W912EP18R0019_Task_Order_0001_Volume_2.pdf
PDF 617 KB Posted
- Solicitation number
- W912EP18R0019
About this file
This is a notice for an indefinite delivery indefinite quantity multiple award task order contract to provide cutoff wall construction services along 28.6 miles of the Herbert Hoover Dike on the southwestern side of Lake Okeechobee. The contract will have a base period of one year and four one-year options, with a maximum combined capacity of $387 million. Work will be divided into five sections from STA 2907+78 to STA 3348+50, STA 3348+50 to STA 3720+00, STA 3720+00 to STA 3994+00, STA 3994+00 to STA 4201+31, and STA 4515+70 to STA 4665+00. The request for proposal will be issued on July 27, 2018 with proposals due August 30, 2018. Evaluation will be based on technical merit and past performance, with price not evaluated at the contract award stage but a factor in task order selection. The solicitation can be found on www.fbo.gov and firms must register with SAM to be eligible for award.
Task Order 0001 Volume 2
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912EP-18-R-0019
Jacksonville District
Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall MATOC Task Order 0001
Palm Beach, Hendry, and Glades Counties, Florida
Construction Solicitation and Specifications Volume 2 of 2
See Volume 1 of 2 for Issue Date
Her ber t Hoover Di ke Rehabi l i t at i on Pr oj ect Dam Modi f i cat i on Cut of f Wal l MATOC Task Or der 0001
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 31 21 CONTROL MONUMENT DESCRI PTI ONS
00 31 32 GEOTECHNI CAL DATA REPORT ( SEE SEPARATE FI LE)
00 33 50 WEATHER AND WATER STAGE DATA
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 30 00 ADMI NI STRATI VE PROCEDURES ( SEE BASE MATOC)
01 32 01 PROJECT SCHEDULE ( SEE BASE MATOC)
01 33 00 SUBMI TTAL PROCEDURES ( SEE BASE MATOC)
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS ( SEE BASE MATOC)
01 45 00 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM) ( SEE
BASE MATOC)
01 45 04 CONTRACTOR QUALI TY CONTROL ( SEE BASE MATOC)
01 50 02 TEMPORARY CONSTRUCTI ON FACI LI TI ES ( SEE BASE MATOC)
01 52 10 CONTRACTI NG OFFI CER' S FI ELD OFFI CE ( SEE BASE MATOC)
01 57 20 ENVI RONMENTAL PROTECTI ON ( SEE BASE MATOC)
01 57 25 TURBI DI TY AND DI SPOSAL MONI TORI NG ( SEE BASE MATOC)
01 57 50 DRI LLI NG PROGRAM PLAN ( SEE BASE MATOC)
01 78 02 CLOSEOUT SUBMI TTALS ( SEE BASE MATOC)
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 22 13 VI BRATI ON MONI TORI NG REQUI REMENTS FOR EXI STI NG STRUCTURES
02 32 00 VERI FI CATI ON DRI LLI NG AND PERMEABI LI TY TESTI NG OF
I N- PLACE CUTOFF WALL ( SEE BASE MATOC)
02 32 10 SUBSURFACE DRI LLI NG AND SAMPLI NG FOR PI EZOMETER
I NSTALLATI ON ( SEE BASE MATOC)
02 35 29 CUTOFF WALL ( SEE BASE MATOC)
02 41 00 DEMOLI TI ON ( SEE BASE MATOC)
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 50 00 I NSTRUMENTATI ON ( GENERAL) ( SEE BASE MATOC)
13 50 05 AUTOMATED DATA ACQUI SI TI ON SYSTEM ( ADAS) ( SEE BASE MATOC)
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 51 13 DATA AND I NFORMATI ON MANAGEMENT
DI VI SI ON 31 - EARTHWORK
31 05 19 GEOTEXTI LE ( SEE BASE MATOC)
31 23 24 CONTROLLED LOW STRENGTH MATERI AL ( FLOWABLE FI LL) ( SEE
BASE MATOC)
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 11 23 LI MEROCK BASE FOR ROADS ( SEE BASE MATOC)
32 12 16 ASPHALT FOR ROADS ( SEE BASE MATOC)
32 92 23 SODDI NG ( SEE BASE MATOC)
DI VI SI ON 33 - UTI LI TI ES
PROJECT TABLE OF CONTENTS Page 1
W912EP-18-R-0019 RTA
33 24 15 AUTOMATED PI EZOMETERS ( SEE BASE MATOC)
33 29 00 DECOMMI SSI ONI NG WELLS ( SEE BASE MATOC)
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 31 19 STONE PROTECTI ON FOR STRUCTURES ( SEE BASE MATOC)
35 31 20 ARTI CULATI NG CONCRETE BLOCK REVETMENTS ( SEE BASE MATOC)
35 41 00 EMBANKMENT CONSTRUCTI ON ( SEE BASE MATOC)
35 41 17 JET GROUT CUTOFF WALL ( SEE BASE MATOC)
35 42 01 CUTOFF WALL CONSTRUCTI ON DATA REPORT ( SEE BASE MATOC)
35 42 35 FI LTER GRAVEL ( SEE BASE MATOC)
35 52 01 WORK PLATFORM ( SEE BASE MATOC)
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 2
SECTION 00 31 21
CONTROL MONUMENT DESCRIPTIONS
DESIGNATION - E 413
PID - AD8235
STATE/COUNTY- FL/PALM BEACH
MARKER: METAL ROD
SETTING: STAINLESS STEEL ROD IN SLEEVE (10 FT.+)
STAMPING: E 413 1992
MARK LOGO: NGS
PROJECTION: FLUSH
MAGNETIC: MARKER IS A STEEL ROD
STABILITY: PROBABLY HOLD POSITION/ELEVATION WELL
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR
SATELLITE OBSERVATIONS - June 13, 2013 ROD/PIPE-DEPTH: 9.3 meters SLEEVE-DEPTH: 0.9 meters
HISTORY - Date Condition Report By
HISTORY - 1992 MONUMENTED NGS
HISTORY - 20080207 GOOD AIMENG
HISTORY - 20130613 GOOD BAKER
STATION DESCRIPTION
DESCRIBED BY NATIONAL GEODETIC SURVEY 1992
0.20 MI NORTHERLY ALONG BERNER ROAD FROM THE POST OFFICE IN CLEWISTON,
THENCE 1.85 MI EASTERLY ALONG STATE HIGHWAY 80, THENCE 0.35 MI NORTHERLY
ALONG RIDGELAWN ROAD LEADING THROUGH A CORPS OF ENGINEERS COMPLEX TO THE
TOP OF THE LAKE OKEECHOBEE LEVEE, THENCE 3.35 MI EASTERLY ALONG A LEVEE
ROAD, 29.5 FT NORTHEAST OF A WITNESS POST, 16.1 FT NORTHEAST OF THE
CENTER OF THE ROAD, AND 2.0 FT BELOW THE LEVEL OF THE ROAD.
NOTE--ACCESS TO THE DATUM POINT IS THROUGH A 5-INCH LOGO CAP.
STATION RECOVERY (2008)
RECOVERY NOTE BY AIM ENGINEERING AND SURVEYING 2008 (BRH)
RECOVERED IN GOOD CONDITION.
