This document outlines a federal contract opportunity for lock rehabilitation work issued by the Department of the Army Corps of Engineers Engineering District Rock Island. The solicitation seeks bids for lock rehabilitation work at the Illinois River Basin Dresden Island Lock and Dam in Morris, Will County, Illinois. The base work includes installation of a government furnished miter gate, replacement of miter gate machinery, and electrical system replacement. An option is included for fairlead and checkpost replacement. Bids are due by the solicitation response date of W912EK22R0008. The contract will be awarded to rehabilitate the lock and support infrastructure at the specified location.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C O
N T
R A
C T /T .O
N O
P R
O J E
C T C
O D
E
M A
T O
C /I
D
IQ
C
O N
T R
A C
T N
O
A N
S I
D
S O
L
IC
IT
A T
IO
N
L O
C K R
E H
A B
IL
IT
A T
IO
N
G R
U N
D Y C
O U
N T
Y
IL
D R
E S
D E
N I S
L A
N D L
O C
K A
N D D
A M
IL
L
IN
O
IS
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
IC
T
C A
M P
B E
L
E
E
C T
R
IC
A L S
Y S
T E
M R
E P
L A
C E
M E
N T
C O
V E
R S
H E
E T
G-001
D
D
IL
L O
N
A
C A
M P
B E
B
IW
L D
B
R A
D T
K E
ELECTRICAL
W E
K
R
PLAN SET: ELECTRICAL SYSTEM REPLACEMENT
of Engineers
US Army Corps
LOCK REHABILITATION
GRUNDY COUNTY, IL
DRESDEN ISLAND LOCK AND DAM
ILLINOIS RIVER BASIN
ROCK ISLAND DISTRICT
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
A N
S I
D
S O
L
IC
IT
A
T
IO
N
L O
C K
R E
H A
B
IL
IT
A
T
IO
N
G R
U N
D Y
C O
U N
T Y
IL
D R
E S
D E
N I
S L
A N
D L
O C
K A
N D
D A
M
IL
L
IN
O
IS
R
IV
E
R B
A S
IN
/0
/2
R O
C K
I S
L A
N D
IL
L
IN
IS
C K
I S
L A
N D
D
IS
T R
C A
M P
B E
H
E E
T I
N D
E X
G-002
D
D
IL
L O
N
A
C A
M P
B E
IW
L D
B
R A
D T
K E
ELECTRICAL
W
E K
R
MECHANICAL SCHEDULE SWITCHBOARD BUILDING M-610
DETAIL - SWITCHBOARD BUILDING SUMP PUMPM-510
SECTION - DRAIN PIPE M-304
SECTION - DRAIN PIPE M-303
SECTION - DRAIN PIPE M-302
SECTION - DRAIN PIPE M-301
PLAN - SWITCHBOARD BUILDING MECHANICAL UNITSM-110
PLAN - DRAIN PIPE M-103
PLAN - DRAIN PIPE M-102
PLAN - DRAIN PIPE M-101
SWITCHBOARD BUILDING SECTIONS A-103
SWITCHBOARD BUILDING ELEVATIONS A-102
SWITCHBOARD BUILDING FLOOR PLAN A-101
DETAIL - MITER GATE AND SLIDE VALVE RECEPTACLES S-541
DETAIL - MITER GATE AND SLIDE VALVE RECEPTACLES ASSEMBLY S-540
DETAIL - WALL ARMOR AND TRENCH S-503
DETAIL - SWITCHBOARD BUILDING S-502
DETAIL - WALL ARMOR S-501
SECTION - EXISTING CROSSOVER DUCT BANK S-307
SECTION - SWITCHBOARD BUILDING S-306
SECTION - GALLERY AND UTILITY TRENCH S-305
SECTION - GALLERY AND UTILITY TRENCH S-304
SECTION - CROSSOVER DUCT BANK CROSS-SECTIONS S-303
SECTION - CROSSOVER DUCT BANK CROSS-SECTIONS S-302
SECTION - CROSSOVER DUCT BANK OVERALL S-301
ELEVATION - CROSSOVER DUCT BANK S-201
PLAN - I-WALL MANHOLE [Region4]S-105
PLAN - SWITCHBOARD BUILDING [Region4]S-104
PLAN - GALLERY AND UTILITY TRENCH S-103
PLAN - CROSSOVER DUCT BANK S-102
PLAN - OVERALL S-101
DETAILS - ELEMENTARY DIAGRAM INTERLOCK AND SHUNT TRIP CONTROLSE-708
DETAILS - ELEMENTARY DIAGRAM LOWER TRAFFIC SIGNAL CONTROLSE-707
DETAILS - ELEMENTARY DIAGRAM UPPER TRAFFIC SIGNAL AND AIR HORN CONTROLSE-706
DETAILS - ELEMENTARY DIAGRAM UPPER RIGHT CONTROLSE-705
DETAILS - ELEMENTARY DIAGRAM LOWER RIGHT CONTROLSE-704
DETAILS - ELEMENTARY DIAGRAM UPPER LEFT CONTROLSE-703
DETAILS - ELEMENTARY DIARAM LOWER LEFT CONTROLSE-702
DETAILS - CONTROL INTERLOCK FLOW CHARTS E-701
SCHEDULES - CABLES E-629
SCHEDULES - CABLES E-628
SCHEDULES - CABLES E-627
SCHEDULES - CABLES E-626
SCHEDULES - CABLES E-625
SCHEDULES - NEW PANELBOARDS E-622
SCHEDULES - NEW PANELBOARD E-621
SCHEDULES - CONTROL CONSOLES E-611
GROUNDING DIAGRAM E-608
MOTOR WIRING DIAGRAMS E-606
ONE LINE DIAGRAM E-601
DETAILS - MITER GATE AND SLIDE VALVE RECEPTACLES E-540
DETAILS - TRAFFIC CONTROL PANEL E-522
DETAILS - CONTROL POWER AND INTERLOCK CONTROL PANEL E-521
DETAILS - HIGH MAST LIGHTING CONTROLLER E-520
DETAILS - PANEL BOARD E-519
DETAILS - MAIN SWITCHBOARD "SB-1" E-518
DETAILS - JOYSTICK SELECTOR SWITCHES E-517
DETAILS - CONTROL CONSOLE SUBPANEL ELEVATIONSE-516
DETAILS - UPPER/LOWER RIGHT CONTROL CONSOLE E-513
DETAILS - UPPER/LOWER LEFT CONTROL CONSOLE E-512
DETAILS - NEW CONTROL CONSOLE E-511
DETAILS - INTERMEDIATE WALL RECESS PROXIMITY SWITCH AND MAGNETE-505
DETAILS - INTERMEDIATE WALL MITER PROXIMITY SWITCH AND MAGNETE-504
DETAILS - LAND WALL RECESS PROXIMITY SWITCH AND MAGNETE-503
DETAILS - LAND WALL MITER PROXIMITY SWITCH AND MAGNETE-502
DETAILS - MITER GATE LEAF ROTARY CAM LIMIT SWITCH INTERNAL PLANE-501
ELEVATION - NEW CROSSOVER DUCT BANK AND MANHOLES E-205
SWITCHBOARD BUILDING FLOOR PLAN E-150
PLAN - UPSTREAM MITER GATE AND SLIDE VALVE RECEPTACLESE-141
PLAN - DOWNSTREAM MITER GATE AND SLIDE VALVE RECEPTACLESE-140
PLAN - CENTRAL CONTROL BUILDING FIRST FLOOR AND BASEMENTE-110
PLAN - DOWNSTREAM INTERMEDIATE WALL E-109
PLAN - CENTER INTERMEDIATE WALL E-108
PLAN - UPSTREAM INTERMEDIATE WALL E-107
PLAN - DOWNSTREAM LANDWALL E-106
PLAN - CENTER LAND WALL E-105
PLAN - UPSTREAM LAND WALL E-104
PLAN - ESPLANADE & SERVICE ENTRANCE E-103
MAIN LOCK ELECTRICAL PLAN E-102
OVERALL ELECTRICAL SITE PLAN E-101
GENERAL NOTES G-005
GENERAL NOTES AND SUGGESTED SEQUENCE OF WORK G-004
LEGEND AND ABBREVIATIONS G-003
SHEET INDEX G-002
COVER SHEET ELECTRICAL SYSTEM REPLACEMENT G-001
SHEET TITLESHEET ID
SHEET INDEX
SECTION - GALLERY AND UTILITY TRENCH DEMOLITIONSD305
SECTION - GALLERY AND UTILITY TRENCH DEMOLITIONSD304
SECTION - CROSSOVER DUCT BANK CROSS-SECTIONS DEMOLITIONSD303
SECTION - CROSSOVER DUCT BANK CROSS-SECTIONS DEMOLITIONSD302
SECTION - CROSSOVER DUCT BANK OVERALL DEMOLITIONSD301
ELEVATIONS - CROSSOVER DUCT BANK DEMOLITION CROSSOVER DUCT BANKSD201
PLAN - UPSTREAM ELECTRICAL RECEPTACLES DEMOLITIONSD141
PLAN - DOWNSTREAM ELECTRICAL RECEPTACLES DEMOLITIONSD140
PLAN - GALLERY AND UTILITY TRENCH DEMOLITIONSD103
PLAN - CROSSOVER DUCTBANK DEMOLITIONSD102
PLAN - OVERALL DEMOLITIONSD101
EXISTING CABLE SCHEDULE DOWNSTREAM RIGHT DEMOLITIONED634
EXISTING CABLE SCHEDULE UPSTREAM RIGHT DEMOLITIONED633
EXISTING CABLE SCHEDULE DOWNSTREAM LEFT DEMOLITIONED632
EXISTING CABLE SCHEDULE UPSTREAM LEFT DEMOLITIONED631
EXISTING PANELBOARDS SCHEDULES DEMOLITION ED622
EXISTING PANELBOARDS SCHEDULES DEMOLITION ED621
EXISTING ONE LINE DIAGRAM DEMOLITION ED602
EXISTING ONE LINE DIAGRAM DEMOLITION ED601
CENTRAL CONTROL BUILDING PLAN DEMOLITION ED105
DOWNSTREAM PLAN DEMOLITION ED104
UPSTREAM PLAN DEMOLITION ED103
MAIN LOCK ELECTRICAL PLAN DEMOLITION ED102
OVERALL ELECTRICAL SITE PLAN DEMOLITION ED101
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
R A
C T /T .O
N O
P R
O J E
C T C
O D
E
M A
T O
C /I
D
IQ
C
O N
T R
A C
T N
O
A N
S I
D
S O
L
IC
IT
A T
IO
N
L O
C K R
E H
A B
IL
IT
A T
IO
N
G R
U N
D Y C
O U
N T
Y
IL
D R
E S
D E
N I S
L A
N D L
O C
K A
N D D
A M
IL
L
IN
O
IS
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
C A
M P
B E
G E
N D A
N D A
B B
R E
V
IA
T
IO
N S
G-003
D
D
IL
L O
N
A
C A
M P
B E
IW
L D
B
R A
D T
K E
ELECTRICAL
W E
K
R
X
DISCONNECT SWITCH
CURRENT TRANSFORMER
POTENTIAL TRANSFORMER
SIZE AS INDICATED
MAGNETIC CIRCUIT BREAKER,
FIXED MOLDED-CASE THERMAL
WIRING CONNECTION
DISCONNECTING DEVICE PLUG
WITH RATINGS AS INDICATED
POWER TRANSFORMER
MOTOR, HP INDICATED
GENERATOR SET NO. 1
COMBINATION
DRAWOUT FUSE/CONTACTOR
TRANSFORMER
WYE TRANSFORMER
BREAKER,SIZE AS INDICATED
PLUG-IN MOLDED-CASE CIRCUIT
STARTER, AIZE AS INDICATED
MOTOR SHORT CIRCUIT PROTECTOR
PLUG-IN COMBINATION MOLDED CASE
THERMAL OVERLOAD DEVICE
IDENTIFICATION
CONDUIT AND CONDUCTOR
LENSE COLOR INDICATED
INDICATING LIGHT
PUSHBUTTON W/ MOMENTARY CONTACT
FLOW SENSOR
STARTER SELECTOR SWITCH
THREE POSITION MAINTAINED
LOCAL
OFF
REMOTE
UNIT 2UNIT 1
UNIT SELECTOR SWITCH
TWO POSITION MAINTAINED
BLUEBL
AMBERA
WHITEW
GREENG
REDR
SOLENOID
FIELD WIRING SHOWN ON SCHEMATIC
MOTOR CONTACTOR
VOLTMETER
AMMETER
VOLTMETER SWITCH
UTILITY METER
AMMETER SWITCH
RECEPTACLE CONNECTION
LOCK MACHINERY
400AF
GEN-1
H1
H2H3
Y3
Y2
Y1
20A
100A
CR-
CR-
R
CR-
CR-
CR-
HP
VM
AM
VS
AS
AO-AI-
GW
S
ABBREVIATIONSONE-LINE DIAGRAM & SCHEMATIC LEGEND
SITE LEGEND
DO-DI-
POWER RECEPTACLES)
MITER GATE, AND TOW HAULAGE UNIT
INDICATED (TYPICAL FOR SLIDE VALVES,
POWER RECEPTACLE WITH CALLOUT AS
480V NEMA 4 INTEGRALLY INTERLOCKED
480V RECEPTACLE
120V WEATHERPROOF GFCI RECEPTACLE
120V DUPLEX RECEPTACLE
(UNLESS NOTED OTHERWISE)
JUNCTION BOX / ELECTRICAL ENCLOSURE
CONCRETE EMBEDDED PVC-COATED RIGID STEEL CONDUIT
CONCEALED CONDUIT, DIRECT BURIED CONDUIT, OR
PLC DISCRETE INPUT/OUTPUT
PLC ANALOG INPUT/OUTPUT
DPMM DIGITAL POWER MULTI-METER
8/C
2"C
COMBINATION MOTOR STARTER
POWER PANEL
EXPOSED STEEL CONDUIT
LIGHTING SWITCH-SPDT
EXAMPLE FOR 8 CONDUCTORS
EXAMPLE FOR 2 INCH CONDUIT
CONTROL, GROUNDING & LIGHTING)
ELECTRICAL PLAN LEGEND (POWER,
OS
EMERGENCY LIGHTING FIXTURE
WALL MOUNT EXIT SIGN
CEILING MOUNT EXIT SIGN
OS WALL MOUNT OCCUPANCY SENSOR
(ARROW DETERMINES DIRECTION OF EGRESS)
CEILING MOUNT EXIT SIGN
(ARROW DETERMINES DIRECTION OF EGRESS)
WALL MOUNT SIGN EXIT
S3
WALL MOUNT EXTERIOR LIGHTING FIXTURE
CEILING MOUNT EXTERIOR LIGHTING FIXTURE
FUSE
FIXTURE
CEILING MOUNT EMERGENCY EXTERIOR LIGHTING
WALL MOUNT EMERGENCY EXTERIOR LIGHTING FIXTURE
DISCONNECT
G=GFCI AND/OR W=WEATHERPROOF)
120V DUPLEX RECEPTACLE (#=CIRCUIT ASSIGNMENT;
PLC DISCRETE OUTPUT, NORMALLY OPEN
PLC DISCRETE OUTPUT, NORMALLY CLOSED
500 KVA
3 PH, 60 HZ
13.2 KV
480/277V
NORMALLY OPEN
PLC INTERNAL LOGIC CONTACT
PRESSURE OR VACUUM SWITCH, NORMALLY CLOSED
OPEN
PRESSURE OR VACUUM SWITCH, NORMALLY NORMALLY
LIQUID LEVEL FLOAT SWITCH, NORMALLY CLOSED
LIQUID LEVEL FLOAT SWITCH, NORMALLY OPEN
CLOSED
PLC INTERNAL LOGIC CONTACT NORMALLY
CLOSED
TEMPERATURE SWITCH, NORMALLY
OPEN
TEMPERATURE SWITCH, NORMALLY
PDS
LIMIT SWITCH, NORMALLY OPEN, SEE
PDS
LIMIT SWITCH, NORMALLY CLOSED, SEE
SEE PDS
LIMIT SWITCH, NORMALLY OPEN,
THREE WAY SWITCH
PLC INTERNAL LOGIC RELAY
a DENOTES CONTROL CIRCUIT (IF APL)
CEILING MOUNT OCCUPANCY SENSORa
CONTROL CIRCUIT (IF APL)
A DENOTES FIXTURE LABEL, a DENOTES
LIGHTING FIXTURE
a
A
HOME RUN TO PANEL MDP, BREAKER 46MDP-46
AND TYPE AS INDICATED
SPECIAL RECEPTACLE, VOLTAGE
XFMR
V
UTV
UPS-X
UMG
ULW
UH-X
UCV
UCSP
TYP
TX
TVSS
TV
TRBL
TL-X
TH-X
THU
TEMP
TEL
SWBD
SV
SSI
SS
SPD
S/N
S
RGS
RECP
PV
PT-X
PS-X
PRGS
PNL
PLC
PL
PH
PDS
PB
OL
OH
ODP
MS
MH
MG
MCC
LWCSP
LW
LTV
LTS
LOR
TRANSFORMER
VOLTS
UPPER TAINTER VALVE
UNINTERRUPTABLE POWER SUPPLY NO. X
UPPER MITER GATE
UPPER LAND WALL
UNIT HEATER NO. X
UPPER CULVERT VALVE
UPPER CONTROL STAND PANEL
TYPICAL
TRANSFORMER
TRANSIENT VOLTAGE SURGE SUPPRESSION
TAINTER VALVE (OR CULVERT VALVE)
TROUBLE
TRAFFIC SIGNAL LIGHT NO. X
TRAFFIC HORN NO. X
TOW HAULAGE UNIT
TEMPERATURE
TELEPHONE
SWITCHBOARD
SOLENOID VALVE
ABSOLUTE ENCODER MODULE
SYNCHRONOUS SERIAL INTERFACE
USAGE DEPENDENT
SELECTOR SWITCH or STAINLESS STEEL, SURGE PROTECTION DEVICE
SOLID NEUTRAL
TOGGLE SWITCH
RIGID GALVANIZED STEEL (CONDUIT)
RECEPTACLE
PROPORTIONAL VALVE
PRESSURE TRANSDUCER NO. X
PRESSURE SWITCH NO. X
PVC COATED RIGID GALVANIZED STEEL CONDUIT
PANEL
PROGRAMMABLE LOGIC CONTROLLER
PILOT LIGHT
PHASE
POSITION DISPLACEMENT SENSOR
PUSHBUTTON
OVERLOAD
OVERHEAD
DISTRIBUTION PANEL
OFFICE/MAINTENANCE AREA
MOTOR STARTER
MANHOLE
MITER GATE
MOTOR CONTROL CENTER
LANDWALL CONTROL STATION (PLC) PANEL
LANDWALL
LOWER TAINTER VALVE
LIGHTS
LOCAL-OFF-REMOTE
LMG
LLW
LCSP
KW
KVA
KV
KCMIL
JB
IWPP
IWDP
IWCSP
IW
ICE-PIER
HZ
HYD
HP
HMI
H-O-A
DP1-X
GND
GFE
GEN-X
FX
FS-X
FO
FM-X
FLR
FCV
ETM
EF-X
DO
DM-X
DISTR
DI
DD
CV
CT
CSP-U
CSP-L
CS
COR
CKT
CCTV
CCS
C
BKR
BOD
ATS
AT
AO
AI
AF
A
LOWER MITER GATE
LOWER LAND WALL
LOWER CONTROL STAND SHELTER PANEL
KILOWATTS
KILOVOLT - AMPERES
KILOVOLTS
THOUSAND CIRCULAR MILS
JUNCTION BOX
INTERMEDIATE WALL (120/208) BACK POWER PANEL
INTERMEDIATE WALL (480) DISTRIBUTION PANEL
I-WALL CONTROL STATION (PLC) PANEL
INTERMEDIATE WALL (I-WALL)
HIGH-MAST LIGHTING PIER (OR TRANSFORMER PIER)
HERTZ
HYDRAULIC
HORSEPOWER
(PC OR HARDWIRED DEVICES)
HUMAN-MACHINE INTERFACE
HAND-OFF-AUTO SELECTOR SWITCH
CIRCUIT BREAKER PANEL NO. X
GROUND
GOVERNMENT FURNISHED EQUIPMENT
GENERATOR NO. X
LIGHT FIXTURE NO. X
FLOAT SWITCH NO. X
FIBER OPTIC
FLOW METER SENSOR NO. X
FLOOR
FLOW CONTROL VALVE
ELAPSED TIME METER
EXHAUST VENT FAN NO. X
DISCRETE OUTPUT
DAMPER MOTOR NO. X
DISTRIBUTION
DISCRETE INPUT
DIGITAL DISPLAY
CULVERT VALVE (OR TAINTER VALVE)
CURRENT TRANSFORMER
CONTROL SHELTER ELECTRICAL PANEL - UPPER
CONTROL SHELTER ELECTRICAL PANEL - LOWER
CONTROL SHELTER
CONTRACTING OFFICER'S REPRESENTATIVE
CIRCUIT
CLOSED CIRCUIT TV
CENTRAL CONTROL STATION
SEE PLAN LEGEND THIS SHEET
CONDUCTORS OR CONDUIT, USAGE DEPENDENT;
BREAKER
BASIS OF DESIGN
AUTOMATIC TRANSFER SWITCH
AMPERES - TRIP
ANALOG OUTPUT
ANALOG INPUT
AMPERES - FRAME
AMPERES
CCTV
TELEPHONE
GW
CO-AXIAL CABLE CONNECTOR
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
R A
C T /T .O
N O
P R
O J E
C T C
O D
E
M A
T O
C /I
D
IQ
C
O N
T R
A C
T N
O
A N
S I
D
S O
L
IC
IT
A T
IO
N
L O
C K R
E H
A B
IL
IT
A T
IO
N
G R
U N
D Y C
O U
N T
Y
IL
D R
E S
D E
N I S
L A
N D L
O C
K A
N D D
A M
IL
L
IN
O
IS
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
C A
M P
B E
N
D S
U G
G E
S T
E D S
E Q
U E
N C
E O
F W
O R
K
G E
N E
R A
L N
O T
E S
G-004
D
D
IL
L O
N
A
C A
M P
B E
IW
L D
B
R A
D T
K E
ELECTRICAL
W E
K
R
GENERAL INSTALLATION NOTESGENERAL REMOVAL NOTESGENERAL SEQUENCE OF CONSTRUCTION
GENERAL CONSTRUCTION NOTES
FOLLOWING CONSTRUCTION
CONSTRUCTION POWER
CONTROL REQUIREMENTS.
SEE MECHANICAL SHEETS FOR ADDITIONAL HYDRAULIC PUMP AND HYDRAULIC SYSTEM 5.
CONTROLS ON DRAWINGS.
ENCLOSURE FOR EACH PUMP UNIT, INTEGRAL WITH THE DISCONNECT AND INDICATED
THE STARTERS FOR EACH OF THE FOUR NEW 65HP PUMP UNITS SHALL BE MOUNTED IN A NEMA 1 4.
APPLICABLE SPECIFICATIONS.
MAINTAIN NORMAL OPERATION OF THE LOCK EXCEPT AS ALLOWED BY THE SPECIFICATIONS. SEE 3.
COSTS INCLUDED FOR TEMPORARY CONSTRUCTION POWER AND OTHER UILITY WORK.
TEMPORARY POWER ALONG WITH AN ANTICIPATED TIMELINE. CONTRACTOR SHALL PAY ALL
SUBMIT SHOP DRAWINGS INCLUDING PLANS INDICATING LOCATION AND INSTALLATION OF
THIS SEQUENCE DOES NOT INCLUDE FURTHER CONSIDERATION OF CONSTRUCTION POWER.)
SPECIFICATIONS AND THIS SHEET FOR REQUIREMENTS CONCERNING CONSTRUCTION POWER.
INSTALL CONSTRUCTION POWER AND COORDINATE TEMPORARY UTILITIES AS REQUIRED. (SEE 2.
SHALL BE COORDINATED WITH ALL OTHER CONSTRUCTION.
AS COORDINATED WITH AND APPROVED BY THE CONTRACTING OFFICER. ELECTRICAL WORK
THE CONTRACTOR SHALL FOLLOW THE SEQUENCE OF CONSTRUCTION NOTED BELOW EXCEPT 1.
TO EXISTING STRUCTURES.
MATERIALS, AND PATCH AND PAINT LOCATIONS WHERE TEMPORARY EQUIPMENT WAS MOUNTED
REMOVE CONSTRUCTION FACILITIES, TEMPORARY POWER AND METERING EQUIPMENT, WASTE 1.
COR.
CONTRACTOR SHALL SUBMIT ALL TEMPORARY CONTROL AND POWER PLANS FOR APPROVAL BY 11.
SETTINGS AND RESULTS FOR APPROVAL.
COMPLETE ALL ELECTRICAL INSTALLATION, COMMISSIONING, AND SUBMIT COMMISSIONING 10.
NEW CONTROL STAND BOOTHS.
EXTENT POSSIBLE TO RUN TO NEW JB'S ON TOP OF ICE PIERS TO MAKE CONNECTIONS TO THE
REPLACE EXISTING TRAFFIC SIGNALS. EXISTING CONDUIT MAY BE UTILIZED TO THE GREATEST
INSTALL NEW LED-TYPE TRAFFIC LIGHTS AT BOTH ENDS OF THE LOCK INCLUDING ALL WIRING TO 9.
ALL PRODUCTS, ALL GATE AND VALVE MACHINERY, AND CONTROL STANDS.
INSTALL, ENERGIZE, AND TEST SWITCHBOARDS, INCLUDING PLC, CONTROLS, AND SETTINGS OF 8.
TEMPORARY TRANSFORMATION TO 120/208 VOLTS AS REQUIRED BY THE LOADS.
THREE PHASE, 480 VOLTS AND INCLUDE A BACKUP SOURCE (SUCH AS A GENERATOR). PROVIDE
CONSTRUCTION NEEDS. TEMPORARY POWER SOURCE MUST BE NOT LESS THAN 200 AMPERES,
PROVIDE TEMPORARY POWER AS REQUIRED TO MAINTAIN POWER AND LIGHTING FOR
REMOVE EXISTING SWITCHBOARD BUSSES AND DEVICES AS REQUIRED AND INSTALL NEW. 7.
CONNECTIONS.
INSTALL NEW ALL MITER GATE AND TAINTER VALVE POSITION SENSOR EQUIPMENT AND MAKE 6.
REMOVE ALL EXISTING CONDUCTORS AS INDICATED. INSTALL ALL NEW CONDUCTORS.5.
NOT USED4.
PHASES.
INSTALLATION AND TERMINATION SHALL BE COMPLETED DURING INDICATED CONSTRUCTION
THE MACHINERY OUT TO NEW CYLINDER AND ACTUATOR LOCATIONS. FINAL CONDUCTOR
PRESSURE AND FLOW RATE SENSORS. INSTALL ALL ASSOCIATED ELECTRICAL CONDUIT FROM
SOLENOIDS, VARIABLE FLOW PROPORTIONAL VALVES, MANIFOLDS, VARIABLE RELIEF VALVES,
UNITS INCLUDING, BUT NOT LIMITED TO ELECTRICALLY ACTUATED DIRECTIONAL VALVE
COORDINATE WITH MECHANICAL CONTRACTOR FOR INSTALLATION OF NEW HYDRAULIC POWER 3.
ARE TO REMAIN IN SERVICE THROUGHOUT EACH CONSTRUCTION PHASE.
CONTRACTOR SHALL TAKE CARE TO NOTE AND MAINTAIN THE CABLES AND EQUIPMENT THAT 2.
COMPLETE AND ALL O & M MANUALS ARE TURNED OVER.
EQUIPMENT IN THE EVENT OF PROBLEMS OR FAILURES UNTIL TRAINING OF LOCK PERSONNEL IS
KEEP THE CONTRACTING OFFICER INFORMED OF THE POINT OF CONTACT FOR ALL NEW 1.
PERMANENT EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONFIGURATION AND CONDITION.
CONTRACT. ALL CONSTRUCTION POWER FACILITIES SHALL BE REMOVED AND REMAINING
REQUIREMENTS SET FORTH IN THE SPECIFICATIONS THROUGH THE COMPLETION OF THE
POWER. CONSTRUCTION POWER SERVICE EQUIPMENT SHALL MEET THE QUALITY AND SAFETY
THE CONTRACTOR SHALL FURNISH AND INSTALL ALL COMPONENTS FOR CONSTRUCTION 2.
DURING NAVIGATION UNTIL THE TIME THAT THE NEW LOCK EQUIPMENT IS OPERATIONAL.
COORDINATION, SEPARATE METERING, TEMPORARY POWER, AND STANDBY LOCK POWER
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UTILITY CONSTRUCTION POWER, INCLUDING 1.
GEN-SET.
AVAILABLE, SO THAT THE ACTUATORS CAN OPERATE THE LOUVERS PRIOR TO STARTING THE
OPERATE ON A POWER SOURCE AVAILABLE (LIKE 12VDC) WHEN THE UTILITY POWER IS NOT
MOTORIZED LOUVER OPERATORS IN BOTH STAND-BY GENERATOR-SET ENCLOSURES SHALL 8.
FITTINGS TO SEAL OUT SILT AND WATER TO GREATEST EXTENT POSSIBLE.
FLOODING SHALL BE NEMA TYPE 4X, WITH COMPRESSION SEALING FITTINGS AND CGB TYPE
ALL JUNCTION BOXES AND ELECTRICAL ENCLOSURES INSTALLED IN AREAS SUBJECT TO 7.
CONNECTING RIGID CONDUIT.
SHALL USE STAINLESS STEEL BRAIDED HYDRAULIC HOSE WITH CUSTOM ENDS TO MATE UP WITH
POSITION SENSORS, PROXIMITY SWITCHES, ENCODERS, AND CONTROLS TO THE JUNCTION BOX
ALL FLEXIBLE CONNECTIONS ON THE HYDRAULIC CYLINDERS AND POWER UNITS FROM 6.
INSTALLATION PLANS TO THE GREATEST EXTENT POSSIBLE BEFORE NAVIGATION CLOSURE.
CONTRACTOR SHALL PREPARE AND PRE-ASSEMBLE ALL EQUIPMENT, TOOLING, AND 5.
CONTRACTOR SHALL INSTALL A COMPLETE AND OPERATIONAL SYSTEM AS DESCRIBED HEREIN.
NOT EVERY CONTROL CABLE, CONDUIT, JUNCTION BOX, FITTING, OR MOUNTING IS SHOWN. 4.
CLEANED AS INDICATED IN THE SPECIFICATIONS.
ALL EMBEDDED CONDUITS AND MANHOLES INDICATED FOR RE-USE SHALL BE INSPECTED AND 3.
CABLE SPLICING KITS.
OR AS MANUFACTURED BY 3M, SCOTCHCAST 78-R SERIES RE-ENTERABLE SIGNAL AND CONTROL
LOCATIONS AND SEALED WATER TIGHT USING RESIN KITS AND HEAT SHRINK TUBING, SIMILAR TO
OR AS OTHERWISE APPROVED. SPLICES, WHERE APPROVED, SHALL BE IN ACCESSIBLE
ALL CABLE INSTALLATIONS SHALL BE CONTINUOUS RUNS WITHOUT SPLICES, EXCEPT AS NOTED 2.
REPLACED BY THE CONTRACTOR.
EQUIPMENT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AND THE EQUIPMENT SHALL BE
STEEL DRILL BITS ON STAINLESS STEEL EQUIPMENT). ANY DAMAGE INCURRED TO ELECTRICAL
CUT, DRILLED, FILED, OR BRUSHED WITH CARBON STEEL TOOLS (E.G. DO NOT USE CARBON
COMPATIBLE FOR USE WITH STAINLESS STEEL. STAINLESS STEEL EQUIPMENT MUST NOT BE
ELECTRICAL EQUIPMENT MUST ONLY BE CUT, DRILLED, FILED, OR BRUSHED WITH EQUIPMENT
(SUCH AS OVERSPRAY FROM NEARBY PAINTING OR GRINDING). ALSO, STAINLESS STEEL
CONTRACTOR MUST PROTECT ALL ELECTRICAL EQUIPMENT FROM ADJACENT WORK ACTIVITIES 1.
CONDITIONS.
REFERENCE DRAWINGS ARE RECORD DRAWING ONLY AND MAY NOT REPRESENT "AS BUILT" 11.
SO DIRECTED BY THE CONTRACTING OFFICER.
CONTRACTOR SHALL REMOVE DEMOLITION ITEMS FROM THE SITE WEEKLY OR MORE OFTEN IF 10.
AND FIELD CONDITIONS.
COORDINATE ALL WORK WITH REFERENCE DRAWINGS, SPECIFICATIONS, OTHER CONTRACTORS 9.
NOT USED.8.
CONTRACT REQUIREMENTS.
IN CABLE TRAY. SUCH WIRING SHALL BE EXECUTED IN A WORKMAN LIKE MANNER AND MEET ALL
REQUIRED TO MAINTAIN POWER TO THE REMAINING EQUIPMENT. NO SPLICES WILL BE ALLOWED
BOX TO RECONNECT CIRCUITS WHICH REMAIN IN OPERATION. EXTEND CONDUIT AND WIRING AS
EQUIPMENT REMOVAL IN CERTAIN LOCATIONS MAY REQUIRE THE INSTALLATION OF A JUNCTION 7.
INSTALLING NEW ITEMS.
THE OTHER CONTRACTORS AT THE JOB SITE BEFORE REMOVING EXISTING ELECTRICAL AND
CONTRACTOR SHALL COORDINATE ALL REMOVAL WORK WITH THE CONTRACTING OFFICER AND 6.
SHALL BE REMOVED WITH THE CONDUIT.
EXPOSED AND NOT BEING REUSED, ALL ASSOCIATED CLAMPS, SUPPORTS, HANGERS, ETC.,
HAND REMOVABLE PLUG AFTER REMOVAL OF THE CONDUCTORS. WHERE CONDUIT IS RUN
ALL CONDUIT PENETRATING CONCRETE AND IS NOT BEING REUSED SHALL BE PLUGGED WITH 5.
SERVING THE DEVICE EXCEPT WHERE OTHERWISE NOTED.
ASSOCIATED CONDUIT AND WIRE BACK TO THE PANELBOARD OR FEEDER JUNCTION BOX
GENERATOR SETS ETC., ARE INDICATED AS BEING REMOVED, IT SHALL ALSO INCLUDE ALL
UNLESS OTHERWISE NOTED, WHERE LIGHTS, SWITCHES, RECEPTACLES, TRANSFER SWITCHES, 4.
THE CONTRACTING OFFICER.
TURNING OFF POWER TO CIRCUITS, FEEDERS, PANELS, ETC. COORDINATE ALL OUTAGES WITH
THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CONTRACTING OFFICER BEFORE 3.
REMOVED FROM THE SITE AND DISPOSED OF BY THE ELECTRICAL CONTRACTOR.
NOTED AS RELOCATED, REUSED OR DELIVERED TO THE CONTRACTING OFFICER, SHALL BE
ELECTRICAL ITEMS (I.E., RECEPTACLES, JUNCTION BOXES, SWITCHES, ETC.) REMOVED AND NOT 2.
DO NOT INDICATE EVERY BOX, CONDUIT OR WIRE THAT MUST BE REMOVED.
REMOVED. THE DRAWINGS ARE INTENDED TO INDICATE THE SCOPE OF WORK REQUIRED AND
THE ELECTRICAL DEMOLITION DRAWINGS INDICATE EXISTING ELECTRICAL ITEMS TO BE 1.
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
R A
C T /T .O
N O
P R
O J E
C T C
O D
E
M A
T O
C /I
D
IQ
C
O N
T R
A C
T N
O
A N
S I
D
S O
L
IC
IT
A T
IO
N
L O
C K R
E H
A B
IL
IT
A T
IO
N
G R
U N
D Y C
O U
N T
Y
IL
D R
E S
D E
N I S
L A
N D L
O C
K A
N D D
A M
IL
L
IN
O
IS
R
IV
E R B
A S
IN
/0
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
C A
M P
B E
G
N E
R A
L N
O T
E S
G-005
D
D
IL
L O
N
A
C A
M P
B E
IW
L D
B
R A
D T
K E
ELECTRICAL
W E
K
R
GENERAL ELECTRICAL DEMOLITION NOTES
ABANDON THE RESPECTIVE BOLTS IN-PLACE.
REUSED SHALL BE CUT OFF AND GROUND OFF FLUSH WITH ADJACENT CONCRETE SURFACE AND
UNLESS NOTED OTHERWISE DEMOLISH ABANDONED AND ANCHOR BOLTS THAT ARE NOT TO BE 12.
RACEWAY IN-PLACE.
CONCRETE SURFACE, PATCHED WITH NON-SHRINK GROUT TO SEAL CONDUIT, AND ABANDON THE
EMEDDED RACEWAY THAT IS NOT TO BE REUSED SHALL BE CUT-OFF FLUSH WITH ADJACENT
UNLESS NOTED OTHERWISE DEMOLISH ALL EXPOSED ELECTRICAL RACEWAYS WHERE POSSIBLE. 11.
SWITCHBOARDS.
ELECTRICAL CABLES, EXPOSED RACEWAYS, ASSOCIATED MAIN LOCK ELECTRICAL EQUIPMENT, AND UNLESS OTHERWISE NOTED, DEMOLISH ALL EXISTING LOCK POWER, CONTROL, AND LIGHTING 10.
REMOVED AND MAINTAINED IN GOOD CONDITION.
EQUIPMENT THAT IS REQUIRED TO BE SALVAGED AND/OR REINSTALLED SHALL BE CAREFULLY 9.
FROM THE SITE WEEKLY OR MORE OFTEN IF SO DIRECTED BY THE CONTRACTING OFFICER.
SHALL BE PROERLY DISPOSED OF BY THE CONTRACTOR. REMOVE DEMOLISHED ITEMS AND REFUSE ALL ELECTRICAL EQUIPMENT REMOVED AND DEMOLISHED THAT IS NOT REQUIRED TO BE SALVAGED 8.
TO MAINTAIN POWER TO REMAINING EQUIPMENT.
TO RECONNECT CIRCUITS THAT REMAIN IN OPERATION. EXTEND CONDUIT AND WIRING AS REQUIRED EQUIPMENT REMOVAL IN CERTAIN LOCATIONS MAY REQUIRE THE INSTALLATION OF A JUNCTION BOX 7.
REMOVED.
REMOVED, UNLESS OTHERWISE INDICATED. REMOVE HANGERS AND STRAPS WHEN CONDUIT IS
BACK TO THE PANELBOARD OR FEEDER JUNCTION BOX SERVING THE DEVICE SHALL ALSO BE
WHERE ELECTRICAL EQUIPMENT IS PERMAENTLY REMOVED, ALL ASSOCIATED CONDUIT AND WIRE 6.
OR WIRE, THAT MUST BE REMOVED. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS.
DRAWINGS INDICATE THE SCOPE OF WORK REQUIRED AND DO NOT INDICATE EVERY BOX, C0NDUIT, THE ELECTRICAL DEMOLITION DRAWINGS INDICATE EXISTING ELECTRICAL ITEMS TO BE REMOVED. 5.
ABANDONED.
SEAL THE ENDS OF ALL EXISTING CROSSOVER DUCT BANK DUCTS TO PREPARE THEM TO BE
CONSTRUCTION WORK PERMITS AS APPROPRIATE WITH RESPECT TO THE STAGE OF WORK. PLUG TO
DEMOLISH ALL EXISTING CABLES FROM OUT OF THE EXISTING CROSSOVER DUCT BANK AS 4.
PRIOR TO DE-ENERGIZING AND REMOVING THE PERMANENT DAM FEEDER CABLE.
DE-ENERGIZED. THE TEMPORARY POWER SYSTEM MUST BE INSTALLED, INSPECTED, AND TESTED WHENEVER THE NORMAL UTILITY POWER (A.K.A. PERMANENT DAM POWER) IS DISCONNECTED OR
CONTRACTOR MUST PROVIDE TEMPORARY MAIN POWER AND TEMPORARY BACKUP POWER
POWER AND STANDBY BACKUP POWER TO THE DAM AT ALL TIMES DURING CONSTRUCTION.
CABLE AND REPLACEMENT WITH A NEW DAM POWER FEEDER CABLE. CONTRACTOR MUST PROVIDE
THE PHASE OF CONSTRUCTION. CONTRACT REQUIRES DEMOLITION OF THE DAM POWER FEEDER
DEMOLITION OF LOCK ELECTRICAL EQUIPMENT MAY BE LIMITED TO SPECIFIC AREAS DEPENDING ON 3.
REMOVING EXISTING ELECTRICAL EQUIPMENT.
CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER CONTRACTORS AT THE JOB SITE BEFORE 2.
OTHERWISE BY THE GOVERNMENT (COR).
LESS THAN 14 DAYS PRIOR TO THE PLANNED OUTAGE UNLESS COORDINATED AND APPROVED
THE GOVERNMENT CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND RECEIVE APPROVAL NOT CONTRACTOR SHALL COORDINATE AND REQUEST IN WRITING ALL POWER SYSTEM OUTAGES WITH 1.
MONOLITH JOINT.
EXPANSION/CONTRACTION/DEFLECTION CONDUIT COUPLING AT EACH LOCK WALL CONCRETE
OVER EACH EMBEDDED CONDUIT. PROVIDE EMBEDDED NEOPRENE
PROPERLY SECURE CONDUITS IN TRENCHES AND PROVIDE NOT LESS THAN 4-INCH CONCRETE COVER
TO ENSURE NO INTERFERENCES. SAWCUT AND DEMOLISH EXISTING CONCRETE TO INSTALL AND
NEW CONCRETE EMBEDDED CONDUITS: PRELIMINARY LAYOUT ROUTE OF NEW EMBEDDED CONDUITS 56.
TEMPORARY EQUIPMENT WAS MOUNTED TO EXISTING STRUCTURES.
PREPARATION OF PROJECT CLOSE OUT. PATCH AND PAINT IF NECESSARY TO REPAIR LOCATIONS WHERE
MATERIALS UPON CHANGEOVER TO NEW PERMANT EQUIPMENT NEAR END OF CONSTRUCTION IN
REMOVE CONSTRUCTION FACILITIES, TEMPORARY POWER AND METERING EQUIPMENT, AND WASTE 55.
EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONFIGURATION AND CONDITION.
POWER FACILITIES SHALL BE REMOVED WHEN ITS USE HAS ENDED AND REMAINING PERMANENT
SET FORTH IN THE SPECIFICATIONS THROUGH THE COMPLETION OF THE CONTRACT. ALL CONSTRUCTION CONSTRUCTION POWER SERVICE EQUIPMENT SHALL MEET THE QUALITY AND SAFETY REQUIREMENTS 54.
SPECIFICATIONS SECTION 00 73 05.
NAVIGATION UNTIL THE TIME THAT THE NEW LOCK EQUIPMENT IS OPERATIONAL. REFER TO
COORDINATION, SEPARATE METERING, TEMPORARY POWER, AND STANDBY LOCK POWER DURING
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UTILITY CONSTRUCTION POWER, INCLUDING 53.
EQUIPMENT SHALL BE REPLACED BY THE CONTRACTOR.
ELECTRICAL EQUIPMENT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AND THE
CARBON STEEL DRILL BITS ON STAINLESS STEEL EQUIPMENT). ANY DAMAGE INCURRED TO
MUST NOT BE CUT, DRILLED, FILED, OR BRUSHED WITH CARBON STEEL TOOLS (E.G. DO NOT USE
WITH EQUIPMENT COMPATIBLE FOR USE WITH STAINLESS STEEL. STAINLESS STEEL EQUIPMENT
STAINLESS STEEL ELECTRICAL EQUIPMENT MUST ONLY BE CUT, DRILLED, FILED, OR BRUSHED
(SUCH AS OVERSPRAY FROM NEARBY PAINTING, GRINDING, CUTTING, AND WELDING). ALSO,
CONTRACTOR MUST PROTECT ALL ELECTRICAL EQUIPMENT FROM ADJACENT WORK ACTIVITIES 52.
CIRCUITS AND CABLES PRIOR TO REMOVING ANY EQUIPMENT.
CONDITIONS. CONTRACTOR MUST VERIFY, IDENTIFY, AND LABEL ALL EXISTING ELECTRICAL
REFERENCE DRAWINGS ARE RECORD DRAWINGS ONLY AND MAY NOT REPRESENT "AS BUILT" 51.
WSR.
MATING PLUGS. BASIS OF DESIGN IS APPLETON POWERTITE OR CROUSE-HIND ARKTITE TYPE
BE THE SAME, TYPE WSR, INTERCHANGEABLE 4 POLE, 4 WIRE, GROUNDED TYPE PROVIDED WITH
NEW 480 VOLTS, 3 PHASE INTERLOCKED RECEPTACLES OF THE SAME AMPERAGE RATING MUST 50.
LOCATIONS.
NOTED OR AS OTHERWISE APPROVED. SPLICES, WHERE APPROVED, SHALL BE IN ACCESSIBLE
ALL ELECTRICAL CABLES MUST BE INSTALLED CONTINUOUS RUNS WITHOUT SPLICES, EXCEPT AS 49.
ELECTRICAL CABLE SPLICES ARE NOT ALLOWED IN THE CABLE TRENCHES.48.
THE END OF THIS PROJECT.
ELECTRICAL POWER, LIGHTING, CONTROL, COMMUNICATIONS, AND INSTRUMENTS SYSTEMS BY
CONDUCTORS, LABOR, ETC TO PROVIDE A COMPLETE AND FUNCTIONAL NAVIGATION LOCK
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL EQUIPMENT, RACEWAY, CABLES, 47.
BONDED-SHIELDED TYPE OR TYPE METAL CLAD(MC) OR COMPOSITE SHIELDED TYPE.
MULTI-CONDUCTOR CONTINUOUS RUNS, UNLESS OTHERWISE NOTED. CABLES SHALL BE EITHER
NEW ELECTRICAL CABLES SHALL BE 600 VOLTS, 90 DEGREE CELCIUIS, COPPER, TYPE XHHW 46.
ACTIVITIES.
ELECTRIC POWER FOR ALL CONSTRUCTION ACTIVITIES, INCLUDING GOVERNMENT DEWATERING
INSTALLED, ENERGIZED, TESTED, AND APPROVED. COORDINATE, PROVIDE, AND MAINTAIN
SERVICE TRANSFORMER UNTIL NEW UTILITY POWER AND PERMANENT LOCK POWER IS
PARALLEL POWER FEEDER CONDUCTORS AND RACEWAY FROM UTILITY PAD-MOUNT 225KVA
LOCK CLOSURE CONSTRUCTION TIME PERIOD. MAINTAIN AND PROTECT EXISTING LANDWALL
KEEP THE CENTRAL CONTROL STATION BUILIDING (CCS) AND DAM OPERATIONAL DURING THE
MAINTAIN EXISTING POWER SERVICE AS REQUIRED TO KEEP LOCK POWER OPERATIONAL AND TO 45.
BUILDING.
INSTALLATION TO PROVIDE A NEW, LARGER SERVICE ENTRANCE TO THE NEW SWITCHBOARD
INCURRED BY THE ELECTRIC POWER UTILITY FOR COORIDINATION, PRODUCTS, MATERIALS, AND
INCREASED LOCK & DAM SERVICE TRANSFORMER SIZE. CONTRACTOR SHALL PAY ALL COSTS
CONTRACTOR SHALL COORDINATE WITH ELECTRIC POWER UTILITY (COMM-ED) TO PROVIDE NEW 44.
TYPE SOOW CABLE.
EACH MITER GATE LEAF. THE MITER GATE “RECESS” PROXIMITY SENSOR CABLE SHALL ALSO BE
SHALL BE SOOW CABLE TO WITHSTAND THE REPEATED FLEXING AT THE QUOIN END OF THE
"MITER” PROXIMITY SENSOR CABLES AND MITER GATE STRUT ARM TORQUE SWITCHES CABLES
ELECTRICAL CABLES SHALL BE CONTINUOUS UNLESS OTHERWISE NOTED. THE MITER GATE 43.
AND CONTRACTION OF CONDUITS.
COUPLINGS AT EVERY CONCRETE MONOLITH JOINT INSTALLED TO ALLOW PROPER EXPANSION
80, SIZED AS INDICATED ON DRAWINGS. PROVIDE EXPANSION/CONTRACTION CONDUIT
ALL RIGID ELECTRICAL CONDUITS INSTALLED IN TRENCHES SHALL BE UV-RATED PVC SCHEDULE 42.
ADJUST EQUIPMENT TO FINAL CALIBRATED SETTINGS REPORTED BY COORDINATION STUDY.
MODELED USING FINAL ACTUAL INSTALLED EQUIPMENT AND THEIR FINAL CALIBRATED SETTINGS.
OUTDOORS. PROVIDE LOAD STUDY, ARC FLASH HAZARD ANALYSIS, AND COORDINATION STUDY
ARC FLASH HAZARD ADHESIVE LABELS FOR ALL APPLICABLE EQUIPMENT INDOORS AND
CONTRACTOR SHALL PROVIDE PROPERLY-APPLIED PERMANENT WEATHERPROOF UV-RESISTANT 41.
EXACT LOCATIONS OF MECHANICAL EQUIPMENT.
REFER TO MECHANICAL DRAWINGS AND COORDINATE WITH MECHANICAL CONTRACTORS FOR 40.
DESIGNATED FOR RE-USE OR TO BE RELOCATED.
APPROPRIATE CARE SHALL BE TAKEN NOT TO DAMAGE EQUIPMENT, DEVICES, AND WIRING THAT IS 39.
GROUND CONDUCTORS ARE NOT CONSIDERED CURRENT CARRYING.
CARRYING CONDUCTORS IN ONE CONDUIT. NEUTRALS AND HOTS ARE CURRENT CARRYING,
EXCEPT FOR NIPPLES SHORTER THAN 24 INCHES , DO NOT RUN MORE THAN 9 CURRENT 38.
AND BRANCH CIRCUIT SHALL CONTAIN A GREEN INSULATED GROUND CONDUCTOR.
#12 AWG, AND MINIMUM CONDUIT SIZE SHALL BE 3/4" UNLESS OTHERWISE NOTED. EACH FEEDER
AWG AND SMALLER, AND STRANDED FOR #8 AND LARGER. MINIMUM CONDUCTOR SIZE SHALL BE
WIRING FOR POWER AND BRANCH CIRCUITS SHALL BE COPPER, TYPE XHHW. USE SOLID FOR # 10 37.
COMPLETE.
EQUIPMENT SHALL BE CAREFUILY REMOVED, PROTECTED, AND REINSTALLED WHEN WORK IS
WHERE EXISTING EQUIPMENT IS IN THE WAY OF WORK PEREORMED UNDER THIS CONTRACT, THE 36.
20A MINIMUM, AND HEAVY DUTY RATED.
METALLIC, GASKETED IN USE COVERS. NEW LIGHT SWITCHES AND RECEPTACLES SHALL BE 120V, OF BUILDING OR IN RESTROOMS. EXTERIOR BUILDING RECEPTACLES SHALL INCLUDE HEAVY DUTY
PERFORMED UNDER THIS CONTRACT. INSTALL GFCI TYPE WHERE LOCATED AROUND EXTERIOR
REPLACE LIGHT SWITCHES AND CONVENIENCE RECEPTACLES IN AREAS WHERE WORK IS TO BE 35.
NUMBER OF POLES, WIRE, AND CONDUIT SIZED.
AS-BUILT DRAWINGS. PROVIDE INFORMATION OF DISCONNECTS INCLUDING AMPERE RATING,
AS-BUILT DRAWINGS: CONTRACTOR SHALL INCLUDE LOCATIONS OF ALL EQUIPMENT ON REDLINE 34.
ALL LIGHT FIXURES SHALL BE COMPLETE WITH LAMPS.33.
ALL CONDUCTORS SHALL BE INSTALLED IN RACEWAY, EXCEPT WHERE NOTED OTHERWISE. 32.
GENERAL ELECTRICAL NOTES
SEPARATE CONDUITS.
KEEP LOW VOLTAGE WIRING ( 30 VOLTS AND LESS), 120 VOLT WIRING, AND 480 VOLT WIRING IN 31.
ROUTING.
GOVERNMENT SHALL HAVE FINAL APPROVAL ON ALL EQUIPMENT, LOCATIONS, AND CONDUIT 30.
BREAK VISIBLE BLADES AND PROVIDE NEMA 4X DRAIN.
DISCONNECT SAFETY SWITCHES SHALL BE NEMA 4X HEAVY DUTY TYPE, WITH QUICK-MAKE, QUICK-29.
POWDER-ACTUATED ANCHORS ARE NOT PERMITTED.28.
PROVIDE NEMA 4X DRAINS IN ALL NEMA 4 AND NEMA 4X ELECTRICAL ENCLOSURES. 27.
TERMINATED IN NEW CABLE TRENCH UNLESS NOTED OTHERWISE.
PROVIDE INSULATED THROAT GROUNDING TYPE CONDUIT BUSHINGS FOR ALL CONDUITS 26.
ELECTICAL ENCLOSURES.
PROVIDE GROUNDING TYPE INSULATED-THROAT HUBS TO TERMINATE CONDUITS AT ALL 25.
REQUIREMENT. USE NON-FERROUS SCREWS TO ATTACH NAMEPLATES.
MAXIMUM FUSE SIZE (IF APPLICABLE LABELING SWITCH AS S-A, S-B ETC.,DOES NOT SATISFY THIS
ELECTRICAL EQUIPMENT BY NAME AND FUNCTION INCLUDING OPERATING VOLTAGE, AND
LETTER TO IDENTIFY ALL DISCONECT SWITCHES, STARTERS, AND OTHER MAJOR PIECES OF
WHITE LAMINATE NAMEPLATES WITH BLACK CORE SHALL BE ENGRAVED WITH 3/16 INCH HIGH 24.
MATCH THE ADJACENT SURFACES.
UNLESS OTHERWISE NOTED, CONDUIT EXPOSED TO VIEW IN OFFICE AREAS SHALL BE PAINTED TO 23.
SUSPENDED CEILING SUPPORTS.
WALLS. CONDUIT SHALL NOT BE SUPPORTED BY OTHER CONDUIT, PIPING, HVAC DUCTWORK, OR
EACH BOX AND FITTING. USE STRAP TYPE CONDUIT SUPPORTS FOR EXPOSED CONDUITS ON
PROVIDE SUPPORT AT EACH BOX. PROVIDE AN ADDITIONAL CONDUIT SUPPORT WITHIN 3 FEET OF 22.
PENTRATIONS AS CLOSE TO WALL AS POSSIBLE.
ANNULAR SPACE AROUND CONDUIT SHALL BE SEALED WITH NON-SHRINK GROUT. KEEP FLOOR
WHEN APPLICABLE OPENINGS IN EXISTING WALLS AND FLOORS SHALL BE CORE DRILLED. 21.
SOURCES SUCH AS FLUES, HOT WATER PIPE, ETC.
BETWEEN CONDUIT AND PIPING. MAINTAN 12 INCH CLEARANCE BETWEEN CONDUIT AND HEAT
AND PERPENDICULAR TO WALLS AND ADJACENT PIPING, MAINTAIN MINIMUM 6 INCH CLEARANCE
CONDUIT SHALL BE INSTALLED ABOVE ACCESSIBLE CEILINGS WHERE POSSIBLE AND PARALLEL 20.
POSSIBLE.
UNLESS NOTED OTHERWISE, RUN CONDUIT TIGHT TO BUILDING STRUCTURE CEILINGS WHEREVER
ARRANGE CONDUIT TO MAINTAIN MAXIMUM HEADROOM AND PRESENT A NEAT APPERANCE. 19.
ALLOWED WITHOUT PRIOR WRITTEN APPROVAL BY THE CONTRACTING OFFICER.
OFFSET A MINIMUM OF 24 INCHES HORIZONTALLY. "THRU-THE- WALL" BOXES SHALL NOT BE
OF 6 INCHES HORIZONTALLY. BOXES ON OPPOSITE SIDES OF FIRE RATED WALLS SHALL BE
BOXES LOCATED ON OPPOSITE SIDES OF NON-FIRE RATED WALLS SHALL BE OFFSET A MINIMUM 18.
INSTALL ALL NEW LIGHT SWITCHES AT +4 FEET FROM FLOOR.17.
BREAKERS FEEDING NEW EMERGENCY CIRCUITS.
FROM ALL OTHER CIRCUITS. INSTALL MANUFACTURERS " LOCK ON" DEVICES ON CIRCUIT
CIRCUITS SERVING EMERGENCY AND EXIT FIXTURES SHALL BE RUN IN SEPARATE RACEWAYS 16.
PANELBOARD CIRCUITS.
DIRECTORIES WHERE DEMOLITION OR NEW WORK HAS BEEN PERFORFORMED ON RESPECTIVE
CONTRACTOR SHALL UPDATE PANELBOARD DIRECTORIES WITH NEW TYPED- WRITTEN 15.
MONOTLITH EXPANSION JOINT.
WHERE APPLICABLE) CONDUIT COUPLINGS WHEREVER CONDUITS CROSS A CONCRETE
EMBEDDED CONDUITS ARE REQUIRED. PROVIDE EXPANSION/CONTRACTION (AND DEFLECTION
PENETRATIONS INTO AND OUT OF CONCRETE. PROVIDE SCHEDULE 40 PVC CONDUIT WHERE
RIGID GALVANIZED STEEL (RGS) EXPOSED OUTDOORS, INSIDE MANHOLES, AND AT ALL CONDUIT
UNLESS OTHERWISE NOTED, ALL CONDUIT SHALL BE UL LISTED EMT INDOORS AND PVC-COATED 14.
PROTECTION.
COORDINATE OVERCURRENT PROTECTION SIZES WITH MANUFACTURER RECOMMENDED CIRCUIT 13.
EXISTING JOISTS.
MATERIALS FOR OPENINGS IN FIRE RATED WALLS, DO NOT DRILL HOLES INTO OR THROUGH
CONTRACTOR. CONDUITS SHALL BE GROUTED OR SEALED INTO OPENINGS. USE FLAMEPROOF
OPENINGS SHALL BE REPAIRED BY A QUALIFIED CONTRACTOR AT THE EXPENSE OF THIS
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN STRUCTURES. ALL 12.
INSTALLATION.
COORDINATE ALL EQUIPMENT LOCATIONS PRIOR TO MAKING THE ACTUAL ELECTRICAL 11.
OTHER STORAGE CLOSETS WITHOUT CEILING MAY BE EXPOSED ON BUILDING STRUCTURE.
OTHERWISE INDICATED ON THE PLANS. CONDUIT IN MECHANICAL ROOMS, PIPE CHASES, AND
BUILDING (CCS) IN EXISTING WALLS, PARITITIONS, AND ABOVE SUSPENDED CEILING UNLESS
CONCEAL ALL CONDUIT AND CABLES INSTALLED IN THE EXISTING CENTRAL CONTROL STATION 10.
MINMUM).
CONDUCTOR. NEUTRAL CONDUCTOR AND A GREEN INSULATED GROUND CONDUCTOR (12 AWG
EACH INDICATED HOME RUN CIRCUIT TO THE RESPECTIVE PANEL SHALL HAVE A SEPARATE PHASE 9.
EXCEED 6 FEET IN LENGTH.
GROUND THROUGH FLEXIBLE CONDUIT TO THE LOAD'S GROUND. FLEXIBLE CONDUIT SHALL NOT
CONNECTORS AS REQUIRED TO MAKE CONNECTIONS. ROUTE GROUNDING WIRE FROM CIRCUIT
3/4-INCH SIZE MINIMUM UNLESS OTHERWISE NOTED. PROVIDE HOT DIPPED GALVANIZED
C EXTREME TEMPERATURE TYPE ATLA WITH HOT DIPPED GALVANIZED STEEL CORE. PROVIDE
O
C - O
LIQUIDTIGHT FLEXIBLE METAL CONDUIT. FLEXIBLE LIQUIDTIGHT FLEXIBLE CONDUIT RATED -50
ALL FINAL ELECTRICAL CONNECTIONS TO EQUIPMENT THAT VIBRATES SHALL BE MADE WITH 9.
EQUIPMENT AND PRODUCTS ON EQUIPMENT SHALL BE COORDINATED PRIOR TO INSTALLATION.
ACCESS TO ELECTRICAL AND MECHANICAL EQUIPMENT. ALL MOUNTING OF ELECTRICAL
ELECTRICAL EQUIPMENT SHALL BE MOUNTED TO AVOID IMPEDANCE OF OPERATION AND/OR 8.
OPERATION AND MAINTENANCE (O& M) MANUALS.
ALL NEW EQUIPMENT SHALL BE PROVIDED WITH MANUFACTURER'S STANDARD WARRANTY AND 7.
U.S. ARMY CORPS OF ENGINEERS SAFETY MANUAL EM-385-1-1 (LATEST EDITION).
SAFE WORKING ENVIRONMENT. COMPLY WITH OSHA STANDARDS 29 CFR 1910 AND 1926, AND THE
IT IS THE RESPONSIBILITY OF ALL PERSONNEL WORKING UNDER THIS CONTRACT TO MAINTAIN A 6.
APPLICABLE (E.G. UL LISTED).
NEMA, ANSI, ETC.) AND SHALL BE NATIONAL RECOGNIZED TESTING LABORATORY (NRTL) LISTED AS
ALL NEW EQUIPMENT SHALL COMPLY WITH RELEVANT AMERICAN INDUSTRY STANDARDS (E.G. 5.
ON THE PANELBOARD AS EVENLY AS POSSIBLE BETWEEN EACH PHASE.
CIRCUIT. COMMON NEUTRALS SHALL NOT BE USED FOR ANY CIRCUITING. BALANCE THE LOADS
NUMBERING ON THE PANELBOARD. ROUTE AN EQUIPMENT GROUNDING CONDUTOR WITH EACH
FOR ALL CIRCUITS INCLUDED FOR WORK IN THE CONTRACT. CIRCUITING SHALL AGREE WITH
PROVIDED AT EACH END DEVICE INCLUDING NEW RECEPTACLES FOR CIRCUIT IDENTIFICATION
CIRCUIT NUMBERS IN THE FORM OF ENGRAVED NAMEPLATES AS SPECIFIED HEREIN SHALL BE 4.
BY THE GOVERNMENT.
ALL OPERATIONAL OUTAGES AND POWER OUTAGES SHALL BE COORDINATED WITH AND APPROVED 3.
NATIONAL ELECTRICAL CODE.
ALL ELECTRICAL INSTALLATIONS SHALL COMPLY WITH MOST RECENT VERSION OF NFPA 70, 2.
ELECTRICAL CONSTRUCTION.
SEE SPECIFICATIONS FOR CONSTRUCTION SEQUENCE DESCRIPTIONS AND IMPACTS ON 1.
GENERAL ELECTRICAL NOTES (CONTINUED)
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
R A
C T /T .O
N O
P R
O J E
C T C
O D
E
M A
T O
C /I
D
IQ
C
O N
T R
A C
T N
O
MAIN LOCKMAIN LOCK
Ice Chute
Arch Dam
Spillway Dam
Upstream Guide WallDownstream Guide Wall
A
C A
M P
B E
V
E R
A L L E
L E
C T
R
IC
A L S
IT
E P
L A
N
E-101
T L E
E C
H
B P
A T
T S
C H
U
IW
L D
B
R A
D T
K E
ELECTRICAL
A N
S I
X
S O
L
IC
IT
A T
IO
N
L O
C K R
E H
A B
IL
IT
A T
IO
N
G R
U N
D Y C
O U
N T
Y
IL
D R
E S
D E
N I S
L A
N D L
O C
K A
N D D
A M
IL
L
IN
O
IS
R
IV
E R B
A S
IN
W E
K
R
/0
/2
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
SHEET KEYNOTES
INSIDE THE RIVER WALL ENCLOSURE FOR FUTURE EXTENSION BY OTHERS.
WALL. COIL APPROXIMATELY 800 FEET OF FIBER OPTIC CABLE F1 AND STORE
STAINLESS STEEL JUNCTION BOX ON SMALL LOCK INTERMEDIATE WALL AND RIVER
SURFACE INSTALLED ON ARCH DAM, PROVIDE NEW 36"X36"X12" NEMA 4X 316
PROVIDE NEW SPARE DAM FIBER OPTIC CABLE "F1" IN NEW 2" RGS CONDUIT 14.
NEW UTILITY SERVICE TRANSFORMER TO NEW MANHOLE MH-SB.
PROVIDE NEW CONCRETE EMBEDDED SERVICE ENTRANCE DUCT BANK FROM 13.
NEW SWITCHBOARD BUILDING, SWITCHBOARD, AND MANHOLE MH-SB.12.
PROVIDED IN THE LOCK’S NEW SWITCHBOARD.
WITH THE SETTINGS OF THE NEW DAM FEEDER CIRCUIT BREAKER BEING
OVERCURRENT SETTINGS NEED TO MATCH AND THEY MUST BE COORDINATED
PDG3 ASSEMBLY. THE BOILER MCC MAIN AND SUBFEEDER BREAKERS
ASSEMBLY AND THE MCC SUBFEEDER CIRCUIT BREAKER WITH THE OTHER NEW
REMOVE AND REPLACE THE MCC MAIN CIRCUIT BREAKER WITH ONE NEW PDG3
AMPERES, 65KA AIC, CIRCUIT BREAKERS AND NEW MCC BUCKET ASSEMBLIES.
BREAKER COORDINATION. PROVIDE TWO (2) NEW EATON 480 VAC, PDG3, 200
PROVIDE NEW CIRCUIT PROTECTION IN DAM MCC TO CORRECT EXISTING CIRCUIT 11.
TRENCH. SEE NEW CABLE SCHEDULE.
CONDUIT WITH NEW PVC-COATED RGS CONDUIT TO AND INTO NEW CABLE
EXPOSE, AND INTERCEPT EXISTING BURIED 2" CONDUIT AND EXTEND EXISTING
BUILDING TO EXISTING VISITOR'S CENTER BUILDING. LOCATE, EXCAVATE TO
PROVIDE NEW ELECTRIC POWER FEEDER CIRCUIT FROM NEW SWITCHBOARD 10.
ANY WORK.
PROTECT THE ELECTRICAL CIRCUITS WHICH DO NOT OTHERWISE REQUIRE
GARAGES ARE FED FROM THE EXISTING TOWER BUILDING. MAINTAIN AND
MAINTAIN AND PROTECT THE EXISTING OUT-BUILDINGS: THE EXISTING 9.
CONTROLS. RECONNECT EXISTING ELECTRICAL POWER FEEDER CABLE.
VEHICLE GATE MOTORIZED OPERATOR, CAMERA, INTERCOM, AND
MAINTAIN AND PROTECT THE EXISTING VISITOR'S ENTRY SECURITY 8.
CONTROLS. RECONNECT EXISTING ELECTRICAL POWER FEEDER CABLE.
VEHICLE GATE MOTORIZED OPERATOR, CAMERA, INTERCOM, AND
MAINTAIN AND PROTECT THE EXISTING EMPLOYEE'S ENTRY SECURITY 7.
TO FACILITATE ENTRY OF THE NEW SERVICE ENTRANCE DUCT BANK.
SECONDARY CONDUITS ENTERING THE TRANSFORMER ONLY AS NEEDED
SECONDARY CONDUCTORS WHICH ARE DISCONNECTED. DEMOLISH
MOUNTED SERVICE TRANSFORMER. DEMOLISH THE 480 VOLTS
EXISTING 500KVA ELECTRIC POWER UTILITY OWNED MEDIUM VOLTAGE PAD-
PROVIDE A NEW UTILITY SERVICE TO THE NEW SWITCHBOARD. THE
TRANSFORMER AS COORDINATED WITH AND REQUIRED BY COMED TO
REUSE EXISTING PAD-MOUNTED UTILITY-OWNED 500 KVA SERVICE 6.
RECONNECT EXISTING ELECTRICAL POWER FEEDER CABLE.
FEEDER INSIDE THE CENTRAL CONTROL BUILDING FOR RECONNECTION.
EXISTING OLD TOWER BUILDING. MAINTAIN AND PROTECT THE CABLE 5.
CONTROL STAND TO MAINTENANCE BUILDING.
FEEDER CABLE FROM NEW ULDP LOCATED AT NEW UPSTREAM LEFT
TRENCH. PROVIDE NEW 480 VOLTS MAINTENANCE ELECTRICAL POWER
MAINTENANCE POWER FEEDER CONDUIT IN GALLERY TO INSIDE NEW
PROVIDE NEW 2" PVC-COATED RGS CONDUIT FROM EXISTING 4.
EXISTING GUIDE WALL CABLES AS INDICATED IN PLAN AND DETAIL SHEETS.
ELECTRICAL CABLES. CONNECT NEW CABLES FROM NEW CIRCUITS TO THE
MAINTAIN, PROTECT, AND REUSE EXISTING DOWNSTREAM GUIDE WALL 3.
EXISTING GUIDE WALL CABLES AS INDICATED IN PLAN AND DETAIL SHEETS.
ELECTRICAL CABLES. CONNECT NEW CABLES FROM NEW CIRCUITS TO THE
MAINTAIN, PROTECT, AND REUSE EXISTING UPSTREAM GUIDE WALL 2.
200 AMPERES, 480 VOLTS AC.
TO THE DAM WHICH SHALL BE NOT LESS THAN FULLY RATED CAPACITY OF
THE DAM AT ALL TIMES. CONTRACTOR MUST PROVIDE TEMPORARY POWER
WATER POOL ELEVATION. DAM ELECTRICAL POWER MUST BE AVAILABLE TO
OPERATIONS ARE MAINTAINED TO OPEN AND CLOSE DAM GATES TO ADJUST
FEEDER CABLE AS PROPERLY SEQUENCED TO ENSURE THAT THE DAM
ALSO SEE SHEET ED-101. REMOVE AND REPLACE THE EXISTING DAM
DAM SERVICE BRIDGE ACCESS RAMP. SEE NEW CABLE SCHEDULE AND
DAM FEEDER DISCONNECT SAFETY SWITCH LOCATED ADJACENT TO THE
ACROSS THE ARCH DAM, IN CONCRETE EMBEDDED DUCTS TO EXISTING
DISTRIBUTION PANEL URDP ROUTED THROUGH THE NEW CABLE TRENCH,
PROVIDE NEW DAM FEEDER CABLE FROM NEW UPSTREAM RIGHT 1.
GENERAL SHEET NOTES
POWER.
POWER AND SEQUENCE WORK THAT MAY AFFECT THE DAM ELECTRICAL
PROPER DAM OPERATIONS. CONTRACTOR MUST PROVIDE TEMPORARY
DAM ELECTRICAL POWER MUST BE AVAILABLE AT ALL TIMES TO ALLOW 2.
FOR LOCATION OF EXISTING GALLERY.
EXISTING CABLE GALLERY IS NOT SHOWN. SEE REFERENCE DRAWINGS 1.
9 9
RIVERWALL
SMALL LOCK
SWITCHBOARD
EXISTING WP
FLOW
BOILER HOUSE
EXISTING DAM
A1
SCALE: 1"=100'-0"
SITE PLAN
100' 200'0
E-102
A1
E-103
A1
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
R A
C T /T .O
N O
P R
O J E
C T C
O D
E
M A
T O
C /I
D
IQ
C
O N
T R
A C
T N
O
A
C A
M P
B E
M
IN
L
O C
K E
L E
C T
R
IC
A L P
L A
N
E-102
T L E
E C
H
B P
A T
T S
C H
U
IW
L D
B
R A
D T
K E
ELECTRICAL
A N
S I
X
S O
L
IC
IT
A T
IO
N
L O
C K R
E H
A B
IL
IT
A T
IO
N
G R
U N
D Y C
O U
N T
Y
IL
D R
E S
D E
N I S
L A
N D L
O C
K A
N D D
A M
IL
L
IN
O
IS
R
IV
E R B
A S
IN
W E
K
R
/0
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
LAND WALL
UPPER LEFT
ILLINOIS WATERWAY
FLOW
DRESDEN ISLAND MAIN LOCK CHAMBER
LAND WALL
INTERMEDIATE WALL (I-WALL)
GUIDEWALL
UPSTREAM
LAND WALL
LOWER LEFT
INTERMEDIATE WALL
LOWER RIGHT
STATION BUILDING
CENTRAL CONTROL
13 12
3 10
INTERMEDIATE WALL
UPPER RIGHT
TERMINATION OF PERMANENT GAUGE WELL EQUIPMENT.
EXISTING, INSTALLATION OF TEMPORARY, REMOVAL OF TEMPORARY, AND
COORDINATE WITH GOVERNMENT REGARDING DISCONNECTION OF
INSTRUMENTATION CONDUCTORS ON GAUGE WELL EQUIPMENT.
AND REMOVE TEMPORARY GAUGE WELL EQUIPMENT, AND TERMINATE
THE GOVERNMENT WILL UNTERMINATE INSTRUMENTATION CABLE, PROVIDE 3.
ELECTRICAL CABLES, AND CONNECTIONS.
SEE ED-DRAWINGS AND REFRENCE DRAWINGS FOR EXISTING STRUCTURE, 2.
SEE GENERAL ELECTRICAL NOTES ON SHEET E-00011.
GENERAL SHEET NOTES
SHEET KEYNOTES
FOUR.
ELECTRICAL CABLE FOR EXISTING FLOATING MOORING BITS. TYPICAL OF
PROVIDE NEW EMBEDDED CONDUIT TO NEW CABLE TRENCH AND NEW 8.
ELECTRICAL CABLES. TYPICAL OF ONE.
PROVIDE EXISTING AIR COMPRESSOR WITH NEW RACEWAYS AND NEW
RECONNECT AND REUSE EXISTING 150 HP BUBBLER AIR COMPRESSOR. 7.
TYPICAL OF TWO.
TOW HAULAGE UNITS WITH NEW RACEWAYS AND NEW ELECTRICAL CABLES.
REINSTALL AND REUSE EXISTING TOW HAULAGE UNITS. PROVIDE EXISTING 6.
ANCHORAGES (2 PER MITER GATE LEAF).
LOCATION OF EXISTING AND NEW CONCRETE EMBEDDED MITER GATE 5.
TYPICAL OF FOUR.
NEW RACEWAYS AND NEW ELECTRICAL CABLES TO SLIDE VALVE EQUIPMENT.
CONTROLLERS. PROVIDE REUSE EXISTING SLIDE VALVE MACHINERY AND
VALVE MACHINERY, AND HPU WITH INTEGRAL CONTROLLER. REINSTALL TO
LOCATION OF EXISTING HYDRAULICS SLIDE VALVE CONCRETE RECESS, SLIDE 4.
LOCATION OF NEW MITER GATE CONCRETE RECESS AND MACHINERY. 3.
EQUIPMENT INSIDE NEW CONTROL STAND STRUCTURE. TYPICAL OF FOUR.
PROVIDE NEW CONTROL CONSOLE, MCC, AND OTHER ELECTRICAL 2.
ASSEMBLY COVER. TYPICAL OF FOUR.
THE NEW GFE STRUT ARM BUFFER BOX INSIDE THE NEW GFE LIMIT SWITCH
SWITCH ACTUATORS AND PROVIDE FOUR NEW LIMIT SWITCHES INSTALLED ON
BOX COVERS SAME AS EXISTING. SALVAGE AND RELOCATE THE EXISTING
PROVIDE NEW STRUT ARM LIMIT SWITCH ASSEMBLY IN LOCATION ON BUFFER 1.
SHEETS.
PROVIDE NEW RACEWAYS AND ELECTRICAL CABLES. SEE APPLICABLE DETAIL
EXISTING TRAFFIC LIGHT FIXTURES (RED, YELLOW, & GREEN) FOR REUSE.
MAINTAIN AND PROTECT EXISTING TRAFFIC SIGNAL LIGHT POLES AND 18.
ELECTRICAL CABLES. SEE APPLICABLE DETAIL SHEETS.
ADDITIONAL NEW RACEWAYS, EXTEND TO EXISTING, AND PROVIDE NEW
EXISTING DAM PATH LIGHT RACEWAYS FOR THEIR REUSE. PROVIDE
MAINTAIN AND PROTECT EXISTING LIGHT POLES FOR REUSE. INTERCEPT 17.
ELECTRICAL CABLES. SEE APPLICABLE DETAIL SHEETS.
ABUTMENT. REFEED WITH NEW RACEWAYS, EXISTING RACEWAYS, AND NEW
CENTER 4 (MCC4) TO EXISTING TO SAFETY SWITCH LOCATED AT DAM
PROVIDE NEW DAM FEEDER CABLE ROUTED FROM NEW MOTOR CONTROL 16.
GENERAL NOTE 3.
ELECTRICAL CABLES. PROVIDE ALL WORK FOR NEW POWER CABLE. ALSO SEE
EQUIPMENT EXCEPT CABLES AND RACEWAYS. PROVIDE NEW RACEWAYS AND
MAINTAIN AND PROTECT DOWNSTREAM POOL GAUGE JUNCTION BOX AND 15.
GENERAL NOTE 3.
ELECTRICAL CABLES. PROVIDE ALL WORK FOR NEW POWER CABLE. ALSO SEE
EQUIPMENT EXCEPT CABLES AND RACEWAYS. PROVIDE NEW RACEWAYS AND
BOX AND MAINTAIN AND PROTECT UPSTREAM POOL GAUGE JUNCTION 14.
FEEDER CONDUCTORS.
EXISTING ROUTE OF THE EXISTING 500KVA TRANSFORMER SECONDARY
CONDUCTORS ROUTE. TRACE, IDENTIFY, RECORD, AND REPORT THE
UNTERMINATED, BUT IT IS NOT KNOWN WHERE THE SECONDARY
BUT THE SECONDARY LOW VOLTAGE CONDUCTORS EXIST IN THE CABINET
PRIMARY WINDING. THE 500 KVA SECONDARY WINDINGS ARE DISCONNECTED,
DAISY CHAIN WHICH ROUTES TO THE 225 KVA SERVICE TRANSFORMER
TRANSFORMER. THE MEDIUM VOLTAGE CABLES PRIMARY CONNECTION IS A
LOCATION OF EXISTING UTILITY-OWNED 500 KVA, 480/277 VAC PAD-MOUNTED 13.
ELECTRICAL PAD-MOUNTED SERVICE TRANSFORMER.
LOCATION OF EXISTING UTILITY-OWNED 225 KVA, 480/277 VAC LOCK & DAM 12.
CABLES. TYPICAL OF TWO.NEW RACEWAYS AND NEW ELECTRICAL
REUSE. REFEED WITH TRAFFIC FIXTURES (RED, YELLOW, & GREEN) FOR
POLES AND MAINTAIN AND PROTECT EXISTING TRAFFIC SIGNAL LIGHT 11.
LOCK, ONE ON LOWER GUIDE WALL, AND ONE ON UPPER GUIDE WALL.
ELECTRICAL CABLES TO REFEED LIGHT POLES. TYPICAL OF FIVE ON THE MAIN
RACEWAYS AND AND FIXTURES FOR REUSE. PROVIDE WITH NEW
LIGHT POLES MAINTAIN AND PROTECT EXISTING 100 FEET TALL HIGH MAST 10.
CONTAIN OTHER UNKNOWN CABLES.
LOCATED IN ESPLANADE CONTAINS EXISTING HIGH MAST LIGHTS. MAY
APPROXIMATE LOCATION OF EXISTING FLUSH ELECTRICAL PULL BOXES 9.
SIGNAL LIGHT POLE
EXISTING TRAFFIC
A1
SCALE: 1"=30'-0"
SITE PLAN
30' 60'0
THIS SHEET)
NOT SHOWN ON
(OFF SHEET AND
POOL GAGE WELL
DOWNSTREAM
N
2E-110
A1
A1
E-107
E-109
A1
E-106
A1
E-111
A1
A1
E-105
E-108
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
R A
C T /T .O
N O
P R
O J E
C T C
O D
E
M A
T O
C /I
D
IQ
C
O N
T R
A C
T N
O
A
C A
M P
B E
P L
A N
A D
E S
E R
V
IC
E E
N T
R A
N C
E
P L
A N
E-103
T L E
E C
H
B P
A T
T S
C H
U
IW
L D
B
R A
D T
K E
ELECTRICAL
A N
S I
X
S O
L
IC
IT
A T
IO
N
L O
C K R
E H
A B
IL
IT
A T
IO
N
G R
U N
D Y C
O U
N T
Y
IL
D R
E S
D E
N I S
L A
N D L
O C
K A
N D D
A M
IL
L
IN
O
IS
R
IV
E R B
A S
IN
W E
K
R
/0
C K I S
L A
N D
IL
L
IN
O
IS
C K I S
L A
N D D
IS
T R
SCALE: 1/16"=1'-0"
PLAN - ESPLANADE & SERVICE ENTRANCE
CENTER
EXISTING VISITOR
TRANSFORMER
EXISTING UTILITY EQUIPMENT
SECURITY GATE AND
EXISTING EMPLOYEE
TRANSFORMER PAD
CONCRETE
TRANSFORMER AND
NEW SERVICE
CONDUCTORS
SERVICE ENTRANCE
DUCT BANK AND
NEW SERVICE ENTRY
1 2
17 18 19 20
SEE GENERAL ELECTRICAL NOTES ON SHEET G-004 AND G-0051.
GENERAL SHEET NOTES
SHEET KEYNOTES
VEHICLE SECURITY GATE ENTRANCE EQUIPMENT.
MAINTAIN AND PROTECT EXISTING VISITOR'S ENTRANCE 4.
COMMUNICATION PEDESTALS.
DETECTION LOOPS, CAMERA, PUSHBUTTON PADS, AND
VEHICLE SECURITY GATE, GATE OPERATOR, PAVEMENT
MAINTAIN AND PROTECT EXISTING EMPLOYEE'S ENTRANCE 3.
NEW CABLE SCHEDULE FOR SERVICE CABLE SIZES.
BUILDING. PROVIDE NEW SERVICE ENTRANCE CABLES. SEE
MANHOLE MHSWB LOCATED UNDER NEW SWITCHBOARD
DUCT BANK FROM EXISTING TRANFORMER PAD TO NEW
PROVIDE NEW 4" CONCRETE ENCASED DUCTS IN NEW 2X2 2.
(COMED) AND WITH THE GOVERNMENT.
CUTOVERS, AND OUTAGES WITH ELECTRIC POWER UTILITY
EQUIPMENT, TEMPORARY AND PERMANENT CONNECTIONS,
COORDINATE EXISTING AND NEW SERVICE TRANSFORMER
PROVIDE NEW PAD-MOUNTED SERVICE TRANSFORMER. 1.
GATE AND EQUIPMENT
VEHICLE SECURITY
EXISTING VISITOR
UPSTREAM GUIDEWALL
0 8' 32'16'
SECURITY FENCE
EXISTING INNER
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
A N
S I
D
S O
L
IC
IT
A
T
IO
N
L O
C K
R E
H A
B
IL
IT
A
T
IO
N
G R
U N
D Y
C O
U N
T Y
IL
D R
E S
D E
N I
S L
A N
D L
O C
K A
N D
D A
M
IL
L
IN
O
IS
R
IV
E
R B
A S
IN
/0
/2
R O
C K
I S
L A
N D
IL
L
IN
C K
I S
L A
N D
D
IS
T R
C A
M P
B E
U P
S T
R E
A M
L A
N D
W A
L L
P L
A N
E-104
T
L E
E C
H
B P
A T
T S
C H
U
IW
L D
B
R A
D T
K E
ELECTRICAL
W
E K
R
SCALE: 1/4"=1'-0"
PLAN - UPSTREAM LAND WALL
0 4' 8'2'
WALL
TO UPSTREAM GUIDE
LIGHT POLE
EXISTING HIGH MAST
NEW CABLE TRENCH
TOW HAULAGE UNIT
RELOCATED EXISTING
SHEET KEYNOTES
FROM NEW CABLE TRENCH.
EXISTING GRAVEL TO PROVIDE NEW CONCRETE-EMBEDDED CONDUITS
DEMOLISH EXISTING CONCRETE AS WELL AS EXCAVATE AND TRENCH 16.
FROM NEW CABLE TRENCH TO RELOCATED TOW HAULAGE EQUIPMENT.
PROVIDE NEW 2" AND 1" CONCRETE ENCASED PVC-COATED RGS CONDUITS 15.
ABOVE TOP GUARDRAIL ELEVATION TO ALLOW DOOR TO FULLY OPEN.
GUIDE WALL PULLBOX. INSTALL BOTTOM OF NEW ENCLOSURE LOCATED
JUNCTION BOX. CORE-OUT AND REUSE EXISTING CONDUIT HOLES INTO
ENCLOSURE WILL REPLACE EXISTING RACEWAY AND ELIMINATES EXISTING
BOX LOCATED ON THE UPSTREAM GUIDE WALL. NEW CONDUITS AND
ON FACE OF LOCK WALL FROM THIS NEW ENCLOSURE TO THE FIRST PULL
ROUTE FOUR(4) NEW 4" PVC-COATED RGS CONDUITS SURFACE INSTALLED
LOCATE BOTTOM OF ENCLOSURE ABOVE TOP OF LOCK WALL ELEVATION.
PANEL, HINGED 3-PT LATCH OR HALF-TURN DOOR THREE NEMA 4X DRAINS.
STEEL, 60"HIGH X 36" WIDE X 24" DEEP ELECTRICAL ENCLOSURE WITH BACK
END OF THE NEW CABLE TRENCH TO A NEW NEMA 4X TYPE 316 STAINLESS
NEW CABLE TRENCH. PROVIDE THE…