USA ENGINEER DISTRICT, JACKSONVILLE
PRUDENTIAL OFFICE BLDG
701 SAN MARCO BLVD
JACKSONVILLE REGIONAL CONTRACTING CENTER
JACKSONVILLE FL 32207-8175
UNDER DPAS (15 CFR 700)
11. DELIVERY FOR FOB
RFQ
SEE SCHEDULE
14. METHOD OF SOLICITATION
IFB RFP
CODE
SEE ADDENDUM
BLOCK IS MARKED
DESTINATION UNLESS
12. DISCOUNT TERMS
(No Collect Calls)
$14.0 Mil
13b. RATING
13a. THIS CONTRACT IS A RATED ORDER
X
CODE
W912EP-12-R-0027 14-Aug-2012
b. TELEPHONE NUMBER
904-232-1884
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 14 Sep 2012
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV 3/2005)
Prescribed by GSA
FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY
CODE 10. THIS ACQUISITION IS
UNRESTRICTED
FAX: NAICS:
TEL:
CODE 18a. PAYMENT WILL BE MADE BYOFFEROR
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TEL.
W912EP
SIZE STD:
9. ISSUED BY
FACILITY
CODE
17a.CONTRACTOR/
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JOHN D VOHLKEN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES
SEE SCHEDULE
541990
TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS
SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
SB
HUBZONE SB
SET ASIDE: 100 % FOR
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
TEL: EMAIL:
1 COPIES
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
.OFFER DATED YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
X
8(A)
SVC-DISABLED VET-OWNED SB
EMERGING SB
X
X
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
SEE SCHEDULE
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT
PAGE 2 OF
23. UNIT PRICE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV 3/2005) BACK
Prescribed by GSA
FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
W912EP-12-R-0027
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Civil Works Senior Quality Assurance
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with the attached Performance Work Statement for Civil Works program. The number of personnel required will be included in each subclin. Please see the attached historical data and projected data for more detailed information.
FOB: Destination
NET AMT
0001AA 1 Hours Standard Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with the attached Performance Work Statement for Civil Works program.
0001AB 1 Hours Overtime Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
Civil Works Junior Quality Assurance
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the attached Performance Work Statement for Civil Works program. The number of personnel required will be in each subclin. Please see the attached historical data and projected data for more detailed information.
0002AA 1 Hours Standard Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the attached Performance Work Statement for Civil Works program.
0002AB 1 Hours Overtime Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
Civil Works Laboratory Technician
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the Performance Work Statement for Civil Works program. The number of personnel required will be in each subclin. Please see the attached historical data and projected data for more detailed information.
0003AA 4,160 Hours Standard Hourly Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the Performance Work Statement for Civil Works program.
0003AB 416 Hours Overtime Hourly Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
Civil Works Subject Matter Expert
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Civil Works program. The number of personnel required will be in each subclin. Please see the attached historical data and projected data for more detailed information. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each task order as required.
0004AA Hours Standard Hourly Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Civil Works program. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each task order as required.
0004AB Hours Overtime Hourly Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Civil Works program. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each task
Disaster Recovery Senior Quality Assuran
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be included in each subclin. Please see the attached historical data and projected data for more detailed information.
0005AA 1,300 Hours Standard Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects.
0005AB 1 Hours Overtime Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
Disaster Recovery Junior Quality Assuran
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
0006AA 1,300 Hours Standard Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects.
0006AB 1 Hours Overtime Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
Disaster Recovery Administrative Special
FFP
Contractor shall furnish Administrative Specialist personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached historical data and projected data for more detailed
0007AA 200 Hours Standard Hourly Rate
FFP
Contractor shall furnish Administrative Specialist personnel in accordance with the
0007AB 1 Hours Overtime Rate
FFP
Contractor shall furnish Administrative Specialist personnel in accordance with the
Disaster Recovery Data Entry Clerk
FFP
Contractor shall furnish Data Entry Clerk personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
0008AA 200 Hours Standard Hourly Rate
FFP
Contractor shall furnish Data Entry Clerk personnel in accordance with the
0008AB 1 Hours Overtime Rate
FFP
Contractor shall furnish Data Entry Clerk personnel in accordance with the
Disaster Recovery Laboratory Technician
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
0009AA 1 Hours Standard Hourly Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
0009AB 1 Hours Overtime Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
Disaster Recovery Subject Matter Expert
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. Please see the attached historical data and projected data for more detailed information. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each task order as required.
