RFP_W912EF-15-R-0001 _with_specs _LoMo_1_and_2.pdf
PDF 7 MB Posted
- Attached to
- Lower Monumental Dam Unit 1 Rewind, Linkage, and Cavitation Repair, and Unit 2 Cavitation Repair
- Solicitation number
- W912EF-15-R-0001
About this file
Solicitation including specifications
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV50500431
CONSTRUCTION PROJECT: LOWER MONUMENTAL DAM UNIT #1 REWIND, LINKAGE REPAIR, AND CAVITATION REPAIR, AND UNIT #2
CAVITATION REPAIR
PHYLLIS L BUERSTATTE 509-527-7211
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
13-Mar-2015
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section 00700
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________6 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________05 May 2015 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USAED, WALLA WALLA - CONTRACTING DIV.
PHYLLIS L. BUERSTATTE
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
509-527-7802FAX:TEL: 509-527-7211 TEL: FAX:
W912EF-15-R-0001 92
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00010 - Solicitation Contract Form
ATTENTION TO OFFERORS
Offeror(s) may be asked to provide the following information for the Government’s use in the determination of offeror(s) responsibility, pursuant to FAR Part 9. Do not include it with your offer.
1. Current Balance Sheet and latest Profit and Loss Statement prepared from the most recent fiscal/calendar year and certified by an officer of the company.
2. The name of your banking institution, telephone number and the name of the individual to contact for a line-of-credit reference. (If you are the apparent low bidder, please contact your bank reference to let him/her know our office will be calling for financial information.)
Bank Institution ________________________________ Telephone Number ______________________________ Contact ________________________________________ Email Address __________________________________
3. Tax Identification Number ________________________
4. List of present work to include agency or firm name, address, telephone number, and email address of primary point of contact responsible for inspection and acceptance of the work. (Attach list) Will performance of the present work inhibit your ability to perform this contract? ___________
5. Offeror’s email address: ____________________________________
Return completed form with all attachments to:
Email: Phyllis.L.Buerstatte@usace.army.mil
OR
Physical/Mailing Address: Walla Walla District Corps of Engineers, 201 North Third Avenue, Walla Walla, WA 99362-1876.
TABLE OF CONTENTS
mailto:Phyllis.L.Buerstatte@usace.army.mil
Section 00010, Solicitation Contract Form
Section 00100, Bidding Schedule/Instructions to Bidders
Section 00600, Representations and Certifications
Section 00700, Contract Clauses
Section 00800, Special Contract Requirements
Technical Specifications
Drawings, as listed in Section 00700
Section 00100 - Bidding Schedule/Instructions to Bidders
BID SCHEDULE
Walla Walla District Corps of Engineers
LOWER MONUMENTAL UNIT 1 REWIND, LINKAGE, AND CAVITATION REPAIR AND UNIT 2 CAVITATION
REPAIR
Unrestricted Competition
The magnitude of construction is estimated to be between $10,000,000 and $25,000,000
ITEM
DESCRIPTION
QUANTITY
U/M
U/P
AMOUNT
0001 Mobilization And Demobilization 1 JOB XXXXX $________
BASIC REQUIREMENTS
UNIT 1
0002 Prototype Stator Bars 1 JOB XXXXX $________
0003 Furnish Complete Set of Stator Bars 1 JOB XXXXX $________
0004 Furnish Stator Core 1 JOB XXXXX $________
Disassemble, Reassemble, And Align Generator
1 JOB XXXXX $________
0006 Inspect, Clean, and Test Stator Core 1 JOB XXXXX $________
0007 Install and Test Stator Winding 1 JOB XXXXX $________
0008 Inspect, Clean, and Test Rotor Poles 1 JOB XXXXX $________
