This solicitation is for multiple award task order contracts to provide cutoff wall construction services for the Herbert Hoover Dike rehabilitation project. Services will include construction of cutoff walls along a 28.6 mile stretch of the Lake Okeechobee dike between stations 2907+78 to 3348+50, 3348+50 to 3720+00, 3720+00 to 3994+00, 3994+00 to 4201+31, and 4515+70 to 4665+00. The contracts have a base period of one year and four one-year options, for a total value of $387 million across all awardees. Task orders will range between $50-150 million. Proposals are due August 30, 2018 and will be evaluated on technical merit and past performance. Technical factors include means and methods and demonstrated experience, particularly with jet grouting and cutoff walls. Pricing will not be evaluated for the indefinite delivery/indefinite quantity contracts, but will be a selection factor for individual task orders. The solicitation is unrestricted and issued by the U.S. Army Corps of Engineers Jacksonville District.
W912EP18R0019 Amendment 0006
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W32CS580716242
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall MATOC Palm Beach and Hendry Counties, Florida
"If an offeror had already submitted a proposal under this solicitation an entire new proposal is not required. Offerors can submit only the information that is affected by amendment 0004 and all thereafter."
See SF30 Continuation Page for Details.
The proposal due date remain unchanged 15 November 2018 at 2:00PM local time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP18R0019
X 9B. DATED (SEE ITEM 11)
03-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Nov-2018
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SF 30 CONTINUATION SHEET
Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall MATOC Palm Beach and Hendry Counties, Florida
SUMMARY OF CHANGES
1. SPECIFICATIONS:
The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents. New sections are added without underlines and cross-outs.
Changes to Specifications:
Volume 1 of 2 – Contract Clauses (Base MATOC):
Replace Section 00100A Part F. FACTOR 3 – SMALL BUSINESS PARTICIPATION with the Attached Part F. FACTOR 3 – SMALL BUSINESS PARTICIPATION.
Replace Section 00100A ATTACHMENT 4 PROPOSAL COVER SHEET with the Attached ATTACHMENT 4
PROPOSAL COVER SHEET
Volume 2 of 2 – Technical Specifications (Base MATOC):
No changes.
2. DRAWINGS:
No changes.
(End of Summary of Changes)
W912EP-18-R-0019 2 Amendment 0006
F. FACTOR 3–SMALL BUSINESS PARTICIPATION
The Small Business Participation Plan consists of two elements, Small Business Participation Proposal and Small Business Past Performance. Both elements are equal.
Element 1 – Small Business Participation Proposal
SUBMISSION REQUIREMENTS
In this factor all offerors (both small and large business firms) shall provide its “planned” level of commitment for using small business firms by thoroughly completing a Small Business Participation Proposal (SBPP) using the template found at (Attachment 5). No minimum small business participation goals have been assigned to this project. Contractors shall propose their Best Effort (goals) for SB participation. A goal is defined as a number GREATER THAN ZERO that results from the offeror expending good faith effort to use small business subcontractors (as defined in FAR Part 19) to the maximum practicable extent.
• Large businesses primes may achieve the small business participation goals through subcontracting to small businesses.
• Small business primes may achieve small business participation goals through their own performance/participation as a prime and also through subcontracting to other small businesses.
• Offerors are cautioned to complete Attachment 5 in its entirety or risk receiving an unacceptable for this element.
Element 2 - Small Business Past Performance
SUBMISSION REQUIREMENTS
In this element all offerors (both small and large business firms) shall submit verifiable past performance that demonstrated adequate compliance with FAR clause 52.219-8, Utilization of Small Business Concerns (Small & Large primes), and FAR clause 52.219- 9, Small Business Subcontracting Plan (Large Business primes only).
Offerors are required to submit verifiable information on three projects that demonstrate the degree (by total dollars and percentage of contract value) to which the contractor utilized small business firms in performing the projects:
Amendment 0006
Project 1:
Title:
Company Name:
Current representative & contact info:
Contract Number:
Contract Award amount:
Project completion date:
Dollar amount and Percent Self Performed:
Dollar amount and Percent of Contract Subcontracted:
Dollar amount and Percent Subcontracted to Small Business:
Dollar amount and Percent Subcontracted to Large Business:
Project 2:
Title:
Company Name:
Current representative & contact info:
Contract Number:
Contract Award amount:
Project completion date:
Dollar amount and Percent Self Performed:
Dollar amount and Percent of Contract Subcontracted:
Dollar amount and Percent Subcontracted to Small Business:
Dollar amount and Percent Subcontracted to Large Business:
Project 3:
Title:
Company Name:
Current representative & contact info:
Contract Number:
Contract Award amount:
Project completion date:
Dollar amount and Percent Self Performed:
Dollar amount and Percent of contract Subcontracted:
Dollar amount and Percent Subcontracted to Small Business:
Dollar amount and Percent Subcontracted to Large Business:
Large Business Offerors shall submit FINAL ISR (Individual Subcontracting Report) reports for THREE of the most recently completed Federal contracts.
Evaluation Method
In this factor, all offerors (both small and large business firms) will be evaluated on the level of small business commitment they are demonstrating for the proposed acquisition, and their prior level of commitment to utilizing small businesses in performance of prior contracts.
Element 1 – Proposed Small Business Participation Proposal Small Business Participation Plans (from other than small and small businesses) will be evaluated on the basis of:
• Level of commitment for using small business firms completed with their Best Effort (goals) for SB Participation for all Small Business Socioenomic Categories.
• All goals submitted for small business categories are greater than zero.
Element 2 – Small Business Past Performance
Small Business Participation Plans (from large and small businesses) will be evaluated on the basis of:
The offeror submitted verifiable information on three past performance (as stated in the submission requirements) that demonstrated adequate compliance with FAR clause 52.219-8, Utilization of Small Business Concerns (Small & Large primes), and FAR clause 52.219-9, Small Business Subcontracting Plan (Large Business primes only).
The Government may use information supplied by the offeror and information obtained from other sources to evaluate past utilization of small business concerns.
Small Business Participation Ratings
Small Business Participation will be rated using the ratings listed below.
Acceptable – Proposal indicates an adequate approach and understanding of the small business objectives.
Unacceptable – Proposal does not meet small business objectives.
NOTE: IN THE CASE OF AN OFFEROR WHO HAS NOT HAD A CONTRACT THAT
INCLUDED THE CLAUSE FAR 52.219-8, THE OFFEROR MUST INDICATE THIS
FACT IN WRITING IN THEIR PROPOSAL. THE OFFEROR MAY NOT BE
EVALUATED FAVORABLY OR UNFAVORABLY FOR SMALL BUSINESS PAST
PERFORMNCE. THEREFORE, THE OFFEROR SHALL BE DETERMINED TO HAVE
UNKNOWN (OR "NEUTRAL") SMALL BUSINESS PAST PERFORMANCE.
UNKNOWN (OR “NEUTRAL”) FOR SMALL BUSINESS PAST PERFORMANCE
SHALL BE CONSIDERED "ACCEPABLE".
ATTACHMENT 4 PROPOSAL COVER SHEET
Source Selection Information -- See FAR 2.101 and 3.104
SOLICITATION NO. W912EP18R0019
OFFEROR’S COMPANY NAME:
VOLUME II
(Include this Cover Sheet in the front of each Volume II binder submitted)
This Volume contains the following documents: Offeror check applicable items]
TAB F – FACTOR 1 – Technical Merit
______ Sub-Factor 1 – Means and Methods
______ Sub-Factor 2 – Demonstrated Experience
______ Sub-Factor A – Jet Grouting Experience
______ Sub-Factor B – Cutoff Wall Demonstrated Experience
TAB G – FACTOR 2 – Past Performance
PPQs (Attachment 2) for each project submitted, completed and signed by an Owner of the Project (Client) point of contact or “POC. If a Construction Contractor Appraisal Support System (CCASS) or a Contractor Performance Assessment Reporting System (CPARS) record is available for any of the projects submitted, the CCASS or CPARS record may be submitted in lieu of the completed Past Performance Questionnaire or an official Performance Evaluation from a non-Federal agency.
_____ Explanation of why the project is relevant to this project for each project submitted.
______TAB H – FACTOR 3 – Small Business Participation
______ Element 1 – Proposed Small Business Participation Proposal
_______ Element 2 – Small Business Past Performance
| Continuation pg W912EP18R0019 Am0006.pdf |
| SUMMARY OF CHANGES |
| Changes to Specifications: |
| Volume 2 of 2 – Technical Specifications (Base MATOC): |