17-Q-0066-0001_Amend_McNary_Top_of_Dam_Parking.docx

DOCX document 30 KB Posted

Attached to
McNary Parking Top of Dam
Solicitation number
W912EF-17-Q-0066
Issued by

About this file

Amendment to solicitation W912EF-17-Q-0066 to change the magnitude of contracting project.

View the file

Other files

File Type Posted
Amend-0002_TechSpecs.pdf PDF
Plans_Amendment-02.pdf PDF
17-Q-0066_Amend_0002.doc DOC document
Plans.pdf PDF
W912EF-17-Q-0066_McNary_Parking_Top_of_Dam.doc DOC document
TechSpec_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912EF-17-Q-0066

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

CLIN 0001

The FSC code Z2KA has been added.

The PROG code C20 has been added.

The WSC Equipment code 000 has been added.

The NAICS code 238990 has been added.

The MDAP/MAIS Code 000 has been added.

The following have been modified:

BID SCHEDULE

Walla Walla District Corps of Engineers McNary Lock and Dam, Columbia River, Oregon and Washington, Parking at Top of Dam

The magnitude of construction is estimated to be between $25,000 and $100,000.

ITEM

DESCRIPTION

QUANTITY

U/M

U/P

AMOUNT

Items

0001
Top of Dam Parking with Barrier Wall
1
JOB
XXXXX
$________
0002
Paving, striping, and wheel stops
1
JOB
XXXXX
$________

SCHEDULE TOTAL $__________

IMPORTANT See Section 01 22 00.00 28; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.

(End of Summary of Changes) image1.wmf