0009 Refurbish Rotor Poles *Est. 80 EA $_______ $________
0010 Surface Air Cooler Assembly 1 JOB XXXXX $________
0011 Post-Assembly Operational Testing 1 JOB XXXXX $________
0012 Furnish Generator Spare Parts 1 JOB XXXXX $________
Disassembly, Repair, and Reassembly of Turbine Runner
Refurbish Wicket Gate Operating Mechanism
0015 Clean and Inspect Oil Head and Pipes 1 JOB XXXXX $________
0016 Furnish and Install Oil Head Bushings 1 JOB XXXXX $________
Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping
Inspect and Test High Pressure Lift System
Main Shaft Packing Box Inspection and Painting
0020 Furnish and Install Turbine Shaft Sleeve 1 JOB XXXXX $________
0021 Furnish Spare Turbine Shaft Sleeve 1 JOB XXXXX $________
Furnish and Install Inner Head Cover Seat Ring
0023 NDE of all Main Shaft Flange Fillets 1 JOB XXXXX $________
Furnish and Install New Exposed Hub Unwatering Piping
Furnish And Install Thrust Bearing Cooler Assembly
Disassemble, Inspect, Reassemble, and Test Two Wicket Gate Servomotors
Furnish And Install Two Wicket Gate Servomotor Piston Rod Bushings
Chrome Plate Two Wicket Gate Servomotor Piston Rods
0029 Thrust Bearing Inspection - Phase 1 1 JOB XXXXX $________
0030 Turbine Guide Bearing Inspection 1 JOB XXXXX $________
Inspection of Upper and Lower Generator Guide Bearing Sets
0032 Remove Blocks from Runner Hub 1 JOB XXXXX $________
Cavitation Repair of Discharge Ring - 72 inches x 1/4 inch deep
0034 Spot Cavitation Repair - Mild Steel Est. 950 Cu. In. $_______ $________
0035 Spot Cavitation Repair - Stainless Steel Est. 900 Cu. In. $_______ $________
Repair of Unit 1 Discharge Ring Weld Seams
Est. 150 LF $_______ $________
0037 Discharge Ring Anchorage Est. 420 EA $_______ $________
0038 Epoxy Injection Est. 5 Cu. Ft. $_______ $________
0039 Paint Runner Blades 1 JOB XXXXX $________
0040 Commissioning 1 JOB XXXXX $________
BASIC REQUIREMENTS
UNIT 2
Cavitation Repair of Discharge Ring - 72 inches x 1/4 inch deep
0042 Spot Cavitation Repair - Mild Steel Est. 950 Cu. In. $_______ $________
0043 Spot Cavitation Repair - Stainless Steel Est. 900 Cu. In. $_______ $________
0044 Repair of Discharge Ring Weld Seams Est. 150 LF $_______ $________
0045 Discharge Ring Anchorage Est. 420 EA $_______ $________
0046 Epoxy Injection Est. 5 Cu. Ft. $_______ $________
BASIC REQUIREMENTS ITEMS TOTAL $______________
OPTIONAL REQUIREMENTS
UNIT 1
0047 Perform Additional Stator Core Interlaminar Insulation Test (Optional)
JOB
XXXXX
0048 Stator Core Iron Repair (Optional)
*NTE 200
MH $_______ $________
0049 Replace Stator Core (Optional) 1 JOB XXXXX $________
0050 Hone Runner Blade Servomotor Cylinder (Optional)
0051 Bore and Hone Runner Blade Servomotor Cylinder (Optional)
0052 Hone Wicket Gate Servomotor Cylinder
Est. 2 EA $_______ $________
0053 Bore and Hone Wicket Gate Servomotor Cylinder (Optional)
Est. 2 EA $_______ $________
0054 Furnish and Install Wicket Gate Servomotor Piston Ring Set (Optional)
Est. 2 SET $_______ $________
0055 Light Machine Cut On The Packing Box Bore (Optional)
0056 Skim Cut on Both Faces of the Packing Box Mounting Flange (Optional)
0057 Restore Packing Box Bore (Optional) 1 JOB XXXXX $________
Furnish and Install One Set of Outer Head Cover Tie Down Studs and Nuts
Furnish and Install One Set of Intermediate Head Cover Tie-Down Studs and Nuts (Optional)
Furnish and Install One Set of Inner Head Cover Tie Down Studs and Nuts
Furnish Piston Cap Stud and Nut
Est. 32 EA $_______ $________
Thrust Runner and Thrust Collar Phase 2 Inspections (Optional)
Thrust Shoes Phase 2 Inspections
Resurface the Running Surface of the Thrust Runner (Optional)
Complete Refurbishment of Thrust Runner (Optional)
Refurbish One Set of Thrust Bearing Shoes (Optional)
Refurbish Thrust Bearing Collar
Refurbish One Turbine Guide Bearing
