This document outlines a federal contract opportunity for lock rehabilitation work issued by the Department of the Army Corps of Engineers Engineering District Rock Island. The solicitation seeks bids for lock rehabilitation work at the Illinois River Basin Dresden Island Lock and Dam in Morris, Will County, Illinois. The base work includes installation of a government furnished miter gate, replacement of miter gate machinery, and electrical system replacement. An option is included for fairlead and checkpost replacement. Bids are due by the solicitation response date of W912EK22R0008. The contract will be awarded to rehabilitate the lock and support infrastructure at the specified location.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C O

N T

R A

C T /T .O

N O

P R

O J E

C T C

O D

E

M A

T O

C /I

D

IQ

C

O N

T R

A C

T N

O

A N

S I

D

S O

L

IC

IT

A T

IO

N

L O

C K R

E H

A B

IL

IT

A T

IO

N

G R

U N

D Y C

O U

N T

Y

IL

D R

E S

D E

N I S

L A

N D L

O C

K A

N D D

A M

IL

L

IN

O

IS

R

IV

E R B

A S

IN

/0

/2

R O

C K I S

L A

N D

IL

L

IN

O

IS

C K I S

L A

N D D

IS

T R

IC

T

C A

M P

B E

L

E

E

C T

R

IC

A L S

Y S

T E

M R

E P

L A

C E

M E

N T

C O

V E

R S

H E

E T

G-001

D

D

IL

L O

N

A

C A

M P

B E

B

IW

L D

B

R A

D T

K E

ELECTRICAL

W E

K

R

PLAN SET: ELECTRICAL SYSTEM REPLACEMENT

of Engineers

US Army Corps

LOCK REHABILITATION

GRUNDY COUNTY, IL

DRESDEN ISLAND LOCK AND DAM

ILLINOIS RIVER BASIN

ROCK ISLAND DISTRICT

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

A N

S I

D

S O

L

IC

IT

A

T

IO

N

L O

C K

R E

H A

B

IL

IT

A

T

IO

N

G R

U N

D Y

C O

U N

T Y

IL

D R

E S

D E

N I

S L

A N

D L

O C

K A

N D

D A

M

IL

L

IN

O

IS

R

IV

E

R B

A S

IN

/0

/2

R O

C K

I S

L A

N D

IL

L

IN

IS

C K

I S

L A

N D

D

IS

T R

C A

M P

B E

H

E E

T I

N D

E X

G-002

D

D

IL

L O

N

A

C A

M P

B E

IW

L D

B

R A

D T

K E

ELECTRICAL

W

E K

R

MECHANICAL SCHEDULE SWITCHBOARD BUILDING M-610

DETAIL - SWITCHBOARD BUILDING SUMP PUMPM-510

SECTION - DRAIN PIPE M-304

SECTION - DRAIN PIPE M-303

SECTION - DRAIN PIPE M-302

SECTION - DRAIN PIPE M-301

PLAN - SWITCHBOARD BUILDING MECHANICAL UNITSM-110

PLAN - DRAIN PIPE M-103

PLAN - DRAIN PIPE M-102

PLAN - DRAIN PIPE M-101

SWITCHBOARD BUILDING SECTIONS A-103

SWITCHBOARD BUILDING ELEVATIONS A-102

SWITCHBOARD BUILDING FLOOR PLAN A-101

DETAIL - MITER GATE AND SLIDE VALVE RECEPTACLES S-541

DETAIL - MITER GATE AND SLIDE VALVE RECEPTACLES ASSEMBLY S-540

DETAIL - WALL ARMOR AND TRENCH S-503

DETAIL - SWITCHBOARD BUILDING S-502

DETAIL - WALL ARMOR S-501

SECTION - EXISTING CROSSOVER DUCT BANK S-307

SECTION - SWITCHBOARD BUILDING S-306

SECTION - GALLERY AND UTILITY TRENCH S-305

SECTION - GALLERY AND UTILITY TRENCH S-304

SECTION - CROSSOVER DUCT BANK CROSS-SECTIONS S-303

SECTION - CROSSOVER DUCT BANK CROSS-SECTIONS S-302

SECTION - CROSSOVER DUCT BANK OVERALL S-301

ELEVATION - CROSSOVER DUCT BANK S-201

PLAN - I-WALL MANHOLE [Region4]S-105

PLAN - SWITCHBOARD BUILDING [Region4]S-104

PLAN - GALLERY AND UTILITY TRENCH S-103

PLAN - CROSSOVER DUCT BANK S-102

PLAN - OVERALL S-101

DETAILS - ELEMENTARY DIAGRAM INTERLOCK AND SHUNT TRIP CONTROLSE-708

DETAILS - ELEMENTARY DIAGRAM LOWER TRAFFIC SIGNAL CONTROLSE-707

DETAILS - ELEMENTARY DIAGRAM UPPER TRAFFIC SIGNAL AND AIR HORN CONTROLSE-706

DETAILS - ELEMENTARY DIAGRAM UPPER RIGHT CONTROLSE-705

DETAILS - ELEMENTARY DIAGRAM LOWER RIGHT CONTROLSE-704

DETAILS - ELEMENTARY DIAGRAM UPPER LEFT CONTROLSE-703

DETAILS - ELEMENTARY DIARAM LOWER LEFT CONTROLSE-702

DETAILS - CONTROL INTERLOCK FLOW CHARTS E-701

SCHEDULES - CABLES E-629

SCHEDULES - CABLES E-628

SCHEDULES - CABLES E-627

SCHEDULES - CABLES E-626

SCHEDULES - CABLES E-625

SCHEDULES - NEW PANELBOARDS E-622

SCHEDULES - NEW PANELBOARD E-621

SCHEDULES - CONTROL CONSOLES E-611

GROUNDING DIAGRAM E-608

MOTOR WIRING DIAGRAMS E-606

ONE LINE DIAGRAM E-601

DETAILS - MITER GATE AND SLIDE VALVE RECEPTACLES E-540

DETAILS - TRAFFIC CONTROL PANEL E-522

DETAILS - CONTROL POWER AND INTERLOCK CONTROL PANEL E-521

DETAILS - HIGH MAST LIGHTING CONTROLLER E-520

DETAILS - PANEL BOARD E-519

DETAILS - MAIN SWITCHBOARD "SB-1" E-518

DETAILS - JOYSTICK SELECTOR SWITCHES E-517

DETAILS - CONTROL CONSOLE SUBPANEL ELEVATIONSE-516

DETAILS - UPPER/LOWER RIGHT CONTROL CONSOLE E-513

DETAILS - UPPER/LOWER LEFT CONTROL CONSOLE E-512

DETAILS - NEW CONTROL CONSOLE E-511

DETAILS - INTERMEDIATE WALL RECESS PROXIMITY SWITCH AND MAGNETE-505

DETAILS - INTERMEDIATE WALL MITER PROXIMITY SWITCH AND MAGNETE-504

DETAILS - LAND WALL RECESS PROXIMITY SWITCH AND MAGNETE-503

DETAILS - LAND WALL MITER PROXIMITY SWITCH AND MAGNETE-502

DETAILS - MITER GATE LEAF ROTARY CAM LIMIT SWITCH INTERNAL PLANE-501

ELEVATION - NEW CROSSOVER DUCT BANK AND MANHOLES E-205

SWITCHBOARD BUILDING FLOOR PLAN E-150

PLAN - UPSTREAM MITER GATE AND SLIDE VALVE RECEPTACLESE-141

PLAN - DOWNSTREAM MITER GATE AND SLIDE VALVE RECEPTACLESE-140

PLAN - CENTRAL CONTROL BUILDING FIRST FLOOR AND BASEMENTE-110

PLAN - DOWNSTREAM INTERMEDIATE WALL E-109

PLAN - CENTER INTERMEDIATE WALL E-108

PLAN - UPSTREAM INTERMEDIATE WALL E-107

PLAN - DOWNSTREAM LANDWALL E-106

PLAN - CENTER LAND WALL E-105

PLAN - UPSTREAM LAND WALL E-104

PLAN - ESPLANADE & SERVICE ENTRANCE E-103

MAIN LOCK ELECTRICAL PLAN E-102

OVERALL ELECTRICAL SITE PLAN E-101

GENERAL NOTES G-005

GENERAL NOTES AND SUGGESTED SEQUENCE OF WORK G-004

LEGEND AND ABBREVIATIONS G-003

SHEET INDEX G-002

COVER SHEET ELECTRICAL SYSTEM REPLACEMENT G-001

SHEET TITLESHEET ID

SHEET INDEX

SECTION - GALLERY AND UTILITY TRENCH DEMOLITIONSD305

SECTION - GALLERY AND UTILITY TRENCH DEMOLITIONSD304

SECTION - CROSSOVER DUCT BANK CROSS-SECTIONS DEMOLITIONSD303

SECTION - CROSSOVER DUCT BANK CROSS-SECTIONS DEMOLITIONSD302

SECTION - CROSSOVER DUCT BANK OVERALL DEMOLITIONSD301

ELEVATIONS - CROSSOVER DUCT BANK DEMOLITION CROSSOVER DUCT BANKSD201

PLAN - UPSTREAM ELECTRICAL RECEPTACLES DEMOLITIONSD141

PLAN - DOWNSTREAM ELECTRICAL RECEPTACLES DEMOLITIONSD140

PLAN - GALLERY AND UTILITY TRENCH DEMOLITIONSD103

PLAN - CROSSOVER DUCTBANK DEMOLITIONSD102

PLAN - OVERALL DEMOLITIONSD101

EXISTING CABLE SCHEDULE DOWNSTREAM RIGHT DEMOLITIONED634

EXISTING CABLE SCHEDULE UPSTREAM RIGHT DEMOLITIONED633

EXISTING CABLE SCHEDULE DOWNSTREAM LEFT DEMOLITIONED632

EXISTING CABLE SCHEDULE UPSTREAM LEFT DEMOLITIONED631

EXISTING PANELBOARDS SCHEDULES DEMOLITION ED622

EXISTING PANELBOARDS SCHEDULES DEMOLITION ED621

EXISTING ONE LINE DIAGRAM DEMOLITION ED602

EXISTING ONE LINE DIAGRAM DEMOLITION ED601

CENTRAL CONTROL BUILDING PLAN DEMOLITION ED105

DOWNSTREAM PLAN DEMOLITION ED104

UPSTREAM PLAN DEMOLITION ED103

MAIN LOCK ELECTRICAL PLAN DEMOLITION ED102

OVERALL ELECTRICAL SITE PLAN DEMOLITION ED101

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

N T

R A

C T /T .O

N O

P R

O J E

C T C

O D

E

M A

T O

C /I

D

IQ

C

O N

T R

A C

T N

O

A N

S I

D

S O

L

IC

IT

A T

IO

N

L O

C K R

E H

A B

IL

IT

A T

IO

N

G R

U N

D Y C

O U

N T

Y

IL

D R

E S

D E

N I S

L A

