B.08.03 Solicitation 23B0001-0002.pdf

PDF 399 KB Posted

Attached to
MNA - Navlock Power & Controls Upgrade Federal contract opportunity
Solicitation number
W912EF23B0001
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

This amendment modifies a solicitation for a firm-fixed-price construction contract valued between $10 million to $25 million to upgrade the electrical power and controls systems at McNary Navigation Lock. The scope of work includes replacing feeders, power distribution equipment, cameras, grounding details, and the control systems for gates, valves and a bascule bridge. It also involves upgrading control stands and replacing substation transformers with new oil filled pad-mounted units including spill containment. The contractor must complete all work by June 18, 2024. A bid bond of 20% or $3 million is required, as well as 100% performance and payment bonds. The solicitation allows unrestricted competition and has a NAICS code of 238210 with a small business size standard of $16.5 million. A site visit will be offered approximately two weeks after posting, with foreign national clearance required at least four weeks in advance.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

467365

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

POC: Chandra Crow ; chandra.d.crow @usace.army.mil

Please see summary of changes.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Dec-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF23B0001

X 9B. DATED (SEE ITEM 11)

23-Nov-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Dec-2022

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

CHANDRA D. CROW

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF23B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Wage Determination 7 02-NOV-2022 Attachment 2 Technical Specifications 589 02-NOV-2022 Attachment 3 Plans 179 02-NOV-2022 Attachment 4 Plans - Resource 1 52 02-NOV-2022 Attachment 5 Plans - Resource 2 37 02-NOV-2022 Attachment 6 Plans - Resource 3 24 02-NOV-2022 Attachment 7 Plans - Resource 4 21 02-NOV-2022 Attachment 8 Plans - Resource 5 54 02-NOV-2022 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Wage Determination 7 02-NOV-2022 Attachment 10 23B0001_Plans_Amend-

5 21-DEC-2022

Attachment 11 Appendix C - Laboratory Reports & Chain of Custodies

194 21-DEC-2022

Attachment 12 Appendix E - Summary Tables

36 21-DEC-2022

Attachment 2 Technical Specifications 589 02-NOV-2022 Attachment 3 Plans 179 02-NOV-2022 Attachment 4 Plans - Resource 1 52 02-NOV-2022 Attachment 5 Plans - Resource 2 37 02-NOV-2022 Attachment 6 Plans - Resource 3 24 02-NOV-2022 Attachment 7 Plans - Resource 4 21 02-NOV-2022 Attachment 8 Plans - Resource 5 54 02-NOV-2022 Attachment 9 TECHSPECS_23B0001_ amd0002

79 21-DEC-2022

The following have been added by full text:

SUMMARY OF CHANGES 0002

Summary of Changes for McNary Power & Controls Upgrade(22R0001) amd 0002 Specifications:

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

1.3: SD-05 added as was a submittal for Design Data under SD-05

W912EF23B0001

2.1: New subpart added submission requirements and accelerated timeframe to submit

26 23 15.00 28 HIGH RESISTANCE GROUNDING (HRG) SYSTEM – LOW VOLTAGE (480V)

2.2.4: Revised submission timeframe from 60 to 10 days from NTP

26 24 13 SWITCHBOARDS

1.4: SD-05 added as was a submittal for Design Data under SD-05 2.1: New subpart added submission requirements and accelerated timeframe to submit

26 24 19.00 40 MOTOR CONTROL CENTERS

1.3: SD-05 added as was a submittal for Design Data under SD-05 2.1.1: Added submission requirements and accelerated timeframe to submit

35 01 41.00 10

2.5.4: new subpart “Existing Machinery” added

Attachments:

Asbestos Survey Results (Appendix C (see pages 40, 68-71, 102-108) and Appendix E) Drawings:

Revised: E-212, E-601, E-604, EI657, EI662.

(End of Summary of Changes)