This document consists of three components: a Standard Form 30 Amendment to Solicitation, Vendor Questions and Answers, and a Statement of Work for furniture removal and installation services.
The Standard Form 30 Amendment (dated 13 March 2026) to RFQ W912DY-26-Q-A080 incorporates government responses to vendor questions and a revised Statement of Work for removal and installation of furnishings at Navy Region Northwest buildings 885 and 2309 at Naval Base Kitsap. The amendment confirms this is an open-market commercial procurement (not GSA Schedule) with TAA compliance requirements for all items. Key clarifications address facility specifications, warehouse locations, pickup and delivery procedures, and knock-down/assembly requirements. For Building 885, vendors must remove existing furnishings including 60 metal stackable beds, 48 wood lift-deck beds with drawers, 304 wood wardrobes, and various appliances and equipment, then transport 196 bunk beds and 196 wardrobes to Warehouse 1 for storage. For Building 2309, no removal is required; vendors must pick up items from two warehouses and install 48 beds, wardrobes, desks, chairs, and accessories in 24 double-occupancy rooms across a 3-story building. Installation must include assembly, cleaning, polishing, protective covering removal, battery installation, equipment leveling, and artwork mounting at specified heights. Delivery is staged for occupied Building 885 (10 rooms per day minimum) and non-staged for empty Building 2309. All deliveries require 48-hour advance notification and TR approval; security access through Naval Base Kitsap requires Base Access and Visitor Requests submitted two weeks in advance. The contractor is responsible for all trash disposal, recyclables management, packing material removal within 24 hours, and damage repairs to building components caused by installation activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att 1 - LIS - NBK Bldg 885 Casegoods.xlsx | XLSX spreadsheet | |
| RFQ How To Guide.pdf | ||
| RFQ W912DY26QA080 Navy Region NW WA Building 885 2309.pdf | ||
| ATT 7 - Navy Region NW - NBK 885 2309 Casegoods.docx | DOCX document | |
| Att 1 - LIS - NBK Bldg 2309 Casegoods.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
Vendor Questions and Answers Navy Region NW - Casegoods
RFQ W912DY-26-Q-A080
03/12/3026
1. Vendor Question: Per GSA regulations, tariffs are not allowable under the MAS Schedule. Please confirm this applies to this solicitation. If an open-market/commercial quote is specifically required, please disregard this request.
HNC RESPONSE: While you cannot add Tariff's to your GSA Schedule price, you can quote tariff's on our attachment 1's if they apply.
2. Vendor Question: Please confirm whether this procurement will be made under the GSA MAS Schedule or as an open-market commercial purchase. The GSA MAS fields have been removed from the Attachment 1 documents, so we would like to verify that all items are intended to be procured on an open-market/commercial basis.
HNC RESPONSE: Open Market is confirmed
3. Vendor Question: Please verify whether OSHA 30 requirements will apply to this opportunity
HNC RESPONSE: This is a contract for goods to be used within the United States, so the BAA does apply as far as compliance with regulations. For specific sections of regulation you need to determine that for your own products
4. Vendor Question: Please confirm that this RFQ permits items compliant with TAA requirements, including U.S.-made, qualifying country, and designated country products.
HNC RESPONSE: This RFQ is designated as "unrestricted" so the TAA does apply.
5. Vendor Question: WC15 – Study Carrel, FID 3.10:
Please confirm the mill, pattern, and color required for the fabric tackboard.
HNC RESPONSE: Provide a color coordinating fabric for review in the submittal.
6. Vendor Question: WC16 – Wardrobe, FID 3.11:
Please clarify whether the doors and drawers must lock simultaneously with the locking mechanism. If so, would it be acceptable for the doors to be full-length with the drawers concealed behind them to support proper function of a three-point locking mechanism?
HNC RESPONSE: The drawers can lock separately. Provide information for review in submittal.
7. LS05 – Upholstered Three-Seat Sofa, FID 5.6:
Please confirm that wood arm caps are not required for this item, as this differs from requirements stated for FID 5.4 and 5.5.
HNC RESPONSE: Provide what is specified in the FID.
8. Vendor Question: Recreational Furniture (FID 6.1, 6.2, 6.3, 6.4, 6.5):
Recreational furniture has been removed from the MAS Schedule per the Executive Order and GSA MAS Refresh #27. Because quoting these items as open-market would exceed the allowable open-market threshold outlined in SF18 Section 8.J (page 9), we respectfully request that these items be removed from the solicitation. If an open-market/commercial quote is specifically required, please disregard this request.
HNC RESPONSE: See RFQ requirements.
9. Vendor Question: EQ01-1 – Stick Vacuum Cleaner, FID 7.5:
This is a sole-source item listed on GSA Advantage with a country of origin of the Republic of South Korea. We respectfully request removal from the solicitation. If an open-market/commercial quote is specifically required, please disregard this request.
HNC RESPONSE: Any models referenced in the FID are strictly for example purposes only and are in no way a representation of product BAA/TAA compliance. Models should be referenced as an example of desired salient features only and not for any other purpose or intent.
