Vendor_Q&A_.pdf

PDF 77 KB Posted

Attached to
Army Lodging Europe Region and Camp Zama
Solicitation number
W912DY-18-T-0251
Issued by

About this file

Vendor Q&A 30 July 2018.

View the file

Other files

File Type Posted
Amendment_0003_W912DY-18-T-0251.pdf PDF
Att_1__Stuttgart_Germany_Army_Lodging_FY18.xlsx XLSX spreadsheet
Att_1__Grafenwoeher_Germany_Army_Lodging_FY18.xlsx XLSX spreadsheet
Att_1__Chievres_Belgium_Army_Lodging_FY18.xlsx XLSX spreadsheet
Att_1__Vilseck_Germany_Army_Lodging_FY18.xlsx XLSX spreadsheet
Att_3_-_SOW_FY18_Lodging_Europe_and_Camp_Zama.pdf PDF
Att_2-FID-Army_Lodging_Europe_Region_and_Camp_Zama_FY18.pdf PDF
Attach_8_ADMIN.docx DOCX document
RFQ_Instructions.pdf PDF
Att_1__Ansbach_Germany_Army_Lodging_FY18.xlsx XLSX spreadsheet
Att_1__Camp_Zama_Japan_Army_Lodging_FY18.xlsx XLSX spreadsheet
Att_1__Vicenza_Italy_Army_Lodging_FY18.xlsx XLSX spreadsheet
RFQ_W912DY-18-T-0251.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendor Questions and Answers

Army Lodging Europe and Japan RFQ T-0251

1. Beginning with item # 10.21 on the Attachment 1's, the item numbers are not matching up with the descriptions in the FID. Can we get an amendment correcting them ?

HNC Response:

Our technical team has reviewed all Attachment #1 forms and do not find the numbering issues mentioned. We have amended line 10.29 to remove “Mobile” to match the item description title in the Attachment #2 FID. See amended Attachment #1 dated 07/26/18 for each location.

2. Do you have any required specifications for the drawer pulls? Would one of our standard black pulls be acceptable?

HNC Response:

Where pulls are required, there is a general style and metal finish identified in the Finish section of each line item. These items are location specific, so some items require black and some require brushed nickel. Please refer to each item in the FID for the specific metal finish requirement. Furniture

3. Would you accept using Plywood tops instead of particleboard / fiberboard core top ?

HNC Response: See amended FID dated 30 Jul 2018

4. Scenario 1: storage is identified prior to leaving will have to be OCONUS which could be our own controlled warehouse/storage facilities. Is this acceptable?

HNC Response: Yes, this is acceptable

5. Scenario 2: storage is identified after items have departed be our own controlled warehouse/storage facilities. Can contractor put the shipping container at a location on-base as an alternative for storage?

(especially in Japan off-base storage can be extremely expensive)

HNC Response: If available, Yes. If it is not available, you will need to be prepared to procure off site storage.