Statement_of_Work.docx

DOCX document 14 KB Posted

Attached to
Narrow Dam Transformer Federal contract opportunity
Solicitation number
W912EE-16-R-0004
Issued by
Department of the Army Corps of Engineers Engineering District Vicksburg

About this file

The principal components of the work to be performed include design manufacture factory test and deliver to Narrows Dam Power Plant in Arkansas four 8 400/12 000 kVA 69 kV/39.8 kV high-voltage winding 13.2 kV low-voltage winding cooling class OFAF/OFAF Class I single-phase GSU power transformers and accessories with an option to provide on-site long-term temporary storage. The work will also include offloading and movement of the transformers at the Narrows Dam Power plant reassembly .

View the file

Other files for this federal contract opportunity

Other files attached to Narrow Dam Transformer, newest first.
File Type Posted
W912EE-16-R-0004_Solicitation_AMEN_04_7_June_2016.pdf PDF
A22_Solicitation_W912EE-16-R-0004_June_3_Amendment_003.pdf PDF
W912EE-16-R-0004-0002_19_May_2016.pdf PDF
W912EE-16-R-0004_Solicitation_AM_0001_4_May_2016.pdf PDF
Solicitaion_Signed_W912EE-16-R-0004.pdf PDF
Specifications.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Transformer Supply, Vicksburg District:

Narrows Dam, U.S. Army Corps of Engineers (USACE)

1. Scope: The principal components of the work to be performed include design, manufacture, factory test, and deliver to Narrows Dam Power Plant in Arkansas; four 8,400/12,000 kVA, 69 kV/39.8 kV high-voltage winding, 13.2 kV low-voltage winding; cooling class OFAF/OFAF, Class I single-phase GSU power transformers and accessories, with an option to provide on-site long-term temporary storage. The work will also include offloading and movement of the transformers at the Narrows Dam Power plant, reassembly, oil-filling, perform field tests and furnishing of spare parts. All work will be performed to comply with site operations, environmental protection, and safety and health provisions.

2. Materials: The Bill of Materials is below.

Line Item #
Item Description
Qty
1
Design, Manufacture and Test

8,400/12,000 kVA; 69 kV/39.84 kV high-voltage winding, 13.2 kV low-voltage winding; cooling class OFAF/OFAF; single-phase GSU power transformer and accessories.

2
Deliver Transformer and Accessories

FFP

Deliver 8,400/12,000 kVA single-phase power transformer and accessories from manufacturing facility complete to the Narrows Dam power plant

3
Off-load Transformer and Accessories

FFP

Off-load 8,400/12,000 kVA transformer and accessories at the Narrows Dam power plant transformer yard, perform inspections, perform cleaning, move transformers to its operating location, perform transformer reassembly, furnish transformer oil and perform oil-filling and processing, perform field tests, and provide the of services of an Erecting Engineer and Commissioning Agent.

4
Furnish Spare Parts
1

3. Delivery: The Government requires delivery to be made to the Narrows Dam Power Plant in Arkansas.

4. Period of Performance: The period of performance shall be from date of award and be delivered NLT one year from date of award.

File details come from the government source that posted it. Updated .