Vendor_Q&A_.pdf
PDF 77 KB Posted
- Attached to
- Army Lodging Europe Region and Camp Zama
- Solicitation number
- W912DY-18-T-0251
About this file
Vendor Q&A 30 July 2018.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0003_W912DY-18-T-0251.pdf | ||
| Att_1__Stuttgart_Germany_Army_Lodging_FY18.xlsx | XLSX spreadsheet | |
| Att_1__Grafenwoeher_Germany_Army_Lodging_FY18.xlsx | XLSX spreadsheet | |
| Att_1__Chievres_Belgium_Army_Lodging_FY18.xlsx | XLSX spreadsheet | |
| Att_1__Vilseck_Germany_Army_Lodging_FY18.xlsx | XLSX spreadsheet | |
| Att_3_-_SOW_FY18_Lodging_Europe_and_Camp_Zama.pdf | ||
| Att_2-FID-Army_Lodging_Europe_Region_and_Camp_Zama_FY18.pdf | ||
| Attach_8_ADMIN.docx | DOCX document | |
| RFQ_Instructions.pdf | ||
| Att_1__Ansbach_Germany_Army_Lodging_FY18.xlsx | XLSX spreadsheet | |
| Att_1__Camp_Zama_Japan_Army_Lodging_FY18.xlsx | XLSX spreadsheet | |
| Att_1__Vicenza_Italy_Army_Lodging_FY18.xlsx | XLSX spreadsheet | |
| RFQ_W912DY-18-T-0251.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vendor Questions and Answers
Army Lodging Europe and Japan RFQ T-0251
1. Beginning with item # 10.21 on the Attachment 1's, the item numbers are not matching up with the descriptions in the FID. Can we get an amendment correcting them ?
HNC Response:
Our technical team has reviewed all Attachment #1 forms and do not find the numbering issues mentioned. We have amended line 10.29 to remove “Mobile” to match the item description title in the Attachment #2 FID. See amended Attachment #1 dated 07/26/18 for each location.
2. Do you have any required specifications for the drawer pulls? Would one of our standard black pulls be acceptable?
HNC Response:
Where pulls are required, there is a general style and metal finish identified in the Finish section of each line item. These items are location specific, so some items require black and some require brushed nickel. Please refer to each item in the FID for the specific metal finish requirement. Furniture
3. Would you accept using Plywood tops instead of particleboard / fiberboard core top ?
HNC Response: See amended FID dated 30 Jul 2018
4. Scenario 1: storage is identified prior to leaving will have to be OCONUS which could be our own controlled warehouse/storage facilities. Is this acceptable?
HNC Response: Yes, this is acceptable
5. Scenario 2: storage is identified after items have departed be our own controlled warehouse/storage facilities. Can contractor put the shipping container at a location on-base as an alternative for storage?
(especially in Japan off-base storage can be extremely expensive)
HNC Response: If available, Yes. If it is not available, you will need to be prepared to procure off site storage.
File details come from the government source that posted it.