0 3.0
3.0
3.0
2.9
2.9
2.9
2.9 2.9
2.8 2.7
2.6
2.6
2.6
2.6
2.5 2.5
2.5
2.5
2.3 2.3 2.3
2.3
2.3
2.2
2.1
2.1
1.9
1.9
1.9
1.9
1.8
1.8 1.8
1.7 1.7
1.7
1.7
1.7
1.6
1.5
.4
.3
.1
.6
.8
.2
.0
.9
.7
.5
9.
9 49
3.
1.
.8
6.
5.
.7
.8
.4
8.
7.
17.
6.
6.
86.
6.
4.
4.
F
C-04
F
C-04
S T
A
G S -B
IM
C -6
C B -B
IM
C -1
V B -B
IM
C -3
C B -B
IM
C -1
G S -B
IM
C -7
C B -B
IM
C -1
C B -B
IM
C -1
G S -B
IM
C -9
C B -B
IM
C -1
G S -B
IM
C -8
G S -B
IM
C -1
V B -B
IM
C -4
C B -B
IM
C -1
C B -B
IM
C T -0
C B -B
IM
C T -0
C B -B
IM
C T -0
C B -B
IM
C T -1
C B -B
IM
C T -1
C B -B
IM
C T -0
C B -B
IM
C T -0
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10 11 12
H
J
13 14
K
L
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S pw:\\PWINT-CPC.EIS.DS.USACE.ARMY.MIL:CESAJ - Jacksonville District\Documents\Navigation Projects\Marine Corps Terminal\USMC Terminal MD FY21\080 - Plans\05 Civil\Dredging Plan
/1
/2
D R
A W
IN
G D
A T
E
F
IL
E N
A M
E
A N
S I E
X X
X X
X X -X
X -X -X
X
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J E
C T
D U
V A
L C
O U
N T
Y F
L O
R
ID
A H T
R O
C H
E
V
B O
G
IN
A
W
R E
IL
R
IN
E C
O R
P S S
U P
P O
R T F
A C
IL
IT
Y B
L O
U N
T I S
L A
DBN-1 (02/21) 493,890 2,203,447
PLANE COORDINATES
X Y
R"36"
SEC GATE BUOY
SEC GATE BUOY
G"1"
LABEL
MAP
TIE BACK BUOY
SEC GATE BUOY
G"37"
B/W
LT-36 (02/21) 495,609 2,203,265
LT-37 (02/21) 495,182 2,203,323
INFO BDN (02/21) 493,739 2,203,226
TIE BACK BUOY (08/20) 493,241 2,204,693
SEC GATE BUOY (08/20) 493,716 2,204,340
SEC GATE BUOY (08/20) 493,559 2,203,775
SEC GATE BUOY (08/20) 493,519 2,203,727
NAME
AIDS TO NAVIGATION
"T
IE
_B
ACK_
BUO
Y"
"D
BN-
1"
"L T-
"S F_
BUO
Y"
"IN
FO
"S F_
BUO
Y"
"S F_
BUO
Y"
"G
LB
-3 7"
RGE. 707.5
RGE. 500
RGE. 292.5
RGE. 500
RGE. 292.5
Y= 2, 4, RGE. 707.5
Y= 2, 3, X ,5
S
J
H
R I V E R
L
IM
IT
S O
F P
R O J E
C T S
T A .8
X ,5
X ,0
X ,0
Y= 2, 5, X ,5
Y= 2, 4, Y= 2, 5, Y= 2, 4, X ,5
Y= 2, 5, X ,0
N
-M
C T -C
N P
L N .d g n
C-02
IL
M A
T C
H L
H
E E
T C
- 0
A
X ,0
X ,5
X ,5
X ,5
X ,0
X ,5
X ,0
Y= 2, 2, Y= 2, 2, Y= 2, 3, Y= 2, 3, Y= 2, 5, Y= 2, 4, D R
E D
G
IN
G P
L A
N
S T
A T
O S
T A
.1
SHEET GENERAL NOTES
100' 200'0
DREDGE PLAN
O F F S
E T
S E
E N
O T
E
M O
O R
IN
G D
O L P
H
IN
APPROXIMATE SHORELINE
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
2 FOOT ALLOWABLE OVERDEPTH
38-FOOT REQUIRED DEPTH PLUS
L
IM
IT
S O
F P
R O J E
C T S
T A .1
C U T
D A M
P
I
F U L T
U T O F F
SECURITY BARRIER
EASTERN LIMIT OF PROJECT
APPROXIMATE SHORELINE
S E
E N
O T
E
S E
N S
IT
IV
E
S
T R
U C
T U
R E
S
APPROVED BY CONTRACTING OFFICER.