N D L

O C

K A

N D D

A M

IL

L

IN

O

IS

R

IV

E R B

A S

IN

/0

/2

R O

C K I S

L A

N D

IL

L

IN

O

IS

C K I S

L A

N D D

IS

T R

C A

M P

B E

G E

N D A

N D A

B B

R E

V

IA

T

IO

N S

G-003

D

D

IL

L O

N

A

C A

M P

B E

IW

L D

B

R A

D T

K E

ELECTRICAL

W E

K

R

X

DISCONNECT SWITCH

CURRENT TRANSFORMER

POTENTIAL TRANSFORMER

SIZE AS INDICATED

MAGNETIC CIRCUIT BREAKER,

FIXED MOLDED-CASE THERMAL

WIRING CONNECTION

DISCONNECTING DEVICE PLUG

WITH RATINGS AS INDICATED

POWER TRANSFORMER

MOTOR, HP INDICATED

GENERATOR SET NO. 1

COMBINATION

DRAWOUT FUSE/CONTACTOR

TRANSFORMER

WYE TRANSFORMER

BREAKER,SIZE AS INDICATED

PLUG-IN MOLDED-CASE CIRCUIT

STARTER, AIZE AS INDICATED

MOTOR SHORT CIRCUIT PROTECTOR

PLUG-IN COMBINATION MOLDED CASE

THERMAL OVERLOAD DEVICE

IDENTIFICATION

CONDUIT AND CONDUCTOR

LENSE COLOR INDICATED

INDICATING LIGHT

PUSHBUTTON W/ MOMENTARY CONTACT

FLOW SENSOR

STARTER SELECTOR SWITCH

THREE POSITION MAINTAINED

LOCAL

OFF

REMOTE

UNIT 2UNIT 1

UNIT SELECTOR SWITCH

TWO POSITION MAINTAINED

BLUEBL

AMBERA

WHITEW

GREENG

REDR

SOLENOID

FIELD WIRING SHOWN ON SCHEMATIC

MOTOR CONTACTOR

VOLTMETER

AMMETER

VOLTMETER SWITCH

UTILITY METER

AMMETER SWITCH

RECEPTACLE CONNECTION

LOCK MACHINERY

400AF

GEN-1

H1

H2H3

Y3

Y2

Y1

20A

100A

CR-

CR-

R

CR-

CR-

CR-

HP

VM

AM

VS

AS

AO-AI-

GW

S

ABBREVIATIONSONE-LINE DIAGRAM & SCHEMATIC LEGEND

SITE LEGEND

DO-DI-

POWER RECEPTACLES)

MITER GATE, AND TOW HAULAGE UNIT

INDICATED (TYPICAL FOR SLIDE VALVES,

POWER RECEPTACLE WITH CALLOUT AS

480V NEMA 4 INTEGRALLY INTERLOCKED

480V RECEPTACLE

120V WEATHERPROOF GFCI RECEPTACLE

120V DUPLEX RECEPTACLE

(UNLESS NOTED OTHERWISE)

JUNCTION BOX / ELECTRICAL ENCLOSURE

CONCRETE EMBEDDED PVC-COATED RIGID STEEL CONDUIT

CONCEALED CONDUIT, DIRECT BURIED CONDUIT, OR

PLC DISCRETE INPUT/OUTPUT

PLC ANALOG INPUT/OUTPUT

DPMM DIGITAL POWER MULTI-METER

8/C

2"C

COMBINATION MOTOR STARTER

POWER PANEL

EXPOSED STEEL CONDUIT

LIGHTING SWITCH-SPDT

EXAMPLE FOR 8 CONDUCTORS

EXAMPLE FOR 2 INCH CONDUIT

CONTROL, GROUNDING & LIGHTING)

ELECTRICAL PLAN LEGEND (POWER,

OS

EMERGENCY LIGHTING FIXTURE

WALL MOUNT EXIT SIGN

CEILING MOUNT EXIT SIGN

OS WALL MOUNT OCCUPANCY SENSOR

(ARROW DETERMINES DIRECTION OF EGRESS)

CEILING MOUNT EXIT SIGN

(ARROW DETERMINES DIRECTION OF EGRESS)

WALL MOUNT SIGN EXIT

S3

WALL MOUNT EXTERIOR LIGHTING FIXTURE

CEILING MOUNT EXTERIOR LIGHTING FIXTURE

FUSE

FIXTURE

CEILING MOUNT EMERGENCY EXTERIOR LIGHTING

WALL MOUNT EMERGENCY EXTERIOR LIGHTING FIXTURE

DISCONNECT

G=GFCI AND/OR W=WEATHERPROOF)

120V DUPLEX RECEPTACLE (#=CIRCUIT ASSIGNMENT;

PLC DISCRETE OUTPUT, NORMALLY OPEN

PLC DISCRETE OUTPUT, NORMALLY CLOSED

500 KVA

3 PH, 60 HZ

13.2 KV

480/277V

NORMALLY OPEN

PLC INTERNAL LOGIC CONTACT

PRESSURE OR VACUUM SWITCH, NORMALLY CLOSED

OPEN

PRESSURE OR VACUUM SWITCH, NORMALLY NORMALLY

LIQUID LEVEL FLOAT SWITCH, NORMALLY CLOSED

LIQUID LEVEL FLOAT SWITCH, NORMALLY OPEN

CLOSED

PLC INTERNAL LOGIC CONTACT NORMALLY

CLOSED

TEMPERATURE SWITCH, NORMALLY

OPEN

TEMPERATURE SWITCH, NORMALLY

PDS

LIMIT SWITCH, NORMALLY OPEN, SEE

PDS

LIMIT SWITCH, NORMALLY CLOSED, SEE

SEE PDS

LIMIT SWITCH, NORMALLY OPEN,

THREE WAY SWITCH

PLC INTERNAL LOGIC RELAY

a DENOTES CONTROL CIRCUIT (IF APL)

CEILING MOUNT OCCUPANCY SENSORa

CONTROL CIRCUIT (IF APL)

A DENOTES FIXTURE LABEL, a DENOTES

LIGHTING FIXTURE

a

A

HOME RUN TO PANEL MDP, BREAKER 46MDP-46

AND TYPE AS INDICATED

SPECIAL RECEPTACLE, VOLTAGE

XFMR

V

UTV

UPS-X

UMG

ULW

UH-X

UCV

UCSP

TYP

TX

TVSS

TV

TRBL

TL-X

TH-X

THU

TEMP

TEL

SWBD

SV

SSI

SS

SPD

S/N

S

RGS

RECP

PV

PT-X

PS-X

PRGS

PNL

PLC

PL

PH

PDS

PB

OL

OH

ODP

MS

MH

MG

MCC

LWCSP

LW

LTV

LTS

LOR

TRANSFORMER

VOLTS

UPPER TAINTER VALVE

UNINTERRUPTABLE POWER SUPPLY NO. X

UPPER MITER GATE

UPPER LAND WALL

UNIT HEATER NO. X

UPPER CULVERT VALVE

UPPER CONTROL STAND PANEL

TYPICAL

TRANSFORMER

TRANSIENT VOLTAGE SURGE SUPPRESSION

TAINTER VALVE (OR CULVERT VALVE)

TROUBLE

TRAFFIC SIGNAL LIGHT NO. X

TRAFFIC HORN NO. X

TOW HAULAGE UNIT

TEMPERATURE

TELEPHONE

SWITCHBOARD

SOLENOID VALVE

ABSOLUTE ENCODER MODULE

SYNCHRONOUS SERIAL INTERFACE

USAGE DEPENDENT

SELECTOR SWITCH or STAINLESS STEEL, SURGE PROTECTION DEVICE

SOLID NEUTRAL

TOGGLE SWITCH

RIGID GALVANIZED STEEL (CONDUIT)

RECEPTACLE

PROPORTIONAL VALVE

PRESSURE TRANSDUCER NO. X

PRESSURE SWITCH NO. X

PVC COATED RIGID GALVANIZED STEEL CONDUIT

PANEL

PROGRAMMABLE LOGIC CONTROLLER

PILOT LIGHT

PHASE

POSITION DISPLACEMENT SENSOR

PUSHBUTTON

OVERLOAD

OVERHEAD

DISTRIBUTION PANEL

OFFICE/MAINTENANCE AREA

MOTOR STARTER

MANHOLE

MITER GATE

MOTOR CONTROL CENTER

LANDWALL CONTROL STATION (PLC) PANEL

LANDWALL

LOWER TAINTER VALVE

LIGHTS

LOCAL-OFF-REMOTE

LMG

LLW

LCSP

KW

KVA

KV

KCMIL

JB

IWPP

IWDP

IWCSP

IW

ICE-PIER

HZ

HYD

HP

HMI

H-O-A

DP1-X

GND

GFE

GEN-X

FX

FS-X

FO

FM-X

FLR

FCV

ETM

EF-X

DO

DM-X

DISTR

DI

DD

CV

CT

CSP-U

CSP-L

CS

COR

CKT

CCTV

CCS

C

BKR

BOD

ATS

AT

AO

AI

AF

A

LOWER MITER GATE

LOWER LAND WALL

LOWER CONTROL STAND SHELTER PANEL

KILOWATTS

KILOVOLT - AMPERES

KILOVOLTS

THOUSAND CIRCULAR MILS

JUNCTION BOX

INTERMEDIATE WALL (120/208) BACK POWER PANEL

INTERMEDIATE WALL (480) DISTRIBUTION PANEL

I-WALL CONTROL STATION (PLC) PANEL

INTERMEDIATE WALL (I-WALL)

HIGH-MAST LIGHTING PIER (OR TRANSFORMER PIER)

HERTZ

HYDRAULIC

HORSEPOWER

(PC OR HARDWIRED DEVICES)

HUMAN-MACHINE INTERFACE

HAND-OFF-AUTO SELECTOR SWITCH

CIRCUIT BREAKER PANEL NO. X

GROUND

GOVERNMENT FURNISHED EQUIPMENT

GENERATOR NO. X

LIGHT FIXTURE NO. X

FLOAT SWITCH NO. X

FIBER OPTIC

FLOW METER SENSOR NO. X

FLOOR

FLOW CONTROL VALVE

ELAPSED TIME METER

EXHAUST VENT FAN NO. X

DISCRETE OUTPUT

DAMPER MOTOR NO. X

DISTRIBUTION

DISCRETE INPUT

DIGITAL DISPLAY

CULVERT VALVE (OR TAINTER VALVE)

CURRENT TRANSFORMER

CONTROL SHELTER ELECTRICAL PANEL - UPPER

CONTROL SHELTER ELECTRICAL PANEL - LOWER

CONTROL SHELTER

CONTRACTING OFFICER'S REPRESENTATIVE

CIRCUIT

CLOSED CIRCUIT TV

CENTRAL CONTROL STATION

SEE PLAN LEGEND THIS SHEET

CONDUCTORS OR CONDUIT, USAGE DEPENDENT;

BREAKER

BASIS OF DESIGN

AUTOMATIC TRANSFER SWITCH

AMPERES - TRIP

ANALOG OUTPUT

ANALOG INPUT

AMPERES - FRAME

AMPERES

CCTV

TELEPHONE

GW

CO-AXIAL CABLE CONNECTOR

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

N T

R A

C T /T .O

N O

P R

O J E

C T C

O D

E

M A

T O

C /I

D

IQ

C

O N

T R

A C

T N

O

A N

S I

D

S O

L

IC

IT

A T

IO

N

L O

C K R

E H

A B

IL

IT

A T

IO

N

G R

U N

D Y C

O U

N T

Y

IL

D R

E S

D E

N I S

L A

N D L

O C

K A

N D D

A M

IL

L

IN

O

IS

R

IV

E R B

A S

IN

/0

/2

R O

C K I S

L A

N D

IL

L

IN

O

IS

C K I S

L A

N D D

IS

T R

C A

M P

B E

N

D S

U G

G E

S T

E D S

E Q

U E

N C

E O

F W

O R

K

G E

N E

R A

L N

O T

E S

G-004

D

D

IL

L O

N

A

C A

M P

B E

IW

L D

B

R A

D T

K E

ELECTRICAL

W E

K

R

GENERAL INSTALLATION NOTESGENERAL REMOVAL NOTESGENERAL SEQUENCE OF CONSTRUCTION

GENERAL CONSTRUCTION NOTES

FOLLOWING CONSTRUCTION

CONSTRUCTION POWER

CONTROL REQUIREMENTS.