STATION RECOVERY (2013)
RECOVERY NOTE BY M BAKER JR INCORPORATED 2013 (SJC)
WITNESS POST IS MISSING.
DESIGNATION - LO 7
PID - AD8234
MARKER: SURVEY DISK
SETTING: SET IN A MASSIVE RETAINING WALL
SP_SET: RETAINING WALL
STAMPING: LO 7 1982 BM
MARK LOGO: SFLWMD
MAGNETIC: NO MAGNETIC MATERIAL
STABILITY: PROBABLY HOLD POSITION/ELEVATION WELL
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR SATELLITE
OBSERVATIONS - June 13, 2013
HISTORY - Date Condition Report By
HISTORY - 1982 MONUMENTED SFLWMD
HISTORY - 19920327 GOOD NGS
HISTORY - 20020517 GOOD MAPTEC
HISTORY - 20071101 GOOD GCT
0.20 MI NORTHERLY ALONG BERNER ROAD FROM THE POST OFFICE IN CLEWISTON,
THENCE 1.85 MI EASTERLY ALONG STATE HIGHWAY 80, THENCE 0.35 MI NORTHERLY
ALONG RIDGELAWN ROAD LEADING THROUGH A CORPS OF ENGINEERS COMPLEX TO THE
TOP OF THE LAKE OKEECHOBEE LEVEE, THENCE 4.60 MI EASTERLY ALONG A LEVEE
ROAD, IN TOP OF AND 0.3 FT SOUTHEAST OF THE NORTHWEST END OF THE CONCRETE
RETAINING WALL OF AN INTAKE AT PUMPING STATION NUMBER S 236, 110.9 FT
NORTHEAST OF THE CENTER OF THE LEVEE ROAD, 9.8 FT BELOW THE LEVEL OF THE
ROAD, 0.7 FT WEST OF THE WEST CORNER OF A CHAIN-LINK FENCE, AND 0.3 FT
NORTHEAST OF THE SOUTHWEST EDGE OF THE RETAINING WALL.
RECOVERED IN GOOD CONDITION.
DESIGNATION - E 414
PID - AD8232
MARKER: METAL ROD
SETTING: STAINLESS STEEL ROD W/O SLEEVE (10 FT.+)
STAMPING: E 414 1992
MARK LOGO: NGS
PROJECTION: FLUSH
MAGNETIC: MARKER IS A STEEL ROD
STABILITY: PROBABLY HOLD POSITION/ELEVATION WELL
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR
SATELLITE OBSERVATIONS - June 13, 2013 ROD/PIPE-DEPTH: 9.7 meters
HISTORY - Date Condition Report By
HISTORY - 1992 MONUMENTED NGS
HISTORY - 20020518 GOOD MAPTEC
0.20 MI NORTHERLY ALONG BERNER ROAD FROM THE POST OFFICE IN CLEWISTON,
THENCE 1.85 MI EASTERLY ALONG STATE HIGHWAY 80, THENCE 0.35 MI NORTHERLY
ALONG RIDGELAWN ROAD LEADING THROUGH A CORPS OF ENGINEERS COMPLEX TO THE
TOP OF THE LAKE OKEECHOBEE LEVEE, THENCE 6.40 MI EASTERLY ALONG A LEVEE
ROAD, ON THE EXTENDED CENTER OF A CROSSOVER OF STATE HIGHWAY 80, 14.4 FT
NORTHEAST OF THE CENTER OF THE ROAD, 3.0 FT BELOW THE LEVEL OF THE ROAD,
AND 1.6 FT NORTHWEST OF A WITNESS POST.
NOTE--ACCESS TO THE DATUM POINT IS THROUGH A 5-INCH LOGO CAP.
WITNESS POST IS MISSING.
SECTION 00 33 50
WEATHER AND WATER STAGE DATA
1. The below stated water fluctuations are for informational purposes only and are not to be utilized in conjunction with any contract related hydrographic surveying purposes as noted on the control drawing(s) of the contract plans. All elevations in this Section 00 33 50 are in feet, National Geodetic Vertical Datum of 1929 (feet, NGVD).
2. The Herbert Hoover Dike (HHD) Rehabilitation Project-Dam Modification Cutoff Wall Multiple Award Task Order Contract: Task Order One is located in Reach 2 from Structure 354 (S-354) and extends west to Structure 310 (S-310).
Between this two structures is Structure 236 (S-236) S-276).
3. S-354 is a 2-bay reinforced concrete U-shaped spillway consisting of 2 vertical lift gates installed on the crest of the ogee weir. The design discharge is 1,450 cfs when the headwater elevation is 10.5 and tailwater is
10.0 ft., NGVD. However, S-354 could discharge up to 2,000 cfs at a headwater and tailwater elevation of 27.7 and 13.2 ft., NGVD, respectively.
In the closed position the top of the gates will seal against the bottom of the reinforced concrete. This structure is located in HHD, Levee Division 2 (L-D2) at the north end of the Miami Canal which is approximately three miles west of the city of Belle Glade. S-354 is normally closed; however, the gates are opened for the following three purposes:
(1) to meet agricultural requirements in the area served by the Miami Canal between Lake Harbor and Structure 8 (S-8) or meet requirements in coastal Dade County or in the Everglades National Park. These conditions generally occur in the dry season between mid-October and mid-May. The first condition occurs under a dry season stage below 11.0 ft., NGVD between S-354 and S-8, along with other factors. The second condition occurs under a dry season stage below optimum in coastal Dade County when water is not available in Water Conservation Area No. 3 (WCA3). The third requirement occurs under a condition when legally required releases to the Everglades National Park cannot be met by releases from WCA3.
(2) To discharge flood flows from the Everglades Agricultural Area between S-354 and S-8 when Lake Okeechobee is low (generally below 11.0 ft., NGVD). Such occasions are very rare but could occur in the late spring.
(3) To make regulatory discharges form Lake Okeechobee when conditions in the Everglades Agricultural Area will permit, and when WCA3 is below schedule.
4. Structure 3 (S-3) is a pump station that consists of 3 pumping units with a total pump capacity of 2,580 cfs. S-3 is adjacent to S-354. This pump station pumps surplus water into Lake Okeechobee from the Miami Canal when the water elevation in either of these canals exceeds an elevation of 13.0 feet, NGVD.
5. Structure 236(S-236 (S-236) is a pump station that consists of 3 pumping units with a total capacity of 255 cfs. This pump station is to provide flood control and drainage at a design rate of ¾ inch of runoff per day from a 0.3 Square mile drainage area located in Palm Beach and Hendry counties. The area is bounded on the north by Herbert Hoover Dike, L-D2, on the east by Levee 25 (Miami Canal) and on the south by the South Florida Conservancy District levees. On the west it adjoins the Pump Station 4 drainage area.
6. Structure277 (S-277) is a box culvert that consists of three barrels that are all flap/slide gate combination. S-277 is approximately 150 feet east of S-236.
Flood control of the S277 service area is provided by S-236. If the landside stage exceeds the lake stage, the gates will automatically open to permit gravity drainage into the lake. The slide gates can be operated to maintain desirable water levels for irrigation supply and other demands in the service area form the lake. If the head differential is greater than one to two feet, the flapgates can be mechanically operated to provide additional water from the lake.