10. Vendor Question: AP11 – Microwave Oven with Exhaust Vent, FID 8.4:
These items are manufactured in China. Additionally, we cannot quote the required exhaust-vent components without building structure details necessary to determine installation requirements. We respectfully request this item be removed.
HNC RESPONSE: Any models referenced in the FID are strictly for example purposes only and are in no way a representation of product BAA/TAA compliance. Models should be referenced as an example of desired salient features only and not for any other purpose or intent.
11. Vendor Question: Artwork – FID 9.10.a (AR-01) and FID 9.10.b (AR-02):
Please confirm the wall type(s) to which the artwork will be mounted.
HNC RESPONSE: Gypsum board over metal studs.
12. Vendor Question: Building 2309 Attachment 1 Question: Please confirm that no beds are required. Beds are not listed in Attachment 1; however, mattresses, covers, and under-bed units are included. Please verify.
HNC RESPONSE: Confirmed…see SOW table 1 for 2309…Items stored at warehouse block.
Bldg 885 Service questions: Installation Questions
13. Vendor Question: Will other contractors or vendors be present during the installation period?
HNC RESPONSE: Joint Occupancy is not allowed on this or any project without being stated in the SOW
14. Vendor Question: How many rooms are there per building?
HNC REPONSE: 885 – 160
15.Vendor Question: Will driveways and sidewalks be accessible during installation?
HNC RESPONSE: Yes
16. Vendor Question: Are there exterior rooms, and can a forklift or telehandler be used to access upper floors via balconies?
HNC RESPONSE: No, see building specific information block of the table 1
17. Vendor Question: Can an extended boom forklift be used to reach catwalks?
HNC RESPONSE: There are no catwalks
18. Vendor Question: Will access to rooms be limited to a specific number per day?
HNC RESPONSE: See SOW Table 1
19. Vendor Question: How close can trucks park to the building(s)?
HNC RESPONSE: see building specific information block of table 1
20. Vendor Question: Is space available for storage trailers? If so, how far from the building?
HNC RESPONSE: Yes, 2 maximum 50-100 ft from bldg
21. Vendor Question: Can floor plans be provided for reference?
HNC RESPONSE: No
22. Vendor Question: Is lodging available on-site for the installation crew?
23. Vendor Question: Pickup and Transfer of Existing Furniture: Please clarify the requirement outlined on page 15 of 22 in the SOW. Our understanding is that the contract requires us to retrieve sixteen (16) movie theater chairs from Warehouse 4 only (Building 885 1st floor kitchen), transport them, and install them in the 3rd- and 8th-floor lounges only. Please confirm that no additional furniture is expected to be picked up, transported, or installed under this requirement stored in onsite storage?
Additionally, please clarify the number of items located at each warehouse that require pickup and transport to Building 335, as the SOW references four separate warehouses.
HNC RESPONSE: The numbers are already given in table 1 of the SOW. Reference the warehouse number beside each list of items.
24. Vendor Question: Removal of Existing Onsite Furniture: Please provide clarification regarding the items to be removed as outlined on page 16 of 22 in the SOW. The SOW references forty-eight (48) wood lift-deck beds with three drawers, three hundred four (304) wardrobes, and Twin XL mattresses. To support accurate evaluation, please provide photos of the units currently onsite. If the items are required to be palletized and shrink-wrapped will the government be providing the pallets and wrap, additional details on the existing units will be necessary for precise assessment and pricing.
HNC RESPONSE: No pictures are being provided. These products are exactly as described in table 1 of the Att 3.
Knock-Down Requirement:
25. Vendor Question: Please provide photos of all units requiring disassembly—particularly the bed—showing components and identifying construction type (e.g., wood, metal, under-bed drawers, etc.), including whether the unit contains under-bed drawers.
HNC RESPONSE: No pictures will be provided. The units are exactly as described in table 1 of the Att 3.
26. Vendor Question: Please confirm whether pallets and shrink wrap will be provided for the unassembled lift-deck beds.
HNC RESPONSE: Items slated for removal and disposal will be for the vendor to discern. For the items that will be put back into the warehouse, yes, vendor is to provide palettes and shrink wrap.
27. Vendor Question: Please note that the onsite bed being removed and stored in the warehouse was not manufactured by our company; therefore, we are unable to provide a warranty for this item.
HNC RESPONSE: None is expected
28. Vendor Question: Please confirm that the bed is a Twin XL unit.
HNC RESPONSE: Confirmed
29. Vendor Question: Please clarify whether the sixteen (16) surplus sets of case goods referenced are new furniture rather than existing items. Additionally, please provide detailed information on the quantity and types of pieces included in each set (e.g., beds, wardrobes, chairs, etc.), as well as which items are required to be palletized.
HNC RESPONSE: These are the items being ordered via this procurement. 16 set of the items you are quoting.