SEE MECHANICAL SHEETS FOR ADDITIONAL HYDRAULIC PUMP AND HYDRAULIC SYSTEM 5.

CONTROLS ON DRAWINGS.

ENCLOSURE FOR EACH PUMP UNIT, INTEGRAL WITH THE DISCONNECT AND INDICATED

THE STARTERS FOR EACH OF THE FOUR NEW 65HP PUMP UNITS SHALL BE MOUNTED IN A NEMA 1 4.

APPLICABLE SPECIFICATIONS.

MAINTAIN NORMAL OPERATION OF THE LOCK EXCEPT AS ALLOWED BY THE SPECIFICATIONS. SEE 3.

COSTS INCLUDED FOR TEMPORARY CONSTRUCTION POWER AND OTHER UILITY WORK.

TEMPORARY POWER ALONG WITH AN ANTICIPATED TIMELINE. CONTRACTOR SHALL PAY ALL

SUBMIT SHOP DRAWINGS INCLUDING PLANS INDICATING LOCATION AND INSTALLATION OF

THIS SEQUENCE DOES NOT INCLUDE FURTHER CONSIDERATION OF CONSTRUCTION POWER.)

SPECIFICATIONS AND THIS SHEET FOR REQUIREMENTS CONCERNING CONSTRUCTION POWER.

INSTALL CONSTRUCTION POWER AND COORDINATE TEMPORARY UTILITIES AS REQUIRED. (SEE 2.

SHALL BE COORDINATED WITH ALL OTHER CONSTRUCTION.

AS COORDINATED WITH AND APPROVED BY THE CONTRACTING OFFICER. ELECTRICAL WORK

THE CONTRACTOR SHALL FOLLOW THE SEQUENCE OF CONSTRUCTION NOTED BELOW EXCEPT 1.

TO EXISTING STRUCTURES.

MATERIALS, AND PATCH AND PAINT LOCATIONS WHERE TEMPORARY EQUIPMENT WAS MOUNTED

REMOVE CONSTRUCTION FACILITIES, TEMPORARY POWER AND METERING EQUIPMENT, WASTE 1.

COR.

CONTRACTOR SHALL SUBMIT ALL TEMPORARY CONTROL AND POWER PLANS FOR APPROVAL BY 11.

SETTINGS AND RESULTS FOR APPROVAL.

COMPLETE ALL ELECTRICAL INSTALLATION, COMMISSIONING, AND SUBMIT COMMISSIONING 10.

NEW CONTROL STAND BOOTHS.

EXTENT POSSIBLE TO RUN TO NEW JB'S ON TOP OF ICE PIERS TO MAKE CONNECTIONS TO THE

REPLACE EXISTING TRAFFIC SIGNALS. EXISTING CONDUIT MAY BE UTILIZED TO THE GREATEST

INSTALL NEW LED-TYPE TRAFFIC LIGHTS AT BOTH ENDS OF THE LOCK INCLUDING ALL WIRING TO 9.

ALL PRODUCTS, ALL GATE AND VALVE MACHINERY, AND CONTROL STANDS.

INSTALL, ENERGIZE, AND TEST SWITCHBOARDS, INCLUDING PLC, CONTROLS, AND SETTINGS OF 8.

TEMPORARY TRANSFORMATION TO 120/208 VOLTS AS REQUIRED BY THE LOADS.

THREE PHASE, 480 VOLTS AND INCLUDE A BACKUP SOURCE (SUCH AS A GENERATOR). PROVIDE

CONSTRUCTION NEEDS. TEMPORARY POWER SOURCE MUST BE NOT LESS THAN 200 AMPERES,

PROVIDE TEMPORARY POWER AS REQUIRED TO MAINTAIN POWER AND LIGHTING FOR

REMOVE EXISTING SWITCHBOARD BUSSES AND DEVICES AS REQUIRED AND INSTALL NEW. 7.

CONNECTIONS.

INSTALL NEW ALL MITER GATE AND TAINTER VALVE POSITION SENSOR EQUIPMENT AND MAKE 6.

REMOVE ALL EXISTING CONDUCTORS AS INDICATED. INSTALL ALL NEW CONDUCTORS.5.

NOT USED4.

PHASES.

INSTALLATION AND TERMINATION SHALL BE COMPLETED DURING INDICATED CONSTRUCTION

THE MACHINERY OUT TO NEW CYLINDER AND ACTUATOR LOCATIONS. FINAL CONDUCTOR

PRESSURE AND FLOW RATE SENSORS. INSTALL ALL ASSOCIATED ELECTRICAL CONDUIT FROM

SOLENOIDS, VARIABLE FLOW PROPORTIONAL VALVES, MANIFOLDS, VARIABLE RELIEF VALVES,

UNITS INCLUDING, BUT NOT LIMITED TO ELECTRICALLY ACTUATED DIRECTIONAL VALVE

COORDINATE WITH MECHANICAL CONTRACTOR FOR INSTALLATION OF NEW HYDRAULIC POWER 3.

ARE TO REMAIN IN SERVICE THROUGHOUT EACH CONSTRUCTION PHASE.

CONTRACTOR SHALL TAKE CARE TO NOTE AND MAINTAIN THE CABLES AND EQUIPMENT THAT 2.

COMPLETE AND ALL O & M MANUALS ARE TURNED OVER.

EQUIPMENT IN THE EVENT OF PROBLEMS OR FAILURES UNTIL TRAINING OF LOCK PERSONNEL IS

KEEP THE CONTRACTING OFFICER INFORMED OF THE POINT OF CONTACT FOR ALL NEW 1.

PERMANENT EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONFIGURATION AND CONDITION.

CONTRACT. ALL CONSTRUCTION POWER FACILITIES SHALL BE REMOVED AND REMAINING

REQUIREMENTS SET FORTH IN THE SPECIFICATIONS THROUGH THE COMPLETION OF THE

POWER. CONSTRUCTION POWER SERVICE EQUIPMENT SHALL MEET THE QUALITY AND SAFETY

THE CONTRACTOR SHALL FURNISH AND INSTALL ALL COMPONENTS FOR CONSTRUCTION 2.

DURING NAVIGATION UNTIL THE TIME THAT THE NEW LOCK EQUIPMENT IS OPERATIONAL.

COORDINATION, SEPARATE METERING, TEMPORARY POWER, AND STANDBY LOCK POWER

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UTILITY CONSTRUCTION POWER, INCLUDING 1.

GEN-SET.

AVAILABLE, SO THAT THE ACTUATORS CAN OPERATE THE LOUVERS PRIOR TO STARTING THE

OPERATE ON A POWER SOURCE AVAILABLE (LIKE 12VDC) WHEN THE UTILITY POWER IS NOT

MOTORIZED LOUVER OPERATORS IN BOTH STAND-BY GENERATOR-SET ENCLOSURES SHALL 8.

FITTINGS TO SEAL OUT SILT AND WATER TO GREATEST EXTENT POSSIBLE.

FLOODING SHALL BE NEMA TYPE 4X, WITH COMPRESSION SEALING FITTINGS AND CGB TYPE

ALL JUNCTION BOXES AND ELECTRICAL ENCLOSURES INSTALLED IN AREAS SUBJECT TO 7.

CONNECTING RIGID CONDUIT.

SHALL USE STAINLESS STEEL BRAIDED HYDRAULIC HOSE WITH CUSTOM ENDS TO MATE UP WITH

POSITION SENSORS, PROXIMITY SWITCHES, ENCODERS, AND CONTROLS TO THE JUNCTION BOX

ALL FLEXIBLE CONNECTIONS ON THE HYDRAULIC CYLINDERS AND POWER UNITS FROM 6.

INSTALLATION PLANS TO THE GREATEST EXTENT POSSIBLE BEFORE NAVIGATION CLOSURE.

CONTRACTOR SHALL PREPARE AND PRE-ASSEMBLE ALL EQUIPMENT, TOOLING, AND 5.

CONTRACTOR SHALL INSTALL A COMPLETE AND OPERATIONAL SYSTEM AS DESCRIBED HEREIN.

NOT EVERY CONTROL CABLE, CONDUIT, JUNCTION BOX, FITTING, OR MOUNTING IS SHOWN. 4.

CLEANED AS INDICATED IN THE SPECIFICATIONS.

ALL EMBEDDED CONDUITS AND MANHOLES INDICATED FOR RE-USE SHALL BE INSPECTED AND 3.

CABLE SPLICING KITS.

OR AS MANUFACTURED BY 3M, SCOTCHCAST 78-R SERIES RE-ENTERABLE SIGNAL AND CONTROL

LOCATIONS AND SEALED WATER TIGHT USING RESIN KITS AND HEAT SHRINK TUBING, SIMILAR TO

OR AS OTHERWISE APPROVED. SPLICES, WHERE APPROVED, SHALL BE IN ACCESSIBLE

ALL CABLE INSTALLATIONS SHALL BE CONTINUOUS RUNS WITHOUT SPLICES, EXCEPT AS NOTED 2.

REPLACED BY THE CONTRACTOR.

EQUIPMENT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AND THE EQUIPMENT SHALL BE

STEEL DRILL BITS ON STAINLESS STEEL EQUIPMENT). ANY DAMAGE INCURRED TO ELECTRICAL

CUT, DRILLED, FILED, OR BRUSHED WITH CARBON STEEL TOOLS (E.G. DO NOT USE CARBON

COMPATIBLE FOR USE WITH STAINLESS STEEL. STAINLESS STEEL EQUIPMENT MUST NOT BE

ELECTRICAL EQUIPMENT MUST ONLY BE CUT, DRILLED, FILED, OR BRUSHED WITH EQUIPMENT

(SUCH AS OVERSPRAY FROM NEARBY PAINTING OR GRINDING). ALSO, STAINLESS STEEL

CONTRACTOR MUST PROTECT ALL ELECTRICAL EQUIPMENT FROM ADJACENT WORK ACTIVITIES 1.

CONDITIONS.

REFERENCE DRAWINGS ARE RECORD DRAWING ONLY AND MAY NOT REPRESENT "AS BUILT" 11.

SO DIRECTED BY THE CONTRACTING OFFICER.

CONTRACTOR SHALL REMOVE DEMOLITION ITEMS FROM THE SITE WEEKLY OR MORE OFTEN IF 10.

AND FIELD CONDITIONS.

COORDINATE ALL WORK WITH REFERENCE DRAWINGS, SPECIFICATIONS, OTHER CONTRACTORS 9.

NOT USED.8.

CONTRACT REQUIREMENTS.

IN CABLE TRAY. SUCH WIRING SHALL BE EXECUTED IN A WORKMAN LIKE MANNER AND MEET ALL

REQUIRED TO MAINTAIN POWER TO THE REMAINING EQUIPMENT. NO SPLICES WILL BE ALLOWED

BOX TO RECONNECT CIRCUITS WHICH REMAIN IN OPERATION. EXTEND CONDUIT AND WIRING AS

EQUIPMENT REMOVAL IN CERTAIN LOCATIONS MAY REQUIRE THE INSTALLATION OF A JUNCTION 7.

INSTALLING NEW ITEMS.

THE OTHER CONTRACTORS AT THE JOB SITE BEFORE REMOVING EXISTING ELECTRICAL AND

CONTRACTOR SHALL COORDINATE ALL REMOVAL WORK WITH THE CONTRACTING OFFICER AND 6.

SHALL BE REMOVED WITH THE CONDUIT.

EXPOSED AND NOT BEING REUSED, ALL ASSOCIATED CLAMPS, SUPPORTS, HANGERS, ETC.,

HAND REMOVABLE PLUG AFTER REMOVAL OF THE CONDUCTORS. WHERE CONDUIT IS RUN

ALL CONDUIT PENETRATING CONCRETE AND IS NOT BEING REUSED SHALL BE PLUGGED WITH 5.

SERVING THE DEVICE EXCEPT WHERE OTHERWISE NOTED.

ASSOCIATED CONDUIT AND WIRE BACK TO THE PANELBOARD OR FEEDER JUNCTION BOX

GENERATOR SETS ETC., ARE INDICATED AS BEING REMOVED, IT SHALL ALSO INCLUDE ALL

UNLESS OTHERWISE NOTED, WHERE LIGHTS, SWITCHES, RECEPTACLES, TRANSFER SWITCHES, 4.

THE CONTRACTING OFFICER.

TURNING OFF POWER TO CIRCUITS, FEEDERS, PANELS, ETC. COORDINATE ALL OUTAGES WITH

THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CONTRACTING OFFICER BEFORE 3.

REMOVED FROM THE SITE AND DISPOSED OF BY THE ELECTRICAL CONTRACTOR.

NOTED AS RELOCATED, REUSED OR DELIVERED TO THE CONTRACTING OFFICER, SHALL BE

ELECTRICAL ITEMS (I.E., RECEPTACLES, JUNCTION BOXES, SWITCHES, ETC.) REMOVED AND NOT 2.

DO NOT INDICATE EVERY BOX, CONDUIT OR WIRE THAT MUST BE REMOVED.

REMOVED. THE DRAWINGS ARE INTENDED TO INDICATE THE SCOPE OF WORK REQUIRED AND

THE ELECTRICAL DEMOLITION DRAWINGS INDICATE EXISTING ELECTRICAL ITEMS TO BE 1.

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

N T

R A

C T /T .O

N O

P R

O J E

C T C

O D

E

M A

T O

C /I

D

IQ

C

O N

T R

A C

T N

O

A N

S I

D

S O

L

IC

IT

A T

IO

N

L O

C K R

E H

A B

IL

IT

A T

IO

N

G R

U N

D Y C

O U

N T

Y

IL

D R

E S

D E

N I S

L A

N D L

O C

K A

N D D

A M

IL

L

IN

O

IS

R

IV

E R B

A S

IN

/0

/2

R O

C K I S

L A

N D

IL

L

IN

O

IS

C K I S

L A

N D D

IS

T R

C A

M P

B E

G

N E

R A

L N

O T

E S

G-005

D

D

IL

L O

N

A

C A

M P

B E

IW

L D

B

R A

D T

K E

ELECTRICAL

W E

K

R

GENERAL ELECTRICAL DEMOLITION NOTES

ABANDON THE RESPECTIVE BOLTS IN-PLACE.

REUSED SHALL BE CUT OFF AND GROUND OFF FLUSH WITH ADJACENT CONCRETE SURFACE AND

UNLESS NOTED OTHERWISE DEMOLISH ABANDONED AND ANCHOR BOLTS THAT ARE NOT TO BE 12.

RACEWAY IN-PLACE.

CONCRETE SURFACE, PATCHED WITH NON-SHRINK GROUT TO SEAL CONDUIT, AND ABANDON THE

EMEDDED RACEWAY THAT IS NOT TO BE REUSED SHALL BE CUT-OFF FLUSH WITH ADJACENT

UNLESS NOTED OTHERWISE DEMOLISH ALL EXPOSED ELECTRICAL RACEWAYS WHERE POSSIBLE. 11.

SWITCHBOARDS.

ELECTRICAL CABLES, EXPOSED RACEWAYS, ASSOCIATED MAIN LOCK ELECTRICAL EQUIPMENT, AND UNLESS OTHERWISE NOTED, DEMOLISH ALL EXISTING LOCK POWER, CONTROL, AND LIGHTING 10.

REMOVED AND MAINTAINED IN GOOD CONDITION.

EQUIPMENT THAT IS REQUIRED TO BE SALVAGED AND/OR REINSTALLED SHALL BE CAREFULLY 9.

FROM THE SITE WEEKLY OR MORE OFTEN IF SO DIRECTED BY THE CONTRACTING OFFICER.

SHALL BE PROERLY DISPOSED OF BY THE CONTRACTOR. REMOVE DEMOLISHED ITEMS AND REFUSE ALL ELECTRICAL EQUIPMENT REMOVED AND DEMOLISHED THAT IS NOT REQUIRED TO BE SALVAGED 8.

TO MAINTAIN POWER TO REMAINING EQUIPMENT.

TO RECONNECT CIRCUITS THAT REMAIN IN OPERATION. EXTEND CONDUIT AND WIRING AS REQUIRED EQUIPMENT REMOVAL IN CERTAIN LOCATIONS MAY REQUIRE THE INSTALLATION OF A JUNCTION BOX 7.

REMOVED.

REMOVED, UNLESS OTHERWISE INDICATED. REMOVE HANGERS AND STRAPS WHEN CONDUIT IS

BACK TO THE PANELBOARD OR FEEDER JUNCTION BOX SERVING THE DEVICE SHALL ALSO BE

WHERE ELECTRICAL EQUIPMENT IS PERMAENTLY REMOVED, ALL ASSOCIATED CONDUIT AND WIRE 6.

OR WIRE, THAT MUST BE REMOVED. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS.

DRAWINGS INDICATE THE SCOPE OF WORK REQUIRED AND DO NOT INDICATE EVERY BOX, C0NDUIT, THE ELECTRICAL DEMOLITION DRAWINGS INDICATE EXISTING ELECTRICAL ITEMS TO BE REMOVED. 5.

ABANDONED.

SEAL THE ENDS OF ALL EXISTING CROSSOVER DUCT BANK DUCTS TO PREPARE THEM TO BE

CONSTRUCTION WORK PERMITS AS APPROPRIATE WITH RESPECT TO THE STAGE OF WORK. PLUG TO

DEMOLISH ALL EXISTING CABLES FROM OUT OF THE EXISTING CROSSOVER DUCT BANK AS 4.

PRIOR TO DE-ENERGIZING AND REMOVING THE PERMANENT DAM FEEDER CABLE.

DE-ENERGIZED. THE TEMPORARY POWER SYSTEM MUST BE INSTALLED, INSPECTED, AND TESTED WHENEVER THE NORMAL UTILITY POWER (A.K.A. PERMANENT DAM POWER) IS DISCONNECTED OR

CONTRACTOR MUST PROVIDE TEMPORARY MAIN POWER AND TEMPORARY BACKUP POWER

POWER AND STANDBY BACKUP POWER TO THE DAM AT ALL TIMES DURING CONSTRUCTION.

CABLE AND REPLACEMENT WITH A NEW DAM POWER FEEDER CABLE. CONTRACTOR MUST PROVIDE

THE PHASE OF CONSTRUCTION. CONTRACT REQUIRES DEMOLITION OF THE DAM POWER FEEDER

DEMOLITION OF LOCK ELECTRICAL EQUIPMENT MAY BE LIMITED TO SPECIFIC AREAS DEPENDING ON 3.

REMOVING EXISTING ELECTRICAL EQUIPMENT.

CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER CONTRACTORS AT THE JOB SITE BEFORE 2.

OTHERWISE BY THE GOVERNMENT (COR).

LESS THAN 14 DAYS PRIOR TO THE PLANNED OUTAGE UNLESS COORDINATED AND APPROVED

THE GOVERNMENT CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND RECEIVE APPROVAL NOT CONTRACTOR SHALL COORDINATE AND REQUEST IN WRITING ALL POWER SYSTEM OUTAGES WITH 1.

MONOLITH JOINT.

EXPANSION/CONTRACTION/DEFLECTION CONDUIT COUPLING AT EACH LOCK WALL CONCRETE

OVER EACH EMBEDDED CONDUIT. PROVIDE EMBEDDED NEOPRENE

PROPERLY SECURE CONDUITS IN TRENCHES AND PROVIDE NOT LESS THAN 4-INCH CONCRETE COVER

TO ENSURE NO INTERFERENCES. SAWCUT AND DEMOLISH EXISTING CONCRETE TO INSTALL AND

NEW CONCRETE EMBEDDED CONDUITS: PRELIMINARY LAYOUT ROUTE OF NEW EMBEDDED CONDUITS 56.

TEMPORARY EQUIPMENT WAS MOUNTED TO EXISTING STRUCTURES.

PREPARATION OF PROJECT CLOSE OUT. PATCH AND PAINT IF NECESSARY TO REPAIR LOCATIONS WHERE

MATERIALS UPON CHANGEOVER TO NEW PERMANT EQUIPMENT NEAR END OF CONSTRUCTION IN

REMOVE CONSTRUCTION FACILITIES, TEMPORARY POWER AND METERING EQUIPMENT, AND WASTE 55.

EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONFIGURATION AND CONDITION.

POWER FACILITIES SHALL BE REMOVED WHEN ITS USE HAS ENDED AND REMAINING PERMANENT

SET FORTH IN THE SPECIFICATIONS THROUGH THE COMPLETION OF THE CONTRACT. ALL CONSTRUCTION CONSTRUCTION POWER SERVICE EQUIPMENT SHALL MEET THE QUALITY AND SAFETY REQUIREMENTS 54.

SPECIFICATIONS SECTION 00 73 05.

NAVIGATION UNTIL THE TIME THAT THE NEW LOCK EQUIPMENT IS OPERATIONAL. REFER TO

COORDINATION, SEPARATE METERING, TEMPORARY POWER, AND STANDBY LOCK POWER DURING

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UTILITY CONSTRUCTION POWER, INCLUDING 53.

EQUIPMENT SHALL BE REPLACED BY THE CONTRACTOR.

ELECTRICAL EQUIPMENT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AND THE

CARBON STEEL DRILL BITS ON STAINLESS STEEL EQUIPMENT). ANY DAMAGE INCURRED TO

MUST NOT BE CUT, DRILLED, FILED, OR BRUSHED WITH CARBON STEEL TOOLS (E.G. DO NOT USE

WITH EQUIPMENT COMPATIBLE FOR USE WITH STAINLESS STEEL. STAINLESS STEEL EQUIPMENT

STAINLESS STEEL ELECTRICAL EQUIPMENT MUST ONLY BE CUT, DRILLED, FILED, OR BRUSHED

(SUCH AS OVERSPRAY FROM NEARBY PAINTING, GRINDING, CUTTING, AND WELDING). ALSO,

CONTRACTOR MUST PROTECT ALL ELECTRICAL EQUIPMENT FROM ADJACENT WORK ACTIVITIES 52.

CIRCUITS AND CABLES PRIOR TO REMOVING ANY EQUIPMENT.

CONDITIONS. CONTRACTOR MUST VERIFY, IDENTIFY, AND LABEL ALL EXISTING ELECTRICAL

REFERENCE DRAWINGS ARE RECORD DRAWINGS ONLY AND MAY NOT REPRESENT "AS BUILT" 51.

WSR.

MATING PLUGS. BASIS OF DESIGN IS APPLETON POWERTITE OR CROUSE-HIND ARKTITE TYPE

BE THE SAME, TYPE WSR, INTERCHANGEABLE 4 POLE, 4 WIRE, GROUNDED TYPE PROVIDED WITH

NEW 480 VOLTS, 3 PHASE INTERLOCKED RECEPTACLES OF THE SAME AMPERAGE RATING MUST 50.

LOCATIONS.

NOTED OR AS OTHERWISE APPROVED. SPLICES, WHERE APPROVED, SHALL BE IN ACCESSIBLE

ALL ELECTRICAL CABLES MUST BE INSTALLED CONTINUOUS RUNS WITHOUT SPLICES, EXCEPT AS 49.

ELECTRICAL CABLE SPLICES ARE NOT ALLOWED IN THE CABLE TRENCHES.48.

THE END OF THIS PROJECT.

ELECTRICAL POWER, LIGHTING, CONTROL, COMMUNICATIONS, AND INSTRUMENTS SYSTEMS BY

CONDUCTORS, LABOR, ETC TO PROVIDE A COMPLETE AND FUNCTIONAL NAVIGATION LOCK

CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL EQUIPMENT, RACEWAY, CABLES, 47.

BONDED-SHIELDED TYPE OR TYPE METAL CLAD(MC) OR COMPOSITE SHIELDED TYPE.

MULTI-CONDUCTOR CONTINUOUS RUNS, UNLESS OTHERWISE NOTED. CABLES SHALL BE EITHER

NEW ELECTRICAL CABLES SHALL BE 600 VOLTS, 90 DEGREE CELCIUIS, COPPER, TYPE XHHW 46.

ACTIVITIES.

ELECTRIC POWER FOR ALL CONSTRUCTION ACTIVITIES, INCLUDING GOVERNMENT DEWATERING

INSTALLED, ENERGIZED, TESTED, AND APPROVED. COORDINATE, PROVIDE, AND MAINTAIN

SERVICE TRANSFORMER UNTIL NEW UTILITY POWER AND PERMANENT LOCK POWER IS

PARALLEL POWER FEEDER CONDUCTORS AND RACEWAY FROM UTILITY PAD-MOUNT 225KVA

LOCK CLOSURE CONSTRUCTION TIME PERIOD. MAINTAIN AND PROTECT EXISTING LANDWALL

KEEP THE CENTRAL CONTROL STATION BUILIDING (CCS) AND DAM OPERATIONAL DURING THE

MAINTAIN EXISTING POWER SERVICE AS REQUIRED TO KEEP LOCK POWER OPERATIONAL AND TO 45.

BUILDING.

INSTALLATION TO PROVIDE A NEW, LARGER SERVICE ENTRANCE TO THE NEW SWITCHBOARD

INCURRED BY THE ELECTRIC POWER UTILITY FOR COORIDINATION, PRODUCTS, MATERIALS, AND

INCREASED LOCK & DAM SERVICE TRANSFORMER SIZE. CONTRACTOR SHALL PAY ALL COSTS

CONTRACTOR SHALL COORDINATE WITH ELECTRIC POWER UTILITY (COMM-ED) TO PROVIDE NEW 44.

TYPE SOOW CABLE.

EACH MITER GATE LEAF. THE MITER GATE “RECESS” PROXIMITY SENSOR CABLE SHALL ALSO BE

SHALL BE SOOW CABLE TO WITHSTAND THE REPEATED FLEXING AT THE QUOIN END OF THE

"MITER” PROXIMITY SENSOR CABLES AND MITER GATE STRUT ARM TORQUE SWITCHES CABLES

ELECTRICAL CABLES SHALL BE CONTINUOUS UNLESS OTHERWISE NOTED. THE MITER GATE 43.

AND CONTRACTION OF CONDUITS.

COUPLINGS AT EVERY CONCRETE MONOLITH JOINT INSTALLED TO ALLOW PROPER EXPANSION

80, SIZED AS INDICATED ON DRAWINGS. PROVIDE EXPANSION/CONTRACTION CONDUIT

ALL RIGID ELECTRICAL CONDUITS INSTALLED IN TRENCHES SHALL BE UV-RATED PVC SCHEDULE 42.

ADJUST EQUIPMENT TO FINAL CALIBRATED SETTINGS REPORTED BY COORDINATION STUDY.

MODELED USING FINAL ACTUAL INSTALLED EQUIPMENT AND THEIR FINAL CALIBRATED SETTINGS.

OUTDOORS. PROVIDE LOAD STUDY, ARC FLASH HAZARD ANALYSIS, AND COORDINATION STUDY

ARC FLASH HAZARD ADHESIVE LABELS FOR ALL APPLICABLE EQUIPMENT INDOORS AND

CONTRACTOR SHALL PROVIDE PROPERLY-APPLIED PERMANENT WEATHERPROOF UV-RESISTANT 41.

EXACT LOCATIONS OF MECHANICAL EQUIPMENT.

REFER TO MECHANICAL DRAWINGS AND COORDINATE WITH MECHANICAL CONTRACTORS FOR 40.

DESIGNATED FOR RE-USE OR TO BE RELOCATED.

APPROPRIATE CARE SHALL BE TAKEN NOT TO DAMAGE EQUIPMENT, DEVICES, AND WIRING THAT IS 39.

GROUND CONDUCTORS ARE NOT CONSIDERED CURRENT CARRYING.

CARRYING CONDUCTORS IN ONE CONDUIT. NEUTRALS AND HOTS ARE CURRENT CARRYING,

EXCEPT FOR NIPPLES SHORTER THAN 24 INCHES , DO NOT RUN MORE THAN 9 CURRENT 38.

AND BRANCH CIRCUIT SHALL CONTAIN A GREEN INSULATED GROUND CONDUCTOR.

#12 AWG, AND MINIMUM CONDUIT SIZE SHALL BE 3/4" UNLESS OTHERWISE NOTED. EACH FEEDER

AWG AND SMALLER, AND STRANDED FOR #8 AND LARGER. MINIMUM CONDUCTOR SIZE SHALL BE

WIRING FOR POWER AND BRANCH CIRCUITS SHALL BE COPPER, TYPE XHHW. USE SOLID FOR # 10 37.

COMPLETE.

EQUIPMENT SHALL BE CAREFUILY REMOVED, PROTECTED, AND REINSTALLED WHEN WORK IS

WHERE EXISTING EQUIPMENT IS IN THE WAY OF WORK PEREORMED UNDER THIS CONTRACT, THE 36.

20A MINIMUM, AND HEAVY DUTY RATED.

METALLIC, GASKETED IN USE COVERS. NEW LIGHT SWITCHES AND RECEPTACLES SHALL BE 120V, OF BUILDING OR IN RESTROOMS. EXTERIOR BUILDING RECEPTACLES SHALL INCLUDE HEAVY DUTY

PERFORMED UNDER THIS CONTRACT. INSTALL GFCI TYPE WHERE LOCATED AROUND EXTERIOR

REPLACE LIGHT SWITCHES AND CONVENIENCE RECEPTACLES IN AREAS WHERE WORK IS TO BE 35.

NUMBER OF POLES, WIRE, AND CONDUIT SIZED.

AS-BUILT DRAWINGS. PROVIDE INFORMATION OF DISCONNECTS INCLUDING AMPERE RATING,

AS-BUILT DRAWINGS: CONTRACTOR SHALL INCLUDE LOCATIONS OF ALL EQUIPMENT ON REDLINE 34.

ALL LIGHT FIXURES SHALL BE COMPLETE WITH LAMPS.33.

ALL CONDUCTORS SHALL BE INSTALLED IN RACEWAY, EXCEPT WHERE NOTED OTHERWISE. 32.

GENERAL ELECTRICAL NOTES

SEPARATE CONDUITS.

KEEP LOW VOLTAGE WIRING ( 30 VOLTS AND LESS), 120 VOLT WIRING, AND 480 VOLT WIRING IN 31.

ROUTING.

GOVERNMENT SHALL HAVE FINAL APPROVAL ON ALL EQUIPMENT, LOCATIONS, AND CONDUIT 30.

BREAK VISIBLE BLADES AND PROVIDE NEMA 4X DRAIN.

DISCONNECT SAFETY SWITCHES SHALL BE NEMA 4X HEAVY DUTY TYPE, WITH QUICK-MAKE, QUICK-29.

POWDER-ACTUATED ANCHORS ARE NOT PERMITTED.28.

PROVIDE NEMA 4X DRAINS IN ALL NEMA 4 AND NEMA 4X ELECTRICAL ENCLOSURES. 27.

TERMINATED IN NEW CABLE TRENCH UNLESS NOTED OTHERWISE.

PROVIDE INSULATED THROAT GROUNDING TYPE CONDUIT BUSHINGS FOR ALL CONDUITS 26.

ELECTICAL ENCLOSURES.

PROVIDE GROUNDING TYPE INSULATED-THROAT HUBS TO TERMINATE CONDUITS AT ALL 25.

REQUIREMENT. USE NON-FERROUS SCREWS TO ATTACH NAMEPLATES.