7. Structure 310 (S-310) is a lock located along the south shore of Lake Okeechobee in L-D2 just north of Clewiston at the mouth of the Industrial Canal and is approximately 8 miles northwest of S-354. S-310 is operated in conjunction with S-169, S-4, and the culverts in Levee Division One (L-D1) according to the following table:
GATE STATUS
Lake Okeechobee Stage
S-310 LD-1
Culverts
S-235 S-169 Normal Range S-4 Headwater
Over 15.5 Closed Closed Full Open
Auto 11 - 14
14 – 15.5 Full Open
Closed Full Open
Closed 11 - 14
13 - 14 Full Open
Closed Full Open
Closed 11 - 14
Below 13 Full Open
Full Open
Closed Full Open
Below 13
The optimum elevation for the industrial canal is 15.0 ft, NGVD when the lock is in operation.
Please note. The S-310 navigational locks must be operated whenever Lake Okeechobee is at an elevation of 15.5 feet or higher. SFWMD operates the navigational locks during the following hours of operation:
October 1st through April 30th – 5:30AM to 8:00PM.
May 1st through September 30th – 5:30AM to 9:00PM
8. Water levels at the project locations are mainly affected by rainfall, evaporation, local runoff, groundwater levels (e.g., seepage from Lake Okeechobee) and the operation of Lake Okeechobee. Lake Okeechobee is managed by the Jacksonville District, U.S. Army Corps of Engineers (Corps) in accordance with the 2008 Lake Okeechobee Regulation Schedule (2008 LORS), which is shown in Figures 1 through 4. The lake’s optimum range of elevations is between 12.5 and 15.5 feet, NGVD on a seasonally varying basis. This optimum elevation range may be exceeded due to rainfall events over the lake’s watershed, and/or wind effects on the lake.
9. Historical average daily Lake Okeechobee elevations from January 1932 through January 30, 2018 are provided graphically in Figure 5. The maximum average daily lake elevation of 18.77 feet, NGVD occurred on November 3, 1947. These average daily water elevations may be exceeded due to rainfall events over the lake’s watershed, and/or wind effects on the lake. Exceedance curves for the Lake Okeechobee average daily water elevations for the above referenced period of record are contained in Figure 6. The graph contains the 10, 25, 50, 75 and 90 percent exceedance values through the calendar year. For example, for a given day in the calendar year, the “10% Exceedance” curve shows the water elevation at which 10 percent of the values on that day were greater for the period of record. These graphs may also be used as a rough indicator of the probable seasonal variations in elevations.
10. Historical discharges through S-354 for the period of record from January 2012 through February 4, 2018 are provided graphically in Figure 7. A maximum flow of 1,446 cfs was recorded on December 11, 2013.
11. Historical Miami Canal elevations as measured at S-3 for the period of record from January 2012 through January 21, 2018 are provided graphically in Figure 8. A maximum elevation of 17.39 feet, NGVD was recorded on October 12, 12017.
12. Note that all hydrometeorological data in this Section are provisional and subject to revision. In general, historic water levels and discharges are not necessarily indicative of future levels and discharges. The contractor should be able to obtain hydrometeorological data from the Jacksonville District, Water Management Section’s website, which can be found at:
http://www.saj.usace.army.mil/Missions/Civil-Works/Water-Management/ and also the SFWMD’s website which can be found at: http://www.sfwmd.gov
13. It shall be the contractor's responsibility to obtain information concerning rain and wind. Reference is made to the National Oceanic and Atmospheric Administration (NOAA) publication entitled Local Climatological Data – Monthly Summary, which contains climatological and meteorological observations and data, including wind, rain, and temperature data for the project area. Subscription price and ordering information is available from the National Climatic Data Center, Federal Plaza, 151 Patton Avenue, Asheville, North Carolina 28801-5001. NOAA also has an internet information page at: http://www.ncdc.noaa.gov/
14. The climate of the area is essentially subtropical and humid. Temperatures below freezing are rare. The wet season in the project area is from May through October. The hurricane season is from June through November. In general, the winter months constitute the dry season, and rainfall is usually associated with mid-latitude systems (fronts and low-pressure systems) and is distributed in a spatially uniform pattern. The summer months comprise the wet season and rainfall is closely associated with convective activity. These rainfall events are normally of short duration, and amounts are quite variable spatially. Occasionally, daily rainfall in the dry season can be quite heavy as mid-latitude systems penetrate into South Florida. The project site is subject to tropical storms and hurricanes from June through November, and to windy and/or rainy weather throughout the year.
Weather forecasts as well as actual rainfall information from the National Weather Service Miami-South Florida forecast office can be found at:
http://www.srh.noaa.gov/mfl/.
15. The following data are provided:
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORK
DAYS BASED ON 5-DAY WORK WEEK
The average number of work days in each calendar month with precipitation greater than or equal to 0.50 inches is provided for the project area in the below table.
This information is based on data obtained from Station Clewiston, Florida located at latitude 26.7422 and longitude -80.94.
Average Number of Days per Month With Precipitation >= 0.50 Inches
Gage Name Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Clewiston 1 1 2 1 1 4 3 3 2 2 1 1
The data was obtained from Climatography of the United States No. 20 Monthly Station Climate Summaries for Florida, published by the National Climatic Data Center, NOAA, for the period of record 1981-2010. The values in this table have been rounded to http://www.saj.usace.army.mil/Missions/Civil-Works/Water-Management/ http://www.ncdc.noaa.gov/ http://www.srh.noaa.gov/mfl/ the nearest whole number.
Figure 5
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
20.00
E le va tio n (f t, N
G V
D
Lake Elevation (1932 through January 30, 2018)
A maximum elevation of 18.77 ft, NGVD was recorded on November 3, 1947.
Figure 6
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
20.00
1-Jan 1-Feb 1-Mar 1-Apr 1-May 1-Jun 1-Jul 1-Aug 1-Sep 1-Oct 1-Nov 1-Dec
E le va tio n (f t, N
G V
D
Lake Okeechobee Elevation Exceedance Curves
10% Exceedance 25% Exceedance
50% Exceedance 75% Exceedance
90% Exceedance
Figure 7
1-
Ja n-
1-
M ar
-1
1- M ay -1
1-
Ju l-1
1-
Se p-
1-
N ov
-1
1- Ja n-
1- M ar -1
1-
M ay
-1
1- Ju l-1
1- Se p-
1- N ov -1
1-
Ja n-
1-
M ar
-1
1- M ay -1
1-
Ju l-1
1-
Se p-
1-
N ov
-1
1- Ja n-
1- M ar -1
1-
M ay
-1
1- Ju l-1
1- Se p-
1- N ov -1
1-
Ja n-
1-
M ar
-1
1- M ay -1
1-
Ju l-1
1-
Se p-
1-
N ov
-1
1- Ja n-
1- M ar -1
1-
M ay
-1
1- Ju l-1
1- Se p-
1- N ov -1
1-
Ja n-
Fl ow
(c fs
S-354 Flow (January 2012 through February 4, 2018)
A maximum flow of 1,446 cfs was recorded on December 11, 2013.
Figure 8
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
20.00
E le va tio n (f t, N
G V
D
Miami Canal as measured at S-3 (January 2012 through January, 21, 2018)
A maximum elevation of 17.39 ft, NGVD was recorded on October
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1. 1 REFERENCES
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
1. 2. 1. 1 Phase 1
1. 2. 1. 2 Phase 2
1. 2. 2 Or der of Wor k
1. 2. 3 Locat i on and Access
1. 2. 4 Saf et y Requi r ement s
1. 2. 5 Wor k Per f or med by Ot her s
1. 2. 6 Bypass of Wat er Pl an and Requi r ement s
1. 2. 6. 1 Bypass Pumpi ng Syst em
1. 3 COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK
1. 4 LI QUI DATED DAMAGES - CONSTRUCTI ON
1. 5 PHYSI CAL DATA
1. 5. 1 Physi cal Condi t i ons
1. 5. 2 Weat her , Wat er St age and Ti de Dat a
1. 5. 3 Cont r act or I nvest i gat i on
1. 5. 4 Mar i t i me Tr af f i c
1. 6 LAYOUT OF WORK
1. 6. 1 Est abl i shed Pr oj ect Cont r ol
1. 6. 2 Layout
1. 6. 3 Sur vey
1. 7 DAMAGE TO WORK
1. 8 DAMAGE TO WORK - - COFFERDAM REQUI RED
1. 9 EXI STI NG WORK
1. 10 LOCATI ON OF UNDERGROUND FACI LI TI ES
1. 10. 1 Not i f i cat i on Pr i or t o Excavat i on
1. 10. 2 Ut i l i t i es at Sout h Fl or i da Wat er Management Di st r i ct
Structures
1. 10. 3 US Sugar Raw Wat er I nt ake
1. 10. 4 Pi ezomet er s
1. 11 TI ME EXTENSI ONS FOR UNUSUALLY SEVERE WEATHER ( 31 OCT 1989)
1. 11. 1 Schedul e of Mont hl y Ant i c i pat ed Adver se Weat her Del ays
1. 11. 2 Cont r act or Responsi bi l i t y
1. 12 UNI TS OF MEASURE
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON ( NOT APPLI CABLE)
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 11 00 Page 1
SECTI ON 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
GDR Sect i on 00 31 32, Geot echni cal Dat a Repor t f or Her ber t Hoover Di ke Dam Modi f i cat i on Cut of f Wal l MATOC Task Or der # 1
EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
The wor k i ncl udes const r uct i ng 8. 4 mi l es of cut of f wal l s i n Reach 2 ( Segment s 3, 4, and 5) of t he Her ber t Hoover Di ke ( HHD) embankment f r om Lake Har bor t o Cl ewi st on. Wor k i s di v i ded i nt o t wo phases as f ol l ows:
1. 2. 1. 1 Phase 1
The l i mi t s of const r uct i on ar e f r om St at i on 2916+00 t o St at i on 2921+00 t o al l ow f or const r uct i on and r emoval of t he const r uct i on pl at f or m. Cut of f wal l const r uct i on i s f r om St at i on 2916+50 t o St at i on 2921+50 ( Demonst r at i on Sect i on) .
1. 2. 1. 2 Phase 2
The l i mi t s of const r uct i on ar e f r om St at i on 2903+50 t o St at i on 3378+06 t o al l ow f or const r uct i on and r emoval of t he const r uct i on pl at f or m. Cut of f wal l const r uct i on i s f r om St at i on 2905+89. 5 t o St at i on 2916+50 and St at i on 2921+50 t o St at i on 3349+26.
1. 2. 2 Or der of Wor k
The Cont r act or wi l l r ecei ve a separ at e Not i ce t o Pr oceed ( NTP) f or each phase of wor k. The f i r st NTP wi l l be t o const r uct a 500 l i near f eet cut of f wal l demonst r at i on sect i on as shown ( Phase 1) . Once t he demonst r at i on sect i on i s accept ed by t he Gover nment , NTP f or Phase 2 wi l l be i ssued. Upon compl et i on of al l wor k wi t hi n a phase ( i ncl udi ng sod est abl i shment ) , t he Gover nment may accept t he compl et ed wor k and t he l i mi t s of t he accept ed phase shal l be t ur ned over t o t he Gover nment .
1. 2. 3 Locat i on and Access
The pr oj ect ar ea i s l ocat ed on t he sout h s i de of Lake Okeechobee bet ween
SECTI ON 01 11 00 Page 2
Lake Har bor and Cl ewi st on i n Pal m Beach and Hendr y Count i es, Fl or i da.
The Cont r act or ' s ent r ances ar e shown on t he dr awi ngs and ar e shar ed by ot her s. Access t o t he S- 310 st r uct ur e v i a Ri dgel and Road i s l i mi t ed t o hour s 7 am t o 4: 30 pm Monday t hr ough Fr i day. The Cont r act or shal l compl y wi t h al l l anguage cont ai ned wi t hi n t he Ri ght s of Ent r i es obt ai ned by t he Uni t ed St at es Ar my Cor ps of Engi neer s ( USACE) . The Cont r act or i s r esponsi bl e f or obt ai ni ng and compl yi ng wi t h al l Feder al , St at e, Count y, and any ot her j ur i sdi ct i onal agency, r equi r ement s f or per mi t s, cr i t er i a, and use. For const r uct i on access, const r uct access r amps and t ur n- ar ound t o accommodat e const r uct i on equi pment and const r uct i on means and met hods.
For access and t r af f i c cont r ol al ong t he cr est of HHD, t he Cont r act or may el ect t o desi gn and const r uct t empor ar y t ur nout s ever y 1000 f eet al ong t he embankment . I f so el ect ed, t he Cont r act or must pr ovi de a desi gn and submi t a Tempor ar y Tur nout Pl an f or appr oval by t he gover nment pr i or t o commencement of wor k. The pl an shal l compl y wi t h t he r equi r ement of Haul Road pr escr i bed i n Speci f i cat i on Sect i on 01 50 02 Tempor ar y Const r uct i on Facilities.
The Cont r act or may ut i l i ze ar ea wi t hi n t he l i mi t s of const r uct i on as l aydown ar eas. The l i mi t s of const r uct i on ar e shown. I f t he l akesi de sl ope of t he embankment i s used, t he l akesi de sl ope wi l l be subj ect t o l ake- st age, l ake- sur ge and l ake- waves whi ch may i nundat e t he l akesi de sl ope, see Speci f i cat i on Sect i on 00 33 50.
1. 2. 4 Saf et y Requi r ement s
See Sect i on 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS and EM 385- 1- 1.
1. 2. 5 Wor k Per f or med by Ot her s
See par agr aph PROJECT COORDI NATI ON of Sect i on 01 30 00 ADMI NI STRATI VE
PROCEDURES.
1. 2. 6 Bypass of Wat er Pl an and Requi r ement s
Dur i ng Phase 2 of t hi s cont r act as Cut of f wal l i nst al l at i on appr oaches St r uct ur e 236 ( S- 236) , bypass of wat er f or cont i nual f l ood pr ot ect i on f or t he dur at i on of t i me t hat S- 236 i s out of ser vi ce i s r equi r ed. The Cont r act or shal l pr epar e and submi t a Bypass Pl an f or car e and di ver si on of wat er t o t he Gover nment f or appr oval pr i or t o commencement of wor k.
