This document is Amendment 0001 to RFQ W912DY-26-Q-A073, issued by the U.S. Army Engineer Support Center (W912DY) at Huntsville, Alabama, effective April 14, 2026. The amendment provides responses to vendor questions regarding the scope of work for microwave installation at Fort Huachuca and Fort Carson locations.
The amendment clarifies delivery and installation requirements for two separate buildings. Building 52309 requires delivery and offload only into the warehouse, which has a loading dock available. Building 1954 at Fort Carson requires full installation services, including delivery to a three-story building with no elevator access. The revised Statement of Work (Attachment 3, dated April 13, 2026) specifies that Building 1954 installation involves placement of microwaves with comprehensive contractor responsibilities including unloading, placement, assembly, cleaning, and disposal of packaging materials. The contractor must provide all necessary equipment, materials, and power cords for full functionality. Work hours are 0700-1600, with delivery trucks able to access within 20 feet of buildings via exterior hallways. All installation work must comply with Fort Carson security requirements, including entry through Gate 1 with valid driver's licenses, insurance documentation, and background clearance. The statement of work includes detailed safety requirements per FAR and Army standards, including accident prevention plans, site safety and health officer requirements, and security/OPSEC compliance measures. Recyclable cardboard must be delivered to Building 1535 South Sheridan Avenue, Fort Carson, CO 80913.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 16
0001 14 APR 2026
W912DY
W2V6 USA ENG SPT CTR HUNTSVIL
300 SECURE GATEWAY, KO CONTRACTING DIVISION
REDSTONE ARSENAL, AL 35898-0000
UNITED STATES
CHERYL SMITH, EMAIL: CHERYL.C.SMITH@USACE.ARMY.MIL TELEPHONE: 256-
895-1551
SCD: PAS:
W912DY26QA073
14 APR 2026
SEE CONTINUATION
The purpose of this amendment is to:
a. Provide additional Responses to vendor questions.
b. All other terms and conditions remain the same.
FAR 52.212-4(c) Contract Terms and Conditions Commercial Items
Vendor Questions and Answers Army, Ft. Huachuca – Microwaves
RFQ W912DY-26-Q-A073
Amendment 2
1. Vendor Question: The ATT1 asks for installation and removal cost, but the SOW shows that the appliances only need delivery and offloading into the warehouse. Please confirm on the correct scope of work.?
HNC RESPONSE: This will be a delivery and offload; Attachment #1 will be updated to reflect correctly.
2. Vendor Question: If only delivery and offload is needed, please advise if the warehouse has a offloading dock
HNC RESPONSE: Warehouse does have a loading dock.
3. Vendor Question: If no offloading dock, please advise the number of flight of stairs needed to be covered to deliver inside the warehouse.
HNC RESPONSE: N/A
4. Vendor Question: There are two ATT1 for Bldg 52309. One for Offload and one for Install remove. I’m guessing the ATT1 with install; remove is from the initial RFQ posting. Please confirm that the amendment only requires Bldg 52309 to offload the appliances in warehouse
HNC RESPONSE: Bldg 52309 is offload.
5. Vendor Question: ATT1 for Bldg 1954 asks for Installation cost, but the SOW says that the delivery type is “Offload”
HNC RESPONSE: 1954 is Install. See revised ATT3 – ISOW, dated 4-13-26
6. Vendor Question: For Bldg 1954 - If only delivery and offload is needed, please advise if the building has a offloading dock.
HNC RESPONSE: 1954 is Install.
7. Vendor Question: If no offloading dock at Bldg 1954, please advise the number of flight of stairs or steps needed to be covered to deliver inside the building. Can elevators be used.
HNC RESPONSE: 1954 is Install. 3 floors, no elevator available.
W912DY26QA073
Attachment 3 Ft. Carson 1954 – Microwaves REV 4-13-26
Attachment 3 Page 1 of 14
Statement of Work (SOW)
Installation of Casegoods
Housing Furnishings Program
Attachment 3 Page 2 of 14
TABLE OF CONTENTS PAGE NO.
1.0 GENERAL
2.0 DELIVERY
3.0 RECEIVE AND UNLOAD
4.0 PLACE AND INSTALL
5.0 ASSEMBLY
6.0 PROTECTION OF PROPERTY
7.0 PRODUCT DOCUMENTATION
8.0 CLEANUP
9.0 EXCESS ITEMS
10.0 SAFETY
11.0 AT-OPSEC
TABLE 1: Project Information
Attachment 3 Page 3 of 14
1.0 GENERAL
1.1 The Contractor shall provide all necessary materials, equipment, labor, supervision, and management to (1) coordinate delivery; (2) load and unload; (3) place/install in designated rooms; (4) assemble items as required; (5) secure and store, as designated and; (6) properly dispose of all associated packaging/crating materials.
1.2 Awarded Contractor is responsible for verifying all existing field conditions, i.e., electrical power including, but not limited to, voltage, hertz, amperage and outlets, at each building.
1.3 The Technical Representative (TR) for this project is as shown in Table 1 of this document.
1.4 The Contractor shall provide a digital color board of all furniture, finishes, and fabrics to the TR for reference, prior to manufacturing.
2.0 DELIVERY
DELIVERY TYPES:
• Staged Delivery – This type of delivery is selected for occupied buildings whereby the rooms must be emptied of old furnishings and reinstalled with the new furnishings by the end of each workday. The number of rooms that must be completed per day will be stated in the Table 1 of the Statement of Work (SOW). If there is a limited space for containers in the staging area, this will also be noted in the Table 1 of the Statement of Work. This information is important as it may dictate how the containers are loaded for delivery.
• Non-Staged Delivery – This type of delivery is selected typically for empty buildings whereby the entire building is accessible during the install dates listed in the contract. This is important because it will dictate how the items are loaded into the containers for shipment.
2.1 The Contractor shall contact the TR at least 15 working days prior to shipping to ensure that the building is ready. The Contractor shall coordinate item delivery from all sub-contractors and ship the goods only if the TR confirms that the building is ready. At this time, the Contractor shall also ensure they fully understand all security regulations for the installation and have started any required procedures so as to minimize the impact on the installation personnel.
Attachment 3 Page 4 of 14
2.2 In the event that a delay in delivery is requested by the TR, or if the Contractor is unable to confirm that the building is ready, the Contractor shall immediately notify the Contracting Officer and Project Manager for further direction.
2.3 The Contractor shall provide the TR with a minimum of 48-hour notification as to the date and time that the trucks will be arriving. The Contractor shall also provide email notification as to the date and time the trucks will be arriving to:
furnishinginvoices@usace.army.mil at least 48 hours prior to scheduled arrival time.
2.4 Contractor must ensure that the driver of the delivery vehicle has copies of the
Delivery Order (DD Form 1155) for the items being delivered in order to gain entry to the facility.
2.5 Drivers of the delivery vehicles shall not attempt to deliver any items before the scheduled delivery date. In the event the delivery date falls on a Saturday, Sunday, or federally recognized holiday, the delivery date shall be the next workday after the Saturday, Sunday, or holiday.
2.6 Shipping Label shall read as specified in Table 1 of this document.
2.7 Items shall be labeled with the building number(s) provided in Contract Line Item
(CLIN) 0001, unless otherwise noted in this paragraph.
3.0 RECEIVE AND UNLOAD
3.1 Contractor shall start assembling and installing items in rooms upon delivery between the hours specified in Table 1. The Contractor may work outside this time frame with prior approval of the TR.
3.2 If the Contractor is unable to complete the assembly and placement of all unloaded items before end of the workday, the contractor will transport those items to a location designated by the TR for storage until the next workday. The Contractor will be responsible for moving the items from the overnight storage site to its designated position in the building.
3.3 The Contractor shall verify and inspect all items. Any deficiencies
(damage/overage/shortage) shall be brought to the attention of the TR. The Contractor shall store damaged items in the location designated by the TR.
3.4 The Contractor shall maintain a complete file of all documents relating to each discrepancy. Copies of discrepancy reports shall be forwarded to the TR on a daily basis.
mailto:furnishinginvoices@usace.army.mil
Attachment 3 Page 5 of 14
3.5 The Contractor shall repair or coordinate for replacement of damaged, defective, or missing items.
3.6 Additional items identified in Table 1 shall be picked up from location specified in
Table 1, on the date and time specified by the TR, and installed. If these items have been picked up, but not installed, they must be handled in accordance with paragraph 3.2. above. If no items are identified in Table 1, then there are no items in storage that must be installed under this contract.
3.7 Mattresses and box springs (if applicable) shall be installed whether provided by the Contractor or by the Government, even if not noted in Table 1. If mattresses are provided by the Government, the Contractor shall pick up these items from the location specified by the TR and install in accordance with this Statement of Work.
4.0 PLACE AND INSTALL
4.1 Contractor shall place items in building(s) noted in CLIN 0001 of the contract.
Items shall be placed in the rooms in accordance with the drawings attached to this Statement of Work. If no drawings are provided herein, the furniture shall be placed as directed by the TR. Information about the building may be found in Table 1.
4.2 The Contractor shall complete installation of furnishings under this Statement of
Work in the time period specified in Table 1.
4.3 The contractor shall clean and polish all items that have been installed.
4.4 The Contractor shall ensure all light fixtures have the appropriate bulbs as identified in the contract as well as ensure they are in working order.
4.5 The Contractor shall remove all protective coverings off of electronics such as protective film on the microwaves, TVs, and lamp shades, etc.
4.6 The Contractor shall ensure that all stickers and labels are removed, and no adhesive residue remains on the surface.
4.7 The Contractor shall ensure that items which require batteries have been provided with new alkaline batteries, and that they are working properly.
4.8 If recreational equipment is provided in this procurement, the Contractor shall install the recreational equipment. In addition, the Contractor shall be responsible for providing equipment, material, and expertise needed to place, assemble, and level pool tables, soccer tables, table tennis, and dart boards as identified in the contract.
Attachment 3 Page 6 of 14
4.9 If electric appliances are provided in this procurement, the Contractor shall install the appliances. In addition, the Contractor shall be responsible for providing all equipment and material to install the ice machines, refrigerators, electric ranges, microwaves, clothes washers, and electric dryers as identified in the contract. The contractor shall provide power cords for all electrical items, which are appropriate for the item and the building’s electrical service, as well as hoses, vent kits, and/or other accessories required to have a fully functioning unit. Vendor is not responsible for connecting gas appliances to the gas supply.
4.10 If artwork is provided in this procurement, the Contractor shall install the artwork.
In addition, the Contractor shall be responsible for providing equipment and material needed to install artwork in TV rooms, dayrooms, game rooms, etc. of each building as identified in the contract. The TR will provide locations for placement of artwork. Mount artwork at standing eye-level height of 5’-6” on center above finished floor or at seated eye-level height of 4’-4” on center above finished floor, per direction from TR.
4.11 If floor cleaning equipment is provided in this procurement, the Contractor shall uncrate, assemble, and provide all materials and equipment necessary to ensure the buffer, shampooers, and vacuum cleaners are in operational condition, and locate equipment within the building per direction from the TR.
4.12 The Contractor shall be responsible for installing other items that have been shipped to and/or stored at the installation as noted in Table 1. If no items are identified in these blocks, then there are no other items that must be installed under this contract.
4.13 Mattresses and box springs (if applicable) shall be installed whether provided by the Contractor or by the Government, even if not noted in Table 1. If mattresses are provided by the Government, the Contractor shall pick up these items from the location specified by the TR and install in accordance with this Statement of Work.
5.0 ASSEMBLY
5.1 The Contractor shall uncrate all items received and perform all required assembly in accordance with the manufacturers' instructions.
5.2 All furniture, equipment and accessories shall be level, plumb, square, and in proper alignment with adjoining furniture. Furnishings shall be securely attached to the building where applicable.
5.3 The Contractor shall inspect to ensure that the furniture is free of surface dirt and defects, that the installation is complete, and the furniture is ready to use.
Attachment 3 Page 7 of 14
5.4 If required, the Contractor shall reverse doors and handles on the refrigerators in sleeping rooms.
6.0 PROTECTION OF PROPERTY
6.1 The Contractor shall perform an inspection of the buildings and grounds with the
TR prior to starting work. The Contractor shall protect all items from damage during both removal and installation. The Contractor shall take precaution against damage to the building, grounds, and other furnishings. The Contractor shall perform a final inspection of the buildings and grounds after completing work. A corrective action plan shall be provided by the Contractor that details type, source, and schedule of repairs.
6.2 The Contractor shall repair or replace any items, building components, or grounds damaged due to negligence and/or direct action by the Contractor using materials of the same quality, size, texture, and color to match adjacent existing work. All repairs beyond simple surface cleaning require concurrence of the TR before the Contractor or anyone other than the facility construction contractor (or its subcontractors) may perform any significant repair work. Use of the facility construction contractor (or appropriate subcontractor) is required for all significant repairs so that the building warranty is maintained.
6.3 The Contractor shall be responsible for security of the area in which work is being performed and prior to completion and transfer to the Government. The Contractor shall maintain accountability and control of any keys provided, and shall return them to the TR upon completion of work.
6.4 Material-handling equipment shall have rubber wheels.
7.0 PRODUCT DOCUMENTATION
7.1 The Contractor shall ensure that all owner’s manuals, warranty information, assembly instructions, maintenance and care instructions, operating instructions, and any other information is provided to the TR upon completion of the installation.
7.2 The Contractor shall collect special assembly tools, the security hardware wrench, and any spare parts provided with the furnishings and turn them over to the TR.
8.0 CLEANUP
8.1 The Contractor will be responsible for the removal and disposal of all trash connected with uncrating and assembling furniture and other items installed under this contract. Final acceptance of the furniture (Technical Representative
Attachment 3 Page 8 of 14 signing acceptance on Delivery Order/contract), from the contractor will not occur until all trash connected with the furniture installation is removed from the site.
8.2 Recyclable cardboard products shall be disposed of in accordance with Table 1.
8.3 Packing materials will not be stored in the buildings for any period exceeding 24 hours.
8.4 Personal trash (food wrappers, drinks, etc.) shall be removed from the site on a daily basis by the contractor.
9.0 EXCESS ITEMS
9.1 Once equipment is installed as shown on the furniture layout, the Contractor shall coordinate with the TR as to where any excess items are to be stored. Contractor will be responsible for delivery of excess items to storage area designated by TR.
10.0 SAFETY
10.1 Safety Compliance Requirements. Contractor shall comply with FAR 52.236-13
Accident Prevention and execute all work in accordance with (IAW) the latest version of Safety Manual EM 385-1-1 per base contract.
10.2 Site Visit Accident Prevention Plan (SVAPP). A SVAPP is required if an APP with a site/survey activity hazard analysis (AHA) has not been provided and accepted by the furnishings program CEHNC KO in coordination with (ICW) CEHNC Safety and Occupational Health Office (SOHO). The SVAPP is intended and necessary for any site visit not covered by an APP and these site visits shall be for visual inspection/observation or office type work only. If work must be performed (i.e., metering, work on energized equipment), an Accident Prevention Plan (APP) must be submitted and accepted.
10.3 Accident Prevention Plan. The APP shall follow the minimum requirements of EM
385-1-1 Chapter 2-7 and this PWS. Follow the mandatory ENG Form 6293 (Accident Prevention Plan Worksheet). The APP must be submitted and accepted by the CEHNC KO ICW CEHNC SOHO prior to starting any work at the site. The contractor is responsible for preparing an APP per EM 385-1-1 for all work that goes beyond the scope of a site. The completed APP shall be submitted to the KO Furnishings Invoice box at least thirty (30) business days prior to field work performance. Field work shall not take place until the APP has been submitted, reviewed, and accepted by the CEHNC Safety Office.
10.4 Contractor shall verify with the controlling installation, the applicability, and requirements for emergency procedures, permit required work procedures, and
Attachment 3 Page 9 of 14 hazardous environments and waste disposal. These findings shall be incorporated into the APP.
10.5 Activity Hazard Analysis (AHA). All AHAs shall be written in accordance with section 6 in each applicable chapter in EM 385-1-1. The identification and proof of qualification for competent/qualified persons (e.g., Confined Space, Electrician, Crane Operator, etc.) and proof of qualification shall be included IAW EM 385-1-1 Chapter 2-6. d(4)(g). Define the steps to be performed for the activity/task/DFOW and the work sequences (for example, site conditions, materials, personnel) needed. Job steps should be detailed so that the reader clearly understands how that job will be accomplished (for example, how the part will be installed or removed, anticipated voltages, quantities of chemicals utilized, equipment utilized to accomplish the task, heights being accessed).
10.6 Site-Specific Addendum (SSA). SSAs are required for each site if work will be conducted on two or more distinct sites. The SSAs shall be submitted to the KO Furnishings invoice box for review and acceptance by the CEHNC Safety Office prior to work starting. Each SSA shall contain detailed site-specific information only applicable to a specific location. It shall be attached to the APP as an appendix and be readily available on the jobsite.
10.7 Safety document resubmittal shall include the original local SOHO comments with detailed responses (Form 7 or 4025) and highlight all changes.
10.8 Any Proposals, Change Orders, and Contract Modifications shall be verified that they are covered under the current accepted APP. If the pending work effort is NOT covered under the initial task order APP, the contractor shall submit, for government review and acceptance, an addendum to the APP.
10.9 Notifications and Reports. All accidents and near misses will be reported in accordance with EM 385-1-1 Table 2-1. Most current version of the ENG Form 3394 Aug 2021 shall be used for all reporting measures. Failure to comply with these requirements will be reflected on CPARS (If applicable).
10.10 Monthly Exposure Hours Report. This report is a compilation of employee-hours worked each month for all site workers, both prime and subcontractors. Hours associated with administrative activities such as payroll, human resource, service order managers/technicians, etc., are not counted. Exposure hours shall be submitted to HNC Contracting Office (CT). The data must be posted/submitted not later than 10 calendar days after the end of each month. Exposure data consists of man-hours expended in direct performance of the work performed on the jobsite. The monthly submission shall be broken down by Contract and identify exposure hours for each Contract. If no hours are worked on the project/task, a report showing zero (0) is required. Contractors should report
Attachment 3 Page 10 of 14 monthly exposure hours by using the Excel Exposure Hour Report via email to *either contract specialist or PgM.
10.11 Prime Contractor Corporate Safety Official / Corporate Official (CSO/CO). This contract requires a minimum of one Corporate Safety Official / Corporate Official to manage and oversee the implementation of the Prime Contractor’s Safety Program. The CSO or CO shall conduct roles and responsibilities listed in EM 385-1-1 (2024) Chapter 2-4. f.
10.12 Site Safety and Health Officer (SSHO). No work shall be conducted at the site of the work until an SSHO (L2 / L3) is present as described and EM 385-1-1 (2024) Chapter 2-8. b. L2s are required for this project that include work that includes LOTO (208V or above), Fall Protection, Confined Space, Use of LHE, Scaffolding, or any other higher hazard activity. L3 is acceptable for any phases of work outside of what is listed above to include office work, providing furniture/equipment support, the receiving and unloading of materials/furniture, or any other low hazard activities. L2/L3 are only permitted on projects with a residual risk of low or medium.
10.13 The SSHO on site must be employed by the prime contractor unless otherwise approved by the KO/COR ICW CEHNC SOHO. If a subcontractor employee is allowed, SSHOs must work under direction of the prime contractors CSO or CO equivalent (CSO or CO does not need to be onsite) from the Prime Contractor.
The APP shall include discussion as to how the CSO or CO will ensure the L2 and/or L3 is/are implementing the requirements of the prime contractor’s safety program, EM 385-1-1, OSHA, consensus standards, any additional local laws and regulations, and all accepted safety plans. This shall include but is not limited to the review of site documentation, site audits, training, meetings, and accident reports.
10.14 After Hours Work/Multiple Shifts. Planned after hours work or multiple shifts like dual shifts or scheduled work designed to not impact the customer is considered normal shift operations and shall still ensure that an SSHO, as required by scope of work, is on-site while work is being performed.
10.15 Multiple sites / Locations outside of 45 minutes: shall still ensure that an L2 is on the main site while work is being performed but would additionally need an L3 or L2 (depending on scope of work) for each location, however processes and procedures must be identified in the APP how communication and reporting will be established between the L3 and L2 for these evolutions.
11.0 AT-OPSEC
11.1 General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the
Attachment 3 Page 11 of 14 prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
11.2 Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See
Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
11.3 Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.
Attachment 3 Page 12 of 14
11.4 Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. The Vendor must ensure that the Candidate has two (2) valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-Verify system. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
11.5 All contractor and all associated sub-contractors’ employees shall comply with applicable installation or facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation and MEDOCM access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition at any installation or facility change, the Government may require changes in contractor security matters or processes.
Attachment 3 Page 13 of 14
TABLE 1: Project Information
Technical Representative:
Ed Ruiz
Tech. Rep. Phone:
719-287-1487
Tech. Rep. Email:
eduardo.ruizmendoza.civ@army.mil
Will the Building be Occupied During Install
No
Delivery Type
Offload Install
If staged, how many rooms accessible per day?
(Min of 10-12 double occupancy rooms)
Acceptable Hours of Delivery:
0700-1600
Number of floors:
Elevator Available for Use During Install No
Elevator Dimensions
DLA Disposition Services: It is the responsibility of the TR to coordinate with DLA to ensure they are aware of the project
DLA Location:
N/A
Point of Contact Name:
Phone/Email:
Address:
Building Number Street Address City, State, Zip Code
Business Hours:
Do they accept mattresses?:
DLA Special Requirements (Pallets, Shrink Wrap):
All recyclable cardboard products to be delivered to:
Address:
Building Number
1535 South Sharidan Ave Fort Carson, CO 80913 Street Address
City, State, Zip Code Phone:
719-526-1695
Access & Delivery Information:
Attachment 3 Page 14 of 14
Security Requirements:
All trucks will enter thru Gate 1. Proper documents are required. Valid drivers license valid insurance and no outstanding traffic violations or criminal records
Shipping Label for Furniture:
Physical Address:
Building Number Street Address
City, State, Zip Code
Bldg 1954 Barkeley Ave.
Fort Carson, Co 80913
Warehouse information:
N/A
Address:
Building Number
Street Address City, State, Zip Code
Building Specific Information:
Other Information such as truck parking, how close the truck can get to the building, can a vendor provided forklift be used on location, are the rooms accessible from the outside via a catwalk or the inside.
Trucks can get within 20 feet of buildings.
Rooms are accessible from exterior hallways.
The fields required if furnishings/window treatments/hardware are being removed as part of this contract.
Old furnishing to be delivered to:
N/A
List ALL furnishings to be removed:
END OF SOW
| ATT 1-Huachuca 52309, SAM.GOV, Microwaves.pdf |
| RFQ |
| ATT 1-Carson 7506, SAM.GOV, Microwaves.pdf |
| RFQ |
| ATT 1-Carson 1954, SAM.GOV, Microwaves.pdf |
| RFQ |
| ATT 1-Carson 1950, SAM.GOV, Microwaves.pdf |
| RFQ |
| ATT 1-Carson 1554, SAM.GOV, Microwaves.pdf |
| RFQ |
| ATT 1-Carson 1552, SAM.GOV, Microwaves.pdf |
| RFQ |
| ADP7889.tmp |
| 1.0 GENERAL |
| 2.0 DELIVERY |
| 3.0 REMOVAL OF EXISTING FURNITURE |
| 4.0 RECEIVE AND UNLOAD |
| 5.0 PLACE AND INSTALL |
| 6.0 ASSEMBLY |
| 7.0 PROTECTION OF PROPERTY |
| 8.0 PRODUCT DOCUMENTATION |
| 9.0 CLEANUP |
| 10.0 EXCESS ITEMS |
| 11.0 SAFETY |
| 12.0 AT-OPSEC |
| TABLE 1: Project Information – Bldg 1552 |
| TABLE 2: Project Information – Bldg 1554 |
| TABLE 3: Project Information – Bldg 1950 |
| TABLE 4: Project Information – Bldg 7506 |
| 8 NAME AND ADDRESS OF CONTRACTOR Number street county State and ZIP Code: |
| FACILITY CODE: |
| CODE: |
| 15A NAME AND TITLE OF SIGNER Type or print: |
| 15C DATE SIGNED: |
File details come from the government source that posted it. Updated .