This document provides details for a forthcoming federal construction solicitation. The U.S. Army Corps of Engineers Walla Walla District will issue a request for proposals to perform necessary transformer maintenance at Lower Monumental Dam in Franklin County, Washington. The work will include disconnecting and removing the existing transformer's radiators and bushings, inspecting valves and devices, replacing gaskets and pressure relief devices, installing new fans and conductors, repainting the tank, vacuum filling the transformer with oil, and performing electrical testing. The solicitation will be awarded as a lowest price technically acceptable, firm-fixed price contract to a small business. Proposals are due approximately 30 days after the solicitation is posted to beta.sam.gov in June 2021. Offerors must be registered in SAM and have a size of less than $39.5 million for NAICS code 237130. The project value is estimated between $500,000 and $1 million, and performance and payment bonds of 100% will be required.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lower Monumental Transformer T2 Leak & Bushing Repair W912EF21R0010 Amend-0001
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 RETAINAGE OF PAYMENT
1.2 CLIN 0001 - REPAIR TRANSFORMER BANK T2
1.3 OPTIONAL ITEMS
1.3.1 CLIN 0002 - ADDITION OF OXIDATION INHIBITOR TO OIL
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 22 00.00 28
G4EDHCMP
Line
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 01 22 00.00 28
SECTION 01 22 00.00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
In each instance, the contract price for an item shall constitute full compensation for furnishing all plant, labor, equipment, and materials, and for performing all operations required to complete the work included in the item as herein specified, or as otherwise approved.
1.1 RETAINAGE OF PAYMENT
Retainage in the amount of 10 percent of original contract award amount will be withheld until the final submittals, listed below, have been approved by the Government. The 10 percent retainage for final submittals will be held until such time as the Contractor has earned 90 percent of the original contract value. See SECTION 01 78 00.00 28 "CLOSEOUT SUBMITTALS" and SECTION 01 78 23.00 28 "OPERATION AND MAINTENANCE DATA" for additional information.
a. Final Shop Drawings.
b. Final As-built Drawings.
c. Final Record Drawings.
d. Closeout submittals.
e. Final Operation and Maintenance Manuals and Parts Catalogs.
f. Final Spare Parts submission.
1.2 CLIN 0001 - REPAIR TRANSFORMER BANK T2
Repair Transformer Bank T2 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN No. 0001, "REPAIR TRANSFORMER BANK T2" which price and payment shall be full compensation for all new components including, but not limited to material, equipment and labor, complete, as specified and approved.
1.3 CLIN 0002 - ACQUIRE AND INSTALL NEW HIGH & LOW VOLTAGE BUSHINGS
Acquire and install new high & low voltage bushings will be measured for payment as a complete pay item (JOB). This includes, but not limited to all parts, material, labor, equipment needed to complete the work and disposal of existing bushings. Payment will be made at the lump sum price for CLIN No. 0002 "INSTALL NEW HIGH & LOW VOLTAGE BUSHINGS", which price and payment shall be full compensation for all material and work required to remove and dispose of existing bushings then provide and install new bushings, complete, as specified and approved.
1.3 OPTIONAL ITEMS
1.3.1 CLIN 0003 0002 - ADDITION OF OXIDATION INHIBITOR TO OIL
Addition of Oxidation Inhibitor To Oil will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN No. 0003 0002 , "ADDITION OF OXIDATION INHIBITOR TO OIL" which price and payment shall be full compensation for all parts and labor required to add oxidation inhibitor to the oil, complete, as specified and approved.
SECTION 01 22 00.00 28
G4EDHCMP
Line
G4EDHCMP
Line
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
SECTION 01 22 00.00 28
| Amend-0001 |