A.07.24_W912EF18R0015_Amendment_00002.pdf
PDF 149 KB Posted
- Attached to
- NWD Regional Hazardous Material Abatement MATOC
- Solicitation number
- W912EF-18R0015
About this file
Amendment 0002
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is listed in the Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF18R0015
X 9B. DATED (SEE ITEM 11)
04-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Jun-2018
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
KENT R. BERNARD 201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF18R0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 05-Jun-2018 02:00 PM to 07-Jun-2018 04:00 PM.
The Issued By organization has changed from
USAED, WALLA WALLA - CONTRACTING DIV.
ELAINE M. VANDIVER
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
to
USAED, WALLA WALLA - CONTRACTING DIV.
KENT R. BERNARD 201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
The following have been added by full text:
AMENDMENT 0002
Summary of changes for Amend – 0002
NWD Hazardous Material MATOC
BID SCHEDULES
NWD Hazardous Material MATOC Bid Schedule
TASK ORDER – Ice Harbor Unit 3 – Bid Schedule
SPECIFICATIONS
- MATOC
REVISED SECTION 01 22 00.00 28 “MEASUREMENT AND PAYMENT”
- TASK ORDER – Ice Harbor Unit 3
a. REVISED SECTION 01 22 00.00 28 “MEASUREMENT AND PAYMENT”
b. REVISED SECTION 01 11 00 00 28 “GENERAL REQUIREMENTS”
a. Removed “Digital Image Available Upon Request” from attachment NEUTRAL AND T- LEAD LAYOUTS UNIT 1-3 – see red line for location
b. Removed “Digital Image Available Upon Request” from attachment STATOR COIL DIAGRAM – see red line for location
The following have been modified:
Walla Walla District Corps of Engineers
NWD Regional Hazardous Waste & Industrial Coating Removal
Seed Project Bid Schedule Ice Harbor Unit 3
ITEM
DESCRIPTION
QUANTITY
U/M
U/P
AMOUNT
UNIT 3 – BASE
0001 SUBMITTAL PREPARATION 1 JOB XXXXX $________
0002 ALL TESTING AND VERIFICATION 1 JOB XXXXX $________
0003 PRE-CLEAN GENERATOR STATOR AND
ROTOR SURFACES
1 JOB XXXXX $________
UNIT 3 - OPTIONAL
0004 BUILD CONTAINMENT, CUT, REMOVE
AND DISPOSE STATOR WINDINGS.
CLEAN/ABATE GENERATOR STATOR
CORE/AREAS
SCHEDULE TOTAL $__________
IMPORTANT See Section 01 22 00.00 28; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.
NWD Regional Hazardous Waste & Industrial Coating Removal
SCHEDULE B
Base Period Option Period
Line No. Item Unit of Measure
Year One Year Two Year Three
0001 Submittal Preparation HR $ $ $
0002 Project Manager HR $ $ $
0003 Supervisor HR $ $ $
0004 Quality Control Manager HR $ $ $
0005 Asbestos Abatement HR $ $ $
0006 Industrial Coating Removal HR $ $ $
0007 Certified Industrial Hygienist HR $ $ $
Asbestos-Containing Materials (ACM) Disposal LBS
Hazardous Waste Disposal
LBS
Asbestos Bulk Sampling
EA
Nonhazardous solid waste disposal EA
TEM air and wipe sampling
EA
PCM Sampling
EA
RCRA 8 TCLP
EA
*Schedule B shall include base rates with fringe benefits and taxes, but exclude G&A and other overhead markups.
*For the Schedule B use Ice Harbor Dam as the point of generation for bidding purposes when calculating costs.
(End of Summary of Changes)
File details come from the government source that posted it.