About this file

SOW reference 10

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLOW-TECHNICS, INC.

Evaluation Report

For

U.S. Army Corps of Engineers

Rice Lake Habitat

Banner, IL

Submitted by:

FLOW – TECHNICS, INC.

Frankfort, IL.

PHONE: 815-277-2600

FAX: 815-534-5311

2/23/2018

Pre-Service Survey

On Wednesday, February 21, 2018, Flow-Technics’ Service Technicians located to Rice

Lake Wildlife Habitat in Banner, Illinois to document the site conditions of the property, junction box electrical connections and electrical conductors within the pumps discharge tube.

Evaluation

All power leads to stator are megging grounded.

Power lines from junction box back to building are megging 200+ @ 1000V.

Connection chamber probe meggs at 200+ @ 200V.

Stator Housing probe megs 10 megs @ 200V.

Seal Chamber probe megs 100 megs @ 200V.

Pump cables were pulled and showed no visible signs of damage. The pump was pulled out of the tube and no obstruction was seen in the propeller area. The pump was set by the road due to rising river level. The connection chamber was opened and looked good.

On Thursday, February 22, 2018 the pump was prepared for transport to the evaluation facility.

The pump was delivered to the evaluation facility on Thursday, February 22, 2018 and will be torn down and evaluated the week of February 26, 2018 upon the approval of the

Army Corp. of Engineers.