The Bypass Pl an shal l be such t hat i t i s capabl e of bei ng oper at ed 24 hour s a day, 7 days a week t hr oughout t he dur at i on of const r uct i on wher e S- 236 i s i mpact ed ( out of ser vi ce) . The Cont r act or shal l coor di nat e t he use and del i ver y of Gover nment f ur ni shed bul kheads t o S- 277 wi t h t he Cont r act i ng Of f i cer .
1. 2. 6. 1 Bypass Pumpi ng Syst em
At St r uct ur e 236 ( S- 236) , t he Cont r act or shal l i nst al l and oper at e a bypass pumpi ng syst em capabl e of t he f ol l owi ng per f or mance:
Landsi de ( S- 236 i nt ake sump) t o Landsi de ( S- 277 i nt ake bay( s) ) 255 cf s ( mi ni mum) over t he l andsi de emer gency bul kheads of S- 277 ( appr ox. 25. 0 f t , NAVD88) wi t h a mi ni mum l andsi de canal ( S- 236 i nt ake sump) st age of 6. 2 f t , NAVD88 ( 7. 5 f t , NGVD29) .
The bypass pumpi ng syst em shal l be mai nt ai ned i n such a manner t hat when
SECTI ON 01 11 00 Page 3 necessar y or r equest ed by t he Cont r act i ng Of f i cer or t he Cont r act i ng Of f i cer s Repr esent at i ve, i t can be oper at ed 24 hour s a day, 7 days a week at f ul l demonst r at ed capaci t y.
The bypass pumpi ng syst em shal l i ncl ude:
( 1) al l hydr aul i c component s and ot her r equi r ed component s needed t o convey wat er f r om t he pump i nt ake t o t he pi ped out l et
( 2) Any si t e i mpr ovement s r equi r ed t o suppl y t he pr escr i bed pump capaci t y t o t he pump( s)
( 3) Di f f user s r equi r ed t o di ssi pat e t ur bi d di schar ge and er osi ve vel oci t i es at t he out l et , and
( 4) Vacuum br eaks or check val ves t o pr event an uncont r ol l ed s i phon.
The mi ni mum per f or mance r equi r ement s shal l be ver i f i ed at t he di schar ge l ocat i on by a f l ow met er or ot her appr oved devi ce. The pr escr i bed pump syst em capaci t y shal l be demonst r at ed t o t he Cont r act i ng Of f i cer at t he pumped out l et .
The bypass pumpi ng syst em shal l be f ul l y oper at i onal and r equi r ed bypass capaci t i es shal l be t est ed bef or e begi nni ng any wor k t o r emove S- 236 f r om service.
Oper at i on of t he bypass pumpi ng syst em shal l be by t he di r ect i on of t he Cont r act i ng Of f i cer or t he Cont r act i ng Of f i cer ' s Repr esent at i ve.
Cont r act or shal l hol d a coor di nat i on meet i ng bet ween t he Gover nment , t he Sout h Fl or i da Wat er Management Di st r i ct ( SFWMD) , and t he Sout h Fl or i da Conser vancy Di st r i ct ( SFCD) pr i or t o t he st ar t of oper at i on of t he bypass pumpi ng syst em at S- 236. A debr i s/ t r ash scr een and measur es t o pr ot ect f i sh and wi l dl i f e at t he i nt ake pi pe l ocat i on( s) shal l be consi der ed. The Cont r act or wi l l al so be r esponsi bl e f or mai nt ai ni ng a pump ut i l i zat i on l og i n or der t o accur at el y t r ack t he number of hour s of pump usage, as wel l as dat es and t i mes t he pumpi ng uni t ( or uni t s) was r equest ed t o be oper at ed.
The Cont r act or can expect Oper at i on of t he bypass pumpi ng syst em t o be i ni t i at ed when t he l andwar d si de wat er sur f ace at S- 236 r eaches 8. 4 f t , NAVD88 ( 9. 7 f t , NGVD29) and t er mi nat ed when i t r eaches 6. 2 f t , NAVD88 ( 7. 5 f t , NGVD29) . Addi t i onal l y, i n r esponse t o heavy r ai nf al l , i t may be r equest ed t hat t he pumpi ng uni t ( or uni t s) be pl aced i n oper at i on and t he st aged l ower ed t o and mai nt ai ned at 6. 2 f t , NAVD88 ( 7. 5 f t , NGVD29) unt i l t he st or m has passed.
1. 3 COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK
a. Read t hi s par agr aph i n conj unct i on wi t h t he Cl ause COMMENCEMENT, PROSECUTI ON, AND COMPLETI ON OF WORK ( FAR 52. 211- 10) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
b. I n addi t i on t o t he above, t he f ol l owi ng shal l appl y: The t i me f or compl et i on does not i ncl ude est abl i shment of gr ass. Gr ass shal l be est abl i shed not l at er t han t he t i me st at ed i n t he Cl ause COMMENCEMENT, PROSECUTI ON, AND COMPLETI ON OF WORK ( FAR 52. 211- 10) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1 pl us t he t i me st at ed f or t he est abl i shment of gr ass as set f or t h i n t he par agr aph SOD ESTABLI SHMENT PERI OD of Sect i on 32 92 23 SODDI NG.
SECTI ON 01 11 00 Page 4
1. 4 LI QUI DATED DAMAGES - CONSTRUCTI ON
Ref er t o t he Cl ause LI QUI DATED DAMAGES - CONSTRUCTI ON ( FAR 52. 211- 12) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 5 PHYSI CAL DATA
Read t hi s par agr aph i n conj unct i on wi t h t he Cl ause PHYSI CAL DATA ( FAR
52. 236- 4) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 5. 1 Physi cal Condi t i ons
The i ndi cat i ons of physi cal condi t i ons on t he dr awi ngs and i n t he speci f i cat i ons ar e t he r esul t of s i t e i nvest i gat i ons by sur veys and/ or by cor e bor i ngs. When t he i ndi cat ed physi cal condi t i ons ar e t he r esul t of s i t e i nvest i gat i ons by cor e bor i ngs, t he cor e bor i ng l ogs and l abor at or y dat a ar e i n Sect i on 00 31 32 GEOTECHNI CAL DATA REPORT ( GDR) and t he cor e bor i ng l ocat i ons ar e shown on t he dr awi ngs. Al so, see t he GDR f or i nst r uct i ons concer ni ng avai l abi l i t y of cor e bor i ngs f or i nspect i on.
1. 5. 2 Weat her , Wat er St age and Ti de Dat a
See Sect i on 00 33 50 WEATHER, WATER STAGE AND TI DE DATA. I t i s t he Cont r act or ' s r esponsi bi l i t y t o obt ai n i nf or mat i on concer ni ng wi nd and r ai n.
1. 5. 3 Cont r act or I nvest i gat i on
Ref er t o t he Cl ause SI TE I NVESTI GATI ON AND CONDI TI ONS AFFECTI NG THE WORK ( FAR 52. 236- 3) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 5. 4 Mar i t i me Tr af f i c
I t i s ant i c i pat ed t hat t her e wi l l be no i mpact s t o mar i t i me t r af f i c .
1. 6 LAYOUT OF WORK
Read t hi s par agr aph i n conj unct i on wi t h t he Cl ause LAYOUT OF WORK ( FAR
52. 236- 17) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 6. 1 Est abl i shed Pr oj ect Cont r ol
The Gover nment has est abl i shed monument s al ong t he wor k s i t e( s) . Each monument i s r epr esent ed i n t he cont r act dr awi ngs by a Desi gnat i on and i n most cases, an al phanumer i c Per manent I dent i f i er ( PI D) . I nf or mat i on concer ni ng t he l ocat i on and el evat i ons can be f ound wi t hi n t he Sur vey Not es on t he pl an sheet s. The Sur vey Not es f or each i ncl uded f i el d sur vey wi l l c i t e a par t i cul ar sur vey number , and speci f y t he cont r ol used t o conduct t hat sur vey. Addi t i onal i nf or mat i on i s i ncl uded i n t he Sur vey Not es t hat must be dupl i cat ed i f an at t empt t o r ecr eat e t he subj ect sur vey i s desi r ed.
For navi gat i on channel s, t he Gover nment has est abl i shed t i dal cal i br at i on s i t es f or pr oj ect s const r uct ed and mai nt ai ned t o a t i dal dat um. Each t i dal cal i br at i on s i t e i s r epr esent ed i n t he pl an sheet dr awi ngs by St at i on I D, and i s c i t ed i n t he Sur vey Not es. Al l pr oj ect s const r uct ed and mai nt ai ned t o a t i dal dat um shal l be cal i br at ed t o t he St at i on I D speci f i ed i n t he pl an sheet dr awi ngs. I nf or mat i on r egar di ng t he l ocat i on and associ at ed benchmar ks of t he r ef er enced St at i on I D i s i ncl uded i n t he Monument Descr i pt i on sect i on of t hese speci f i cat i ons.
SECTI ON 01 11 00 Page 5
See Sect i on 00 31 21 CONTROL MONUMENT DESCRI PTI ONS.
1. 6. 2 Layout
Fr om t he monument s, cont r ol dat a and el evat i ons est abl i shed by t he Gover nment , t he Cont r act or shal l compl et e t he l ayout of t he wor k and shal l be r esponsi bl e f or al l measur ement s t hat may be r equi r ed f or t he execut i on of t he wor k t o t he l ocat i on and l i mi t mar ks pr escr i bed i n t he speci f i cat i ons or on t he cont r act dr awi ngs, subj ect t o such modi f i cat i ons as t he Cont r act i ng Of f i cer may r equi r e t o meet changed condi t i ons or as a r esul t of necessar y modi f i cat i ons t o t he cont r act wor k.
1. 6. 3 Survey
The Cont r act or shal l f ur ni sh, at hi s own expense, such st akes, t empl at es, pl at f or ms, equi pment , t ool s and mat er i al , and al l l abor as may be r equi r ed i n l ayi ng out any par t of t he wor k f r om t he monument s, cont r ol dat a and el evat i ons est abl i shed by t he Gover nment . I t shal l be t he r esponsi bi l i t y of t he Cont r act or t o mai nt ai n and pr eser ve al l st akes and ot her mar ks est abl i shed by t he Cont r act i ng Of f i cer unt i l aut hor i zed t o r emove t hem, and i f such mar ks ar e dest r oyed by t he Cont r act or or t hr ough hi s negl i gence, pr i or t o t hei r aut hor i zed r emoval , t hey may be r epl aced by t he Cont r act i ng Of f i cer , at hi s di scr et i on, and t he expense of r epl acement wi l l be deduct ed f r om any amount s due or t o become due t he Cont r act or .
The Cont r act i ng Of f i cer may r equi r e t hat wor k be suspended at any t i me when l ocat i on and l i mi t mar ks est abl i shed by t he Cont r act or ar e not r easonabl y adequat e t o per mi t checki ng of t he wor k.
1. 7 DAMAGE TO WORK
The r esponsi bi l i t y f or damage t o any par t of t he per manent wor k shal l be as set f or t h i n Cl ause PERMI TS AND RESPONSI BI LI TI ES of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. However , i f , i n t he j udgment of t he Cont r act i ng Of f i cer , any par t of t he per manent wor k per f or med by t he Cont r act or i s damaged by f l ood, ear t hquake, hur r i cane, or t or nado, whi ch damage i s not due t o t he f ai l ur e of t he Cont r act or t o t ake r easonabl e pr ecaut i ons or t o exer ci se sound engi neer i ng and const r uct i on pr act i ces i n t he conduct of t he wor k, t he Cont r act or wi l l make t he r epai r s as or der ed by t he Cont r act i ng Of f i cer and f ul l compensat i on f or such r epai r s wi l l be made at t he appl i cabl e cont r act uni t or j ob pr i ces as f i xed and est abl i shed i n t he cont r act . I f , i n t he opi ni on of t he Cont r act i ng Of f i cer , t her e ar e no cont r act uni t or j ob pr i ces appl i cabl e t o any par t of such wor k, an equi t abl e adj ust ment pur suant t o Cl ause CHANGES of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1 wi l l be made as f ul l compensat i on f or t he r epai r s of t hat par t of t he per manent wor k f or whi ch t her e ar e no appl i cabl e cont r act uni t or j ob pr i ces. Except as her ei n pr ovi ded, damage t o al l wor k ( i ncl udi ng t empor ar y const r uct i on) , ut i l i t i es, mat er i al s, equi pment and pl ant shal l be r epai r ed t o t he sat i sf act i on of t he Cont r act i ng Of f i cer at t he Cont r act or ' s expense, r egar dl ess of t he cause of such damage.
1. 8 DAMAGE TO WORK - - COFFERDAM REQUI RED
a. The r esponsi bi l i t y f or damage t o any par t of t he wor k t o be per f or med under t hi s cont r act shal l be as set f or t h i n Cl ause PERMI TS AND RESPONSI BI LI TI ES of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
However , i f t he cof f er dam( s) i s const r uct ed i n accor dance wi t h pl ans and pr ogr ess schedul es appr oved by t he Cont r act i ng Of f i cer , but i s
SECTI ON 01 11 00 Page 6 over t opped by f l ood and such f l ood causes damage t o t he cof f er dam or i f any par t of t he per manent wor k i s damaged by f l ood, ear t hquake, hur r i cane, or t or nado, whi ch damage i s not due t o t he f ai l ur e of t he Cont r act or t o t ake r easonabl e pr ecaut i on or t o exer ci se sound engi neer i ng and const r uct i on pr act i ces i n t he conduct of t he wor k, t he Cont r act or wi l l make t he r epai r s or der ed by t he Cont r act i ng Of f i cer .
The Cont r act or shal l be compensat ed f or any such r epai r s i n accor dance wi t h t he Cl ause CHANGES of Sect i on 00700 CONTRACT CLAUSES i n Vol ume
1. The equi t abl e adj ust ment shal l be based on t he cont r act uni t or j ob pr i ces appl i cabl e t o any par t of t he damaged wor k.
b. The Cont r act or may, subj ect t o appr oval of t he Cont r act i ng Of f i cer , or t he Cont r act i ng Of f i cer may or der t he Cont r act or t o, f l ood or br each t he cof f er dam dur i ng a r i se pr i or t o, and i n ant i c i pat i on of , nat ur al f l oodi ng due t o over t oppi ng. Such f l oodi ng or br each wi l l be consi der ed t he same as t hough t he cof f er dam, i f const r uct ed i n accor dance wi t h pl ans and pr ogr ess schedul es appr oved by t he Cont r act i ng Of f i cer , had been over t opped, i n whi ch event an equi t abl e adj ust ment wi l l be made f or damages t o t he cof f er dam and/ or any par t of t he per manent wor k, as pr ovi ded i n subpar agr aph a. above.
1. 9 EXI STI NG WORK
I n addi t i on t o " FAR 52. 236- 9, Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s" :
a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.
b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k shal l be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.
1. 10 LOCATI ON OF UNDERGROUND FACI LI TI ES
Scan t he const r uct i on s i t e wi t h el ect r omagnet i c or soni c equi pment , and mar k t he sur f ace of t he gr ound wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound obst r uct i on not i ndi cat ed or speci f i ed t o be r emoved but i ndi cat ed or di scover ed dur i ng scanni ng i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be i nst al l ed.
1. 10. 1 Not i f i cat i on Pr i or t o Excavat i on
Not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o st ar t i ng excavat i on wor k. Cont act t he ut i l i t y aut hor i t y 15 days pr i or t o excavat i ng. Cont r act or i s r esponsi bl e f or mar ki ng al l ut i l i t i es not mar ked by t he ut i l i t y aut hor i t y.
1. 10. 2 Ut i l i t i es at Sout h Fl or i da Wat er Management Di st r i ct St r uct ur es
The cont r act or shal l coor di nat e wi t h Sout h Fl or i da Wat er Management Di st r i ct t o i dent i f y al l ut i l i t i es at st r uct ur es S- 354, S- 3, S- 236, and S- 310. Bel ow ar e t he poi nt s of cont act f or each st r uct ur e.
S- 354, S- 310, and S- 236: Mi ke Hodges ( 863) - 983- 1431x3209
SECTI ON 01 11 00 Page 7
S- 3: Kevi n Jar vi s ( 863) - 983- 1431
1. 10. 3 US Sugar Raw Wat er I nt ake
Ther e ar e f our ( 4) bur i ed el ect r i cal l i nes at t he US Sugar Raw Wat er I nt ake. The Cont r act or shal l cont act t he owner t o de- ener gi ze and secur e t he ut i l i t i es.
1. 10. 4 Piezometers
Pr ot ect exi st i ng pi ezomet er s dur i ng const r uct i on. Shoul d an exi st i ng pi ezomet er become damaged, t he Cont r act or shal l pr ovi de pi ezomet er ( s) i n accor dance wi t h Sect i on 02 32 10 SUBSURFACE DRI LLI NG AND SAMPLI NG FOR PI EZOMETER I NSTALLATI ON at no cost t o t he Gover nment . Exi st i ng pi ezomet er s shown shal l be aut omat ed i n accor dance wi t h Sect i on 33 24 15
VI BRATI NG WI RE PI EZOMETERS.
1. 11 TI ME EXTENSI ONS FOR UNUSUALLY SEVERE WEATHER ( 31 OCT 1989)
Thi s pr ovi s i on speci f i es t he pr ocedur e f or t he det er mi nat i on of t i me ext ensi ons f or unusual l y sever e weat her i n accor dance wi t h t he Cl ause DEFAULT ( FI XED- PRI CE CONSTRUCTI ON) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. I n or der f or t he Cont r act i ng Of f i cer t o awar d a t i me ext ensi on under t hi s c l ause, t he f ol l owi ng condi t i ons must be sat i sf i ed:
a. The weat her exper i enced at t he pr oj ect s i t e dur i ng t he cont r act per i od must be f ound t o be unusual l y sever e; t hat i s , mor e sever e t han t he adver se weat her ant i c i pat ed f or t he pr oj ect l ocat i on dur i ng any gi ven mont h.
b. The unusual l y sever e weat her must act ual l y cause a del ay t o t he compl et i on of t he pr oj ect . The del ay must be beyond t he cont r ol and wi t hout t he f aul t or negl i gence of t he Cont r act or .
1. 11. 1 Schedul e of Mont hl y Ant i c i pat ed Adver se Weat her Del ays
The schedul e of mont hl y ant i c i pat ed adver se weat her del ays i s based upon Nat i onal Oceani c and At mospher i c Admi ni st r at i on ( NOAA) or s i mi l ar dat a f or t he pr oj ect l ocat i on and wi l l const i t ut e t he base l i ne f or mont hl y weat her t i me eval uat i ons. The Cont r act or ' s pr ogr ess schedul e must r ef l ect t hese ant i c i pat ed adver se weat her del ays i n al l weat her dependent act i v i t i es.
See Sect i on 00 33 50 WEATHER, WATER STAGE AND TI DE DATA t o obt ai n MONTHLY
ANTI CI PATED ADVERSE WEATHER DELAY WORK DAYS BASED ON 5- DAY WORK WEEK. A
r easonabl e number of ant i c i pat ed weat her del ay wor k days i s obt ai ned f r om t he aver age number of days per mont h ( r ounded t o t he near est whol e number ) wi t h pr eci pi t at i on gr eat er t han t hat i ndi cat ed i n Sect i on 00 33 50
WEATHER, WATER STAGE AND TI DE DATA.
1. 11. 2 Cont r act or Responsi bi l i t y
Upon acknowl edgment of t he Not i ce t o Pr oceed ( NTP) and cont i nui ng t hr oughout t he cont r act , t he Cont r act or wi l l r ecor d on t he dai l y CQC r epor t t he occur r ence of adver se weat her and r esul t ant i mpact t o nor mal l y schedul ed wor k. Act ual adver se weat her del ay days must pr event wor k on cr i t i cal act i v i t i es f or 50 per cent or mor e of t he Cont r act or ' s schedul ed wor k day. The number of act ual adver se weat her del ay days shal l i ncl ude days i mpact ed by act ual adver se weat her ( even i f adver se weat her occur r ed i n pr evi ous mont h) , be cal cul at ed chr onol ogi cal l y f r om t he f i r st t o t he l ast day of each mont h, and be r ecor ded as f ul l days. I f t he number of
SECTI ON 01 11 00 Page 8 act ual adver se weat her del ay days exceeds t he number of days ant i c i pat ed i n Sect i on 00 33 50 WEATHER, WATER STAGE AND TI DE DATA ( r ounded t o t he near est whol e number ) , t he Cont r act i ng Of f i cer wi l l conver t any qual i f y i ng del ays t o cal endar days, gi v i ng f ul l consi der at i on f or equi val ent f ai r weat her wor k days, and i ssue a modi f i cat i on i n accor dance wi t h t he Cl ause DEFAULT ( FI XED PRI CE CONSTRUCTI ON) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 12 UNI TS OF MEASURE
The st andar d U. S. syst em or t he met r i c syst ems of measur e may be ut i l i zed by t he Cont r act or i n t he per f or mance of hi s wor k. Al l sur vey r ecor ds, of f i c i al document at i on, engi neer i ng dat a, and al l cor r espondence, i ncl udi ng any submi t t al s and shop dr awi ngs, shal l c l ear l y denot e whi ch syst em of measur e i s bei ng ut i l i zed, r ef er enced or di scussed. Any omi ssi on, unpr of essi onal or i naccur at e use of a uni t of measur e on t he par t of t he Cont r act or shal l not r el i eve hi m of hi s r esponsi bi l i t i es under t he cont r act t er ms. The uni t of measur e used i n t hi s speci f i cat i on i s t he st andar d U. S. syst em. The cont r act dr awi ngs denot e bot h st andar d U. S.
syst em and met r i c syst em wher e appr opr i at e. I f no uni t of measur e i s i ndi cat ed on t he dr awi ng such as on r anges, st at i ons, s l ope el evat i ons, and di st ance number s, t hen t hey ar e t o be consi der ed t he st andar d U. S.
system.
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON ( NOT APPLI CABLE)
- - End of Sect i on - -
SECTI ON 01 11 00 Page 9
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 SUMMARY
1. 2 RESI DENT MANAGEMENT SYSTEM ( RMS)
1. 2. 1 Def i ni t i on
1. 2. 2 I nst r uct i ons
1. 3 SUBMI TTALS
1. 4 JOB PAYMENT I TEMS
1. 4. 1 Mobi l i zat i on and Demobi l i zat i on ( Li ne I t ems 0001 and 0008)
1. 4. 2 Jet Gr out i ng ( Li ne I t ems 0012 and 0018)
1. 4. 3 Wor k Pl at f or m I nst al l at i on ( Li ne I t ems 0013 and 0019)
1. 4. 4 Wor k Pl at f or m Removal ( Li ne I t ems 0014 and 0020)
1. 4. 5 Tempor ar y Pump I nt ake Pi pi ng Removal ( Li ne I t em 0015)
1. 4. 6 Bypass Pumpi ng Equi pment St andby ( Li ne I t ems 0016 and 0019)
1. 4. 7 Bypass Pumpi ng Equi pment Oper at i on ( Li ne I t ems 0017)
1. 4. 8 Pi ezomet er s ( Li ne I t em 0022)
1. 4. 9 Par t ner i ng Meet i ng ( Li ne I t em 0026)
1. 4. 10 Dat a Management ( Li ne I t em 0027)
1. 5 UNI T PRI CE PAYMENT I TEMS
1. 5. 1 Wor k Pl at f or m I nst al l at i on ( Li ne I t ems 0002 and 0009)
1. 5. 1. 1 Payment
1. 5. 1. 2 Measur ement
1. 5. 1. 3 Uni t of Measur e
1. 5. 2 Wor k Pl at f or m Removal ( Li ne I t ems 0003 and 0010)
1. 5. 2. 1 Payment
1. 5. 2. 2 Measur ement
1. 5. 2. 3 Uni t of Measur e
1. 5. 3 Convent i onal Cut of f Wal l ( Li ne I t ems 0004 and 0011)
1. 5. 3. 1 Payment
1. 5. 3. 2 Measur ement
1. 5. 3. 3 Uni t of Measur e
1. 5. 4 Ver i f i cat i on Cor i ng/ Test i ng ( Li ne I t ems 0005 and 0021)
1. 5. 4. 1 Payment
1. 5. 4. 2 Measur ement
1. 5. 4. 3 Uni t of Measur e
1. 5. 5 St andby Ti me ( Li ne I t em 0006)
1. 5. 5. 1 Payment
1. 5. 5. 2 Uni t of Measur e
1. 5. 6 Cont r act i ng Of f i cer ' s Fi el d Of f i ce ( Li ne I t em 0007)
1. 5. 6. 1 Payment
1. 5. 6. 2 Measur ement
1. 5. 6. 3 Uni t of Measur e
1. 5. 7 Tr anspor t St ockpi l e Mat er i al ( Li ne I t em 0023)
1. 5. 7. 1 Payment
1. 5. 7. 2 Measur ement
1. 5. 7. 3 Uni t of Measur e
SECTI ON 01 22 00 Page 1
1. 5. 8 I mpor t ed Ri pr ap ( Li ne I t em 0024)
1. 5. 8. 1 Payment
1. 5. 8. 2 Measur ement
1. 5. 8. 3 Uni t of Measur e
1. 5. 9 Lost Tr ai l Asphal t ( Li ne I t em 0025)
1. 5. 9. 1 Measur ement
1. 5. 9. 2 Uni t of Measur e
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON
3. 1 PAYMENT PROCEDURES
3. 1. 1 Request i ng Pr ogr ess Payment
3. 1. 2 Opt i ons and Modi f i cat i on CLI NS
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 22 00 Page 2
SECTI ON 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 SUMMARY
Thi s sect i on descr i bes how Li ne I t ems wi l l be measur ed and pai d f or when maki ng pr ogr ess payment s. Wor k t o be measur ed i s descr i bed i n speci f i cat i on sect i ons l i s t ed f or each Li ne I t em. Measur ement pr ocedur es f or payment , r equi r ed quant i t y sur vey or pr ocur ement document at i on and payment r est r i ct i ons ar e descr i bed i n appl i cabl e speci f i cat i on sect i ons.
Al l ocat e cost s f or wor k not speci f i cal l y ment i oned t o t he Li ne I t em most c l osel y associ at ed wi t h wor k i nvol ved. Unl ess t her e i s a speci f i c Li ne I t em f or admi ni st r at i ve cost s, such as Qual i t y Cont r ol and Saf et y, al l ocat e such cost s pr opor t i onal l y acr oss al l Li ne I t ems.
1. 2 RESI DENT MANAGEMENT SYSTEM ( RMS)
1. 2. 1 Definition
The t er ms " Cont r act Li ne I t em Number ( CLI N) " and " Li ne I t em" ar e i nt er changeabl e her ei n ( e. g. : CLI N 0001 i s Li ne I t em 0001) . The t er m " CLI N" i s a cont r act i ng t er m used i n t he Resi dent Management Syst em ( RMS) payment dat a base.
1. 2. 2 Instructions
See Sect i on 01 45 00 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM) f or mor e i nf or mat i on on CLI Ns, schedul e of val ues of pay act i v i t i es and const r uct i on schedul e, and payment pr ocedur es. The Cont r act or mode user manual wi t h i n- dept h i nst r uct i ons can be downl oaded f r om t he RMS web si t e i ndi cat ed i n Sect i on 01 45 00 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE
( RMS CM) .
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Tr ansmi t submi t t al i t ems i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES. Submi t t he f ol l owi ng pr econst r uct i on submi t t al i t ems no l at er t han 30 cal endar days af t er Not i ce t o Pr oceed:
SD- 01 Pr econst r uct i on Submi t t al s
Schedul e of Val ues; G, RO
Pr ovi de a br eakdown of j ob i t ems i nt o pr oposed pay act i v i t i es as par t of t he i ni t i al pr oj ect schedul e. Schedul e of Val ues wi l l become basi s f or CLI N and Pay Act i v i t y dat a i n t he QCS payment dat a base.
SECTI ON 01 22 00 Page 3
1. 4 JOB PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he LI NE I TEMS AND PRI CI NG SCHEDULE wi t h t he uni t " JOB" and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, shal l be i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
Pr ogr ess payment s f or j ob CLI Ns wi l l be made i n accor dance wi t h t he Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s c l ause of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. Submi t a l i s t of pay act i v i t i es, ( Schedul e of Val ues) t o br eakdown bi d f or each j ob CLI N.