MAXIMUM FUSE SIZE (IF APPLICABLE LABELING SWITCH AS S-A, S-B ETC.,DOES NOT SATISFY THIS

ELECTRICAL EQUIPMENT BY NAME AND FUNCTION INCLUDING OPERATING VOLTAGE, AND

LETTER TO IDENTIFY ALL DISCONECT SWITCHES, STARTERS, AND OTHER MAJOR PIECES OF

WHITE LAMINATE NAMEPLATES WITH BLACK CORE SHALL BE ENGRAVED WITH 3/16 INCH HIGH 24.

MATCH THE ADJACENT SURFACES.

UNLESS OTHERWISE NOTED, CONDUIT EXPOSED TO VIEW IN OFFICE AREAS SHALL BE PAINTED TO 23.

SUSPENDED CEILING SUPPORTS.

WALLS. CONDUIT SHALL NOT BE SUPPORTED BY OTHER CONDUIT, PIPING, HVAC DUCTWORK, OR

EACH BOX AND FITTING. USE STRAP TYPE CONDUIT SUPPORTS FOR EXPOSED CONDUITS ON

PROVIDE SUPPORT AT EACH BOX. PROVIDE AN ADDITIONAL CONDUIT SUPPORT WITHIN 3 FEET OF 22.

PENTRATIONS AS CLOSE TO WALL AS POSSIBLE.

ANNULAR SPACE AROUND CONDUIT SHALL BE SEALED WITH NON-SHRINK GROUT. KEEP FLOOR

WHEN APPLICABLE OPENINGS IN EXISTING WALLS AND FLOORS SHALL BE CORE DRILLED. 21.

SOURCES SUCH AS FLUES, HOT WATER PIPE, ETC.

BETWEEN CONDUIT AND PIPING. MAINTAN 12 INCH CLEARANCE BETWEEN CONDUIT AND HEAT

AND PERPENDICULAR TO WALLS AND ADJACENT PIPING, MAINTAIN MINIMUM 6 INCH CLEARANCE

CONDUIT SHALL BE INSTALLED ABOVE ACCESSIBLE CEILINGS WHERE POSSIBLE AND PARALLEL 20.

POSSIBLE.

UNLESS NOTED OTHERWISE, RUN CONDUIT TIGHT TO BUILDING STRUCTURE CEILINGS WHEREVER

ARRANGE CONDUIT TO MAINTAIN MAXIMUM HEADROOM AND PRESENT A NEAT APPERANCE. 19.

ALLOWED WITHOUT PRIOR WRITTEN APPROVAL BY THE CONTRACTING OFFICER.

OFFSET A MINIMUM OF 24 INCHES HORIZONTALLY. "THRU-THE- WALL" BOXES SHALL NOT BE

OF 6 INCHES HORIZONTALLY. BOXES ON OPPOSITE SIDES OF FIRE RATED WALLS SHALL BE

BOXES LOCATED ON OPPOSITE SIDES OF NON-FIRE RATED WALLS SHALL BE OFFSET A MINIMUM 18.

INSTALL ALL NEW LIGHT SWITCHES AT +4 FEET FROM FLOOR.17.

BREAKERS FEEDING NEW EMERGENCY CIRCUITS.

FROM ALL OTHER CIRCUITS. INSTALL MANUFACTURERS " LOCK ON" DEVICES ON CIRCUIT

CIRCUITS SERVING EMERGENCY AND EXIT FIXTURES SHALL BE RUN IN SEPARATE RACEWAYS 16.

PANELBOARD CIRCUITS.

DIRECTORIES WHERE DEMOLITION OR NEW WORK HAS BEEN PERFORFORMED ON RESPECTIVE

CONTRACTOR SHALL UPDATE PANELBOARD DIRECTORIES WITH NEW TYPED- WRITTEN 15.

MONOTLITH EXPANSION JOINT.

WHERE APPLICABLE) CONDUIT COUPLINGS WHEREVER CONDUITS CROSS A CONCRETE

EMBEDDED CONDUITS ARE REQUIRED. PROVIDE EXPANSION/CONTRACTION (AND DEFLECTION

PENETRATIONS INTO AND OUT OF CONCRETE. PROVIDE SCHEDULE 40 PVC CONDUIT WHERE

RIGID GALVANIZED STEEL (RGS) EXPOSED OUTDOORS, INSIDE MANHOLES, AND AT ALL CONDUIT

UNLESS OTHERWISE NOTED, ALL CONDUIT SHALL BE UL LISTED EMT INDOORS AND PVC-COATED 14.

PROTECTION.

COORDINATE OVERCURRENT PROTECTION SIZES WITH MANUFACTURER RECOMMENDED CIRCUIT 13.

EXISTING JOISTS.

MATERIALS FOR OPENINGS IN FIRE RATED WALLS, DO NOT DRILL HOLES INTO OR THROUGH

CONTRACTOR. CONDUITS SHALL BE GROUTED OR SEALED INTO OPENINGS. USE FLAMEPROOF

OPENINGS SHALL BE REPAIRED BY A QUALIFIED CONTRACTOR AT THE EXPENSE OF THIS

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN STRUCTURES. ALL 12.

INSTALLATION.

COORDINATE ALL EQUIPMENT LOCATIONS PRIOR TO MAKING THE ACTUAL ELECTRICAL 11.

OTHER STORAGE CLOSETS WITHOUT CEILING MAY BE EXPOSED ON BUILDING STRUCTURE.

OTHERWISE INDICATED ON THE PLANS. CONDUIT IN MECHANICAL ROOMS, PIPE CHASES, AND

BUILDING (CCS) IN EXISTING WALLS, PARITITIONS, AND ABOVE SUSPENDED CEILING UNLESS

CONCEAL ALL CONDUIT AND CABLES INSTALLED IN THE EXISTING CENTRAL CONTROL STATION 10.

MINMUM).

CONDUCTOR. NEUTRAL CONDUCTOR AND A GREEN INSULATED GROUND CONDUCTOR (12 AWG

EACH INDICATED HOME RUN CIRCUIT TO THE RESPECTIVE PANEL SHALL HAVE A SEPARATE PHASE 9.

EXCEED 6 FEET IN LENGTH.

GROUND THROUGH FLEXIBLE CONDUIT TO THE LOAD'S GROUND. FLEXIBLE CONDUIT SHALL NOT

CONNECTORS AS REQUIRED TO MAKE CONNECTIONS. ROUTE GROUNDING WIRE FROM CIRCUIT

3/4-INCH SIZE MINIMUM UNLESS OTHERWISE NOTED. PROVIDE HOT DIPPED GALVANIZED

C EXTREME TEMPERATURE TYPE ATLA WITH HOT DIPPED GALVANIZED STEEL CORE. PROVIDE

O

C - O

LIQUIDTIGHT FLEXIBLE METAL CONDUIT. FLEXIBLE LIQUIDTIGHT FLEXIBLE CONDUIT RATED -50

ALL FINAL ELECTRICAL CONNECTIONS TO EQUIPMENT THAT VIBRATES SHALL BE MADE WITH 9.

EQUIPMENT AND PRODUCTS ON EQUIPMENT SHALL BE COORDINATED PRIOR TO INSTALLATION.

ACCESS TO ELECTRICAL AND MECHANICAL EQUIPMENT. ALL MOUNTING OF ELECTRICAL

ELECTRICAL EQUIPMENT SHALL BE MOUNTED TO AVOID IMPEDANCE OF OPERATION AND/OR 8.

OPERATION AND MAINTENANCE (O& M) MANUALS.

ALL NEW EQUIPMENT SHALL BE PROVIDED WITH MANUFACTURER'S STANDARD WARRANTY AND 7.

U.S. ARMY CORPS OF ENGINEERS SAFETY MANUAL EM-385-1-1 (LATEST EDITION).

SAFE WORKING ENVIRONMENT. COMPLY WITH OSHA STANDARDS 29 CFR 1910 AND 1926, AND THE

IT IS THE RESPONSIBILITY OF ALL PERSONNEL WORKING UNDER THIS CONTRACT TO MAINTAIN A 6.

APPLICABLE (E.G. UL LISTED).

NEMA, ANSI, ETC.) AND SHALL BE NATIONAL RECOGNIZED TESTING LABORATORY (NRTL) LISTED AS

ALL NEW EQUIPMENT SHALL COMPLY WITH RELEVANT AMERICAN INDUSTRY STANDARDS (E.G. 5.

ON THE PANELBOARD AS EVENLY AS POSSIBLE BETWEEN EACH PHASE.

CIRCUIT. COMMON NEUTRALS SHALL NOT BE USED FOR ANY CIRCUITING. BALANCE THE LOADS

NUMBERING ON THE PANELBOARD. ROUTE AN EQUIPMENT GROUNDING CONDUTOR WITH EACH

FOR ALL CIRCUITS INCLUDED FOR WORK IN THE CONTRACT. CIRCUITING SHALL AGREE WITH

PROVIDED AT EACH END DEVICE INCLUDING NEW RECEPTACLES FOR CIRCUIT IDENTIFICATION

CIRCUIT NUMBERS IN THE FORM OF ENGRAVED NAMEPLATES AS SPECIFIED HEREIN SHALL BE 4.

BY THE GOVERNMENT.

ALL OPERATIONAL OUTAGES AND POWER OUTAGES SHALL BE COORDINATED WITH AND APPROVED 3.

NATIONAL ELECTRICAL CODE.

ALL ELECTRICAL INSTALLATIONS SHALL COMPLY WITH MOST RECENT VERSION OF NFPA 70, 2.

ELECTRICAL CONSTRUCTION.

SEE SPECIFICATIONS FOR CONSTRUCTION SEQUENCE DESCRIPTIONS AND IMPACTS ON 1.

GENERAL ELECTRICAL NOTES (CONTINUED)

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

N T

R A

C T /T .O

N O

P R

O J E

C T C

O D

E

M A

T O

C /I

D

IQ

C

O N

T R

A C

T N

O

MAIN LOCKMAIN LOCK

Ice Chute

Arch Dam

Spillway Dam

Upstream Guide WallDownstream Guide Wall

A

C A

M P

B E

V

E R

A L L E

L E

C T

R

IC

A L S

IT

E P

L A

N

E-101

T L E

E C

H

B P

A T

T S

C H

U

IW

L D

B

R A

D T

K E

ELECTRICAL

A N

S I

X

S O

L

IC

IT

A T

IO

N

L O

C K R

E H

A B

IL

IT

A T

IO

N

G R

U N

D Y C

O U

N T

Y

IL

D R

E S

D E

N I S

L A

N D L

O C

K A

N D D

A M

IL

L

IN

O

IS

R

IV

E R B

A S

IN

W E

K

R

/0

/2

C K I S

L A

N D

IL

L

IN

O

IS

C K I S

L A

N D D

IS

T R

SHEET KEYNOTES

INSIDE THE RIVER WALL ENCLOSURE FOR FUTURE EXTENSION BY OTHERS.