Refurbish One Set of Upper Generator Guide Bearing Shoes (Optional)
Refurbish One Set of Lower Generator Guide Bearing Shoes (Optional)
Spot Cavitation Repair - Mild Steel
Est. 750 Cu. In. $_______ $________
Spot Cavitation Repair - Stainless Steel
Est. 900 Cu. In. $_______ $________
Furnish BLH Internal Hub Components
Discharge Ring Cavitation Repair - Additional Stainless Steel Band Repair (1" X 1/4") (Optional)
Est. 12 IN $_______ $________
Discharge Ring Cavitation - Additional Mild Steel Band Repair (1" X 1/8")
Repair of Discharge Ring Weld Seams
0077 Epoxy Injection (Optional) Est. 5 Cu. Ft. $_______ $________
OPTIONAL REQUIREMENTS
UNIT 2
Spot Cavitation Repair - Mild Steel
Est. 750 Cu. In. $_______ $________
Spot Cavitation Repair - Stainless Steel
Est. 900 Cu. In. $_______ $________
Additional Stainless Steel Band Repair (1" X 1/4") (Optional)
Additional Mild Steel Band Repair (1" X 1/8") (Optional)
Repair of Discharge Ring Weld Seams
0083 Epoxy Injection (Optional) Est. 5 Cu. In. $_______ $________
OPTIONAL ITEMS TOTAL $___________________
SCHEDULE TOTAL $___________________
IMPORTANT See Section 01 22 00.00 28; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.
*Est = Estimated
*NTE = Not to Exceed
Quantities identified as Estimated (“Est”) in the bid schedule are subject to FAR Clause 52.211-18, VARIATION IN
ESTIMATED QUANTITY, located in Section 00700.
Contract Line Item # 0048 is a labor hour line item. The extended amount for this item is the established ceiling price. Without a modification pursuant to FAR Clause 52.243-3, Changes -- Time-and-Materials or Labor-Hours (Sep 2000), the Contractor exceeds the ceiling at his own risk.
EVALUATION FACTORS FOR AWARD
A. BASIS FOR AWARD
The award will be made based on the best overall (i.e., best value-tradeoff) proposal that is determined to be the most beneficial to the Government, with appropriate consideration given to the four (4) evaluation factors:
Technical, Price, Past Performance and Small Business Participation. The Technical factors are MORE IMPORTANT than the Price factor, which is MORE IMPORTANT than the Past Performance and Small
Business Participation factors combined. The Past Performance and Small Business Participation factors are equal. All evaluation factors other than Price, when combined, are approximately equal to Price.
B. FACTORS AND SUB-FACTORS TO BE EVALUATED
The following evaluation factors and sub-factors will be used to evaluate each proposal. Award will be made to the offeror whose proposal is most advantageous to the Government based upon an integrated assessment of the evaluation factors and sub-factors described below.
1. FACTOR I Technical - The technical evaluation will be comprised of four (4) Sub-Factors. Risk assesses the degree to which the offeror’s proposed technical approach for the requirements of the solicitation may cause disruption of schedule, increased price, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance. Risk will be evaluated as one aspect of the technical evaluation, inherent in the technical evaluation factor or subfactor ratings.
Subfactor A: Technical Work Plan and Capabilities
Subfactor B: Hydraulic Turbine Runner Installation Experience
Subfactor C: Unit Stator Winding Replacement and Commissioning
Subfactor D: Management, Quality Control and Schedule
The four (4) subfactors are of equal importance.
Evaluation of the offeror’s proposal shall address each subfactor as it applies to the scope of work. A detailed explanation of the criteria for the evaluation is set forth in the Evaluation Approach, Paragraph C of this section. During evaluations of each proposal, the Government will assign each subfactor an adjectival rating and write a narrative evaluation reflecting the identified findings.
2. FACTOR II Price - The resulting award will be a firm-fixed price contract. Price reasonableness will be utilized in the evaluation of the proposal.
3. FACTOR III Past Performance - Each offeror’s current and past performance will be reviewed to determine relevancy and confidence.
4. FACTOR IV Small Business Participation - The extent of Small Business Participation will be evaluated for unrestricted acquisitions.
C. EVALUATION APPROACH
All proposals will be evaluated by the Source Selection Evaluation Board (SSEB).
1. The overarching evaluation approach for all factors and subfactors is as follows:
a. Adequacy of Response. The proposal will be evaluated to determine whether the offeror’s methods and approach have adequately and completely considered, defined, and satisfied the requirements specified in the RFP. The proposal will be evaluated to determine the extent to which each requirement has been addressed in the proposal in accordance with the proposal submission section of the RFP. Marginal levels of overall detail could indicate a lack of understanding concerning the requirements and may result in the entire factor receiving an unfavorable rating and/or being eliminated from the competitive range.
2. Factor I Technical - This factor is comprised of the following subfactors:
a. Subfactor A: Technical Work Plan and Capabilities
This subfactor evaluates the offeror’s understanding of the required scope of work and evaluates the offerors capabilities and availability of resources necessary to complete all requirements. The offeror should propose a work plan which clearly defines:
1) Major tasks and outlines all work necessary to complete those tasks.
2) Clearly present the critical path to complete all major tasks.
3) Discuss how work to complete one task may impact or be impacted by work to complete other tasks.
4) Clearly distinguish between work that will be completed on-site versus work that will be completed off-site.
5) Identify any critical assumptions and uncertainties that may impact the completion of work and to identify methods to check assumptions and address uncertainties.
6) Document capabilities and availability of resources necessary to complete all required major tasks.
7) List of all major pieces of equipment and specialty tools necessary and available to complete all major tasks.
8) List any specialty work crews or individuals required to complete unique or special tasks.
b. Subfactor B: Hydraulic Turbine Runner Installation Experience
This subfactor evaluates the offeror’s experience with turbine runner repairs and other work of similar size and scope of that required by this contract. Minimum experience shall be not less than two examples of the below requirements performed in the last six years. The evaluation will focus on the offeror’s documentation of experience with the following:
1) Assembly of large (200" runner diameter) adjustable blade runners.
2) Replacements of large adjustable blade propeller (Kaplan) turbine runners.
3) Alignment of larger vertical units.
4) New and/or refurbished hydro-turbine commissioning.
5) Machining of large turbine components such as the discharge ring and head covers.
6) Modifications to large turbine draft tubes
7) Cavitation repair of Kaplan turbine discharge rings at least 48 inches wide and at least 200 inches in diameter.
c. Subfactor C: Unit Stator Winding Replacement and Commissioning
This subfactor evaluates the experience, approach and capabilities of each offeror and the quality of their proposed technical approach to replace Unit 1 stator core and stator windings as specified in the requirements. The evaluation will focus on the offeror’s documentation of experience with the following:
1) Design of replacement stator windings and stator cores of at least 50 MW.
2) Provide a complete description of the stator core details (i.e. manufacturing process, materials).
3) Provide a complete description of the stator winding and accessories to include:
i. Bar insulation system (including strand, and groundwall insulation material and thickness, cross sectional dimensions and manufacturing process)
iii. Designed dielectric stress of the groundwall insulation at rated voltage
iv. Ground wall insulation application method (hand-wound, machine wound with/without scarf joint, etc.).
4) Identify the location and name(s) of the owning interest in the lamination manufacturing facility (the manufacturing experience of this facility in fabricating lamination shall be documented).
5) Identify the location and name(s) of the owning interest in the winding manufacturing facility (the manufacturing experience of this facility in fabricating stator windings of this size shall be documented).
6) Present guaranteed combined I2R (R corrected to 75 deg. C), stray load loss for their proposed winding in “kw” at 163,421 kVA, 0.95 power factor.
7) Present guaranteed core losses for proposed core in "kw" at rated voltage.
8) Describe technical approach and installation process.
Include a description of the stator core and stator winding installation process as well as details on the side packing system; wedging system including type, dimensions, and materials of wedges, total number of wedges per slot, number of check wedges per slot and end wedge securing method; spring deflection measurement method, brazing method and quality control procedures.
d. Subfactor D: Management, Quality Control and Schedule
This factor will evaluate the offeror’s proposed management and quality team experience and capabilities, and will evaluate proposed schedules necessary to complete the requirements of this contract.
1) Identify key management structure and team for completion of all contract requirements to include:
Resume that describes the experience and responsibility of key personnel with projects of similar type, size and complexity as that required for this contract.
2) Demonstrate the commitment of the offeror to maintain continuity of key management personnel through the completion of the project.
Project Manager, Project Site Superintendent and Construction Quality Control
Manager.
3) Description of the offeror’s Quality Control Program given the requirements in
Specification 01 45 04.00 28.
4) Provide a schedule that identifies the planned activities, order of tasks, task dependencies and durations proposed to successfully accomplish the entire project from notice to proceed to final commissioning for each unit. A baseline schedule will be prepared by the Government and used for comparison purposes.
The Technical Factor Ratings, excerpted below focus on the strengths, deficiencies, weaknesses, risks and uncertainties of the offeror’s proposal. The rating depicts how well the offeror’s proposal meets the
Technical subfactor requirements.
Rating Description Outstanding Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses.
Risk of unsuccessful performance is very low.
Good Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Marginal Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements and contains one or more deficiencies.
Proposal is not awardable.
3. Factor II - Price - The contract will be a Firm Fixed-Price Contract. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement.
Evaluation of options will not obligate the Government to exercise the option(s). The Government will evaluate offers for award purposes by evaluating the prices proposed in the Bid Schedule. The Offeror must provide a price proposal by completing the Bid Schedule as instructed in Section 00100.
Firm Fixed Price Requirements
a. The RFP requires firm-fixed-price contract line items. A price reasonableness approach will be utilized by the Government to determine that the proposed prices offered are fair and reasonable and that a “buy-in” or unbalanced pricing between CLINs or Option Periods is not occurring.
b. The Government will examine price proposals for artificially low unit prices. Offers found to be unreasonably high, unrealistically low (an indication of “buy – in”), or unbalanced, may be considered unacceptable and may be rejected on that basis.
4. Factor III - Past Performance - The Government will evaluate
a. The Government will evaluate the offeror’s record of past and current performance to ascertain the probability of successfully performing the required efforts of the scope of work.
b. The Government will focus its inquiries on the offeror’s (and major subcontractors’) record of performance as it relates to all solicitation requirements, including price, schedule, performance and management of subcontractors. Major subcontractors are defined as members of an offeror’s overall team who are expected to perform ten (10) percent or more of the proposed effort. A significant achievement, problem, or lack of relevant data in any element of the work can become an important consideration in the evaluation process. Therefore, offerors are reminded to include the most current and relevant past efforts (within the past six years) in their proposal. Absent any current and relevant past performance history or when the performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the offeror will be assigned an “unknown confidence rating” and its proposal will not be evaluated either favorably or unfavorably on past performance. The Government may use data provided by the offeror in its proposal and data obtained from other sources, including data in Government files or data obtained through interviews with personnel familiar with the contractor and their current and past performance under Federal, State or Local government or commercial contracts for same or similar services as compared to the North
American Industry Classification System NAICS 237990, Other Heavy and Civil Engineering Construction.
Data used in conducting performance risk assessments shall not extend past six years prior to the issue date of the RFP, but may include performance data generated during the past six years without regard to the contract award date.
c. Offerors shall submit all Government and/or commercial contract numbers and descriptions for the prime offeror and each major subcontractor in performance or awarded during the past six years, from the issue date of this RFP, which are relevant to the efforts required by this RFP. The
Government may consider a wide array of information from a variety of sources, but is not compelled to rely on all of the information available.
d. The past performance factor considers each offeror’s demonstrated current and relevant past record of performance in supplying products and services that meet the contract requirements. There are two aspects to the past performance evaluation: relevancy and performance confidence assessment.
(i) RELEVANCY: The Government will conduct a performance assessment based on the relevancy of the Offeror's current and past performance, as well as that of its major subcontractors, as it relates to the probability of successful accomplishment of the required effort. These efforts include all aspects of schedule, performance and customer support, including the Offeror’s submitted subcontracting plan for this project and the Offeror’s record of: 1) Conforming to specifications and standards of good workmanship; 2) Maintaining program execution within price; 3) Adherence to contract schedules, including the administrative aspects of performance; 4) Ability to resolve technical and manufacturing problems quickly and effectively; 5) Businesslike concern for the interest of its customers; 6) Establishing and maintaining adequate management of subcontractors; and 7) Compliance with subcontracting plans submitted on previous projects.
Past Performance Relevancy Ratings
Rating Definition
Very Relevant Current/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Current/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Current/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Current/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
(ii) PERFORMANCE CONFIDENCE ASSESSMENT: The final step is for the team to arrive at a single consensus performance confidence assessment for the offeror, selecting the most appropriate rating from the chart below. This rating considers the assessed quality of the relevant/current efforts gathered (documented results from Past Performance Questionnaires, interviews, CPARS, and other sources form the support and basis for this assessment).
Performance Confidence Assessments
Rating Definition
Substantial Confidence Based on the offeror’s relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence Based on the offeror’s relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
Unknown Confidence (Neutral) No relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
5. Factor IV - Small Business Participation: All offerors (both large and small businesses) will be evaluated on the level of proposed participation of small businesses in the performance of acquisition (as small business prime offerors or small business subcontractors) relative to the objectives and goals established herein. The government will evaluate:
a. The extent to which such firms, as defined in FAR Part 19, are specifically identified in proposals;
b. The extent of commitment to use such firms (and enforceable commitments will be considered more favorably than non-enforceable ones);
c. Identification of the complexity and variety of the work small firms are to perform;
d. The extent past performance is in compliance with FAR 52.219-8 “Utilization of Small
Business” and maximizing opportunities for U.S. Small Business Subcontractors.
e. The Offeror’s proposal must meet the minimum Total Small Business Participation goal of
15% (through collective small business participation from any type of small business or sub-category of small business). The Government will evaluate the proposals to determine the reasonableness of the portion of work to be subcontracted for each subcategory. The work to be performed directly by the Offeror will also be evaluated as Small Business Participation. The goals are:
Total SB (any type of small business) 15% of total contract value
Subcategory Small Business o HUBZONE small business 3% o Woman Owned Small Business(WOSB) 3% o Service-Disabled Veteran Owned SB (SDVOSB) 3% o Small Disadvantaged Business (SDB) 5% o HBCU/Minority Institutions >0%
Small Business Participation Factor Rating Definitions
Rating Description
Outstanding
Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
Good
Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Marginal
Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements and contains one or more deficiencies. Proposal is unawardable.
D. PROPOSAL SUBMISSION
1. Introduction. The offeror’s proposal shall be submitted in hard copy, with accompanying digital copies, as set forth below. The RFP shall provide the Government address and receipt date for proposal submittal.
The offeror’s proposal shall consist of two (2) volumes. The Volumes are:
Volume I - Technical, Past Performance
Volume II - Price, Small Business Participation, and Solicitation, Offer and Award Documents and
Certifications/Representations.
Files shall not contain classified data. The use of hyperlinks in proposals is prohibited. Proposals must be submitted in hard copy AND electronically. The electronic files shall contain identical information to the hard copy files.
Offerors are cautioned that “parroting” of the Technical requirements with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.
2. Proposal Submission Requirements.
a. Each volume shall be submitted in a separate three-ring binder. Any pages that are changed (as a result of negotiations or proposal revisions) should be of a different color and have changed information clearly marked by a vertical line in the right margin of the page. The revised pages shall be dated. Each binder shall be clearly labeled with its Title and a copy number (e.g., copy
1 of 5).
b. Printing should be single spaced. Each paragraph shall be separated by at least one blank line.
A standard, 12-point minimum font size applies. Arial or New Times Roman fonts are required.
Tables and illustrations may use a reduced font size no less than 8-point and may be landscape.
c. The following volumes of material shall be submitted:
VOLUME TITLE
PRINTED
COPIES
ELECTRONIC
COPIES
Volume I Original + 4 1
Volume II Original + 4 1
3. Proposal Files.
a. Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer.
A Table of Contents should be created using the Table of Content feature in MS Word. MS Word (doc) files shall use the following page setup parameters:
Margins – Top, Bottom, Left, Right – 1”
From Edge – Header, Footer 0.5” Page
Size, Width – 8.5”
Page Size, Height – 11”
NOTE: 11X17 folded pages are acceptable for tables/graphic representations
The following additional restrictions apply:
b. File Packaging. All of the proposal files shall be compressed (zipped) into one file entitled proposal zip using WinZip version 6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc., and provided on CDs or DVDs. Zip disks are not permitted. Files shall be in read-only format, using PDF files. All price breakdown information to aide in the Price evaluation shall be submitted in
Microsoft Office Excel Read/Write format and viewable in Microsoft Excel 2007. Each disc shall be externally labeled with the volume number, date, and the offeror’s name. **Please note – Self extracting exe files are not acceptable. **If the hard-copy proposal differs from the electronic version, the electronic copy will govern.
c. Content Requirement. All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Each file of the proposal shall consist of a Table of
Contents, Summary Section, and the Narrative discussion. The Summary Section shall contain a brief abstract of the file. Proprietary information shall be clearly marked. The following shall be included in the
Narrative discussion:
(i) VOLUME I -Technical. The volume shall be organized into the following section:
(1) Section 1- Subfactor A: Technical Work Plan and Capabilities
(2) Section 2 - Subfactor B: Hydraulic Turbine Runner Experience
(3) Section 3 Subfactor C: Unit Stator Winding Replacement and Commissioning
(4) Section 4 Subfactor D: Management, Quality Control and Schedule
(ii) VOLUME I – Past Performance. This volume shall contain current and past performance information regarding similar contracts. This volume shall not exceed 25 pages plus five pages for each major subcontractor, excluding Past Performance Questionnaire Forms. Offerors shall submit all Government and/or commercial contracts for the prime offeror and each major contract currently in performance or awarded during the past six years, from the issue date of this RFP, which are relevant to the efforts required by this solicitation. Relevant efforts are defined as services/efforts that are the same as or similar to the effort (as compared to NAICS code 237990, Other Heavy and
Civil Engineering Construction) required by the RFP. Data concerning the offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. The Offeror shall also submit the written consent of its major subcontractors to allow the disclosure of its subcontractor’s past performance information to the Offeror. In addition, letters of commitment shall be included for all major subcontractors for their past performance to be considered. This volume shall be organized into the following sections:
(1) Section 1 – Contract Descriptions. This section shall include the following information in the following format. Ensure all information is current and accurate.
(a) Contractor/Subcontractor place of performance, CAGE Code and DUNS
Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization
(name, and current address, e-mail address, and telephone and fax numbers).
(b) Government contracting activity, and current address, Procuring Contracting
Officer’s name, e-mail address, telephone and fax numbers.
(c) Government’s technical representative/COR and current email address, telephone and fax numbers.
(d) Government contract administration activity and the Administrative
Contracting Officer’s name, current e-mail address, telephone and fax number.
(e) Government contract administration activity’s Pre-Award point of contact name, and current e-mail address, telephone and fax numbers.
(f) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements, include Delivery Order Numbers.
(g) Contract Type (specific type such as Fixed-Price (FP), Cost Reimbursement
(CR), Time & Material (T&M), etc.). In the case of Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc.).
(h) Awarded price.
(i) Final or projected final price.
(j) Original delivery schedule, including dates of start and completion or work.
(k) Final or projected final, delivery schedule, including dates of start and completion of work.
(2) Section 2 – Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section 1 - Contract Description, describing the objectives achieved and detailing how the effort is relevant to the requirement of this RFP.
(a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All Requests for Deviation and Requests for Waiver shall be addressed with respect to causes and corrective actions. The offerors shall also provide copy of any Cure Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the offeror or proposed subcontractor. The offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.
(b) For all contracts, the offeror shall provide data on all manufacturing warranty returns. Data shall delineate total number of warranty returns, number of Could Not
Duplicate (CND), number of failures attributable to GFE component failures, and number and nature of failures attributable to the offeror’s delivered product.
(3) Section 3 – Subcontracts. Offerors shall provide an outline of how the effort required by the
RFP will be assigned for performance within the offeror’s corporate entity and among the proposed subcontractors. The information provided for the prime offeror and each proposed major subcontractor must include the entire company name, company address, CAGE Code, DUNS
Number and type of work to be performed by citing the applicable Government technical specification. This includes all subcontractors who will be providing critical hardware/services or whose subcontract is for more than 10% of the total proposed Price.
(4) Section 4 – New Corporate Entities. New corporate entities may submit data on prior contracts involving its officers and employees. However, in addition to the other requirements in this section, the offeror shall discuss in detail the role performed by such persons in the prior contracts cited.
Information should be included in the files described in the sections above. Letters of Commitment shall be included in the proposal for these employees in order to be considered.
(5) Section 5-Past Performance Questionnaire. For all contracts identified in Section 1 - Contract
Descriptions, a Past Performance Questionnaire must be completed and submitted. The offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the
Government contracting activity and technical representative responsible for the current and past contract. The Point of Contacts (POCs) shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Office no later than the proposal due date, to Phyllis.L.Buerstatte@usace.army.mil. The offeror shall e-mail to the Contracting
Officer a list of all the POC’s who were sent a questionnaire. The Government must receive this list no later than the proposal due date. The POC List shall be submitted in Word for Windows
Table Format to include the following fields: Solicitation Number; Company Name; Contract
Number; Government Agency; POC Last Name, First Name; POC Title; POC Telephone Number;
POC E-mail Address; and Date E-Mail to POC (month/day).
(6) Section 6-Submissions. Offerors are discouraged from providing points of contact with another contractors’ facility, i.e., in case an offeror (or one of his/her team members) is in a subcontract with another contractor who has submitted a proposal on the same requirement. Offerors shall provide and submit the prime contract number and all Governmental agency points of contact (POC) in lieu of subcontract numbers or prime contract POCs in situations as described above.
(iii) VOLUME II – Price. This volume shall consist of all information, required to support proposed prices. Certified pricing data is not currently required; however, the Government reserves the right to request such data prior to award. There are no page limitations for this volume.
The offeror shall ensure that the information submitted in this volume is consistent with and fully supports the amounts set forth in the SF1442 and continuation sheets.
(iv) VOLUME II – Small Business Participation Plan – All Offerors (both large and small businesses) are required to complete a Small Business Participation Plan (form attached). Offerors must propose the level of participation of small businesses (as a prime and/or small business subcontractors) in the performance of this acquisition relative to the objectives/goals set forth in the evaluation of this area.
(v) VOLUME II – SOLICITATIONS, OFFER AND AWARD DOCUMENTS AND
CERTIFICATIONS/REPRESENTATIONS
Certifications and Representations – Each offeror shall complete (fill-in and signatures) the solicitation sections indicated below using the file (without modification to the file) provided with the RFP. An authorized official of the firm shall sign the SF 1442 and all certifications requiring original signature. An Acrobat PDF file shall be created to capture the signatures for submission.
Section 00010 – Standard Form 1442 Solicitation, Offer and Award (Construction, Alteration or
Repair) mailto:Phyllis.L.Buerstatte@usace.army.mil
Section 00600 – Representations, Certification and Other Statements of Offerors
Solicitations, Offer and Award Documents and Certifications/Representations shall not be submitted separately from that submitted in VOLUME II – SOLICITATIONS, OFFER AND
AWARD DOCUMENTS AND CERTIFICATIONS /REPRESENTATIONS.
E. DISCUSSIONS
1. GENERAL INFORMATION. In accordance with FAR provision 52.215-1, discussion sessions may be held.
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) 2015
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other
(Explain)
Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information
Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine
How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT
RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the
Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the
Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per
DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than
Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the
Government/Owner.
(U) Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner.