A.07.24_Amend-0002_Section_01_22_00.00_28_Base_Contract.pdf
PDF 22 KB Posted
- Attached to
- NWD Regional Hazardous Material Abatement MATOC
- Solicitation number
- W912EF-18R0015
About this file
Base Contract Specs Amendment 0002
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NWD Hazardous Material MATOC W912EF18R0015 Amend-0002
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 CLIN 0001 SUBMITTAL PREPARATION
1.2 CLIN 0002 PROJECT MANAGER
1.3 CLIN 0003 SUPERVISOR
1.4 CLIN 0004 QUALITY CONTROL MANAGER
1.5 CLIN 0005 ASBESTOS ABATEMENT
1.6 CLIN 0006 INDUSTRIAL COATING REMOVAL
1.7 CLIN 0007 INDUSTRIAL HYGIENIST
1.8 CLIN 0008 ASBESTOS-CONTAINING MATERIALS (ACM) DISPOSAL
1.9 CLIN 0009 LEAD BASED PAINT DISPOSAL
1.10 CLIN 0010 ASBESTOS BULK SAMPLING
1.11 CLIN 0011 NONHAZARDOUS SOLID WASTE DISPOSAL
1.12 CLIN 0012 TEM AIR AND WIPE SAMPLING
1.13 CLIN 0013 PCM SAMPLING
1.14 CLIN 0014 RCRA 8 TCLP
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 22 00.00 28 - Page 1 g4edddca Line
SECTION 01 22 00.00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
In each instance, the contract price for an item shall constitute full compensation for furnishing all plant, labor, equipment, and materials, and for performing all operations required to complete the work included in the item as herein specified, or as otherwise approved.
1.1 CLIN 0001 SUBMITTAL PREPARATION
Submittal preparation will be measured for payment as an hourly rate pay item (HR). Payment will be made at the lump sum price for LINE ITEM No.
0001, "SUBMITTAL PREPARATION," which price and payment shall be full compensation for all work required in each task order for submittal preparation complete, as specified and approved.
1.2 CLIN 0002 PROJECT MANAGER
Project manager will be measured for payment as an hourly rate pay item (HR).
Payment will be made at the lump sum price for LINE ITEM No. 0002, "PROJECT MANAGER," which price and payment shall be full compensation for all work required in each task order for project manager support, as specified and approved.
1.3 CLIN 0003 SUPERVISOR
Supervisor will be measured for payment as an hourly rate pay item (HR).
Payment will be made at the lump sum price for LINE ITEM No. 0003, "SUPERVISOR," which price and payment shall be full compensation for all work required in each task order for supervisory support, as specified and approved.
1.4 CLIN 0004 QUALITY CONTROL MANAGER
Quality control manager preparation will be measured for payment as an hourly rate pay item (HR). Payment will be made at the lump sum price for LINE ITEM No. 0004, "QUALITY CONTROL MANAGER," which price and payment shall be full compensation for all work required in each task order for quality control manager support, as specified and approved.
1.5 CLIN 0005 ASBESTOS ABATEMENT
Asbestos abatement will be measured for payment as an hourly rate pay item (HR). Payment will be made at the lump sum price for LINE ITEM No. 0005, "SUBMITTAL PREPARATION," which price and payment shall be full compensation for all work required in each task order for asbestos abatement, as specified and approved.
1.6 CLIN 0006 INDUSTRIAL COATING REMOVAL
Industrial coating removal will be measured for payment as an hourly rate pay item (HR). Payment will be made at the lump sum price for LINE ITEM No.
0006, " INDUSTRIAL COATING REMOVAL," which price and payment shall be full
SECTION 01 22 00.00 28 - Page 2 compensation for all work required in each task order for industrial coating removal, as specified and approved.
1.7 CLIN 0007 INDUSTRIAL HYGIENIST
Industrial hygienist will be measured for payment as an hourly rate pay item (HR). Payment will be made at the lump sum price for LINE ITEM No.
0007, "INDUSTRIAL HYGIENIST," which price and payment shall be full compensation for all work required in each task order for industrial hygienist support, as specified and approved.
1.8 CLIN 0008 ASBESTOS-CONTAINING MATERIALS (ACM) DISPOSAL
Asbestos-containing materials (ACM) disposal will be measured for payment as a per pound pay item (LBS). Payment will be made at the lump sum price for LINE ITEM No. 0008, "ASBESTOS-CONTAINING MATERIALS (ACM) DISPOSAL," which price and payment shall be full compensation for all work required in each task order for asbestos-containing materials (ACM) disposal, to include handling, storage, transportation, and disposal costs as specified and approved.
1.9 CLIN 0009 LEAD BASED PAINT DISPOSAL
Lead based paint disposal will be measured for payment as a per pound pay item (LBS). Payment will be made at the lump sum price for LINE ITEM No.
0009, "LEAD BASED PAINT DISPOSAL," which price and payment shall be full compensation for all work required in each task order for lead based paint disposal, to include handling, storage, transportation, and disposal costs as specified and approved.
1.10 CLIN 0010 ASBESTOS BULK SAMPLING
Asbestos bulk sampling will be measured for payment as a complete pay item for each complete sample (EA). Payment will be made at the lump sum price for LINE ITEM No. 0010, "ASBESTOS BULK SAMPLING", which price and payment shall be full compensation for all work required in each task order for sampling, handling, testing, etc., as specified and approved.
1.11 CLIN 0011 NONHAZARDOUS SOLID WASTE DISPOSAL
Nonhazardous solid waste disposal will be measured for payment as a per pound pay item (LBS). Payment will be made at the lump sum price for LINE ITEM No. 0011, "NONHAZARDOUS SOLID WASTE DISPOSAL", which price and payment shall be full compensation for all work required in each task order for nonhazardous solid waste disposal complete, to include handling, storage, transportation, and disposal costs as specified and approved.
1.12 CLIN 0012 TEM AIR AND WIPE SAMPLING
TEM Air and Wipe sampling will be measured for payment as a complete pay item for each complete sample (EA). Payment will be made at the lump sum price for LINE ITEM No. 0012, "TEM AIR AND WIPE SAMPLING ", which price and payment shall be full compensation for all work required in each task order for sampling, handling, testing, etc., as specified and approved.
1.13 CLIN 0013 PCM SAMPLING
PCM sampling will be measured for payment as a complete pay item for each complete sample (EA). Payment will be made at the lump sum price for LINE
SECTION 01 22 00.00 28 - Page 3
ITEM No. 0012, "PCM SAMPLING", which price and payment shall be full compensation for all work required in each task order for PCM sampling, handling, testing, etc., as specified and approved.
1.14 CLIN 0014 RCRA 8 TCLP
RCRA 8 TCLP will be measured for payment as a complete pay item for each complete sample (EA). Payment will be made at the lump sum price for LINE ITEM No. 0014, "RCRA 8 TCLP", which price and payment shall be full compensation for all work required in each task order for RCRA 8 TCLP sampling, handling, testing, etc., as specified and approved.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
SECTION 01 22 00.00 28 - Page 4
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 22 00.00 28 - MEASUREMENT AND PAYMENT |
| MEASUREMENT AND PAYMENT |
| PART 1 GENERAL |
| 1.1 CLIN 0001 SUBMITTAL PREPARATION |
| 1.2 CLIN 0002 PROJECT MANAGER |
| 1.3 CLIN 0003 SUPERVISOR |
| 1.4 CLIN 0004 QUALITY CONTROL MANAGER |
| 1.5 CLIN 0005 ASBESTOS ABATEMENT |
| 1.6 CLIN 0006 INDUSTRIAL COATING REMOVAL |
| 1.7 CLIN 0007 INDUSTRIAL HYGIENIST |
| 1.8 CLIN 0008 ASBESTOS-CONTAINING MATERIALS ACM DISPOSAL |
| 1.9 CLIN 0009 LEAD BASED PAINT DISPOSAL |
| 1.10 CLIN 0010 ASBESTOS BULK SAMPLING |
| 1.11 CLIN 0011 NONHAZARDOUS SOLID WASTE DISPOSAL |
| 1.12 CLIN 0012 TEM AIR AND WIPE SAMPLING |
| 1.13 CLIN 0013 PCM SAMPLING |
| 1.14 CLIN 0014 RCRA 8 TCLP |
| PART 2 PRODUCTS Not Applicable |
| PART 3 EXECUTION Not Applicable |
File details come from the government source that posted it.