0010AA 200 Hours Standard Hourly Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each task order as required.
0010AB 1 Hours Overtime Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each
Vehicle
FFP
Contractor shall furnish vehicles in accordance with the Performance Work Statement for either Civil Works or Disaster Recovery projects. Please see the
0011AA 9 Each Weekly Rate
FFP
Contractor shall furnish vehicles in accordance with the Performance Work Statement for either Civil Works or Disaster Recovery projects. This line item shall be priced on a weekly basis. (each equals week).
0011AB 9 Each Monthly Rate
FFP
Contractor shall furnish vehicles in accordance with the Performance Work Statement for either Civil Works or Disaster Recovery projects. This line item shall be priced on a monthly basis. (each equals month).
Travel
FFP
Contractor shall be consistent with the substantive provisions of the Joint Travel Regulation (JTR) and will only be utilized for special trips.
0012AA Each Travel Civil Works
FFP
Contractor shall furnish travel in accordance with the Joint Travel Regulations (JTR). This line item shall be used for special travel to support civil works projects.
0012AB Each Travel Disaster Recovery
FFP
Contractor shall furnish travel in accordance with the Joint Travel Regulations (JTR). This line item shall be used for special travel to support disaster recovery
0013 Each Defense Base Act Insurance
FFP
The amount listed by the offeror on this CLIN is the estimated DBA insurance premium (estimated payroll of the offeror and its subcontractors times the applicable rate(s)). The DBA insurance premium amount varies with payroll and the nature of services and will, therefore, be taken into account during price evaluation of offers. The actual amount paid by the government under this CLIN will be based on the amount of the Rutherfoord invoice, stamp "paid" and submitted by the offeror after contract award. In the event of recalculation of the premium by CNA based on actual payroll amounts, the contracting officer will adjust this CLIN by contract modification to reflect the actual premium amounts paid. See local clauses 999.228-4008 and 999.228-4007 in this solicitation for more information
OPTION Civil Works Senior Quality Assurance
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with the attached Performance Work Statement for Civil Works program. The number of personnel required will be included in each subclin. Please see the attached
1001AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
1001AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
OPTION Civil Works Junior Quality Assurance
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the attached Performance Work Statement for Civil Works program. The number of personnel required will be in each subclin. Please see the attached historical data
1002AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
1002AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
OPTION Civil Works Laboratory Technician
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the Performance Work Statement for Civil Works program. The number of personnel required will be in each subclin. Please see the attached historical data and
1003AA 2,080 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
1003AB 208 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
OPTION Civil Works Subject Matter Expert
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Civil Works program. The number of personnel required will be in each subclin. Please see the attached historical data and projected data for more detailed information. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each task order as
1004AA Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Civil Works program. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each task
1004AB Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Civil Works program. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each task
OPTION Disaster Recovery Senior Quality Assuran
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be included in each subclin. Please see the
1005AA 3,080 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
1005AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
OPTION Disaster Recovery Junior Quality Assuran
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
1006AA 3,080 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
1006AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
OPTION Disaster Recovery Administrative Special
FFP
Contractor shall furnish Administrative Specialist personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
1007AA 200 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Administrative Specialist personnel in accordance with the
1007AB 1 Hours OPTION Overtime Rate
FFP
Contractor shall furnish Administrative Specialist personnel in accordance with the
OPTION Disaster Recovery Data Entry Clerk
FFP
Contractor shall furnish Data Entry Clerk personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
1008AA 200 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Data Entry Clerk personnel in accordance with the
1008AB 1 Hours OPTION Overtime Rate
FFP
Contractor shall furnish Data Entry Clerk personnel in accordance with the
OPTION Disaster Recovery Laboratory Technician
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
1009AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
1009AB 1 Hours OPTION Overtime Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
OPTION Disaster Recovery Subject Matter Expert
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. Please see the attached historical data and projected data for more detailed information. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on
1010AA 200 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each
1010AB 1 Hours OPTION Overtime Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each
OPTION Vehicle
FFP
Contractor shall furnish vehicles in accordance with the Performance Work Statement for either Civil Works or Disaster Recovery projects. Please see the
1011AA 9 Each OPTION Weekly Rate
FFP
Contractor shall furnish vehicles in accordance with the Performance Work Statement for either Civil Works or Disaster Recovery projects. This line item
1011AB 9 Each OPTION Monthly Rate
FFP
Contractor shall furnish vehicles in accordance with the Performance Work Statement for either Civil Works or Disaster Recovery projects. This line item
OPTION Travel
FFP
Contractor shall be consistent with the substantive provisions of the Joint Travel
1012AA Each OPTION Travel Civil Works
FFP
Contractor shall furnish travel in accordance with the Joint Travel Regulations (JTR). This line item shall be used for special travel to support civil works
1012AB Each OPTION Travel Disaster Recovery
FFP
Contractor shall furnish travel in accordance with the Joint Travel Regulations (JTR). This line item shall be used for special travel to support disaster recovery
1013 Each OPTION Defense Base Act Insurance
FFP
The amount listed by the offeror on this CLIN is the estimated DBA insurance premium (estimated payroll of the offeror and its subcontractors times the applicable rate(s)). The DBA insurance premium amount varies with payroll and the nature of services and will, therefore, be taken into account during price evaluation of offers. The actual amount paid by the government under this CLIN will be based on the amount of the Rutherfoord invoice, stamp "paid" and submitted by the offeror after contract award. In the event of recalculation of the premium by CNA based on actual payroll amounts, the contracting officer will adjust this CLIN by contract modification to reflect the actual premium amounts paid. See local clauses 999.228-4008 and 999.228-4007 in this solicitation for
OPTION Civil Works Senior Quality Assurance
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with the attached Performance Work Statement for Civil Works program. The number of personnel required will be included in each subclin. Please see the attached
2001AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
2001AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
OPTION Civil Works Junior Quality Assurance
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the attached Performance Work Statement for Civil Works program. The number of personnel required will be in each subclin. Please see the attached historical data
2002AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
2002AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
OPTION Civil Works Laboratory Technician
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the Performance Work Statement for Civil Works program. The number of personnel required will be in each subclin. Please see the attached historical data and
2003AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
2003AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
OPTION Civil Works Subject Matter Expert
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Civil Works program. The number of personnel required will be in each subclin. Please see the attached historical data and projected data for more detailed information. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each task order as
2004AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Civil Works program. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each task
2004AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Civil Works program. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each task
OPTION Disaster Recovery Senior Quality Assuran
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be included in each subclin. Please see the
2005AA 9,515 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
2005AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
OPTION Disaster Recovery Junior Quality Assuran
FFP
3456Contractor shall furnish Junior Quality Assurance personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects.