ROUTE. EXACT ROUTE TO BE FIELD LOCATED AND
APPROXIMATE LOCATION OF OVERLAND PIPELINE
S T
A
M A R I N E C O R P S S U P P O R T F A C I L I T Y
B A C K R I V E R
B L O U N T I S L A N D C H A N N E L
FEDERAL CHANNEL LIMITS
JACKSONVILLE HARBOR
NECESSARY TO ENSURE THE SETBACK DISTANCE.
PRIOR TO DREDGING AND ADJUST THE DREDGING LIMITS AS
4. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL STRUCTURES
STRUCTURES" FOR DREDGE RESTRICTIONS.
3. SEE SPECIFICATION SECTION 35 20 23 PARAGRAPH TITLED "SENSITIVE
OF PROJECT.
2. THE JACKSONVILLE HARBOR CHANNEL LIMIT LINE IS THE EASTERN LIMIT
REGARDING DREDGING ADJACENT TO STRUCTURES.
"ADJACENT PROPERTY AND STRUCTURES" FOR INSTRUCTIONS
1. SEE SPECIFICATION SECTION 35 20 23 PARAGRAPH TITLED
C U T
- A
O L D
S T . J O
H N S R
I V E R
FEDERAL CHANNEL LIMITS
JACKSONVILLE HARBOR
OF PROJECT.
4. THE JACKSONVILLE HARBOR CHANNEL LIMIT LINE IS THE EASTERN LIMIT
NECESSARY TO ENSURE THE SETBACK DISTANCE.
PRIOR TO DREDGING AND ADJUST THE DREDGING LIMITS AS
3. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL STRUCTURES
STRUCTURES" FOR OVER-DREDGING RESTRICTIONS.
2. SEE SPECIFICATION SECTION 35 20 23 PARAGRAPH TITLED "SENSITIVE
REGARDING DREDGING ADJACENT TO STRUCTURES.
"ADJACENT PROPERTY AND STRUCTURES" FOR INSTRUCTIONS
1. SEE SPECIFICATION SECTION 35 20 23 PARAGRAPH TITLED
A
A
R E
V
IS
E D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T
J U
N
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10 11 12
H
J
13 14
K
L
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S pw:\\PWINT-CPC.EIS.DS.USACE.ARMY.MIL:CESAJ - Jacksonville District\Documents\Navigation Projects\Marine Corps Terminal\USMC Terminal MD FY21\080 - Plans\05 Civil\Dredging Cross Sections
/1
/2
D R
A W
IN
G D
A T
E
F
IL
E N
A M
E
A N
S I E
X X
X X
X X -X
X -X -X
X
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J E
C T
D U
V A
L C
O U
N T
Y F
L O
R
ID
A H T
R O
C H
E
V
B O
G
IN
A
W
R E
IL
R
IN
E C
O R
P S S
U P
P O
R T F
A C
IL
IT
Y B
L O
U N
T I S
L A
PROJECT CHANNEL
AREA TO BE DREDGED
50' 100'010' 20'0
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
600 700 800 900 1000 1100400300200100-100
4+00
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
BERTH 1 BERTH 2
SEE NOTE 1
25' DREDGING OFFSET
LOOKING NORTHWESTDISTANCE IN FEET
S O
U T
H W
E S
T
N O
R T
H E
A S
T
38-FOOT REQUIRED DEPTH
2-FOOT ALLOWABLE OVERDEPTH
+10
+20
+10
+20
25' DREDGING OFFSET
SEE NOTE 1
CROSS SECTION AT STA. 4+00A
C-01
R G
E
R G
E
R G
E
PROJECT CHANNEL
50' 100'010' 20'0
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
600 700 800 900 1000 1100400300200100-100
7+00
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
BERTH 1
LOOKING NORTHWESTDISTANCE IN FEET
S O
U T
H W
E S
T
N O
R T
H E
A S
T
+10
+20
+10
+20
CROSS SECTION AT STA. 7+20B
C-01
R G
E
R G
E
EL. 52.0'
R G
E .5
(TYPICAL)
SQUARE CONCRETE PILES
(TYPICAL)
SQUARE CONCRETE PILES
R G
E .5
(TYPICAL)
SQUARE CONCRETE PILES
(TYPICAL)
SQUARE CONCRETE PILES
C H
A N
N E
L C
E N
T E
R L
IN
E
R G
E .7
MOORING DOLPHIN
BERTH 2
R G
E .2
R G
E
C H
A N
N E
L C
E N
T E
R L
IN
E
R G
E
PROJECT CHANNEL
50' 100'010' 20'0
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
600 700 800 900 1000 1100400300200100-100
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
BERTH 3
LOOKING NORTHWESTDISTANCE IN FEET
S O
U T
H W
E S
T
N O
R T
H E
A S
T
+10
+20
+10
+20
C
C-01
(TYPICAL)
SQUARE CONCRETE PILES
(TYPICAL)
SQUARE CONCRETE PILES
C H
A N
N E
L C
E N
T E
R L
IN
E
BERTH 4
R G
E
12+00
CROSS SECTION AT STA. 12+00
R G
E .5
R G
E .5
38-FOOT REQUIRED DEPTH
2-FOOT ALLOWABLE OVERDEPTH
SEE NOTE 1
15' DREDGING OFFSET 15' DREDGING OFFSET
SEE NOTE 1
AREA TO BE DREDGED
R G
E .5
R G
E .5
RETAINING WALLRETAINING WALL
(NOT SURVEYED)
EXISTING RIP-RAP
DEPTH VARIES
ACTUAL PILE
DEPTH VARIES
ACTUAL PILE
DEPTH VARIES
ACTUAL PILE
DEPTH VARIES
ACTUAL PILE
DEPTH VARIES
ACTUAL PILE
DEPTH VARIES
ACTUAL PILE
(NOT SURVEYED)
EXISTING RIP-RAP
R G
E .5
STRUCTURES
SENSITIVE
STRUCTURES
SENSITIVE
STRUCTURES
SENSITIVE
STRUCTURES
SENSITIVE
STRUCTURES
SENSITIVE
STRUCTURES
SENSITIVE
EL. 47.0'
2-FOOT ALLOWABLE OVERDEPTH
38-FOOT REQUIRED DEPTH
AREA TO BE DREDGED
R G
E .5
R G
E
25' DREDGING OFFSET
SEE NOTE 1 SEE NOTE 1
25' DREDGING OFFSET
EXISTING SUBMERGED REINFORCED CONCRETE SILL
(NOT SURVEYED)
EXISTING RIP-RAP
(NOT SURVEYED)
EXISTING RIP-RAP
STRUCTURES" FOR OVER-DREDGING RESTRICTIONS.
4. SEE SPECIFICATION SECTION 35 20 23 PARAGRAPH TITLED "SENSITIVE
NECESSARY TO ENSURE THE SETBACK DISTANCE.
PRIOR TO DREDGING AND ADJUST THE DREDGING LIMITS AS
3. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL STRUCTURES
STRUCTURES, BUT ARE INCLUDED IN THE PAY PRISM.
MATERIAL. FOR CLARITY, CHANNEL SIDE SLOPES NOT SHOWN NEAR
VARY WITH THE NATURAL ANGLE OF REPOSE FOR THE ADJACENT
CONTRACTUAL PAYMENT PURPOSES ONLY. ACTUAL SIDE SLOPES
2. CHANNEL SIDE SLOPES SHOWN ON CROSS SECTIONS ARE FOR
TO STRUCTURES.
FOR INSTRUCTIONS REGARDING DREDGING ADJACENT
TITLED "ADJACENT PROPERTY AND STRUCTURES"
1. SEE SPECIFICATION SECTION 35 20 23 PARAGRAPH
VERTICAL HORIZONTAL
VERTICAL HORIZONTAL
VERTICAL HORIZONTAL
EXISTING BOTTOM
EXISTING BOTTOM
EXISTING BOTTOM
EXISTING BOTTOM EXISTING BOTTOM
EXISTING BOTTOM
EXISTING BOTTOM
EXISTING BOTTOM EXISTING BOTTOM
IL
C-03
-M
C T -C
N s e c ti o n .d g n
SHEET GENERAL NOTES
D R
E D
G
IN
G C
R O
S S S
E C
T
IO
N S
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
A
AAA
R E
V
IS
E D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T
J U
N
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10 11 12
H
J
13 14
K
L
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S pw:\\PWINT-CPC.EIS.DS.USACE.ARMY.MIL:CESAJ - Jacksonville District\Documents\Navigation Projects\Marine Corps Terminal\USMC Terminal MD FY21\080 - Plans\05 Civil\Typical Cross Sections
/1
/2
D R
A W
IN
G D
A T
E
F
IL
E N
A M
E
A N
S I E
X X
X X
X X -X
X -X -X
X
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J E
C T
D U
V A
L C
O U
N T
Y F
L O
R
ID
A H T
R O
C H
E
V
B O
G
IN
A
W
R E
IL
R
IN
E C
O R
P S S
U P
P O
R T F
A C
IL
IT
Y B
L O
U N
T I S
L A
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
42+00
600 700 800 900 1000 1100400300200100-100 5000
+10
+20
+10
+20
600 700 800 900 1000 1100400300200100-100 5000
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
PROJECT CHANNEL
50' 100'010' 20'0
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
600 700 800 900 1000 1100400300200100-100
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
BERTH 3
LOOKING NORTHWESTDISTANCE IN FEET
S O
U T
H W
E S
T
N O
R T
H E
A S
T
+10
+20
+10
+20
D
C-01
(TYPICAL)
SQUARE CONCRETE PILES
C H
A N
N E
L C
E N
T E
R L
IN
E
R G
E
16+00
CROSS SECTION AT STA. 15+70
R G
E .5
38-FOOT REQUIRED DEPTH
2-FOOT ALLOWABLE OVERDEPTH
SEE NOTE 1
15' DREDGING OFFSET
AREA TO BE DREDGED
R G
E .5
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
PROJECT CHANNEL
50' 100'010' 20'0
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
600 700 800 900 1000 1100400300200100-100
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
BERTH 5
LOOKING NORTHWESTDISTANCE IN FEET
S O
U T
H W
E S
T
N O
R T
H E
A S
T
+10
+20
+10
+20
E
C-01
(TYPICAL)
SQUARE CONCRETE PILES
C H
A N
N E
L C
E N
T E
R L
IN
E
R G
E
21+00
CROSS SECTION AT STA. 21+21
R G
E .5
38-FOOT REQUIRED DEPTH
2-FOOT ALLOWABLE OVERDEPTH
SEE NOTE 1
15' DREDGING OFFSET
AREA TO BE DREDGED
R G
E .5
50' 100'010' 20'0
F
C-02
CROSS SECTION AT STA. 42+00
MOORING DOLPHIN
AREA TO BE DREDGED
PROJECT CHANNEL
R G
E
C H
A N
N E
L C
E N
T E
R L
IN
E
R G
E .5
38-FOOT REQUIRED DEPTH
2-FOOT ALLOWABLE OVERDEPTH
R G
E .5
R G
E .5
R G
E .5
DEPTH VARIES
ACTUAL PILE
DEPTH VARIES
ACTUAL PILE
STRUCTURES
SENSITIVE
STRUCTURES
SENSITIVE
LOOKING NORTHWEST
(NOT SURVEYED)
APPROXIMATE BOTTOM
(NOT SURVEYED)
APPROXIMATE BOTTOM
STRUCTURES" FOR OVER-DREDGING RESTRICTIONS.
4. SEE SPECIFICATION SECTION 35 20 23 PARAGRAPH TITLED "SENSITIVE
NECESSARY TO ENSURE THE SETBACK DISTANCE.
PRIOR TO DREDGING AND ADJUST THE DREDGING LIMITS AS
3. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL STRUCTURES
STRUCTURES, BUT ARE INCLUDED IN THE PAY PRISM.
MATERIAL. FOR CLARITY, CHANNEL SIDE SLOPES NOT SHOWN NEAR
VARY WITH THE NATURAL ANGLE OF REPOSE FOR THE ADJACENT
CONTRACTUAL PAYMENT PURPOSES ONLY. ACTUAL SIDE SLOPES
2. CHANNEL SIDE SLOPES SHOWN ON CROSS SECTIONS ARE FOR
TO STRUCTURES.
FOR INSTRUCTIONS REGARDING DREDGING ADJACENT
TITLED "ADJACENT PROPERTY AND STRUCTURES"
1. SEE SPECIFICATION SECTION 35 20 23 PARAGRAPH
S O
U T
H W
E S
T
N O
R T
H E
A S
T
VERTICAL HORIZONTAL
VERTICAL HORIZONTAL
VERTICAL HORIZONTAL
EXISTING BOTTOM
EXISTING BOTTOM
EXISTING BOTTOM
SHEET GENERAL NOTES
C-04
C
IV
IL
-M
C T -C
N s e c ti o n .d g n
D R
E D
G
IN
G C
R O
S S S
E C
T
IO
N S
SEE NOTE 2
SEE NOTE 2
A
AAA
R E
V
IS
E D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T
J U
N
VERTICAL HORIZONTAL
VERTICAL HORIZONTAL
VERTICAL HORIZONTAL
| 21B0005Am0002SF30Cont |
| 00010A_MCSFBIMD21 |
| Bid Sheet |
| MCBI_Plans-FY21_Amendment00002 |
| G-01 |
| G-02 |
| C-01 |
| C-03 |
| C-04 |
File details come from the government source that posted it. Updated .