Amendment_0003 _with_specs _W912EF-_15-R-0001 _LoMo_1_and_2.pdf
PDF 955 KB Posted
- Attached to
- Lower Monumental Dam Unit 1 Rewind, Linkage, and Cavitation Repair, and Unit 2 Cavitation Repair
- Solicitation number
- W912EF-15-R-0001
About this file
Amendment 0003 including specifications
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV50500431
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
This Amendment 0003 revises the specif ications and clauses, as stated herein.
LOWER MONUMENTAL DAM UNIT #1 REWIND, LINKAGE REPAIR & CAVITATION REPAIR, AND UNIT #2 CAVITATION REPAIR
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-May-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-15-R-0001
X 9B. DATED (SEE ITEM 11)
13-Mar-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-May-2015
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
PHYLLIS L. BUERSTATTE
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-15-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
AMENDMENT 0003
1. Changes to the Specifications
a. Revised SECTION 01 22 00.00 28 MEASUREMENT AND PAYMENT
Revised Paragraph 1.3.38 Painting
b. Added SECTION 01 51 00.00 28 TEMPORARY UTILITIES
c. Revised SECTION 01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE
AREAS
Added Paragraph 1.3.1 Paint Containment Staging Area
d. Revised SECTION 01 78 00.00 28 CLOSEOUT SUBMITTALS Paragraph 2.1.1 Warranty Management Plan Paragraph 2.1.3 Contractor's Response to Warranty Service Requirements Paragraph 2.1.5 Special Conditions
e. Revised SECTION 09 97 02.00 28 PAINTING: HYDRAULIC STRUCTURES Paragraph 3.5 PAINTING SCHEDULES
f. Revised SECTION 48 13 13.02 26 UNIT 1 DISASSEMBLY AND REASSEMBLY OF
HYDRAULIC TURBINE GENERATOR UNIT
Paragraph 1.1.5 Unclassified Asbestos Containing Material (ACM)
g. Revised SECTION 48 13 16.00 26 UNIT 1 GENERATOR REWIND Paragraph 3.27.2 Verification Tests, b
2. Changes to the Contract Clauses in Section 00700 are indicated below.
SECTION 00700 - CONTRACT CLAUSES
The following have been added by full text:
52.232-5000 PAYMENT FOR MATERIALS DELIVERED OFF-SITE ( March 2013) —UAI
(a) Pursuant to FAR 52.232-5, Payments Under Fixed Price Construction Contracts, materials delivered to the contractor at locations other than the site of the work may be taken into consideration in making payments if included in payment estimates and if all the conditions of the General Provisions are fulfilled. Payment for items delivered to locations other than the work site shall be limited to:
http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_232.htm#P31_3455
(1) Materials required by the technical provisions; or
(2) Materials that have been fabricated to the point where they are identifiable to an item of work required under this contract; or
(3) Items specifically listed below.
(b) Payment for materials delivered off-site shall be made only after receipt of paid invoices listing the value of material and labor incorporated in the items along with a canceled check showing the prime contractor’s title to the items delivered off site. Payment for materials delivered off-site shall be limited to the following items: The materials required by CLIN 0003, Complete set of Stator Bars; CLIN 0004, Stator Core; CLIN 0010, Surface
Air Cooler Assembly; and CLIN 0073, BLH Internal Hub Components
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) Commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the dates listed below.
(1) The Contractor shall complete all preconstruction submittal requirements (SD-01) for the entirety of the project within 90 calendar days after Contractor’s receipt of the Notice to Proceed.
(2) The Contractor shall complete all Rewind, Linkage and cavitation repairs for Main Unit 1 by no later than 31 December 2016.
(3) The Contractor shall complete all cavitation repairs for Unit 2 between 9 January 2017 and 12 May 2017.
(4) If any optional items are exercised, work shall be completed by the time specified in the table shown in 52.217-7 OPTION FOR INCREASED QUANTITY – SEPARATELY PRICED LINE ITEM (MAR 1989).
(5) The Contractor shall complete final cleanup and demobilization by not later than Fifteen (15) calendar days after completion of work (c) (3) above.
(6) The Contractor shall complete final submission of O&M manuals (see SECTION 01 78 00.00 28), working “as-built” contract drawings and final approved versions of Contractor prepared drawings (see SECTION 01 78 23.00 28) by not later than Thirty (30) calendar days after completion of all work in (c) (3) above.
(End of clause)
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item(s), identified in the Schedule as an option item(s), in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option(s) by written notice to the Contractor as specified in the OPTIONAL ITEMS Table below:
OPTIONAL ITEMS
CLIN DESCRIPTION
Timeframe when optional ITEM may be exercised
If exercised, time extension to complete work for ITEM
UNIT 1
Perform Additional Stator Core Interlaminar Insulation Test (Optional)
Within Fifteen (15) days after Government Acceptance of the Interlaminar insulation test Report
Two (2) calendar days to 52.211-10 subparagraph (c)(3), after date of exercising the option.
0048 Stator Core Iron Repair (Optional)
Within Fifteen (15) days after Government Acceptance of the Interlaminar insulation test Report
Five (5) calendar days to 52.211-10 subparagraph (c)(3), after date of
0049 Replace Stator Core (Optional) after Government Acceptance of the Stator Inspection Report
Forty-five (45) calendar days to 52.211-10 subparagraph (c)(3), after date of exercising the option.