The number of personnel required will be in each subclin. Please see the attached
2006AA 9,515 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
2006AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
OPTION Disaster Recovery Administrative Special
FFP
Contractor shall furnish Administrative Specialist personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
2007AA 200 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Administrative Specialist personnel in accordance with the
2007AB 1 Hours OPTION Overtime Rate
FFP
Contractor shall furnish Administrative Specialist personnel in accordance with the
OPTION Disaster Recovery Data Entry Clerk
FFP
Contractor shall furnish Data Entry Clerk personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
2008AA 400 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Data Entry Clerk personnel in accordance with the
2008AB 1 Hours OPTION Overtime Rate
FFP
Contractor shall furnish Data Entry Clerk personnel in accordance with the
OPTION Disaster Recovery Laboratory Technician
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
2009AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
2009AB 1 Hours OPTION Overtime Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
OPTION Disaster Recovery Subject Matter Expert
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. Please see the attached historical data and projected data for more detailed information. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on
2010AA 400 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each
2010AB 1 Hours OPTION Overtime Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each
OPTION Vehicle
FFP
Contractor shall furnish vehicles in accordance with the Performance Work Statement for either Civil Works or Disaster Recovery projects. Please see the
2011AA 9 Each OPTION Weekly Rate
FFP
Contractor shall furnish vehicles in accordance with the Performance Work Statement for either Civil Works or Disaster Recovery projects. This line item
2011AB 9 Each OPTION Monthly Rate
FFP
Contractor shall furnish vehicles in accordance with the Performance Work Statement for either Civil Works or Disaster Recovery projects. This line item
OPTION Travel
FFP
Contractor shall be consistent with the substantive provisions of the Joint Travel
2012AA Each OPTION Travel Civil Works
FFP
Contractor shall furnish travel in accordance with the Joint Travel Regulations (JTR). This line item shall be used for special travel to support civil works
2012AB Each OPTION Travel Disaster Recovery
FFP
Contractor shall furnish travel in accordance with the Joint Travel Regulations (JTR). This line item shall be used for special travel to support disaster recovery
2013 Each OPTION Defense Base Act Insurance
FFP
The amount listed by the offeror on this CLIN is the estimated DBA insurance premium (estimated payroll of the offeror and its subcontractors times the applicable rate(s)). The DBA insurance premium amount varies with payroll and the nature of services and will, therefore, be taken into account during price evaluation of offers. The actual amount paid by the government under this CLIN will be based on the amount of the Rutherfoord invoice, stamp "paid" and submitted by the offeror after contract award. In the event of recalculation of the premium by CNA based on actual payroll amounts, the contracting officer will adjust this CLIN by contract modification to reflect the actual premium amounts paid. See local clauses 999.228-4008 and 999.228-4007 in this solicitation for
OPTION Civil Works Senior Quality Assurance
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with the attached Performance Work Statement for Civil Works program. The number of personnel required will be included in each subclin. Please see the attached
3001AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
3001AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
OPTION Civil Works Junior Quality Assurance
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the attached Performance Work Statement for Civil Works program. The number of personnel required will be in each subclin. Please see the attached historical data
3002AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
3002AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
OPTION Civil Works Laboratory Technician
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the Performance Work Statement for Civil Works program. The number of personnel required will be in each subclin. Please see the attached historical data and
3003AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
3003AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
OPTION Civil Works Subject Matter Expert
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Civil Works program. The number of personnel required will be in each subclin. Please see the attached historical data and projected data for more detailed information. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each task order as
3004AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Civil Works program. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each task
3004AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Civil Works program. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each task
OPTION Disaster Recovery Senior Quality Assuran
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be included in each subclin. Please see the
3005AA 9,515 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
3005AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
OPTION Disaster Recovery Junior Quality Assuran
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
3006AA 9,515 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
3006AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
OPTION Disaster Recovery Administrative Special
FFP
Contractor shall furnish Administrative Specialist personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
3007AA 200 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Administrative Specialist personnel in accordance with the
3007AB 1 Hours OPTION Overtime Rate
FFP
Contractor shall furnish Administrative Specialist personnel in accordance with the
OPTION Disaster Recovery Data Entry Clerk
FFP
Contractor shall furnish Data Entry Clerk personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
3008AA 400 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Data Entry Clerk personnel in accordance with the
3008AB 1 Hours OPTION Overtime Rate
FFP
Contractor shall furnish Data Entry Clerk personnel in accordance with the
OPTION Disaster Recovery Laboratory Technician
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
3009AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
3009AB 1 Hours OPTION Overtime Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
OPTION Disaster Recovery Subject Matter Expert
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. Please see the attached historical data and projected data for more detailed information. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on
3010AA 400 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each
3010AB 1 Hours OPTION Overtime Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each
OPTION Vehicle
FFP
Contractor shall furnish vehicles in accordance with the Performance Work Statement for either Civil Works or Disaster Recovery projects. Please see the
3011AA 9 Each OPTION Weekly Rate
FFP
Contractor shall furnish vehicles in accordance with the Performance Work Statement for either Civil Works or Disaster Recovery projects. This line item
3011AB 9 Each OPTION Monthly Rate
FFP
Contractor shall furnish vehicles in accordance with the Performance Work Statement for either Civil Works or Disaster Recovery projects. This line item
OPTION Travel
FFP
Contractor shall be consistent with the substantive provisions of the Joint Travel
3012AA Each OPTION Travel Civil Works
FFP
Contractor shall furnish travel in accordance with the Joint Travel Regulations (JTR). This line item shall be used for special travel to support civil works
3012AB Each OPTION Travel Disaster Recovery
FFP
Contractor shall furnish travel in accordance with the Joint Travel Regulations (JTR). This line item shall be used for special travel to support disaster recovery
3013 Each OPTION Defense Base Act Insurance
FFP
The amount listed by the offeror on this CLIN is the estimated DBA insurance premium (estimated payroll of the offeror and its subcontractors times the applicable rate(s)). The DBA insurance premium amount varies with payroll and the nature of services and will, therefore, be taken into account during price evaluation of offers. The actual amount paid by the government under this CLIN will be based on the amount of the Rutherfoord invoice, stamp "paid" and submitted by the offeror after contract award. In the event of recalculation of the premium by CNA based on actual payroll amounts, the contracting officer will adjust this CLIN by contract modification to reflect the actual premium amounts paid. See local clauses 999.228-4008 and 999.228-4007 in this solicitation for
OPTION Civil Works Senior Quality Assurance
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with the attached Performance Work Statement for Civil Works program. The number of personnel required will be included in each subclin. Please see the attached
4001AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
4001AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
OPTION Civil Works Junior Quality Assurance
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the attached Performance Work Statement for Civil Works program. The number of personnel required will be in each subclin. Please see the attached historical data
4002AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
4002AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
OPTION Civil Works Laboratory Technician
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the Performance Work Statement for Civil Works program. The number of personnel required will be in each subclin. Please see the attached historical data and
4003AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
4003AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
OPTION Civil Works Subject Matter Expert
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Civil Works program. The number of personnel required will be in each subclin. Please see the attached historical data and projected data for more detailed information. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each task order as
4004AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Civil Works program. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each task
4004AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Civil Works program. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each task
OPTION Disaster Recovery Senior Quality Assuran
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be included in each subclin. Please see the
4005AA 9,515 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
4005AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Senior Quality Assurance personnel in accordance with
OPTION Disaster Recovery Junior Quality Assuran
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
4006AA 9,515 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
4006AB 1 Hours OPTION Overtime Hourly Rate
FFP
Contractor shall furnish Junior Quality Assurance personnel in accordance with the
OPTION Disaster Recovery Administrative Special
FFP
Contractor shall furnish Administrative Specialist personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
4007AA 200 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Administrative Specialist personnel in accordance with the
4007AB 1 Hours OPTION Overtime Rate
FFP
Contractor shall furnish Administrative Specialist personnel in accordance with the
OPTION Disaster Recovery Data Entry Clerk
FFP
Contractor shall furnish Data Entry Clerk personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
4008AA 400 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Data Entry Clerk personnel in accordance with the
4008AB 1 Hours OPTION Overtime Rate
FFP
Contractor shall furnish Data Entry Clerk personnel in accordance with the
OPTION Disaster Recovery Laboratory Technician
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. The number of personnel required will be in each subclin. Please see the attached
4009AA 1 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
4009AB 1 Hours OPTION Overtime Rate
FFP
Contractor shall furnish Laboratory Technician personnel in accordance with the
OPTION Disaster Recovery Subject Matter Expert
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. Please see the attached historical data and projected data for more detailed information. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on
4010AA 400 Hours OPTION Standard Hourly Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each
4010AB 1 Hours OPTION Overtime Rate
FFP
Contractor shall furnish Subject Matter Expert personnel in accordance with the attached Performance Work Statement for Disaster Recovery projects. This line item shall be a To Be Negotiated (TBN) line item which will be negotiated on each
OPTION Vehicle
FFP
Contractor shall furnish vehicles in accordance with the Performance Work Statement for either Civil Works or Disaster Recovery projects. Please see the
4011AA 9 Each OPTION Weekly Rate
FFP
Contractor shall furnish vehicles in accordance with the Performance Work Statement for either Civil Works or Disaster Recovery projects. This line item
4011AB 9 Each OPTION Monthly Rate
FFP
Contractor shall furnish vehicles in accordance with the Performance Work Statement for either Civil Works or Disaster Recovery projects. This line item
OPTION Travel
FFP
Contractor shall be consistent with the substantive provisions of the Joint Travel
4012AA Each OPTION Travel Civil Works
FFP
Contractor shall furnish travel in accordance with the Joint Travel Regulations (JTR). This line item shall be used for special travel to support civil works
4012AB Each OPTION Travel Disaster Recovery
FFP
Contractor shall furnish travel in accordance with the Joint Travel Regulations (JTR). This line item shall be used for special travel to support disaster recovery
4013 Each OPTION Defense Base Act Insurance
FFP
The amount listed by the offeror on this CLIN is the estimated DBA insurance premium (estimated payroll of the offeror and its subcontractors times the applicable rate(s)). The DBA insurance premium amount varies with payroll and the nature of services and will, therefore, be taken into account during price evaluation of offers. The actual amount paid by the government under this CLIN will be based on the amount of the Rutherfoord invoice, stamp "paid" and submitted by the offeror after contract award. In the event of recalculation of the premium by CNA based on actual payroll amounts, the contracting officer will adjust this CLIN by contract modification to reflect the actual premium amounts paid. See local clauses 999.228-4008 and 999.228-4007 in this solicitation for
ADDITIONAL IDIQ INFORMATION
The maximum amount of this contract shall not exceed $10,000,000.00. There will not be a specific amount assigned to the base year or option years. The total capacity for this contract is for 5 years (Base year plus option year one, two, three, and option year four) shall not exceed $10,000,000.00.
The minimum guarantee for this requirement is $10,000.00.
Requirements will be issued per task order. Each task order will have a milestone completion date.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 0001AA N/A N/A N/A Government 0001AB N/A N/A N/A Government 0002 N/A N/A N/A Government 0002AA N/A N/A N/A Government 0002AB N/A N/A N/A Government
0003 N/A N/A N/A Government 0003AA N/A N/A N/A Government 0003AB N/A N/A N/A Government 0004 N/A N/A N/A Government 0004AA N/A N/A N/A Government 0004AB N/A N/A N/A Government 0005 N/A N/A N/A Government 0005AA N/A N/A N/A Government 0005AB N/A N/A N/A Government 0006 N/A N/A N/A Government 0006AA N/A N/A N/A Government 0006AB N/A N/A N/A Government 0007 N/A N/A N/A Government 0007AA N/A N/A N/A Government 0007AB N/A N/A N/A Government 0008 N/A N/A N/A Government 0008AA N/A N/A N/A Government 0008AB N/A N/A N/A Government 0009 N/A N/A N/A Government 0009AA N/A N/A N/A Government 0009AB N/A N/A N/A Government 0010 N/A N/A N/A Government 0010AA N/A N/A N/A Government 0010AB N/A N/A N/A Government 0011 N/A N/A N/A Government 0011AA N/A N/A N/A Government 0011AB N/A N/A N/A Government 0012 N/A N/A N/A Government 0012AA N/A N/A N/A Government 0012AB N/A N/A N/A Government 0013 N/A N/A N/A Government 1001 N/A N/A N/A Government 1001AA N/A N/A N/A Government 1001AB N/A N/A N/A Government 1002 N/A N/A N/A Government 1002AA N/A N/A N/A Government 1002AB N/A N/A N/A Government 1003 N/A N/A N/A Government 1003AA N/A N/A N/A Government 1003AB N/A N/A N/A Government 1004 N/A N/A N/A Government 1004AA N/A N/A N/A Government 1004AB N/A N/A N/A Government 1005 N/A N/A N/A Government 1005AA N/A N/A N/A Government 1005AB N/A N/A N/A Government 1006 N/A N/A N/A Government 1006AA N/A N/A N/A Government 1006AB N/A N/A N/A Government 1007 N/A N/A N/A Government 1007AA N/A N/A N/A Government 1007AB N/A N/A N/A Government 1008 N/A N/A N/A Government 1008AA N/A N/A N/A Government
1008AB N/A N/A N/A Government 1009 N/A N/A N/A Government 1009AA N/A N/A N/A Government 1009AB N/A N/A N/A Government 1010 N/A N/A N/A Government 1010AA N/A N/A N/A Government 1010AB N/A N/A N/A Government 1011 N/A N/A N/A Government 1011AA N/A N/A N/A Government 1011AB N/A N/A N/A Government 1012 N/A N/A N/A Government 1012AA N/A N/A N/A Government 1012AB N/A N/A N/A Government 1013 N/A N/A N/A Government 2001 N/A N/A N/A Government 2001AA N/A N/A N/A Government 2001AB N/A N/A N/A Government 2002 N/A N/A N/A Government 2002AA N/A N/A N/A Government 2002AB N/A N/A N/A Government 2003 N/A N/A N/A Government 2003AA N/A N/A N/A Government 2003AB N/A N/A N/A Government 2004 N/A N/A N/A Government 2004AA N/A N/A N/A Government 2004AB N/A N/A N/A Government 2005 N/A N/A N/A Government 2005AA N/A N/A N/A Government 2005AB N/A N/A N/A Government 2006 N/A N/A N/A Government 2006AA N/A N/A N/A Government 2006AB N/A N/A N/A Government 2007 N/A N/A N/A Government 2007AA N/A N/A N/A Government 2007AB N/A N/A N/A Government 2008 N/A N/A N/A Government 2008AA N/A N/A N/A Government 2008AB N/A N/A N/A Government 2009 N/A N/A N/A Government 2009AA N/A N/A N/A Government 2009AB N/A N/A N/A Government 2010 N/A N/A N/A Government 2010AA N/A N/A N/A Government 2010AB N/A N/A N/A Government 2011 N/A N/A N/A Government 2011AA N/A N/A N/A Government 2011AB N/A N/A N/A Government 2012 N/A N/A N/A Government 2012AA N/A N/A N/A Government 2012AB N/A N/A N/A Government 2013 N/A N/A N/A Government 3001 N/A N/A N/A Government 3001AA N/A N/A N/A Government 3001AB N/A N/A N/A Government
3002 N/A N/A N/A Government 3002AA N/A N/A N/A Government 3002AB N/A N/A N/A Government 3003 N/A N/A N/A Government 3003AA N/A N/A N/A Government 3003AB N/A N/A N/A Government 3004 N/A N/A N/A Government 3004AA N/A N/A N/A Government 3004AB N/A N/A N/A Government 3005 N/A N/A N/A Government 3005AA N/A N/A N/A Government 3005AB N/A N/A N/A Government 3006 N/A N/A N/A Government 3006AA N/A N/A N/A Government 3006AB N/A N/A N/A Government 3007 N/A N/A N/A Government 3007AA N/A N/A N/A Government 3007AB N/A N/A N/A Government 3008 N/A N/A N/A Government 3008AA N/A N/A N/A Government 3008AB N/A N/A N/A Government 3009 N/A N/A N/A Government 3009AA N/A N/A N/A Government 3009AB N/A N/A N/A Government 3010 N/A N/A N/A Government 3010AA N/A N/A N/A Government 3010AB N/A N/A N/A Government 3011 N/A N/A N/A Government 3011AA N/A N/A N/A Government 3011AB N/A N/A N/A Government 3012 N/A N/A N/A Government 3012AA N/A N/A N/A Government 3012AB N/A N/A N/A Government 3013 N/A N/A N/A Government 4001 N/A N/A N/A Government 4001AA N/A N/A N/A Government 4001AB N/A N/A N/A Government 4002 N/A N/A N/A Government 4002AA N/A N/A N/A Government 4002AB N/A N/A N/A Government 4003 N/A N/A N/A Government 4003AA N/A N/A N/A Government 4003AB N/A N/A N/A Government 4004 N/A N/A N/A Government 4004AA N/A N/A N/A Government 4004AB N/A N/A N/A Government 4005 N/A N/A N/A Government 4005AA N/A N/A N/A Government 4005AB N/A N/A N/A Government 4006 N/A N/A N/A Government 4006AA N/A N/A N/A Government 4006AB N/A N/A N/A Government 4007 N/A N/A N/A…