A.07.24_Amend-0002_Section_01_22_00.00_28_Seed_Project.pdf
PDF 16 KB Posted
- Attached to
- NWD Regional Hazardous Material Abatement MATOC
- Solicitation number
- W912EF-18R0015
About this file
Seed Project Specs Amendment 0002
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ice Harbor Winding Removal and Asbestos Abatement Unit 3 W912EF18R0015-0001 Amend-0002
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 CLIN 0001 SUBMITTAL PREPARATION
1.2 CLIN 0002 ALL TESTING AND VERIFICATION
1.3 CLIN 0003 PRE-CLEAN GENERATOR STATOR AND ROTOR SURFACES
1.4 CLIN 0004 BUILD CONTAINMENT, CUT, REMOVE AND DISPOSE STATOR WINDINGS
1.5 CLIN 0005 CLEAN/ABATE GENERATOR STATOR CORE/AREAS
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 22 00.00 28 - Page 1 g4edddca Line
SECTION 01 22 00.00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
In each instance, the contract price for an item shall constitute full compensation for furnishing all plant, labor, equipment, and materials, and for performing all operations required to complete the work included in the item as herein specified, or as otherwise approved.
1.1 CLIN 0001 SUBMITTAL PREPARATION
Submittal preparation will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN No. 0001, "SUBMITTAL PREPARATION," which price and payment shall be full compensation for all work required in each task order for submittal preparation complete, as specified and approved.
1.2 CLIN 0002 ALL TESTING AND VERIFICATION
All testing and verification will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN No. 0002, "ALL TESTING AND VERIFICATION," which price and payment shall be full compensation for all work required in each task order for all testing and verification, as specified and approved.
1.3 CLIN 0003 PRE-CLEAN GENERATOR STATOR AND ROTOR SURFACES
Pre-clean generator stator and rotor surfaces will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN No. 0003, "PRE-CLEAN GENERATOR STATOR AND ROTOR SURFACES," which price and payment shall be full compensation for all work required in each task order to pre-clean generator stator and rotor surfaces complete, as specified and approved.
1.4 CLIN 0004 BUILD CONTAINMENT, CUT, REMOVE AND DISPOSE STATOR WINDINGS
Build containment, cut, remove and dispose stator windings will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN No. 0004, "BUILD CONTAINMENT, CUT, REMOVE AND DISPOSE STATOR WINDINGS," which price and payment shall be full compensation for all work required required in each task order to build containment, cut, remove and dispose stator windings complete, as specified and approved.
1.5 CLIN 0005 CLEAN/ABATE GENERATOR STATOR CORE/AREAS
Clean/abate generator stator core/areas will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN No. 0005, "CLEAN/ABATE GENERATOR STATOR CORE/AREAS," which price and payment shall be full compensation for all work required required in each task order to clean/abate generator stator core/areas complete, as specified and approved.
SECTION 01 22 00.00 28 - Page 2 g4edddca Line
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
SECTION 01 22 00.00 28 - Page 3
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 22 00.00 28 - MEASUREMENT AND PAYMENT |
| MEASUREMENT AND PAYMENT |
| PART 1 GENERAL |
| 1.1 CLIN 0001 SUBMITTAL PREPARATION |
| 1.2 CLIN 0002 ALL TESTING AND VERIFICATION |
| 1.3 CLIN 0003 PRE-CLEAN GENERATOR STATOR AND ROTOR SURFACES |
| 1.4 CLIN 0004 BUILD CONTAINMENT, CUT, REMOVE AND DISPOSE STATOR WINDINGS |
| 1.5 CLIN 0005 CLEAN/ABATE GENERATOR STATOR CORE/AREAS |
| PART 2 PRODUCTS Not Applicable |
| PART 3 EXECUTION Not Applicable |