Hone Runner Blade Servomotor Cylinder (Optional)
Within Fifteen (15) days after Government Acceptance of the As Found Inspection Report
No additional time will be allowed
Bore and Hone Runner Blade Servomotor Cylinder (Optional)
Within Fifteen (15) days after Government Acceptance of the As Found Inspection Report
Hone Wicket Gate Servomotor Cylinder (Optional)
Within Fifteen (15) days after Government Acceptance of the Wicket Gate Servomotor Inspection Report
Bore and Hone Wicket Gate Servomotor Cylinder (Optional)
Within Fifteen (15) days after Government Acceptance of the Wicket Gate Servomotor Inspection Report
0054 Furnish and Install Wicket Gate Within Fifteen (15) days No additional time will be
Servomotor Piston Ring Set (Optional) after Government Acceptance of the Wicket Gate Servomotor Inspection Report
Light Machine Cut On The Packing Box Bore (Optional)
Within Fifteen (15) days after Government Acceptance of the Main shaft Packing Box Initial Inspection Report
Skim Cut on Both Faces of the Packing Box Mounting Flange (Optional)
Within Fifteen (15) days after Government Acceptance of the Main shaft Packing Box Initial Inspection Report
0057 Restore Packing Box Bore (Optional) after Government Acceptance of the Main shaft Packing Box Initial Inspection Report
Furnish and Install One Set of Outer Head Cover Tie Down Studs and Nuts (Optional)
Within Fifteen (15) days after Government Acceptance of the Headcover Studs, Nuts, and Bolts Inspection Report
Furnish and Install One Set of Intermediate Head Cover Tie-Down Studs and Nuts (Optional)
Within Fifteen (15) days after Government Acceptance of the Headcover Studs, Nuts, and Bolts Inspection Report
Furnish and Install One Set of Inner Head Cover Tie Down Studs and Nuts (Optional)
Within Fifteen (15) days after Government Acceptance of the Headcover Studs, Nuts, and Bolts Inspection Report
Furnish Piston Cap Stud and Nut (Optional)
Within Fifteen (15) days after Government Acceptance of the Piston Cap, Piston, and Studs Inspection Report
Thrust Runner and Thrust Collar Phase 2 Inspections (Optional)
Within Fifteen (15) days after Government Acceptance of the Thrust Runner Phase 1 inspection Report.
Thrust Shoes Phase 2 Inspections (Optional)
Within Fifteen (15) days after Government Acceptance of the Thrust Shoes Phase 1 inspection Report.
Resurface the Running Surface of the Thrust Runner (Optional)
Within Fifteen (15) days after Government Acceptance of the Thrust Runner as found inspection Report
Complete Refurbishment of Thrust Runner (Optional)
Within Fifteen (15) days after Government Acceptance of the Thrust Runner as found inspection Report
Refurbish One Set of Thrust Bearing Shoes (Optional)
Within Fifteen (15) days after Government Acceptance of the Thrust Bearing Shoes as found inspection Report
Refurbish Thrust Bearing Collar (Optional)
Within Fifteen (15) days after Government Acceptance of the Thrust Bearing Collar Inspection Report
Refurbish One Turbine Guide Bearing (Optional)
Within Fifteen (15) days after Government Acceptance of the Turbine Guide Bearing Inspection Report
Refurbish One Set of Upper Generator Guide Bearing Shoes (Optional)
Within Fifteen (15) days after Government Acceptance of the Generator Guide Bearing Inspection Report
Refurbish One Set of Lower Generator Guide Bearing Shoes (Optional)
Within Fifteen (15) days after Government Acceptance of the Generator Guide Bearing Inspection Report
Spot Cavitation Repair - Mild Steel (Optional)
Within Fifteen (15) calendar days after initial
Five (5) calendar days to 52.211-10 subparagraph excavation. (c)(3), after date of
Spot Cavitation Repair - Stainless Steel (Optional)
Within Fifteen (15) calendar days after initial excavation.
Five (5) to 52.211-10 subparagraph (c)(3), Furnish BLH Internal Hub Components (Optional)
Within Ninety (90) days after the Contractor’s receipt of the Notice to Proceed.
Shall be delivered in accordance with 52.211- 10 subparagraph (c)(3), Discharge Ring Cavitation Repair - Additional Stainless Steel Band Repair (1" X 1/4") (Optional)
Within Fifteen (15) calendar days after Government Acceptance of the discharge ring excavation.
One (1) additional calendar day to 52.211- 10 subparagraph (c)(3), per additional inch of cavitation repair after date of exercising the option.
Discharge Ring Cavitation - Additional Mild Steel Band Repair (1" X 1/8") (Optional)
Within Fifteen (15) calendar days after Government Acceptance of the discharge ring excavation.
One (1) additional calendar day to 52.211- 10 subparagraph (c)(3), per additional inch of cavitation repair after
Repair of Discharge Ring Weld Seams (Optional)
Within Fifteen (15) calendar days after initial excavation.
Ten (10) to 52.211-10 subparagraph (c)(3), 0077 Epoxy Injection (Optional) Immediately after initial excavation determines this work is necessary
Five (5) to52.211-10 subparagraph (c)(3), after date of exercising the option.
OPTIONAL REQUIREMENTS
UNIT 2
Spot Cavitation Repair - Mild Steel (Optional)
Within Fifteen (15) calendar days after initial excavation.
Five (5) calendar days to 52.211-10 subparagraph (c)(2), after date of
Spot Cavitation Repair - Stainless Steel (Optional)
Within Fifteen (15) calendar days after initial excavation.
Five (5) calendar days to 52.211-10 subparagraph
Additional Stainless Steel Band
Within Fifteen (15) calendar days after
One (1) additional calendar day to 52.211-
Repair (1" X 1/4") (Optional) Government Acceptance of the discharge ring excavation.
10 subparagraph (c)(2), per additional inch of cavitation repair after
Additional Mild Steel Band Repair (1" X 1/8") (Optional)
Within Fifteen (15) calendar days after Government Acceptance of the discharge ring excavation.
One (1) additional calendar day to 52.211- 10 subparagraph (c)(2), per additional inch of cavitation repair after
Repair of Discharge Ring Weld Seams (Optional)
Within Fifteen (15) calendar days after initial excavation.
Ten (10) calendar days to 52.211-10 subparagraph (c)(2), 0083 Epoxy Injection (Optional) Immediately after initial excavation determines this work is necessary
Five (5) calendar days to 52.211-10 subparagraph
(End of clause)
(End of Summary of Changes)
W912EF-15-R-0001 Amend-0003 Lower Monumental U1 Rewind & Linkage Repair and U1 & U2 Cavitation Repair
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 RETAINAGE OF PAYMENT
1.2 ITEM 0001 MOBILIZATION AND DEMOBILIZATION
1.3 BASIC REQUIREMENTS UNIT 1
1.3.1 Item 0002 Prototype Stator Bars
1.3.2 Item 0003 Furnish Complete Set of Stator Bars
1.3.3 Item 0004 Furnish Stator Core
1.3.4 Item 0005 Disassemble, Reassemble, And Align Generator
1.3.5 Item 0006 Inspect, Clean, and Test Stator Core
1.3.6 Item 0007 Install and Test Stator Winding
1.3.7 Item 0008 Inspect, Clean, and Test Rotor Poles
1.3.8 Item 0009 Reserved
1.3.9 Item 0010 Surface Air Cooler Assembly
1.3.10 Item 0011 Post-Assembly Operational Testing
1.3.11 Item 0012 Furnish Generator Spare Parts
1.3.12 Item 0013 Disassembly, Repair, and Reassembly of Turbine Runner
1.3.13 Item 0014 Refurbish Wicket Gate Operating Mechanism
1.3.14 Item 0015 Clean and Inspect Oil Head and Pipes
1.3.15 Item 0016 Furnish and Install Oil Head Bushings
1.3.16 Item 0017 Clean, Inspect, and Refurbish Automatic Air Valves, Gates Valves, and Piping
1.3.17 Item 0018 Inspect and Test High Pressure Lift System
1.3.18 Item 0019 Main Shaft Packing Box Inspection and Painting
1.3.19 Item 0020 Furnish and Install Turbine Shaft Sleeve
1.3.20 Item 0021 Furnish Spare Turbine Shaft Sleeve
1.3.21 Item 0022 Furnish And Install Inner Head Cover Seat Ring
1.3.22 Item 0023 NDE of all Main Shaft Flange Fillets
1.3.23 Item 0024 Furnish And Install New Exposed Hub Unwatering Piping
1.3.24 Item 0025 Furnish And Install Thrust Bearing Cooler Assembly
1.3.25 Item 0026 Disassemble, Inspect, Reassemble, and Test Two
Wicket Gate Servomotors
1.3.26 Item 0027 Furnish And Install Two Wicket Gate Servomotor
Piston Rod Bushings
1.3.27 Item 0028 Chrome Plate Two Wicket Gate Servomotor Rods
1.3.28 Item 0029 Thrust Bearing Inspection - Phase 1
1.3.29 Item 0030 Turbine Guide Bearing Inspection
1.3.30 Item 0031 Inspection of Upper and Lower Generator Guide
Bearing Sets
1.3.31 Item 0032 Remove Blocks from Runner Hub
1.3.32 Item 0033 Cavitation Repair of Discharge Ring - 72 inches x
1/4 Inch Deep
1.3.33 Item 0034 Spot Cavitation Repair - Mild Steel
1.3.34 Item 0035 Spot Cavitation Repair - Stainless Steel
1.3.35 Item 0036 Repair of Discharge Ring Weld Seams
1.3.36 Item 0037 Discharge Ring Anchorage
SECTION 01 22 00.00 28
1.3.37 Item 0038 Epoxy Injection
1.3.38 Item 0039 Painting
1.3.39 Item 0040 COMMISSIONING
1.4 BASIC REQUIREMENTS UNIT 2
1.4.1 Item 0041 Cavitation Repair of Discharge Ring - 72 Inches x 1/4
Inch Deep
1.4.2 Item 0042 Spot Cavitation Repair - Mild Steel
1.4.3 Item 0043 Spot Cavitation Repair - Stainless Steel
1.4.4 Item 0044 Repair of Discharge Ring Weld Seams
1.4.5 Item 0045 Discharge Ring Anchorage
1.4.6 Item 0046 Epoxy Injection
1.5 OPTIONAL REQUIREMENTS UNIT 1
1.5.1 Item 0047 Perform Additional Stator Core Interlaminar
Insulation Test (OPTIONAL)
1.5.2 Item 0048 Stator Core Iron Repair (Optional)
1.5.3 Item 0049 Replace Stator Core (Optional)
1.5.4 Item 0050 Hone Runner Blade Servomotor Cylinder (Optional)
1.5.5 Item 0051 Bore and Hone Runner Blade Servomotor Cylinder
(Optional)
1.5.6 Item 0052 Hone Wicket Gate Servomotor Cylinder (Optional)
1.5.7 Item 0053 Bore and Hone Wicket Gate Servomotor Cylinder
(Optional)
1.5.8 Item 0054 Furnish And Install Wicket Gate Servomotor Piston
Ring Set (Optional)
1.5.9 Item 0055 Light Machine Cut On The Packing Box Bore (Optional)
1.5.10 Item 0056 Skim Cut on Both Faces of the Packing Box Mounting
Flange (Optional)
1.5.11 Item 0057 Restore Packing Box Bore (Optional)
1.5.12 Item 0058 Furnish And Install One Set Of Outer Head Cover
Tie-Down Studs And Nuts (Optional)
1.5.13 Item 0059 Furnish And Install One Set of Intermediate Head
Cover Tie-Down Studs and Nuts (Optional)
1.5.14 Item 0060 Furnish and Install One Set of Inner Head Cover
Tie-Down Studs and Nuts (Optional)
1.5.15 Item 0061 Furnish Piston Cap Stud and Nut (Optional)
1.5.16 Item 0062 Thrust Runner and Thrust Collar Phase 2 Inspections
(Optional)
1.5.17 Item 0063 Thrust Shoes Phase 2 Inspections (Optional)
1.5.18 Item 0064 Resurface the Running Surface of the Thrust Runner
(Optional)
1.5.19 Item 0065 Complete Refurbishment of Thrust Runner (Optional)
1.5.20 Item 0066 Refurbish One Set of Thrust Bearing Shoes (Optional)
1.5.21 Item 0067 Refurbish Thrust Bearing Collar (Optional)
1.5.22 Item 0068 Refurbish One Turbine Guide Bearing (Optional)
1.5.23 Item 0069 Refurbish One Set of Upper Generator Guide Bearing
Shoes (Optional)
1.5.24 Item 0070 Refurbish One Set of Lower Generator Guide Bearing
Shoes (Optional)
1.5.25 Item 0071 Spot Cavitation Repair - Mild Steel (Optional)
1.5.26 Item 0072 Spot Cavitation Repair - Stainless Steel (Optional)
1.5.27 Item 0073 Furnish BLH Internal Hub Components (Optional)
1.5.28 Item 0074 Discharge Ring Cavitation Repair - Additional
Stainless Steel Band Repair (1" X 1/4") (Optional)
1.5.29 Item 0075 Discharge Ring Cavitation Repair - Additional Mild
Steel Band Repair (1" X 1/8") (Optional)
1.5.30 Item 0076 Repair of Discharge Ring Weld Seams(Optional)
1.5.31 Item 0077 Epoxy Injection (Optional)
1.5.32 Item 0078 Refurbish Rotor Poles (Optional)
1.6 OPTIONAL REQUIREMENTS UNIT 2
SECTION 01 22 00.00 28
G4EDDRJR
Line
1.6.1 Item 0079 Spot Cavitation Repair - Mild Steel (Optional)
1.6.2 Item 0080 Spot Cavitation Repair - Stainless Steel (Optional)
1.6.3 Item 0081 Discharge Ring Cavitation Repair - Additional
Stainless Steel Band Repair (1" X 1/4") (Optional)
1.6.4 Item 0082 Discharge Ring Cavitation Repair - Additional Mild
Steel Band Repair (1" X 1/8") (Optional)
1.6.5 Item 0083 Repair of Discharge Ring Weld Seams (Optional)
1.6.6 Item 0084 Epoxy Injection (Optional)
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
This page intentionally left blank
SECTION 01 22 00.00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
In each instance, the contract price for an item shall constitute full compensation for furnishing all plant, labor, equipment, and materials, and for performing all operations required to complete the work included in the item as herein specified, or as otherwise approved.
1.1 RETAINAGE OF PAYMENT
Retainage in the amount of 10% of original contract award amount will be withheld until the final submittals, listed below, have been approved by the Government. The 10% retainage for final submittals will not be held until such time as the Contractor has earned 90% of the original contract value. See SECTION 01 78 00.00 28 "CLOSEOUT SUBMITTALS" for additional information.
a. Final Operation and Maintenance Manuals and Parts Catalogs.
b. Final Approved Versions of Contractor Prepared Drawings.
c. As-built contract drawings and FIO drawings.
d. Return of Government Issued Items.
1.2 ITEM 0001 MOBILIZATION AND DEMOBILIZATION
Measurement and payment for mobilization and demobilization will be in accordance with Contract CLAUSE: PAYMENT FOR MOBILIZATION AND DEMOBILIZATION. This item will be measured for payment as a complete pay item (JOB) under Item No. 0001, "Mobilization and demobilization," which price and payment shall be full compensation for mobilizing and demobilizing all plant and equipment required for performance of the work, as specified and approved.
1.3 BASIC REQUIREMENTS UNIT 1
1.3.1 Item 0002 Prototype Stator Bars
Prototype stator bars will be measured for payment as a complete pay item (Job). Payment will be made at the lump sum price for Item No. 0002, "Prototype Stator Bars," which price and payment shall be full compensation for all work required to test and furnish the 8 prototype stator bars, complete, as specified and approved.
1.3.2 Item 0003 Furnish Complete Set of Stator Bars
Furnish complete set of stator bars will be measured for payment as a complete pay item (Job). Payment will be made at the lump sum price for Item No. 0003, "Furnish Complete Set of Stator Bars," which price and payment shall be full compensation for all work required to furnish a complete set of stator bars including all supplies and accessories required for a complete new winding, this also include all costs for factory testing, complete, as specified and approved.
1.3.3 Item 0004 Furnish Stator Core
Furnish stator core will be measured for payment as a complete pay item (Job). Payment will be made at the lump sum price for Item No. 0004, "Furnish Stator Core," which price and payment shall be full compensation for all work required to furnish the stator core including accessories, complete, as specified and approved.
1.3.4 Item 0005 Disassemble, Reassemble, And Align Generator
Disassemble, Reassemble, And Align Generator will be measured for payment as a complete pay item (Job). Payment will be made at the lump sum price for Item No. 0005, "Disassemble, Reassemble, And Align Generator," which price and payment shall be full compensation for all work required for disassembling, reassembling and align generator, complete, as specified and approved. Features included with this item will include, but not be limited to:
a. Pre-disassembly testing.
b. Pre-disassembly measurements.
c. Sealing between mating surfaces.
d. Adjustments.
e. Performing reassembly measurements.
1.3.5 Item 0006 Inspect, Clean, and Test Stator Core
Inspect, Clean, and Test Stator Core will be measured for payment as a complete pay item (Job). Payment will be made at the lump sum price for Item No. 0006, "Inspect, Clean, and Test Stator Core," which price and payment shall be full compensation for all work required to inspect, clean, and test stator core, complete, as specified and approved.
1.3.6 Item 0007 Install and Test Stator Winding
Stator winding installation and testing will be measured for payment as a complete pay item (Job). Payment will be made at the lump sum price for Item No. 0007, "Install and Test Stator Winding," which price and payment shall be full compensation for all work required to install and test the stator winding, complete as specified and approved., complete, as specified and approved.
1.3.7 Item 0008 Inspect, Clean, and Test Rotor Poles
Inspection, cleaning and testing of rotor poles will be measured for payment as a complete pay item (Job). Payment will be made at the lump sum price for Item No. 0008, "Inspect, Clean, and Test Rotor Poles," which price and payment shall be full compensation for all work required to inspect, clean and test the rotor poles, complete, as specified and approved.
1.3.8 Item 0009 Reserved
1.3.9 Item 0010 Surface Air Cooler Assembly
Surface air cooler assembly will be measured for payment as a complete pay item (Job). Payment will be made at the lump sum price for Item No. 0010, "Surface Air Cooler Assembly," which price and payment shall be full compensation for all work required to furnish and assemble 12 coolers for Unit 1 surface air cooler, complete, as specified and approved.
1.3.10 Item 0011 Post-Assembly Operational Testing
Post-assembly operational testing will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0011, "Post-assembly operational testing," which price and payment shall be full compensation for all work required to perform testing after reassembly of the generating unit, complete, as specified and approved.
Features included with this item will include, but not be limited to:
a. System and component testing.
b. Electrical tests.
c. Post-repair operation testing.
d. And 72-hour operational test in accordance with the Contractor's approved startup procedure.
1.3.11 Item 0012 Furnish Generator Spare Parts
Furnish Generator spare parts will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No.
0012, "Furnish Generator Spare Parts," which price and payment shall be full compensation for all work required to furnish the generator spare parts, complete, as specified and approved. Spare parts to be paid for under this bid item are listed below:
a. Stator Bars.
b. RTD and RTD cables.
c. Laminations.
d. Stator Core Vent Duct Spacer.
e. Packaging and Storage Costs.
1.3.12 Item 0013 Disassembly, Repair, and Reassembly of Turbine Runner
Disassembly, repair, and reassembly of turbine runner will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0013, "Disassembly, repair, and reassembly of turbine runner," which price and payment shall be full compensation for all work required for runner disassembly, repair, and reassembly, complete, as specified and approved. Features included with this item will include, but not be limited to:
a. Measurements.
b. Inspections.
c. Final machining and installation of BLH internal hub components.
d. Incidental repairs.
e. Redundant Hub Oil Seal Modification design and installation.
1.3.13 Item 0014 Refurbish Wicket Gate Operating Mechanism
Refurbishing wicket gate operating mechanism will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0014, "Refurbishing wicket gate operating mechanism," which price and payment shall be full compensation for all work required for refurbishing the wicket gate operating mechanism, complete, as specified and approved. Features included with this item will include, but not be limited to:
a. Inspect the wicket gate operating linkage and mechanism.
b. Furnish and install 48 link pins.
c. Furnish and install 96 retaining rings.
d. Furnish and install 24 shear pins.
e. Furnish and install 24 shear pin washers.
f. Furnish and install 24 shear lever pin washers.
g. Furnish and install 24 shear lever pin lock washers.
h. Furnish and install self-lubricating link pin bushings for the wicket gate operating mechanism.
1.3.14 Item 0015 Clean and Inspect Oil Head and Pipes
Clean and inspect oil head and pipes will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0015, "Clean and inspect oil head and pipes," which price and payment shall be full compensation for all work required for cleaning and inspecting oil head and pipes and installing packing, complete, as specified and approved.
1.3.15 Item 0016 Furnish and Install Oil Head Bushings
Furnish and install oil head bushings will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0016, "Furnish and install oil head bushings," which price and payment shall be full compensation for all work required for furnishing and installing new oil head bushings, complete, as specified and approved.
1.3.16 Item 0017 Clean, Inspect, and Refurbish Automatic Air Valves, Gates Valves, and Piping
Clean, inspect, and refurbish automatic air valves, gates valves, and piping will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0017, "Clean, inspect, and refurbish automatic air valves, gates valves, and piping," which price and payment shall be full compensation for all work required to clean, inspect, and refurbish two (2) automatic air valves, two (2) gates valves, and the air admission piping, complete, as specified and approved.
1.3.17 Item 0018 Inspect and Test High Pressure Lift System
Inspect and test high pressure lift system will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0018, "Inspect and test high pressure lift system," which price and payment shall be full compensation for all work required to inspect and test the high pressure lift system, complete, as specified and approved.
1.3.18 Item 0019 Main Shaft Packing Box Inspection and Painting
Main shaft packing box inspection and painting will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0019, "Main shaft packing box inspection and painting," which price and payment shall be full compensation for all work required to inspect and paint one main shaft packing box, complete, as specified and approved.
1.3.19 Item 0020 Furnish and Install Turbine Shaft Sleeve
Furnish and install turbine shaft sleeve will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for
Item No. 0020, "Furnish and install turbine shaft sleeve," which price and payment shall be full compensation for all work required for furnishing and installing the turbine shaft sleeve, complete, as specified and approved.
Features included with this item will include, but not be limited to:
a. Removing the existing shaft sleeve.
b. Measuring the shaft.
c. Fabricating and shipping one new turbine shaft sleeve.
d. Shipping a Government-furnished mandrel from the project site to the shop and back (if applicable).
1.3.20 Item 0021 Furnish Spare Turbine Shaft Sleeve
Furnish spare turbine shaft sleeve will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0021, "Furnish spare turbine shaft sleeve," which price and payment shall be full compensation for all work required for furnishing one new spare turbine shaft sleeve, complete, as specified and approved.
1.3.21 Item 0022 Furnish And Install Inner Head Cover Seat Ring
Furnish and install inner head cover seat ring will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0022, "Furnish And Install Inner Head Cover Seat Ring," which price and payment shall be full compensation for all work required to furnish and install a new inner head cover seat ring, complete, as specified and approved.
1.3.22 Item 0023 NDE of all Main Shaft Flange Fillets
Non Destructive Examination (NDE) of all main shaft flange fillets will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0023, "NDE of all Main Shaft Flange Fillets," which price and payment shall be full compensation for all work required to complete NDE of all main shaft flange fillets, complete, as specified and approved.
1.3.23 Item 0024 Furnish And Install New Exposed Hub Unwatering Piping
Furnish and install new exposed hub unwatering piping will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0024, "Furnish And Install New Exposed Hub Unwatering Piping," which price and payment shall be full compensation for all work required to remove the existing piping, furnish and install new exposed hub unwatering piping, complete, as specified and approved.
1.3.24 Item 0025 Furnish And Install Thrust Bearing Cooler Assembly
Furnish and install thrust bearing cooler assembly will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0025, "Furnish And Install Thrust Bearing Cooler Assembly," which price and payment shall be full compensation for all work required to furnish and install the new thrust bearing coolers, consisting of 2 sections for Unit 1, complete, as specified and approved.
1.3.25 Item 0026 Disassemble, Inspect, Reassemble, and Test Two Wicket Gate Servomotors
Disassemble, inspect, reassemble, and test two wicket gate servomotors will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0026, "Disassemble, inspect, reassemble, and test two wicket gate servomotors," which price and payment shall be full compensation for all work required to disassemble, inspect, reassemble, and test two wicket gate servomotors, complete, as specified and approved.
1.3.26 Item 0027 Furnish And Install Two Wicket Gate Servomotor Piston Rod Bushings
Furnish and install two wicket gate servomotor piston rod bushings will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0027, "Furnish And Install Two Wicket Gate Servomotor Piston Rod Bushings," which price and payment shall be full compensation for all work to furnish and install two wicket gate servomotor piston rod bushings, including all transportation costs, labor, material, and equipment, complete, as specified and approved.
1.3.27 Item 0028 Chrome Plate Two Wicket Gate Servomotor Rods
Chrome plate two wicket gate servomotor rods, one rod for each wicket gate servomotor, will be measured for payment as a complete pay item (JOB).
Payment will be made at the lump sum price for Item No. 0028, "Chrome plate two wicket gate servomotor rods," which price and payment shall be full compensation for all work, including all transportation costs, labor, shop work, materials, and equipment required, complete, as specified and approved.
1.3.28 Item 0029 Thrust Bearing Inspection - Phase 1
Thrust bearing inspection - Phase 1 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0029, "Thrust bearing inspection - Phase 1," which price and payment shall be full compensation for all work required to inspect the thrust bearing - phase 1, complete, as specified and approved.
1.3.29 Item 0030 Turbine Guide Bearing Inspection
Turbine guide bearing inspection will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No.
0030, "Turbine guide bearing inspection," which price and payment shall be full compensation for all work required to inspect the turbine guide bearing, complete, as specified and approved.
1.3.30 Item 0031 Inspection of Upper and Lower Generator Guide Bearing Sets
Inspection of upper and lower generator guide bearing sets will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No.0031, "Inspection of upper and lower generator guide bearing sets," which price and payment shall be full compensation for all work required to inspect upper and lower generator guide bearings, complete, as specified and approved.
1.3.31 Item 0032 Remove Blocks from Runner Hub
Remove blocks from runner hub will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No.
0032, "Remove blocks from runner hub," which price and payment shall be full compensation for all work required to remove blocks and repair blocked surfaces damaged by block installation and removal, complete, as specified and approved.
1.3.32 Item 0033 Cavitation Repair of Discharge Ring - 72 inches x 1/4 Inch Deep
Cavitation Repair of Discharge Ring - 72 inches x 1/4 inch deep will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0033, "Cavitation Repair of Discharge Ring
- 72 inches x 1/4 Inch Deep," Payment includes all labor, material, and equipment required to perform cavitation repair below 1/4 inch of the surface of the discharge ring, complete, as specified and approved.
1.3.33 Item 0034 Spot Cavitation Repair - Mild Steel
Spot cavitation repair - mild steel will be measured for payment as the total number of cubic inches (Cu. In.) of cavitation repair completed.
