AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Reference Solicitation No. W912EE-16-R-0004 for Narrow s Dam Pow er Plant Transformers Supply. The proposal due date has been changed from 10 June 2016, 1200 hrs CST to 15 June 2016, 1200 hrs CST.

See attached pages for changes:

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EE-16-R-0004

X 9B. DATED (SEE ITEM 11)

15-Apr-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Jun-2016

CODE

VICKSBURG CONTRACTING OFFICE

4155 CLAY ST

VICKSBURG MS 39183-3435

W912EE 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EE-16-R-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

SUMMARY OF CHANGES

1.) The proposal due date has been changed from 10 June 2016, 1200 hrs CST to 15 June 2016, 1200 hrs CST

2.) FAR Clause 52.211-8 TIME OF DELIVERY (JUN 1997) has been added by full text, in section F of the solicitation.

3.) FAR Clause 52.228-1 Bid Guarantee (SEP 1996) has been added full text, in section I of the solicitation.

4.) Deleting language referencing, “A model subcontracting plan is included as Attachment C to this solicitation.” A subcontracting plan shall be provided in accordance with in Section L, Tab 4 Small Business Contracting Plan, however each contractor will submit their own format.

5.) Added Small Business Participation Plan Format in attachment B.

6.) Acknowledgement of all amendments needs to be included in the proposal.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0005 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0005 Each OPTION Provide Temporary Long-Term Storage

FFP

Provide temporary long-term storage of the transformer and accessories at the Narrows Dam power plant, including: transport across a bridge with an 80,000 pound maximum load capacity, off-loading and movement to the storage location, provision of an oil containment berm and hardwood timber mats, perform oil filling, provision of temporary grounding and 120 VAC power connections for cabinet heaters and lights, load and move the transformer to the switchyard as the location is made available by the separate installations contractor, and provide the services of an Erecting Engineer FOB: Destination

NET AMT

SECTION F - DELIVERIES OR PERFORMANCE

Revised By Amendment 0004

The following have been added by full text:

52.211-8 TIME OF DELIVERY (JUN 1997)

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

Note: OFFERORS ARE REQUIRED TO COMPLETE OFFEROR’S PROPOSED

DELIVERY SCHEDULE BELOW TO BE DEEMED RESPONSIVE.

Transformers and Accessories are to be delivered and installed no earlier than March 1, 2018 and completed no later than March 31, 2018. Commissioning will occur after March 2018 in coordination with work being performed by a separate installation contractor.

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above.

If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE:

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of clause)

SECTION I - CONTRACT CLAUSES

The following have been added by full text:

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20% of the bid price or $3 Million, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

PROPOSAL SUBMISSION

TAB 4: SMALL BUSINESS SUBCONTRACTING PLAN (LARGE BUSINESS ONLY)

Separate from Small Business Participation Plan, other than U.S. Small Business (e.g. Large Business) Offerors must also submit a subcontracting plan meeting the requirements of FAR 52.219-9 and DFARS 252.219-7003 (or DFARS 252.219-7004 if the Offeror has a comprehensive subcontracting plan) contained in Section I, Contract Clauses. Large businesses must submit acceptable subcontracting plans to be eligible for award. Subcontracting Plans shall reflect and be consistent with the commitments offered in the Small Business Participation Plan.

Large Businesses shall provide a completed Subcontracting Plan and most recent annual subcontracting report. For information on the evaluation of subcontracting plans, see Army Federal Acquisition Regulation Supplement, Appendix DD. (REVISED)

TAB 5: BID GUARANTEE

A bid guarantee equal to 20% of the total price or $_3 Million, whichever is less, shall be submitted with the offer. (REVISED)

Small Business Participation Plan Attachment B

Subcontract Awards % of Total Contract Dollars Subcontracted by

Prime Contractors

Small Business (SB)

Small Disadvantaged Business (SDB)

Women‐Owned Small Business (WOSB)

HUBZone Small Business (HUBZONE SB)

Veteran‐Owned Small Business (VOSB)

Service‐Disabled Veteran‐Owned Small Business

(SDVOSB)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .