W912EP18R0019_Am0007.pdf
PDF 406 KB Posted
- Solicitation number
- W912EP18R0019
About this file
This solicitation requests proposals for indefinite delivery indefinite quantity multiple award task order contracts to provide cutoff wall construction services along 28.6 miles of the Herbert Hoover Dike surrounding Lake Okeechobee in Florida. The work is divided into five sections, with an estimated value between $50-150 million for each. The base period of performance is one year, with four optional one-year extensions, for a total potential contract value of $387 million across all awardees. Proposals are due August 30, 2018 and will be evaluated on technical merit and past performance, with a determination of responsibility also required. The technical factors are described in Section 00100A of the solicitation. Pricing will not be evaluated for the indefinite delivery contracts, but will be a selection criterion at the task order level. The NAICS code is 237990 and size standard is $36.5 million. The solicitation will be issued electronically on FedBizOpps on July 27, 2018. Registration on both FedBizOpps and SAM is required to receive notifications or be eligible for award.
W912EP18R0019 Amendment 0007
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W32CS580716242
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall MATOC Palm Beach and Hendry Counties, Florida
See SF30 Continuation Page for Details.
The proposal due date remain unchanged 15 November 2018 at 2:00PM local time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP18R0019
X 9B. DATED (SEE ITEM 11)
03-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Nov-2018
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SF 30 CONTINUATION SHEET
Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall MATOC Palm Beach and Hendry Counties, Florida
SUMMARY OF CHANGES
1. SPECIFICATIONS:
The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents. New sections are added without underlines and cross-outs.
Changes to Specifications:
Volume 1 of 2 – Contract Clauses (Base MATOC):
Add the Attached Section 00100A ATTACHMENT 4 PROPOSAL COVER SHEET VOLUME IV. to Section
00100A ATTACHMENT 4 PROPOSAL COVER SHEET.
Volume 2 of 2 – Technical Specifications (Base MATOC):
No changes.
2. DRAWINGS:
No changes.
(End of Summary of Changes)
W912EP-18-R-0019 2 Amendment 0007
ATTACHMENT 4 PROPOSAL COVER SHEET
Source Selection Information -- See FAR 2.101 and 3.104
SOLICITATION NO. W912EP18R0019
OFFEROR’S COMPANY NAME:
VOLUME IV
(Include this Cover Sheet in the front of each Volume IV binder submitted)
This Volume contains the following documents: Offeror check applicable items]
______TAB I – FACTOR 3 – Small Business Participation
______ Element 1 – Proposed Small Business Participation Proposal
______ Element 2 – Small Business Past Performance
Amendment 0007
| Continuation pg W912EP18R0019 Am0007.pdf |
| SUMMARY OF CHANGES |
| Changes to Specifications: |
| Volume 2 of 2 – Technical Specifications (Base MATOC): |
File details come from the government source that posted it. Updated .