Payment will be made at the unit price for Item No. 0034, "Spot Cavitation Repair - Mild Steel," which price and payment shall be full compensation for all work required for cavitation repair with mild steel less than 1/4 inch below the surface of the discharge ring along the entire 72 inch high by 1/4 inch surface of the discharge ring, complete, as specified and approved.
1.3.34 Item 0035 Spot Cavitation Repair - Stainless Steel
Spot cavitation repair - stainless steel will be measured for payment as the total number of cubic inches (Cu. In.) of cavitation repair completed.
Payment will be made at the unit price for Item No. 0035, "Spot Cavitation Repair - Stainless Steel," which price and payment shall be full compensation for all work required to perform stainless steel cavitation repair within 1/4 inch of the surface of the runner blades, runner cone, runner hub, seal retainer segments, and other water passage elements, complete, as specified and approved.
1.3.35 Item 0036 Repair of Discharge Ring Weld Seams
Repair of discharge ring weld seams will be measured for payment as the total number of linear feet (LF) repaired. Payment will be made at the unit price for Item No. 0036, "Repair of Discharge Ring Weld Seams," which price and payment shall be full compensation for all work required to repair the discharge ring weld seams whose damage is exposed during the excavation of the discharge ring, complete, as specified and approved.
1.3.36 Item 0037 Discharge Ring Anchorage
Discharge ring anchorage will be measured for payment as the total number each (EA) completed. Payment will be made at the unit price for Item No.
0037, "Discharge Ring Anchorage," which price and payment shall be full compensation for drilling all holes, installing and grouting anchors, and welding exposed ends of anchors to the discharge ring, complete as specified and approved.
1.3.37 Item 0038 Epoxy Injection
Epoxy injection will be measured for payment as the total cubic feet (Cu.
Ft.) of epoxy actually used to fill the voids behind the discharge ring.
Payment will be made at the unit price for Item No. 0038, "Epoxy Injection," which price and payment shall be full compensation for drilling holes in the discharge ring and concrete, furnishing epoxy-injection pipes, furnish and install epoxy, weld up the holes, and check for soundness of the epoxy behind the liner, complete as specified and approved.
1.3.38 Item 0039 Painting Runner Blades
Painting runner, including hub, blades and cone,blades will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0039, "Painting Runner Blades," which price and payment shall be full compensation for all work required to perform System No.
5-E-Z, System No. 23-D and all touchup painting, complete, as specified and approved.
1.3.39 Item 0040 COMMISSIONING
Commissioning will be measured as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0040, "COMMISSIONING," which price and payment shall be full compensation for all work required to commission, complete, as specified and approved.
1.4 BASIC REQUIREMENTS UNIT 2
1.4.1 Item 0041 Cavitation Repair of Discharge Ring - 72 Inches x 1/4 Inch Deep
Cavitation repair of discharge ring - 72 inches x 1/4 inch deep will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0041, "Cavitation Repair of Discharge Ring
- 72 Inches x 1/4 Inch Deep," Payment includes all labor, material, and equipment required to perform cavitation repair below 1/4 inch of the surface of the discharge ring, complete, as specified and approved.
1.4.2 Item 0042 Spot Cavitation Repair - Mild Steel
Spot cavitation repair - mild steel will be measured for payment as the total number of cubic inches (Cu. In.) of cavitation repair completed.
Payment will be made at the unit price for Item No. 0042, "Spot Cavitation Repair - Mild Steel," which price and payment shall be full compensation for all work required for cavitation repair with mild steel less than 1/4 inch below the surface of the discharge ring along the entire 72 inch high by 1/4 inch surface of the discharge ring, complete, as specified and approved.
1.4.3 Item 0043 Spot Cavitation Repair - Stainless Steel
Spot cavitation repair - stainless steel will be measured for payment as the total number of cubic inches (Cu. In.) of cavitation repair completed.
Payment will be made at the unit price for Item No. 0043, "Spot Cavitation Repair - Stainless Steel," which price and payment shall be full compensation for all work required to perform stainless steel cavitation repair within 1/4 inch of the surface of the runner blades, runner cone, runner hub, seal retainer segments, and other water passage elements, complete, as specified and approved.
1.4.4 Item 0044 Repair of Discharge Ring Weld Seams
Repair of discharge ring weld seams will be measured for payment as the total number of linear feet (LF) repaired. Payment will be made at the unit price for Item No. 0044, "Repair of Discharge Ring Weld Seams," which price
SECTION 01 22 00.00 28
and payment shall be full compensation for all work required to repair the discharge ring weld seams whose damage is exposed during the excavation of the discharge ring, complete, as specified and approved.
1.4.5 Item 0045 Discharge Ring Anchorage
Discharge ring anchorage will be measured for payment as the total number each (EA). Payment will be made at the unit price for Item No. 0045, "Discharge Ring Anchorage," which price and payment shall be full compensation for drilling all holes, installing and grouting anchors, and welding exposed ends of anchors to the discharge ring, complete as specified and approved.
1.4.6 Item 0046 Epoxy Injection
Epoxy injection will be measured for payment as the total cubic feet (Cu.
Ft.) of epoxy actually used to fill the voids behind the discharge ring.
Payment will be made at the unit price for Item No. 0046, "Epoxy Injection," which price and payment shall be full compensation for drilling holes in the discharge ring and concrete, furnishing epoxy-injection pipes, furnish and install epoxy, weld up the holes, and check for soundness of the epoxy behind the liner, complete as specified and approved.
1.5 OPTIONAL REQUIREMENTS UNIT 1
1.5.1 Item 0047 Perform Additional Stator Core Interlaminar Insulation Test
(OPTIONAL)
Additional stator core interlaminar insulation test will be measured for payments as a complete pay item (Job). Payment will be made at the lump sum price for Item No. 0047, "Perform Additional Stator Core Interlaminar Insulation Test (Optional)," which price and payment shall be full compensation for all work required to perform an additional stator core interlaminar insulation test, complete as specified and approved.
1.5.2 Item 0048 Stator Core Iron Repair (Optional)
Stator core iron repair will be measured for payment as the number of manhours (MH) the stator core iron repair takes, not to exceed (NTE) 200 hours. Payment will be made at the unit price for Item No. 0048, "Stator Core Iron Repair," which price and payment shall be full compensation for all work required to perform minor stator core iron repair, complete, as specified and approved.
1.5.3 Item 0049 Replace Stator Core (Optional)
Remove stator core will be measured for payments as a complete pay item (Job). Payment will be made at the lump sum price for Item No. 0049, "Remove Stator Core," which price and payment shall be full compensation for all work required to replace stator core, complete as specified and approved.
1.5.4 Item 0050 Hone Runner Blade Servomotor Cylinder (Optional)
Hone runner blade servomotor cylinder will be measured for payment as a complete pay item (Job). Payment will be made at the lump sum price for Item No. 0050, "Hone Runner Blade Servomotor Cylinder (Optional)," which price and payment shall be full compensation for all work required to clean, inspect, hone, and measure the runner blade cylinder on-site, complete as specified and approved., complete, as specified and approved.
1.5.5 Item 0051 Bore and Hone Runner Blade Servomotor Cylinder (Optional)
Bore and hone runner blade servomotor cylinder will be measured for payment as a complete pay item (Job). Payment will be made at the lump sum price for Item No. 0051, "Bore and Hone Runner Blade Servomotor Cylinder (Optional," which price and payment shall be full compensation for all work required to clean, inspect, bore, hone, and measure the runner blade cylinder on-site, complete as specified and approved.
1.5.6 Item 0052 Hone Wicket Gate Servomotor Cylinder (Optional)
Hone wicket gate servomotor cylinder will be measured for payment as the number of times (EA) honing is performed. Payment will be made at the unit price for Item No. 0052, "Hone Wicket Gate Servomotor Cylinder (Optional)," which price and payment shall be full compensation for all work required to hone wicket gate servomotor cylinder, complete as specified and approved.
1.5.7 Item 0053 Bore and Hone Wicket Gate Servomotor Cylinder (Optional)
Bore and hone wicket gate servomotor cylinder will be measured for payment as the number of times (EA) work is performed. Payment will be made at the unit price for Item No. 0053, "Bore and Hone Wicket Gate Servomotor Cylinder (Optional)," which price and payment shall be full compensation for all work required to bore and hone wicket gate servomotor cylinder, complete as specified and approved.
1.5.8 Item 0054 Furnish And Install Wicket Gate Servomotor Piston Ring Set (Optional)
Furnish and install wicket gate servomotor piston ring set will be measured for payment as the number of times (EA) furnished and installed. Payment will be made at the unit price for Item No. 0054, "Furnish And Install Wicket Gate Servomotor Piston Ring Set (Optional)," which price and payment shall be full compensation for all work required to furnish and install the piston ring set, complete as specified and approved. 1 set consists of 3 piston rings.
1.5.9 Item 0055 Light Machine Cut On The Packing Box Bore (Optional)
Light machine cut on the packing box bore will be measured for payment as a complete pay item (Job). Payment will be made at the lump sum price for Item No. 0055, "Light Machine Cut On The Packing Box Bore (Optional)," which price and payment will be full compensation for light machine cut corrections for minor deterioration of the packing box bore, complete as specified and approved.
1.5.10 Item 0056 Skim Cut on Both Faces of the Packing Box Mounting Flange (Optional)
Skim cut on both faces of the packing box mounting flange will be measured for payment as a complete pay item (Job). Payment will be made at the lump sum price for Item No. 0056, "Skim Cut on Both Faces of the Packing Box Mounting Flange (Optional)," which price and payment shall be full compensation for all work required to remove unsatisfactory surface deterioration by performing a skim cut on both faces of the packing box mounting flange, complete as specified and approved.
1.5.11 Item 0057 Restore Packing Box Bore (Optional)
Restore packing box bore will be measured for payment as a complete pay item (Job). Payment will be made at the lump sum price for Item No. 0057, "Restore Packing Box Bore (Optional)," which price and payment shall be full compensation for all work required to refurbish the packing box bore to its original dimensions, complete as specified and approved.
1.5.12 Item 0058 Furnish And Install One Set Of Outer Head Cover Tie-Down Studs And Nuts (Optional)
Furnish and install One set of outer head cover tie-down studs and nuts will be measured for payment as a complete pay item (Job). Payment will be made at the lump sum price for Item No. 0058, "Furnish One Set Of Outer Head Cover Tie-Down Studs And Nuts (Optional)," which price and payment shall be full compensation for all work required to remove the existing outer head cover tie-down studs and nuts and furnish and install new outer head cover tie down studs and nuts, complete as specified and approved.
One set consists of 120 studs and 120 nuts.
1.5.13 Item 0059 Furnish And Install One Set of Intermediate Head Cover Tie-Down Studs and Nuts (Optional)
Furnish and install one set of intermediate head cover tie-down studs and nuts will be measured for payment as a complete pay item (Job). Payment will be made at the lump sum price for Item No.