This amendment modifies a solicitation for the Illinois River Basin Dresden Island Lock and Dam Lock Rehabilitation project. The modification adds a mandatory site visit on May 10th, extends the deadline for bidder inquiries to May 11th, and amends specifications and plan sheets.

The scope of work includes installation of a government-furnished miter gate, replacement of miter gate machinery and electrical systems, and dewatering of the lock chamber. An option for fairlead and checkpost replacement is also included. The solicitation was issued by the Department of the Army Corps of Engineers Rock Island District. All inquiries must be submitted through the ProjNet bidder inquiry system using the provided key by the May 11th deadline.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

96514720887500

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Illinois River Basin Dresden Island Lock and Dam; Morris, Will County, Illinois; Lock Rehabilitation

The reason for this amendment is to add a Site Visit, extend the Bidder Inquiry period, and amend Spec Sections 01 14 00 & 02 10 00 and

Plan Sets: Electrical, MG Install and MG Mach.

All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-May-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EK22R0008

X 9B. DATED (SEE ITEM 11)

25-Apr-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-May-2022

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS 1500 ROCK ISLAND D

ROCK ISLAND IL 61201

W912EK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EK22R0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

The following modifications are made to add Site Visit invitation, Section 01 14 00, and Section

02 10 00.

SITE VISIT

a. PAGE SITE VISIT. Add the site visit invitation immediately behind the Projects

Cover Sheet.

SECTION 01 14 00

b. PAGE SECTION 01 14 00 PAGE 7. Delete page 01 14 00 Page 7, in its entirety, and substitute therefor revised page 01 14 00 Page 7.

SECTION 02 10 00

c. PAGE SECTION 02 10 00 PAGE 5. Delete page 02 10 00 Page 5, in its entirety, and substitute therefor revised page 02 10 00 Page 5.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

MVR.02

QUESTION AND ANSWER VIA PROJNET

ALL SUBMITTED QUESTIONS FOR THIS PROJECT AND THE ANSWERS

PROVIDED SHALL BE VIEWED IN BIDDER INQUIRY IN PROJNET AT

(https://www.projnet.org).

https://www.projnet.org/

W912EK22R0008

Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in

ProjNet at (https://www.projnet.org) No Later Than (NLT) 2:00 PM CT – 11 MAY 2022. To submit or review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment

/question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing.

The Bidder Inquiry Key is: HHE5Q6-6P8XKK

Specific Instructions for First Time ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret

Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be provided any type of password. You will utilize your

Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

(End of Summary of Changes)

DEPARTMENT OF THE ARMY

ROCK ISLAND DISTRICT, CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND, ILLINOIS 61201

REPLY TO

ATTENTION OF http://www.mvr.usace.army.mil

PREBID MEETING NOTICE

A prebid meeting will be held at 10:00am on 10 May 2022, at Dresden

Island Lock. The meeting is to discuss the Miter Gate Installation

Project, Solicitation No. W912EK22R0008 and to provide an opportunity for offerors to visit the site. This will be the only on-site visit with the Corps of Engineers during the bidding phase. Offerors may visit the site on their own and contact the POC listed to set up a site visit.

Offerors are highly encouraged to attend this prebid meeting.

Make arrangements at least 24 hours in advance of the prebid meeting with:

Area Engineer

Eastern Area Office

U.S. Army Corps of Engineers

926 SW Adams Street

Suite 110

Peoria, IL 61602

Telephone No.: 309-235-9029

(Collect calls not accepted.)

Offerors are required to bring Safety Equipment for this meeting:

steel-toed boots and life-vest (US Coast Guard approved).

Questions from Offerors submitted and Government responses will be documented via ProjNet Bidder Inquiry. Please reference clause

MVR.02 - Questions and Answers via ProjNet for further instruction.

Mr. Calvin Schmid

SOLICITATION NO. W912EK22R0008

B5IWLD04202101

c. Place the downstream bulkheads.

d. Contractor floating plant moved to lock chamber and downstream miter gates mitered and chamber to upper pool. Contractor floating plant moved upstream of lock chamber out of Government work area near upstream miter gates.

e. Removal of Upstream Miter Gates by Government: Provide the Government 2 working days to remove the upstream miter gates, starting at 7:00am on 03 June 2023, and be complete at 7:00pm 04 June 2023. The Government will dipsose miter gates.

f. Government equipment will be moved upstream, complete at 9:00pm on 04 June 2023. The work area will be turned over to Contractor at 9:00pm.

g. Contractor can place upstream bulkheads and commence dewatering activities according to Contractor's approved schedule.

1.4.2.2 First Lock Dewatering

Refer to Section 01 53 11, PROTECTION, DEWATERING, AND DEBRIS REMOVAL for requirements to dewatering lock chamber and other dewatering structures.

Commence dewatering operations following placement of the lock chamber bulkheads and continue during daylight hours. During the drawdown period, allow Government access to observation wells and along land wall and I-wall. Complete work in accordance with approved schedule and in coordination with the Contracting Officer. Perform the following work, at a minimum, during the first lock dewatering:

a. Install access stairs to access lock chamber floor.

b. Remove silt and debris from lock chamber floor.

c. Remove existing miter gate components including, but not limited to, top anchorage bars connecting the miter gate gudgeon pin to the embedded anchorage frames, all embedded anchorage frame components, all embedded quoin post components, the pintle balls, pintle shoes, and all embedded pintle base components. Refer to reference drawings for existing miter gate components.

d. Replace concrete at the miter gate recesses, and concrete at the upper miter gate sill.

e. Remove and replace the control stands.

f. Install top anchorage components, pintle bases, and perform all first stage concrete work at the upper sill. The top anchorage components and pintle bases are critical items that are located and installed in accordance with the specified tolerances.

SECTION 01 14 00 Page 7

AMEND 0001

29 APRIL 2022

SOLICITATION NO. W912EK22R0008

B5IWLD04202101

adjustment plan for approval. However, at no point will the Contractor's means and methods include welding the face of the sill beam bearing plate. Lock the sill beams in place prior to move gate leafs away from miter. Adjust the sill corner casting face to be flush with the sill beam and install bolt to lock into place.

c. After the sill beams have been adjusted, adjust the quoin block at the lockwall. CRITICAL: Provide additional personnel located at the quoin end and miter end of each miter gate leaf for the first two complete cycles of the miter gate adjustment process when the gate is placed in the mitered position, to observe potential quoin block contact before the gate is in miter. This has potential for an anchorage bar failure and the miter gate leaf fall into the chamber. Personnel in constant radio communication with the lock operator moving the gate. Any issues, including contact of the quoin blocks prior to full miter, require immediate stopping of the gate leafs and re-evaluation to alleviate the issue. With each gate leaf separately at the miter position, measure the gap between the gate quoin and the wall quoin with no shims installed. If the gap is less than 1/32 inch or greater than 1/16 inch, install shims until measured gap is between 1/32 inch and 1/16 inch. Verify adequate gap by running a 0.030 inch thick 12 inch long feeler gage blade along the whole face of the contact block.

Cycle the gates to ensure gap does not change. Repeat adjustment process until the specified tolerance is achieved in consecutive cycles. Record final gap for each leaf.

d. After the quoin block is adjusted, adjust the miter blocks by bringing the leaves together at miter. CRITICAL: Provide additional personnel located at the quoin end and miter end of each miter gate leaf for the first two complete cycles of the miter gate adjustment when the gate is placed in the mitered position, to observe potential miter block contact before the gate is in miter. Personnel in constant radio communication with the lock operator moving the gate. Any issues, including contact of the miter blocks prior to full miter, require immediate stopping of the gate leafs and re-evaluation to alleviate the issue. Measure gap between miter blocks and install or remove shims so miter blocks are no more than 1/16 inch when in full miter, or just contacting at full miter. Ensure mating miter blocks at same elevation and not misaligned by more than 1/8 inch upstream to downstream.

e. Shim the miter seals for contact with the seal plates.

f. Shim the miter guide to have an 1/2 inch gap when the gates are mitered with hydraulic head.

3.5.2.2 Gate Leaf Plumbness

Include in the Miter Gate Adjustment Plan step-by-step directions of the method and procedure for measuring the out-of-plane dimensions and where each of the 15 measurement points are located, and the process to plumb the gate leaf by tensioning all the diagonals to within their specified ranges that is based on the re-surveyed initial out-of-plane measurements.

a. Establish a reference plane parallel to the downstream face of the gate. Then establish 15 measurement point locations between the reference plane and the downstream face of the leaf. The 15 measurement point locations must be laid out as 3 rows of 5 equally spaced points along the leaf as follows:

SECTION 02 10 00 Page 5

AMEND 0001

29 APRIL 2022

W912EK22R0008 Amendment 0001 Draft
Shortened Spec
DIVISION 01 - GENERAL REQUIREMENTS
WORK RESTRICTIONS
PART 1 GENERAL
1.4 SPECIAL SCHEDULING REQUIREMENTS
1.4.2 Lock Closure Period
1.4.2.2 First Lock Dewatering
DIVISION 02 - EXISTING CONDITIONS
MITER GATE REMOVAL, REINSTALLATION, AND ADJUSTMENT
PART 3 EXECUTION
3.5 MITER GATE ADJUSTMENT
3.5.2 Adjustments
3.5.2.2 Gate Leaf Plumbness