About this file
From the source
Bypass grading canal RR spur DTM
Other files
| File |
Type |
Posted |
| W912EP-17-R-0018-0006.pdf |
PDF |
|
| W912EP-17-R-0018_Amendment_0005.pdf |
PDF |
|
| W912EP-17-R-0018_0004.pdf |
PDF |
|
| W912EP-17-R-0018_Amendment_0003.pdf |
PDF |
|
| NOTE_TO_OFFERORS_RE_Teleconference.pdf |
PDF |
|
| W912EP-17-R-0018-0002.pdf |
PDF |
|
| 2017.06.27_Pre-Bid_Site_Visit_Attendees.pdf |
PDF |
|
| Weir Downstream Grading 2017-06-08.dtm |
— |
|
| East Weir Hydraulic Grading 27.8.dtm |
— |
|
| canal backfill, collector canal, and sump.dtm |
— |
|
| S-69_Mosaiced_-_March_2017_hydrosurvey_update.dtm |
— |
|
| Elev 28 - degrade area.dtm |
— |
|
| W912EP-17-R-0018-0001.pdf |
PDF |
|
| Canal Plug - Phase 1.dtm |
— |
|
| Levee - West - Ramp at End.dtm |
— |
|
| Canal Plug - Phase 2 - Select Fill.dtm |
— |
|
| Reach 3 Repair and Stockpile 2017-05-12 .dtm |
— |
|
| East Levee 2017-05-12.dtm |
— |
|
| Vol_1_W912EP-17-R-0018_.pdf |
PDF |
|
| KRR_S-69_Weir_GDR_2016_2-16-17.pdf |
PDF |
|
| KRR_S-69_Weir_CNT_12A_Specs_Vol_2_(1)-20JUN2017.pdf |
PDF |
|
| KRR_S-69_Weir_CNT_12A_PLANS.pdf |
PDF |
|
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated .