A22_Section B - Supplies or Services and Prices_W912EE23R0005-0002.pdf
PDF 928 KB Posted
- Solicitation number
- W912EE23R0005
About this file
This document is a solicitation for a firm-fixed price contract to operate and maintain a Gulfstream G-IV aircraft and hangar facility for the U.S. Army Corps of Engineers Vicksburg District. The contractor will provide all necessary personnel, materials, supplies, and equipment to operate, maintain, repair, and inspect one government-owned Gulfstream GIV/C20H aircraft and one government-owned hangar facility located at the Vicksburg-Tallulah Regional Airport in Mound, Louisiana. The aircraft will be operated and maintained in accordance with applicable FAA regulations. The base year of performance is from July 7, 2023 to July 6, 2024 with four one-year option periods and one six-month extension option. Pricing will be on a firm-fixed price basis for management, parts, materials, hangar support, travel, training, and contingency overtime costs. Estimated costs are provided for each contract line item.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912EE23R0005
“REVISED BY AMENDMENT 0002”
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
BASE YEAR - G-IV
FFP
Period of Performance: 07JUL2023 thru 06JUL2024
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AA Months
Management, Administration, Personnel
FFP
Management, Administration, Personnel, and Housekeeping Costs. Cost includes all management, administration, training, personnel, housekeeping (aircraft and hangar), and labor for all routine operations, maintenance, CMP operations, repairs and inspections performed at the home base of one Government-owned Gulfstream G-IV/C-20H aircraft and the MVD/MRC hangar.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AB Job
Parts, Materials
COST
Parts and Materials; Cost includes all parts, materials, supplies, and publications, required for work performed in 0001AA above. Cost also includes all Sub- Contracted parts, materials, and supplies, plus Sub-Contracted labor for depot level maintenance, engine overhauls, annual depot tear-down inspections etc., at an authorized repair facility approved by the COR. Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $600,000.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AC Job Hanger and Ground Support Equipment
COST
Hangar and Ground Support Equipment. Cost includes any repairs, alterations, maintenance and subcontract work for hangar facility and ground support activities and required ground support equipment as approved by the COR.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $40,000.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AD Job
Per Diem, Uniform, Travel, and Flight
COST
Per Diem, Uniform Allowance, Travel, and Flight Operations Fees. This cost is for approved travel for crew members and mechanics in the performance of flying or maintenance duties and training. Also, included are any landing fees, customs fees, ramp fees, and incidental fees, as approved by the COR, that cannot be charged on the provided U.S Government Air Card. The Contractor will be reimbursed for actual costs substantiated by receipts as required by the JTR.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $55,000.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AE Job
Training
COST
After assignment to this operation, each pilot is required to comply with 14 CFR
61.58 FAA Regulation to continue to serve as pilot in command (PIC). A copy of the completion certificates will be kept in the pilot folder of each pilot the contractor uses on this contract. Required G-IV initial training and G-IV annual refresher training must be accomplished at FAA approved training courses.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $82,400.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AF Job OPTION Mechanic Contingency Overtime
COST
Should the Government task the aircraft maintenance crew with supporting contingency response operations for an extended period requiring overtime pay, then reimbursement to the Contractor for any maintenance work which would require overtime pay will be made only if approval of the Contracting Officer has been obtained prior to performance of the work. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
First Option Period
FFP
Period of Performance: 07JUL2024 thru 06JUL2025
NET AMT
AMOUNT
OPTION Management, Administration, Personnel
FFP
Management, Administration, Personnel, and Housekeeping Costs. Cost includes all management, administration, training, personnel, housekeeping (aircraft and hangar), and labor for all routine operations, maintenance, CMP operations, repairs and inspections performed at the home base of one Government-owned Gulfstream G-IV/C-20H aircraft and the MVD/MRC hangar.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
0002AA 1 Months 2
0002AB Job OPTION Parts, Materials
COST
Parts and Materials; Cost includes all parts, materials, supplies, and publications, required for work performed in 0002AA above. Cost also includes all Sub- Contracted parts, materials, and supplies, plus Sub-Contracted labor for depot level maintenance, engine overhauls, annual depot tear-down inspections etc., at an authorized repair facility approved by the COR. Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $618,000.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002AC Job OPTION Hanger and Ground Support Equipment
COST
Hangar and Ground Support Equipment. Cost includes any repairs, alterations, maintenance and subcontract work for hangar facility and ground support activities and required ground support equipment as approved by the COR.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $291,200.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002AD Job OPTION Per Diem, Uniform, Travel, and Flight
COST
Per Diem, Uniform Allowance, Travel, and Flight Operations Fees. This cost is for approved travel for crew members and mechanics in the performance of flying or maintenance duties and training. Also, included are any landing fees, customs fees, ramp fees, and incidental fees, as approved by the COR, that cannot be charged on the provided U.S Government Air Card. The Contractor will be reimbursed for actual costs substantiated by receipts as required by the JTR.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $56,650.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002AE Job OPTION Training
COST
After assignment to this operation, each pilot is required to comply with 14 CFR
61.58 FAA Regulation to continue to serve as pilot in command (PIC). A copy of the completion certificates will be kept in the pilot folder of each pilot the contractor uses on this contract. Required G-IV initial training and G-IV annual refresher training must be accomplished at FAA approved training courses.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $84,872.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002AF Job OPTION Mechanic Contingency Overtime
COST
Should the Government task the aircraft maintenance crew with supporting contingency response operations for an extended period requiring overtime pay, then reimbursement to the Contractor for any maintenance work which would require overtime pay will be made only if approval of the Contracting Officer has been obtained prior to performance of the work. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Second Option Period
FFP
Period of Performance: 07JUL2025 thru 06JUL2026
NET AMT
AMOUNT
OPTION Management, Administration, Personnel
FFP
Management, Administration, Personnel, and Housekeeping Costs. Cost includes all management, administration, training, personnel, housekeeping (aircraft and hangar), and labor for all routine operations, maintenance, CMP operations, repairs and inspections performed at the home base of one Government-owned Gulfstream G-IV/C-20H aircraft and the MVD/MRC hangar.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003AB Job OPTION Parts, Materials
COST
Parts and Materials; Cost includes all parts, materials, supplies, and publications, required for work performed in 0003AA above. Cost also includes all Sub- Contracted parts, materials, and supplies, plus Sub-Contracted labor for depot level maintenance, engine overhauls, annual depot tear-down inspections etc., at an authorized repair facility approved by the COR. Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $886,540.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003AC Job OPTION Hanger and Ground Support Equipment
COST
Hangar and Ground Support Equipment. Cost includes any repairs, alterations, maintenance and subcontract work for hangar facility and ground support activities and required ground support equipment as approved by the COR.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $42,436.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
0003AA 1 Months 2
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003AD Job OPTION Per Diem, Uniform, Travel, and Flight
COST
Per Diem, Uniform Allowance, Travel, and Flight Operations Fees. This cost is for approved travel for crew members and mechanics in the performance of flying or maintenance duties and training. Also, included are any landing fees, customs fees, ramp fees, and incidental fees, as approved by the COR, that cannot be charged on the provided U.S Government Air Card. The Contractor will be reimbursed for actual costs substantiated by receipts as required by the JTR.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $58,350.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003AE Job OPTION Training
COST
After assignment to this operation, each pilot is required to comply with 14 CFR
61.58 FAA Regulation to continue to serve as pilot in command (PIC). A copy of the completion certificates will be kept in the pilot folder of each pilot the contractor uses on this contract. Required G-IV initial training and G-IV annual refresher training must be accomplished at FAA approved training courses.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $87,418.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003AF Job OPTION Mechanic Contingency Overtime
COST
Should the Government task the aircraft maintenance crew with supporting contingency response operations for an extended period requiring overtime pay, then reimbursement to the Contractor for any maintenance work which would require overtime pay will be made only if approval of the Contracting Officer has been obtained prior to performance of the work. The Contractor will be reimbursed for actual costs substantiated by receipts.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Third Option Period
FFP
Period of Performance: 07JUL2026 thru 06JUL2027
NET AMT
AMOUNT
OPTION Management, Administration, Personnel
FFP
Management, Administration, Personnel, and Housekeeping Costs. Cost includes all management, administration, training, personnel, housekeeping (aircraft and hangar), and labor for all routine operations, maintenance, CMP operations, repairs and inspections performed at the home base of one Government-owned Gulfstream G-IV/C-20H aircraft and the MVD/MRC hangar.
FOB: Destination
NET AMT _____________________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004AB Job OPTION Parts, Materials
COST
Parts and Materials; Cost includes all parts, materials, supplies, and publications, required for work performed in 0004AA above. Cost also includes all Sub- Contracted parts, materials, and supplies, plus Sub-Contracted labor for depot level maintenance, engine overhauls, annual depot tear-down inspections etc., at an authorized repair facility approved by the COR. Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $1,555,636.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
0004AA 1 Months 2
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004AC Job OPTION Hanger and Ground Support Equipment
COST
Hangar and Ground Support Equipment. Cost includes any repairs, alterations, maintenance and subcontract work for hangar facility and ground support activities and required ground support equipment as approved by the COR.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $43,709.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004AD Job OPTION Per Diem, Uniform, Travel, and Flight
COST
Per Diem, Uniform Allowance, Travel, and Flight Operations Fees. This cost is for approved travel for crew members and mechanics in the performance of flying or maintenance duties and training. Also, included are any landing fees, customs fees, ramp fees, and incidental fees, as approved by the COR, that cannot be charged on the provided U.S Government Air Card. The Contractor will be reimbursed for actual costs substantiated by receipts as required by the JTR.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $60,100.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004AE Job OPTION Training
COST
After assignment to this operation, each pilot is required to comply with 14 CFR
61.58 FAA Regulation to continue to serve as pilot in command (PIC). A copy of the completion certificates will be kept in the pilot folder of each pilot the contractor uses on this contract. Required G-IV initial training and G-IV annual refresher training must be accomplished at FAA approved training courses.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $90,041.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004AF Job OPTION Mechanic Contingency Overtime
COST
Should the Government task the aircraft maintenance crew with supporting contingency response operations for an extended period requiring overtime pay, then reimbursement to the Contractor for any maintenance work which would require overtime pay will be made only if approval of the Contracting Officer has been obtained prior to performance of the work. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Fourth Option Period
FFP
Period of Performance: 07JUL2027 thru 06JUL2028
NET AMT
AMOUNT
OPTION Management, Administration, Personnel
FFP
Management, Administration, Personnel, and Housekeeping Costs. Cost includes all management, administration, training, personnel, housekeeping (aircraft and hangar), and labor for all routine operations, maintenance, CMP operations, repairs and inspections performed at the home base of one Government-owned Gulfstream G-IV/C-20H aircraft and the MVD/MRC hangar.
FOB: Destination
NET AMT
0005AA 1 Months 2
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005AB Job OPTION Parts, Materials
COST
Parts and Materials; Cost includes all parts, materials, supplies, and publications, required for work performed in 0005AA above. Cost also includes all Sub- Contracted parts, materials, and supplies, plus Sub-Contracted labor for depot level maintenance, engine overhauls, annual depot tear-down inspections etc., at an authorized repair facility approved by the COR. Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $1,575,305.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005AC Job OPTION Hanger and Ground Support Equipment
COST
Hangar and Ground Support Equipment. Cost includes any repairs, alterations, maintenance and subcontract work for hangar facility and ground support activities and required ground support equipment as approved by the COR.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $45,020.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005AD Job OPTION Per Diem, Uniform, Travel, and Flight
COST
Per Diem, Uniform Allowance, Travel, and Flight Operations Fees. This cost is for approved travel for crew members and mechanics in the performance of flying or maintenance duties and training. Also, included are any landing fees, customs fees, ramp fees, and incidental fees, as approved by the COR, that cannot be charged on the provided U.S Government Air Card. The Contractor will be reimbursed for actual costs substantiated by receipts as required by the JTR.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $61,903.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005AE Job OPTION Training
COST
After assignment to this operation, each pilot is required to comply with 14 CFR
61.58 FAA Regulation to continue to serve as pilot in command (PIC). A copy of the completion certificates will be kept in the pilot folder of each pilot the contractor uses on this contract. Required G-IV initial training and G-IV annual refresher training must be accomplished at FAA approved training courses.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $92,742.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005AF Job OPTION Mechanic Contingency Overtime
COST
Should the Government task the aircraft maintenance crew with supporting contingency response operations for an extended period requiring overtime pay, then reimbursement to the Contractor for any maintenance work which would require overtime pay will be made only if approval of the Contracting Officer has been obtained prior to performance of the work. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Extension Option NTE Six (6) Months
FFP
In accordance with (IAW) FAR 52.217-8, The Government may require continued performance of any services within the limits and at the rates specified in the contract.
Period of Performance: 07JUL2028 thru 06JAN2029
NET AMT
AMOUNT
OPTION Management, Administration, Personnel
FFP
Management, Administration, Personnel, and Housekeeping Costs. Cost includes all management, administration, training, personnel, housekeeping (aircraft and hangar), and labor for all routine operations, maintenance, CMP operations, repairs and inspections performed at the home base of one Government-owned Gulfstream G-IV/C-20H aircraft and the MVD/MRC hangar.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006AB Job OPTION Parts, Materials
COST
Parts and Materials; Cost includes all parts, materials, supplies, and publications, required for work performed in 0006AA above. Cost also includes all Sub- Contracted parts, materials, and supplies, plus Sub-Contracted labor for depot level maintenance, engine overhauls, annual depot tear-down inspections etc., at an authorized repair facility approved by the COR. Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $347,782.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006AC Job OPTION Hanger and Ground Support Equipment
COST
Hangar and Ground Support Equipment. Cost includes any repairs, alterations, maintenance and subcontract work for hangar facility and ground support activities and required ground support equipment as approved by the COR.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $23,185.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
0006AA 1 Months 2
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006AD Job OPTION Per Diem, Uniform, Travel, and Flight
COST
Per Diem, Uniform Allowance, Travel, and Flight Operations Fees. This cost is for approved travel for crew members and mechanics in the performance of flying or maintenance duties and training. Also, included are any landing fees, customs fees, ramp fees, and incidental fees, as approved by the COR, that cannot be charged on the provided U.S Government Air Card. The Contractor will be reimbursed for actual costs substantiated by receipts as required by the JTR.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $31,880.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006AE Job OPTION Training
COST
After assignment to this operation, each pilot is required to comply with 14 CFR
61.58 FAA Regulation to continue to serve as pilot in command (PIC). A copy of the completion certificates will be kept in the pilot folder of each pilot the contractor uses on this contract. Required G-IV initial training and G-IV annual refresher training must be accomplished at FAA approved training courses.
Additives to costs submitted under this line item shall not exceed % and amount for G&A. (Offerors will insert a percentage in the preceding blank and the total amount of G&A and the estimated cost in the bid schedule blank.) $47,762.00 is the estimated cost which may be incurred. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
ESTIMATED COST ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006AF Job OPTION Mechanic Contingency Overtime
COST
Should the Government task the aircraft maintenance crew with supporting contingency response operations for an extended period requiring overtime pay, then reimbursement to the Contractor for any maintenance work which would require overtime pay will be made only if approval of the Contracting Officer has been obtained prior to performance of the work. The Contractor will be reimbursed for actual costs substantiated by receipts.
FOB: Destination
BASE YEAR AND ALL OPTION YEARS TOTAL AMOUNT ___________________________________
| ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0001 |
| NET AMT |
| NET AMT |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| NET AMT |
| NET AMT |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| NET AMT |
| NET AMT |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| NET AMT |
| NET AMT _____________________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| NET AMT |
| NET AMT |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| NET AMT |
| NET AMT |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
| ESTIMATED COST ______________________ |
File details come from the government source that posted it. Updated .