30. Vendor Question: Please provide door width and height measurements to ensure the existing furniture designated for removal and transport to WHSE 1 and Building 1001 P1 will fit through without disassembling product (e.g., wardrobes).
HNC RESPONSE: No disassembly is required.
31. Vendor Question: Please provide information on access to the basement storage area in Building 1001, including details on stairs, elevators, restricted access, or other conditions that may impact transport. Are these items required to be palletized.
HNC RESPONSE: Bldg 1001 located directly beside Bldg 885, is accessible via a ground floor roll up door about 15’ wide. No forklift is available; however, the vendor is allowed to provide their own for unloading. It cannot be used inside warehouse.
Bldg 2309 Service questions: Installation Questions
32. Vendor Question: Will other contractors or vendors be present during the installation period?
HNC RESPONSE: Joint Occupancy is not allowed on this or any project without being stated so in the SOW
33. Vendor Question: How many rooms are there per building?
HNC RESPONSE: 2309 – 24 Rooms
34. Vendor Question: Will driveways and sidewalks be accessible during installation?
HNC RESPONSE: yes
35. Vendor Question: Are there exterior rooms, and can a forklift or telehandler be used to
HNC RESPONSE: No, see building specific information block of the table 1
36. Vendor Question: Can an extended boom forklift be used to reach catwalks?
HNC RESPONSE: There are no catwalks
37. Vendor Question: Will access to rooms be limited to a specific number per day?
HNC RESPONSE: See SOW Table 1
38. Vendor Question: How close can trucks park to the building(s)?
HNC RESPONSE: see building specific information block of table 1
39. Vendor Question: Is space available for storage trailers? If so, how far is it from the building?
HNC RESPONSE: Yes, 2 maximum 50-100 ft from bldg.
40. Vendor Question: Can floor plans be provided for reference?
41. Vendor Question: Is lodging available on-site for the installation crew?
HNC REPONSE: No
42. Vendor Question: Pickup and Transfer of Existing Furniture: Please clarify the requirement outlined on page 15 of 22 in the SOW. Our understanding is that the contract requires us to retrieve sixteen (16) movie theater chairs from Warehouse 4 only (Building 885 1st floor kitchen), transport them, and install them in the 3rd- and 8th-floor lounges only. Please confirm that no additional furniture is expected to be picked up, transported, or installed under this requirement stored in onsite storage?
Additionally, please clarify the number of items located at each warehouse that require pickup and transport to Building 335, as the SOW references four separate warehouses.
HNC RESPONSE: All items listed in this block are requested to be picked up and installed as part of this contract.
43. Vendor Question: Removal of Existing Onsite Furniture: Please provide clarification regarding the items to be removed as outlined on page 16 of 22 in the SOW. The SOW references forty-eight (48) wood lift-deck beds with three drawers, three hundred four (304) wardrobes, and Twin XL mattresses. To support accurate evaluation, please provide photos of the units currently onsite. If the items are required to be palletized and shrink-wrapped will the government be providing the pallets and wrap, additional details on the existing units will be necessary for precise assessment and pricing.
HNC RESPONSE: Duplicate question
44. Vendor Question: Knock-Down Requirement:
Please confirm whether any items must be disassembled (knocked down) for transport to Building 1001.
Please provide photos of all units requiring disassembly—particularly the bed—showing components and identifying construction type (e.g., wood, metal, under-bed drawers, etc.), including whether the unit contains under-bed drawers.
HNC RESPONSE: See answer above
45. Vendor Question: Please confirm whether pallets and shrink wrap will be provided for the unassembled lift-deck beds.
HNC RESPONSE: Vendor to provide
46. Vendor Question: Please note that the onsite bed being removed and stored in the warehouse was not manufactured by our company; therefore, we are unable to provide a warranty for this item.
HNC RESPONSE: No expectation of warranty
47. Vendor Question: Please confirm that the bed is a Twin XL unit.
HNC RESPONSE: See the Table 1 of Att 3, it varies per requirement
48. Vendor Question: Please clarify whether the sixteen (16) surplus sets of case goods referenced are new furniture rather than existing items. Additionally, please provide detailed information on the quantity and types of pieces included in each set (e.g., beds, wardrobes, chairs, etc.), as well as which items are required to be palletized
HNC REPONSE: See answer above, Duplicate question
49. Vendor Question: Please provide door width and height measurements to ensure the existing furniture designated for removal and transport to WHSE 1 and Building 1001 P1 will fit through without disassembling product (e.g., wardrobes).
HNC RESPONSE: No disassembly required, Duplicate question
50. Vendor Question: Please provide information on access to the basement storage area in Building 1001, including details on stairs, elevators, restricted access, or other conditions that may impact transport. Are these items required to be palletized.
HNC RESPONSE: See answer above, Duplicate question
51. Vendor Question: Bldg 2309 Service questions:
Installation Questions. Will other contractors or vendors be present during the installation period?
HNC RESPONSE: See answer above, Duplicate question
52. Vendor Question: How many rooms are there per building?
HNC RESPONSE: See questions above, Duplicate question
53. Vendor Question: Will driveways and sidewalks be accessible during installation?
HNC RESPONSE: Yes
54. Vendor Question: If elevators are not available, are there internal or external stairwells? Are there any restrictions (e.g., narrow passages)?
HNC RESPONSE: See table 1 of Att 3
55. Vendor Question: Are there exterior rooms, and can a forklift or telehandler be used to
56. Vendor Question: Can an extended boom forklift be used to reach catwalks?
HNC RESPONSE: There are no catwalks. 2309 Has an enclosed external stairwell.
56. Vendor Question: Will access to rooms be limited to a specific number per day?
57. Vendor Question: How close can trucks park to the building(s)?
58. Vendor Question: Are rooms single or double occupancy?
HNC RESPONSE: Double Occupancy
59. Vendor Question: Can floor plans be provided for reference?
HNC RESPONSE: After award if needed, should not be needed, these are typical Navy Barracks
60. Vendor Question: Is lodging available on-site for the installation crew?
HNC RESPONSE: NO
61. Vendor Question: Please provide clarification on number of items in each location for pickup/transport to Building 2309. SOW notates three separate warehouses.
HNC RESPONSE: There are only two warehouses items are coming from, warehouse 3 is a typo
62. Vendor Question: Please provide clarification on items to be removed stated on page 21 of 22 in the SOW.
HNC RESPONSE: This is not a valid question
63. Vendor Question: Our understanding is that we are to retrieve the following items from the onsite warehouses and transport them:
WHSE 1: Bremerton, WA
48 trash cans 6 medium trash containers 24 small trash containers 24 irons 24 ironing boards 24 caddies 48 ergonomic desk chairs 48 wardrobes 48 Single, stackable bed, wood
HNC RESPONSE: These items come from warehouse 1, Bremerton and being installed in 2309 at Bangor
64. Vendor Question: WHSE 2: Silverdale, WA.
48 drop-lid desks
HNC RESPONSE: there is no question to answer
65. Vendor Question: Please confirm that no additional furniture is required to be picked up or transported beyond the items listed above.
HNC RESPONSE: provide as requested in table 1 of the Att 3
66. Vendor Question: Knock-Down Requirement: Do any of the items need to be disassembled (knocked down) for transport?
UH Furnishings Program Statement of Work – Removal and Installation of Furnishings
Navy Region NW - NBK 885 & 2309 Casegoods AMD 12 Mar 26
Attachment 3 Page 1 of 22
1. GENERAL
1.1 The Contractor shall provide all necessary materials, equipment, labor, supervision, and management to: (1) coordinate delivery; (2) remove existing furniture from rooms; (3) deliver removed furniture to location specified; (4) load and unload new furniture; (5) place/install in designated rooms; (6) assemble items as required; (7) secure and store, as designated; and (8) properly dispose of all associated packaging/crating materials.
1.2 Awarded Contractor is responsible for verifying all existing field conditions, i.e., electrical power including, but not limited to, voltage, hertz, amperage, and outlets at each building.
1.3 The Technical Representative (TR) for this project is as shown in Table 1 of this document.
1.4 The contractor shall provide a digital color board of all furniture finishes and fabrics to the TR for reference, prior to manufacturing.
1.5 Upon final approval of the customer, the vendor shall reserve adequate quantities of fabrics from the manufacturer as soon as possible to avoid delays due to “out of stock” and/or “discontinued” fabrics.
1.6 If the awarded fabric is discontinued after award, the vendor shall contact the HNC PM to develop a path forward.
2. DELIVERY
DELIVERY TYPES:
Staged Delivery – This type of delivery is selected for occupied buildings whereby the rooms must be emptied of old furnishings and reinstalled with the new furnishings by the end of each workday. The number of rooms that must be completed per day will be stated in the Table 1 of the Statement of Work (SOW). If there is a limited space for containers in the staging area, this will also be noted in the Table 1 of the Statement of Work. This information is important as it may dictate how the containers are loaded for delivery.
Non-Staged Delivery – This type of delivery is selected typically for empty buildings whereby the entire building is accessible during the install dates listed in the contract. This is important because it will dictate how the items are loaded into the containers for shipment.
Attachment 3 Page 2 of 22
2.1 The Contractor shall contact the TR at least 15 working days prior to shipping to ensure that the building is ready. The Contractor shall coordinate item delivery from all sub-contractors and ship the goods only if the TR confirms that the building is ready. At this time, the Contractor shall also ensure they fully understand all security regulations for the installation and have started any required procedures to minimize the impact on the installation personnel.
2.2 In the event that a delay in delivery is requested by the TR, or if the Contractor is unable to confirm that the building is ready, the Contractor shall notify the Contracting Officer within 1 working day.
2.3 The Contractor shall provide the TR with a minimum of 48-hour notification as to the date and time that the trucks will be arriving. The Contractor shall also provide email notification as to the date and time the trucks will be arriving to:
furnishinginvoices@usace.army.mil at least 48 hours prior to scheduled arrival time.
2.3 Contractor must ensure that the driver of the delivery vehicle has copies of the Delivery Order (contract) for the items being delivered in order to gain entry to the facility.
2.4 Drivers of the delivery vehicles shall not attempt to deliver any items before the scheduled delivery date. In the event the delivery date falls on a Saturday, Sunday, or federally recognized holiday, the delivery date shall be the next workday after the Saturday, Sunday, or holiday.
2.5 Shipping Label shall read as specified in Table 1 of this document.
2.6 Items shall be labeled with the building number(s) provided in Contract Line Item (CLIN) 0001, unless otherwise noted in this paragraph.
3. REMOVAL OF EXISTING FURNITURE
3.1 Contractor shall start removing existing items in the rooms between the hours specified in Table 1. The Contractor may work outside this time frame with prior approval of the TR.
3.2 If a furniture listing is not provided in Table 1, assume existing furniture to include some or all of the following: bed and mattress, wall unit, desk, chair, and chest.
3.3 Contractor shall deliver all removed furniture to location specified by the TR.
Attachment 3 Page 3 of 22
3.4 If the Contractor is unable to complete the removal and storage of items before end of the workday, the contractor will secure those items and ensure they are protected from the elements. If the items are moved to a different storage site overnight, the Contractor will be responsible for moving the items from the overnight storage site to its final location.
3.5 Contractor shall take care to ensure removed furniture is not damaged during removal, transport, and final disposition.
3.6 Contractor shall reference Table 1 below to determine if removed furnishings require palletizing and shrink wrapping. If required, this cost shall be included in the removal line of attachment 1.
3.7 After removal of existing furnishings, rooms shall be swept or vacuumed, as required by flooring type, before placement of new furnishings.
4. RECEIVE AND UNLOAD
4.1 Contractor shall start assembling and installing items in rooms upon completion of furniture removal, between the hours specified in Table 1. The Contractor may work outside this time frame with prior approval of the TR.
4.2 If the Contractor is unable to complete the assembly and placement of all unloaded items before end of the workday, the contractor will transport those items to a location designated by the TR for storage until the next workday. The Contractor will be responsible for moving the items from the overnight storage site to its designated position in the building.
4.3 The Contractor shall verify and inspect all items. Any deficiencies (damage/overage/shortage) shall be brought to the attention of the TR. The Contractor shall store damaged items in the location designated by the TR.
4.4 The Contractor shall maintain a complete file of all documents relating to each discrepancy. Copies of discrepancy reports shall be forwarded to the TR on a daily basis.
4.5 The Contractor shall repair or coordinate for replacement of damaged, defective, or missing items.
4.6 Additional items identified in Table 1 shall be picked up from location specified in Table 1, on the date and time specified by the TR, and installed. If these items have been picked up, but not installed, they must be handled in accordance with paragraph
Attachment 3 Page 4 of 22
3.2. above. If no items are identified in Table 1, then there are no items in storage that must be installed under this contract.
4.7 Mattresses and box springs (if applicable) shall be installed whether provided by the Contractor or by the Government, even if not noted in Table 1. If mattresses are provided by the Government, the Contractor shall pick up these items from the location specified by the TR and install in accordance with this Statement of Work.
5. PLACE AND INSTALL
5.1 Contractor shall place items in building(s) noted in CLIN 0001 of the contract.
Items shall be placed in the rooms in accordance with the drawings attached to this Statement of Work. If no drawings are provided herein, the furniture shall be placed as directed by the TR. Information about the building may be found in Table 1.
5.2 The Contractor shall complete installation of furnishings under this Statement of Work in the time period specified in Table 1.
5.3 The contractor shall clean and polish all items that have been installed.
5.4 The Contractor shall ensure all light fixtures have the appropriate bulbs as identified in the contract as well as ensure they are in working order.
5.5 The Contractor shall remove all protective coverings off of electronics (such as protective film on the microwaves, TVs, and lamp shades, etc.).
5.6 The Contractor shall ensure that all stickers and labels are removed, and no adhesive residue remains on the surface.
5.7 The Contractor shall ensure that items which requires batteries have been provided with new alkaline batteries, and that they are working properly.
5.8 If recreational equipment is provided in this procurement, the Contractor shall install the recreational equipment. In addition, the Contractor shall be responsible for providing equipment, material, and expertise needed to place assemble, and level pool tables, soccer tables, table tennis, and dart boards as identified in the contract.
5.9 If electric appliances are provided in this procurement, the Contractor shall install the appliances. In addition, the Contractor shall be responsible for providing all equipment and material to install the ice machines, refrigerators, electric ranges, microwaves, clothes washers, and electric dryers as identified in the contract. The contractor shall provide power cords for all electrical items, which are appropriate for the item and the building’s electrical service, as well as hoses, vent kits, and/or other
Attachment 3 Page 5 of 22 accessories required to have a fully functioning unit. Vendor is not responsible for connecting gas appliances to the gas supply.
5.10 If artwork is provided in this procurement, the Contractor shall install the artwork.
In addition, the Contractor shall be responsible for providing equipment and material needed to install artwork in TV rooms, dayrooms, game rooms, etc., of each building as identified in the contract. The TR will provide locations for placement of artwork. Mount artwork at standing eye-level height of 5’-6” on center above finished floor, or at seated eye-level height of 4’-4” on center above finished floor, per direction from TR.
5.11 If floor cleaning equipment is provided in this procurement, the Contractor shall uncrate, assemble, and provide all materials and equipment necessary to ensure the buffer, shampooers, and vacuum cleaners are in operational condition, and locate equipment within the building per direction from the TR.
5.12 The Contractor shall be responsible for installing other items that have been shipped to and/or stored at the installation as noted in Table 1. If no items are identified in these blocks, then there are no other items that must be installed under this contract.
5.13 Mattresses and box springs (if applicable) shall be installed whether provided by the Contractor or by the Government, even if not noted in Table 1. If mattresses are provided by the Government, the Contractor shall pick up these items from the location specified by the TR and install in accordance with this Statement of Work.
6. ASSEMBLY
6.1 The Contractor shall uncrate all items received and perform all required assembly in accordance with the manufacturers' instructions.
6.2 All furniture, equipment and accessories shall be level, plumb, square, and in proper alignment with adjoining furniture. Furnishings shall be securely attached to the building where applicable.
6.3 The Contractor shall inspect to ensure that the furniture is free of surface dirt and defects, and that the installation is complete, and the furniture is ready to use.
6.4 If required, the Contractor shall reverse doors and handles on the refrigerators in sleeping rooms.
7. PROTECTION OF PROPERTY
7.1 The Contractor shall perform an inspection of the buildings and grounds with the TR prior to starting work. The Contractor shall protect all items from damage during both
Attachment 3 Page 6 of 22 removal and installation. The Contractor shall take precaution against damage to the building, grounds, and other furnishings. The Contractor shall perform a final inspection of the buildings and grounds after completing work. A corrective action plan shall be provided by the Contractor that details type, source, and schedule of repairs.
7.2 The Contractor shall repair or replace any items, building components, or grounds damaged due to negligence and/or direct action by the Contractor using materials of the same quality, size, texture, and color to match adjacent existing work.
All repairs beyond simple surface cleaning require concurrence of the TR before the Contractor or anyone other than the facility construction contractor (or its subcontractors) may perform any significant repair work. Use of the facility construction contractor (or appropriate subcontractor) is required for all significant repairs so that the building warranty is maintained.
7.3 The Contractor shall be responsible for security of the area in which work is being performed and prior to completion and transfer to the Government. The Contractor shall maintain accountability and control of any keys provided and shall return them to the TR upon completion of work.
7.4 Material-handling equipment shall have rubber wheels.
8. PRODUCT DOCUMENTATION
8.1 The Contractor shall ensure that all owner’s manuals, warranty information, assembly instructions, maintenance and care instructions, operating instructions, and any other information is provided to the TR upon completion of the installation.
8.2 The Contractor shall collect special assembly tools, the security hardware wrench, and any spare parts provided with the furnishings and turn them over to the TR.
9. CLEANUP
9.1 The Contractor will be responsible for the removal and disposal of all trash connected with uncrating and assembling furniture and other items installed under this contract. Final acceptance of the furniture (Technical Representative signing acceptance on Delivery Order/contract), from the contractor will not occur until all trash connected with the furniture installation is removed from the site.
9.2 Recyclable cardboard products shall be disposed of in accordance with Table 1.
9.3 Packing materials will not be stored in the buildings for any period exceeding 24 hours.
Attachment 3 Page 7 of 22
9.4 Personal trash (food wrappers, drinks, etc.) shall be removed from the site on a daily basis by the contractor.
10. EXCESS ITEMS
10.1 Once equipment is installed as shown on the furniture layout, the Contractor shall coordinate with the TR as to where any excess items are to be stored. Contractor will be responsible for delivery of excess items to storage area designated by TR.
11. SAFETY
11.1 Safety Compliance Requirements. Contractor shall comply with FAR 52.236-13 Accident Prevention and execute all work in accordance with (IAW) the latest version of Safety Manual EM 385-1-1 per base contract.
11.2 Site Visit Accident Prevention Plan (SVAPP). A SVAPP is required if an APP with a site/survey activity hazard analysis (AHA) has not been provided and accepted by the furnishings program CEHNC KO in coordination with (ICW) CEHNC Safety and Occupational Health Office (SOHO). The SVAPP is intended and necessary for any site visit not covered by an APP and these site visits shall be for visual inspection/observation or office type work only. If work must be performed (i.e., metering, work on energized equipment), an Accident Prevention Plan (APP) must be submitted and accepted.
11.3 Accident Prevention Plan. The APP shall follow the minimum requirements of EM 385-1-1 Chapter 2-7 and this PWS. Follow the mandatory ENG Form 6293 (Accident Prevention Plan Worksheet). The APP must be submitted and accepted by the CEHNC KO ICW CEHNC SOHO prior to starting any work at the site. The contractor is responsible for preparing an APP per EM 385-1-1 for all work that goes beyond the scope of a site. The completed APP shall be submitted to the KO Furnishings Invoice box at least thirty (30) business days prior to field work performance. Field work shall not take place until the APP has been submitted, reviewed, and accepted by the CEHNC Safety Office.
11.4 Contractor shall verify with the controlling installation, the applicability, and requirements for emergency procedures, permit required work procedures, and hazardous environments and waste disposal. These findings shall be incorporated into the APP.
11.5 Activity Hazard Analysis (AHA). All AHAs shall be written in accordance with section 6 in each applicable chapter in EM 385-1-1. The identification and proof of qualification for competent/qualified persons (e.g., Confined Space, Electrician, Crane Operator, etc.) and proof of qualification shall be included IAW EM 385-1-1 Chapter 2-6.
d(4)(g). Define the steps to be performed for the activity/task/DFOW and the work
Attachment 3 Page 8 of 22 sequences (for example, site conditions, materials, personnel) needed. Job steps should be detailed so that the reader clearly understands how that job will be accomplished (for example, how the part will be installed or removed, anticipated voltages, quantities of chemicals utilized, equipment utilized to accomplish the task, heights being accessed).
11.6 Site-Specific Addendum (SSA). SSAs are required for each site if work will be conducted on two or more distinct sites. The SSAs shall be submitted to the KO Furnishings invoice box for review and acceptance by the CEHNC Safety Office prior to work starting. Each SSA shall contain detailed site-specific information only applicable to a specific location. It shall be attached to the APP as an appendix and be readily available on the jobsite.
11.7 Safety document resubmittal shall include the original local SOHO comments with detailed responses (Form 7 or 4025) and highlight all changes.
11.8 Any Proposals, Change Orders, and Contract Modifications shall be verified that they are covered under the current accepted APP. If the pending work effort is NOT covered under the initial task order APP, the contractor shall submit, for government review and acceptance, an addendum to the APP.
11.9 Notifications and Reports. All accidents and near misses will be reported in accordance with EM 385-1-1 Table 2-1. Most current version of the ENG Form 3394 Aug 2021 shall be used for all reporting measures. Failure to comply with these requirements will be reflected on CPARS (If applicable).
11.10 Monthly Exposure Hours Report. This report is a compilation of employee-hours worked each month for all site workers, both prime and subcontractors. Hours associated with administrative activities such as payroll, human resource, service order managers/technicians, etc., are not counted. Exposure hours shall be submitted to HNC Contracting Office (CT). The data must be posted/submitted not later than 10 calendar days after the end of each month. Exposure data consists of man-hours expended in direct performance of the work performed on the jobsite. The monthly submission shall be broken down by Contract and identify exposure hours for each Contract. If no hours are worked on the project/task, a report showing zero (0) is required. Contractors should report monthly exposure hours by using the Excel Exposure Hour Report via email to *either contract specialist or PgM.
11.11 Prime Contractor Corporate Safety Official / Corporate Official (CSO/CO). This contract requires a minimum of one Corporate Safety Official / Corporate Official to manage and oversee the implementation of the Prime Contractor’s Safety Program.
The CSO or CO shall conduct roles and responsibilities listed in EM 385-1-1 (2024) Chapter 2-4. f.
Attachment 3 Page 9 of 22
11.12 Site Safety and Health Officer (SSHO). No work shall be conducted at the site of the work until an SSHO (L2 / L3) is present as described and EM 385-1-1 (2024) Chapter 2-8. b. L2s are required for this project that include work that includes LOTO (208V or above), Fall Protection, Confined Space, Use of LHE, Scaffolding, or any other higher hazard activity. L3 is acceptable for any phases of work outside of what is listed above to include office work, providing furniture/equipment support, the receiving and unloading of materials/furniture, or any other low hazard activities. L2/L3 are only permitted on projects with a residual risk of low or medium.
11.13 The SSHO on site must be employed by the prime contractor unless otherwise approved by the KO/COR ICW CEHNC SOHO. If a subcontractor employee is allowed, SSHOs must work under direction of the prime contractors CSO or CO equivalent (CSO or CO does not need to be onsite) from the Prime Contractor. The APP shall include discussion as to how the CSO or CO will ensure the L2 and/or L3 is/are implementing the requirements of the prime contractor’s safety program, EM 385-1-1, OSHA, consensus standards, any additional local laws and regulations, and all accepted safety plans. This shall include but is not limited to the review of site documentation, site audits, training, meetings, and accident reports.
11.14 After Hours Work/Multiple Shifts. Planned after hours work or multiple shifts like dual shifts or scheduled work designed to not impact the customer is considered normal shift operations and shall still ensure that an SSHO, as required by scope of work, is on-site while work is being performed.
11.15 Multiple sites / Locations outside of 45 minutes: shall still ensure that an L2 is on the main site while work is being performed but would additionally need an L3 or L2 (depending on scope of work) for each location, however processes and procedures must be identified in the APP how communication and reporting will be established between the L3 and L2 for these evolutions.
12. AT-OPSEC
12.1 General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department
Attachment 3 Page 10 of 22 of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
12.2 Suspicious Activity Reporting training (e.g., iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
12.3 Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.
12.4 Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. The Vendor must ensure that the Candidate has two (2) valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E- Verify system. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for
Attachment 3 Page 11 of 22 employment under United States immigration laws in accordance with FAR 22.102-1(i).
An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
12.5 All contractor and all associated sub-contractors’ employees shall comply with applicable installation or facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation and MEDOCM access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition at any installation or facility change, the Government may require changes in contractor security matters or processes.
Attachment 3 Page 12 of 22
TABLE 1. Project specific information.
NBK 885
Technical Representative: Kelli Ballein
Tech. Rep. Phone: 360-476-8537
Tech. Rep. Email: kelli.d.ballein.civ@us.navy.mil
Will the Building be Occupied During Install
Yes
Delivery Type
Staged
If staged, how many rooms accessible per day?
(Min of 10-12 double occupancy rooms) 10 Double Occupancy
Acceptable Hours of Delivery: M-TH 0730-1600, F 0700-1530
Number of floors: 10
Elevator Available for Use During Install Yes
Elevator Dimensions
Entry door 72W x 84H; Interior 46.5W x73W x 88.5H
DRMO: It is the responsibility of the TR to coordinate with DRMO to ensure they are aware of the project
DRMO Location:
N/A
Point of Contact Name: N/A
Phone/Email: N/A
Address:
Building Number N/A
Street Address
City, State, Zip Code
Business Hours:
Do they accept mattresses?:
DRMO Special Requirements (Pallets, Shrink Wrap):
Attachment 3 Page 13 of 22
All recyclable cardboard products to be delivered to:
Address:
Building Number Contractor is responsible for the removal and disposal of all recyclables and trash.
Phone:
Access & Delivery Information:
Security Requirements: Naval Base Kitsap is a controlled access installation. Base Access and Visitor Requests (BAVR) must be submitted 2 weeks in advance.
Failure to comply may result in delayed access.
Direct questions to:
desiree.r.hartman.civ@us.navy.mil (360)315-5990
**NO ESCORTS WILL BE PROVIDED**
Visitor Control Centers (VCCs) are responsible for authenticating an individual's identity, vetting, and determining their eligibility prior to authorizing access to the installation.
NAVAL BASE KITSAP VCC LOCATIONS
BANGOR: Bldg. 1035 [located off Trident Blvd., adjacent to Trident Main Gate] (360)396- 4665 M-F 0700-1520 BREMERTON: Bldg. 981 [located off WA- 304, adjacent to Missouri Gate] (360)476-4882 M- F 0700-1520 BAVR Web page: https://www.bavr.cnic.navy.mil/ The link can also be found via the NBK Visitor Information page:
https://cnrnw.cnic.navy.mil/Installations/NAVBASE- Kitsap/About/Installation-Guide/Visitor-Information/
A SEPARATE REQUEST IS REQUIRED FOR
EACH INDIVIDUAL
Fill out all *Required Fields, guidance provided below for the specified areas:
-Work Information:
*Personnel Type: CONTRACTOR *Command You Are Visiting: CNRNW
SM
*Company Name or Command:
YOUR EMPLOYER/COMPANY NAME
-Sponsor/Point of Contact Information:
Attachment 3 Page 14 of 22
*Sponsor E-Mail:
desiree.r.hartman.civ@us.navy.mil -Visit Information:
*Purpose of Visit: PROVIDE A DETAILED
EXPLANATION OF WHAT YOU WILL BE DOING
TO INCLUDE AWARD INFORMATION,
LOCATIONS, AND BUILDING NUMBERS. IT IS
POSSIBLE TO AUTHORIZE VISITS FOR
MULTIPLE INSTALLATIONS WITH ONE BAVR
REQUEST, INCLUDE THE DATES YOU WILL
REQUIRE ACCESS FOR EACH SITE HERE.
-Submit your request.
-Once you have received an email notification that your BAVR request has been approved, you will then present a valid/current government issued photo identification and current proof of citizenship to VCC personnel. Not all REAL ID-compliant driver's licenses will meet the requirement for NBK. Please see specifics below or contact the VCC directly with any questions.
REQUIRED DOCUMENTS
In order to be vetted with a background check and identify proofing by VCC personnel, you must bring valid/current government issued photo identification and current proof of citizenship. This applies to all individuals except for active-duty service members and federal civilian employees.
Accepted proof of citizenship:
State issued birth certificate: This must be an original or certified copy.
Enhanced state-issued driver’s license only accepted from Michigan, Minnesota, New York, Vermont, and Washington.
U.S. passport (book or card): can NOT be expired.
Certification of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .