B.08.03 Solicitation (Amend 0003).pdf

PDF 611 KB Posted

Attached to
Lower Monumental PH HVAC System Upgrade
Solicitation number
W912EF26RA007
Issued by

About this file

This is a Standard Form 30 (SF 30) Amendment of Solicitation issued by the US Army Engineer District Walla Walla, Contracting Division on 29 September 2026 for Solicitation W912EF26RA007, originally dated 21 August 2026. Amendment Number 0003 extends the response due date from 30 September 2026 to 05 October 2026. The amendment updates language in three specification sections: 01 11 01.00 28, 23 09 23.02 28, and 26 20 00.00 28, and revises Drawing ID# ED103 titled "Plan - UC-2 Electrical Demo." All other terms and conditions of the original solicitation remain unchanged. Contracting Officer Cynthia H. Jacobsen signed the amendment on 29 September 2026. Contact information for the contracting office is Nathan Bruce at nathan.i.bruce@usace.army.mil or 509-527-7224.

Offerors must acknowledge receipt of this amendment prior to the extended due date and time using one of three methods: completing and returning items 8 and 15 of the amendment, acknowledging receipt on each copy of the offer submitted, or submitting separate written or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt at the designated location prior to the specified date and time may result in rejection of the offer. Offerors may also submit changes to previously submitted offers by letter or electronic communication, provided the correspondence references the solicitation and amendment numbers and is received before the opening hour and date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

J 1 2

0003 29 SEP 2026 A029588

W912EF

US ARMY ENGINEER DISTRICT WALLA WAL

KO CONTRACTING DIVISION, 201 NORTH 3RD AVE

WALLA WALLA, WA 99362-1876

UNITED STATES

NATHAN BRUCE, EMAIL: NATHAN.I.BRUCE@USACE.ARMY.MIL TELEPHONE:

5095277224

SCD: PAS:

W912EF26RA007

21 AUG 2026

SEE SECTION G - CONTRACT ADMINISTRATION DATA

The purpose of this amendment is to update language in Section 01 11 01.00 28, Section 23 09 23.02 28, and Section 26 20 00.00 28, make updates to Drawing ID# ED103 - "Plan - UC-2 Electrical Demo", as well as extend the solicitation due date from 30 Sep 2026 to 05 Oct 2026.

All other Terms and Conditions remain unchanged.

CYNTHIA H. JACOBSEN

29 SEP 2026

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

File details come from the government source that posted it. Updated .