WALL. COIL APPROXIMATELY 800 FEET OF FIBER OPTIC CABLE F1 AND STORE

STAINLESS STEEL JUNCTION BOX ON SMALL LOCK INTERMEDIATE WALL AND RIVER

SURFACE INSTALLED ON ARCH DAM, PROVIDE NEW 36"X36"X12" NEMA 4X 316

PROVIDE NEW SPARE DAM FIBER OPTIC CABLE "F1" IN NEW 2" RGS CONDUIT 14.

NEW UTILITY SERVICE TRANSFORMER TO NEW MANHOLE MH-SB.

PROVIDE NEW CONCRETE EMBEDDED SERVICE ENTRANCE DUCT BANK FROM 13.

NEW SWITCHBOARD BUILDING, SWITCHBOARD, AND MANHOLE MH-SB.12.

PROVIDED IN THE LOCK’S NEW SWITCHBOARD.

WITH THE SETTINGS OF THE NEW DAM FEEDER CIRCUIT BREAKER BEING

OVERCURRENT SETTINGS NEED TO MATCH AND THEY MUST BE COORDINATED

PDG3 ASSEMBLY. THE BOILER MCC MAIN AND SUBFEEDER BREAKERS

ASSEMBLY AND THE MCC SUBFEEDER CIRCUIT BREAKER WITH THE OTHER NEW

REMOVE AND REPLACE THE MCC MAIN CIRCUIT BREAKER WITH ONE NEW PDG3

AMPERES, 65KA AIC, CIRCUIT BREAKERS AND NEW MCC BUCKET ASSEMBLIES.

BREAKER COORDINATION. PROVIDE TWO (2) NEW EATON 480 VAC, PDG3, 200

PROVIDE NEW CIRCUIT PROTECTION IN DAM MCC TO CORRECT EXISTING CIRCUIT 11.

TRENCH. SEE NEW CABLE SCHEDULE.

CONDUIT WITH NEW PVC-COATED RGS CONDUIT TO AND INTO NEW CABLE

EXPOSE, AND INTERCEPT EXISTING BURIED 2" CONDUIT AND EXTEND EXISTING

BUILDING TO EXISTING VISITOR'S CENTER BUILDING. LOCATE, EXCAVATE TO

PROVIDE NEW ELECTRIC POWER FEEDER CIRCUIT FROM NEW SWITCHBOARD 10.

ANY WORK.

PROTECT THE ELECTRICAL CIRCUITS WHICH DO NOT OTHERWISE REQUIRE

GARAGES ARE FED FROM THE EXISTING TOWER BUILDING. MAINTAIN AND

MAINTAIN AND PROTECT THE EXISTING OUT-BUILDINGS: THE EXISTING 9.

CONTROLS. RECONNECT EXISTING ELECTRICAL POWER FEEDER CABLE.

VEHICLE GATE MOTORIZED OPERATOR, CAMERA, INTERCOM, AND

MAINTAIN AND PROTECT THE EXISTING VISITOR'S ENTRY SECURITY 8.

CONTROLS. RECONNECT EXISTING ELECTRICAL POWER FEEDER CABLE.

VEHICLE GATE MOTORIZED OPERATOR, CAMERA, INTERCOM, AND

MAINTAIN AND PROTECT THE EXISTING EMPLOYEE'S ENTRY SECURITY 7.

TO FACILITATE ENTRY OF THE NEW SERVICE ENTRANCE DUCT BANK.

SECONDARY CONDUITS ENTERING THE TRANSFORMER ONLY AS NEEDED

SECONDARY CONDUCTORS WHICH ARE DISCONNECTED. DEMOLISH

MOUNTED SERVICE TRANSFORMER. DEMOLISH THE 480 VOLTS

EXISTING 500KVA ELECTRIC POWER UTILITY OWNED MEDIUM VOLTAGE PAD-

PROVIDE A NEW UTILITY SERVICE TO THE NEW SWITCHBOARD. THE

TRANSFORMER AS COORDINATED WITH AND REQUIRED BY COMED TO

REUSE EXISTING PAD-MOUNTED UTILITY-OWNED 500 KVA SERVICE 6.

RECONNECT EXISTING ELECTRICAL POWER FEEDER CABLE.

FEEDER INSIDE THE CENTRAL CONTROL BUILDING FOR RECONNECTION.

EXISTING OLD TOWER BUILDING. MAINTAIN AND PROTECT THE CABLE 5.

CONTROL STAND TO MAINTENANCE BUILDING.

FEEDER CABLE FROM NEW ULDP LOCATED AT NEW UPSTREAM LEFT

TRENCH. PROVIDE NEW 480 VOLTS MAINTENANCE ELECTRICAL POWER

MAINTENANCE POWER FEEDER CONDUIT IN GALLERY TO INSIDE NEW

PROVIDE NEW 2" PVC-COATED RGS CONDUIT FROM EXISTING 4.

EXISTING GUIDE WALL CABLES AS INDICATED IN PLAN AND DETAIL SHEETS.

ELECTRICAL CABLES. CONNECT NEW CABLES FROM NEW CIRCUITS TO THE

MAINTAIN, PROTECT, AND REUSE EXISTING DOWNSTREAM GUIDE WALL 3.

EXISTING GUIDE WALL CABLES AS INDICATED IN PLAN AND DETAIL SHEETS.

ELECTRICAL CABLES. CONNECT NEW CABLES FROM NEW CIRCUITS TO THE

MAINTAIN, PROTECT, AND REUSE EXISTING UPSTREAM GUIDE WALL 2.

200 AMPERES, 480 VOLTS AC.

TO THE DAM WHICH SHALL BE NOT LESS THAN FULLY RATED CAPACITY OF

THE DAM AT ALL TIMES. CONTRACTOR MUST PROVIDE TEMPORARY POWER

WATER POOL ELEVATION. DAM ELECTRICAL POWER MUST BE AVAILABLE TO

OPERATIONS ARE MAINTAINED TO OPEN AND CLOSE DAM GATES TO ADJUST

FEEDER CABLE AS PROPERLY SEQUENCED TO ENSURE THAT THE DAM

ALSO SEE SHEET ED-101. REMOVE AND REPLACE THE EXISTING DAM

DAM SERVICE BRIDGE ACCESS RAMP. SEE NEW CABLE SCHEDULE AND

DAM FEEDER DISCONNECT SAFETY SWITCH LOCATED ADJACENT TO THE

ACROSS THE ARCH DAM, IN CONCRETE EMBEDDED DUCTS TO EXISTING

DISTRIBUTION PANEL URDP ROUTED THROUGH THE NEW CABLE TRENCH,

PROVIDE NEW DAM FEEDER CABLE FROM NEW UPSTREAM RIGHT 1.

GENERAL SHEET NOTES

POWER.

POWER AND SEQUENCE WORK THAT MAY AFFECT THE DAM ELECTRICAL

PROPER DAM OPERATIONS. CONTRACTOR MUST PROVIDE TEMPORARY

DAM ELECTRICAL POWER MUST BE AVAILABLE AT ALL TIMES TO ALLOW 2.

FOR LOCATION OF EXISTING GALLERY.

EXISTING CABLE GALLERY IS NOT SHOWN. SEE REFERENCE DRAWINGS 1.

9 9

RIVERWALL

SMALL LOCK

SWITCHBOARD

EXISTING WP

FLOW

BOILER HOUSE

EXISTING DAM

A1

SCALE: 1"=100'-0"

SITE PLAN

100' 200'0

E-102

A1

E-103

A1

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

N T

R A

C T /T .O

N O

P R

O J E

C T C

O D

E

M A

T O

C /I

D

IQ

C

O N

T R

A C

T N

O

A

C A

M P

B E

M

IN

L

O C

K E

L E

C T

R

IC

A L P

L A

N

E-102

T L E

E C

H

B P

A T

T S

C H

U

IW

L D

B

R A

D T

K E

ELECTRICAL

A N

S I

X

S O

L

IC

IT

A T

IO

N

L O

C K R

E H

A B

IL

IT

A T

IO

N

G R

U N

D Y C

O U

N T

Y

IL

D R

E S

D E

N I S

L A

N D L

O C

K A

N D D

A M

IL

L

IN

O

IS

R

IV

E R B

A S

IN

W E

K

R

/0

C K I S

L A

N D

IL

L

IN

O

IS

C K I S

L A

N D D

IS

T R

LAND WALL

UPPER LEFT

ILLINOIS WATERWAY

FLOW

DRESDEN ISLAND MAIN LOCK CHAMBER

LAND WALL

INTERMEDIATE WALL (I-WALL)

GUIDEWALL

UPSTREAM

LAND WALL

LOWER LEFT

INTERMEDIATE WALL

LOWER RIGHT

STATION BUILDING

CENTRAL CONTROL

13 12

3 10

INTERMEDIATE WALL

UPPER RIGHT

TERMINATION OF PERMANENT GAUGE WELL EQUIPMENT.

EXISTING, INSTALLATION OF TEMPORARY, REMOVAL OF TEMPORARY, AND

COORDINATE WITH GOVERNMENT REGARDING DISCONNECTION OF

INSTRUMENTATION CONDUCTORS ON GAUGE WELL EQUIPMENT.

AND REMOVE TEMPORARY GAUGE WELL EQUIPMENT, AND TERMINATE

THE GOVERNMENT WILL UNTERMINATE INSTRUMENTATION CABLE, PROVIDE 3.

ELECTRICAL CABLES, AND CONNECTIONS.

SEE ED-DRAWINGS AND REFRENCE DRAWINGS FOR EXISTING STRUCTURE, 2.

SEE GENERAL ELECTRICAL NOTES ON SHEET E-00011.

GENERAL SHEET NOTES

SHEET KEYNOTES

FOUR.

ELECTRICAL CABLE FOR EXISTING FLOATING MOORING BITS. TYPICAL OF

PROVIDE NEW EMBEDDED CONDUIT TO NEW CABLE TRENCH AND NEW 8.

ELECTRICAL CABLES. TYPICAL OF ONE.

PROVIDE EXISTING AIR COMPRESSOR WITH NEW RACEWAYS AND NEW

RECONNECT AND REUSE EXISTING 150 HP BUBBLER AIR COMPRESSOR. 7.

TYPICAL OF TWO.

TOW HAULAGE UNITS WITH NEW RACEWAYS AND NEW ELECTRICAL CABLES.

REINSTALL AND REUSE EXISTING TOW HAULAGE UNITS. PROVIDE EXISTING 6.

ANCHORAGES (2 PER MITER GATE LEAF).

LOCATION OF EXISTING AND NEW CONCRETE EMBEDDED MITER GATE 5.

TYPICAL OF FOUR.

NEW RACEWAYS AND NEW ELECTRICAL CABLES TO SLIDE VALVE EQUIPMENT.

CONTROLLERS. PROVIDE REUSE EXISTING SLIDE VALVE MACHINERY AND

VALVE MACHINERY, AND HPU WITH INTEGRAL CONTROLLER. REINSTALL TO

LOCATION OF EXISTING HYDRAULICS SLIDE VALVE CONCRETE RECESS, SLIDE 4.

LOCATION OF NEW MITER GATE CONCRETE RECESS AND MACHINERY. 3.

EQUIPMENT INSIDE NEW CONTROL STAND STRUCTURE. TYPICAL OF FOUR.

PROVIDE NEW CONTROL CONSOLE, MCC, AND OTHER ELECTRICAL 2.

ASSEMBLY COVER. TYPICAL OF FOUR.

THE NEW GFE STRUT ARM BUFFER BOX INSIDE THE NEW GFE LIMIT SWITCH

SWITCH ACTUATORS AND PROVIDE FOUR NEW LIMIT SWITCHES INSTALLED ON

BOX COVERS SAME AS EXISTING. SALVAGE AND RELOCATE THE EXISTING

PROVIDE NEW STRUT ARM LIMIT SWITCH ASSEMBLY IN LOCATION ON BUFFER 1.

SHEETS.

PROVIDE NEW RACEWAYS AND ELECTRICAL CABLES. SEE APPLICABLE DETAIL

EXISTING TRAFFIC LIGHT FIXTURES (RED, YELLOW, & GREEN) FOR REUSE.

MAINTAIN AND PROTECT EXISTING TRAFFIC SIGNAL LIGHT POLES AND 18.

ELECTRICAL CABLES. SEE APPLICABLE DETAIL SHEETS.

ADDITIONAL NEW RACEWAYS, EXTEND TO EXISTING, AND PROVIDE NEW

EXISTING DAM PATH LIGHT RACEWAYS FOR THEIR REUSE. PROVIDE

MAINTAIN AND PROTECT EXISTING LIGHT POLES FOR REUSE. INTERCEPT 17.

ELECTRICAL CABLES. SEE APPLICABLE DETAIL SHEETS.

ABUTMENT. REFEED WITH NEW RACEWAYS, EXISTING RACEWAYS, AND NEW

CENTER 4 (MCC4) TO EXISTING TO SAFETY SWITCH LOCATED AT DAM

PROVIDE NEW DAM FEEDER CABLE ROUTED FROM NEW MOTOR CONTROL 16.

GENERAL NOTE 3.

ELECTRICAL CABLES. PROVIDE ALL WORK FOR NEW POWER CABLE. ALSO SEE

EQUIPMENT EXCEPT CABLES AND RACEWAYS. PROVIDE NEW RACEWAYS AND

MAINTAIN AND PROTECT DOWNSTREAM POOL GAUGE JUNCTION BOX AND 15.

GENERAL NOTE 3.

ELECTRICAL CABLES. PROVIDE ALL WORK FOR NEW POWER CABLE. ALSO SEE

EQUIPMENT EXCEPT CABLES AND RACEWAYS. PROVIDE NEW RACEWAYS AND

BOX AND MAINTAIN AND PROTECT UPSTREAM POOL GAUGE JUNCTION 14.

FEEDER CONDUCTORS.

EXISTING ROUTE OF THE EXISTING 500KVA TRANSFORMER SECONDARY

CONDUCTORS ROUTE. TRACE, IDENTIFY, RECORD, AND REPORT THE

UNTERMINATED, BUT IT IS NOT KNOWN WHERE THE SECONDARY

BUT THE SECONDARY LOW VOLTAGE CONDUCTORS EXIST IN THE CABINET

PRIMARY WINDING. THE 500 KVA SECONDARY WINDINGS ARE DISCONNECTED,

DAISY CHAIN WHICH ROUTES TO THE 225 KVA SERVICE TRANSFORMER

TRANSFORMER. THE MEDIUM VOLTAGE CABLES PRIMARY CONNECTION IS A

LOCATION OF EXISTING UTILITY-OWNED 500 KVA, 480/277 VAC PAD-MOUNTED 13.

ELECTRICAL PAD-MOUNTED SERVICE TRANSFORMER.

LOCATION OF EXISTING UTILITY-OWNED 225 KVA, 480/277 VAC LOCK & DAM 12.

CABLES. TYPICAL OF TWO.NEW RACEWAYS AND NEW ELECTRICAL

REUSE. REFEED WITH TRAFFIC FIXTURES (RED, YELLOW, & GREEN) FOR

POLES AND MAINTAIN AND PROTECT EXISTING TRAFFIC SIGNAL LIGHT 11.

LOCK, ONE ON LOWER GUIDE WALL, AND ONE ON UPPER GUIDE WALL.

ELECTRICAL CABLES TO REFEED LIGHT POLES. TYPICAL OF FIVE ON THE MAIN

RACEWAYS AND AND FIXTURES FOR REUSE. PROVIDE WITH NEW

LIGHT POLES MAINTAIN AND PROTECT EXISTING 100 FEET TALL HIGH MAST 10.

CONTAIN OTHER UNKNOWN CABLES.

LOCATED IN ESPLANADE CONTAINS EXISTING HIGH MAST LIGHTS. MAY

APPROXIMATE LOCATION OF EXISTING FLUSH ELECTRICAL PULL BOXES 9.

SIGNAL LIGHT POLE

EXISTING TRAFFIC

A1

SCALE: 1"=30'-0"

SITE PLAN

30' 60'0

THIS SHEET)

NOT SHOWN ON

(OFF SHEET AND

POOL GAGE WELL

DOWNSTREAM

N

2E-110

A1

A1

E-107

E-109

A1

E-106

A1

E-111

A1

A1

E-105

E-108

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

N T

R A

C T /T .O

N O

P R

O J E

C T C

O D

E

M A

T O

C /I

D

IQ

C

O N

T R

A C

T N

O

A

C A

M P

B E

P L

A N

A D

E S

E R

V

IC

E E

N T

R A

N C

E

P L

A N

E-103

T L E

E C

H

B P

A T

T S

C H

U

IW

L D

B

R A

D T

K E

ELECTRICAL

A N

S I

X

S O

L

IC

IT

A T

IO

N

L O

C K R

E H

A B

IL

IT

A T

IO

N

G R

U N

D Y C

O U

N T

Y

IL

D R

E S

D E

N I S

L A

N D L

O C

K A

N D D

A M

IL

L

IN

O

IS

R

IV

E R B

A S

IN

W E

K

R

/0

C K I S

L A

N D

IL

L

IN

O

IS

C K I S

L A

N D D

IS

T R

SCALE: 1/16"=1'-0"

PLAN - ESPLANADE & SERVICE ENTRANCE

CENTER

EXISTING VISITOR

TRANSFORMER

EXISTING UTILITY EQUIPMENT

SECURITY GATE AND

EXISTING EMPLOYEE

TRANSFORMER PAD

CONCRETE

TRANSFORMER AND

NEW SERVICE

CONDUCTORS

SERVICE ENTRANCE

DUCT BANK AND

NEW SERVICE ENTRY

1 2

17 18 19 20

SEE GENERAL ELECTRICAL NOTES ON SHEET G-004 AND G-0051.

GENERAL SHEET NOTES

SHEET KEYNOTES

VEHICLE SECURITY GATE ENTRANCE EQUIPMENT.

MAINTAIN AND PROTECT EXISTING VISITOR'S ENTRANCE 4.

COMMUNICATION PEDESTALS.

DETECTION LOOPS, CAMERA, PUSHBUTTON PADS, AND

VEHICLE SECURITY GATE, GATE OPERATOR, PAVEMENT

MAINTAIN AND PROTECT EXISTING EMPLOYEE'S ENTRANCE 3.

NEW CABLE SCHEDULE FOR SERVICE CABLE SIZES.

BUILDING. PROVIDE NEW SERVICE ENTRANCE CABLES. SEE

MANHOLE MHSWB LOCATED UNDER NEW SWITCHBOARD

DUCT BANK FROM EXISTING TRANFORMER PAD TO NEW

PROVIDE NEW 4" CONCRETE ENCASED DUCTS IN NEW 2X2 2.

(COMED) AND WITH THE GOVERNMENT.

CUTOVERS, AND OUTAGES WITH ELECTRIC POWER UTILITY

EQUIPMENT, TEMPORARY AND PERMANENT CONNECTIONS,

COORDINATE EXISTING AND NEW SERVICE TRANSFORMER

PROVIDE NEW PAD-MOUNTED SERVICE TRANSFORMER. 1.

GATE AND EQUIPMENT

VEHICLE SECURITY

EXISTING VISITOR

UPSTREAM GUIDEWALL

0 8' 32'16'

SECURITY FENCE

EXISTING INNER

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

A N

S I

D

S O

L

IC

IT

A

T

IO

N

L O

C K

R E

H A

B

IL

IT

A

T

IO

N

G R

U N

D Y

C O

U N

T Y

IL

D R

E S

D E

N I

S L

A N

D L

O C

K A

N D

D A

M

IL

L

IN

O

IS

R

IV

E

R B

A S

IN

/0

/2

R O

C K

I S

L A

N D

IL

L

IN

C K

I S

L A

N D

D

IS

T R

C A

M P

B E

U P

S T

R E

A M

L A

N D

W A

L L

P L

A N

E-104

T

L E

E C

H

B P

A T

T S

C H

U

IW

L D

B

R A

D T

K E

ELECTRICAL

W

E K

R

SCALE: 1/4"=1'-0"

PLAN - UPSTREAM LAND WALL

0 4' 8'2'

WALL

TO UPSTREAM GUIDE

LIGHT POLE

EXISTING HIGH MAST

NEW CABLE TRENCH

TOW HAULAGE UNIT

RELOCATED EXISTING

SHEET KEYNOTES

FROM NEW CABLE TRENCH.

EXISTING GRAVEL TO PROVIDE NEW CONCRETE-EMBEDDED CONDUITS

DEMOLISH EXISTING CONCRETE AS WELL AS EXCAVATE AND TRENCH 16.

FROM NEW CABLE TRENCH TO RELOCATED TOW HAULAGE EQUIPMENT.

PROVIDE NEW 2" AND 1" CONCRETE ENCASED PVC-COATED RGS CONDUITS 15.

ABOVE TOP GUARDRAIL ELEVATION TO ALLOW DOOR TO FULLY OPEN.

GUIDE WALL PULLBOX. INSTALL BOTTOM OF NEW ENCLOSURE LOCATED

JUNCTION BOX. CORE-OUT AND REUSE EXISTING CONDUIT HOLES INTO

ENCLOSURE WILL REPLACE EXISTING RACEWAY AND ELIMINATES EXISTING

BOX LOCATED ON THE UPSTREAM GUIDE WALL. NEW CONDUITS AND

ON FACE OF LOCK WALL FROM THIS NEW ENCLOSURE TO THE FIRST PULL

ROUTE FOUR(4) NEW 4" PVC-COATED RGS CONDUITS SURFACE INSTALLED

LOCATE BOTTOM OF ENCLOSURE ABOVE TOP OF LOCK WALL ELEVATION.

PANEL, HINGED 3-PT LATCH OR HALF-TURN DOOR THREE NEMA 4X DRAINS.

STEEL, 60"HIGH X 36" WIDE X 24" DEEP ELECTRICAL ENCLOSURE WITH BACK

END OF THE NEW CABLE TRENCH TO A NEW NEMA 4X TYPE 316 STAINLESS

NEW CABLE TRENCH. PROVIDE THE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .