W912DY18R0063 Combined Synopsis-Solicitation.pdf
PDF 1 MB Posted
- Attached to
- FRP MATOC NORTH EAST REGION W912DY-18-R-0063
- Solicitation number
- W912DY18R0063
About this file
This is a solicitation for a multiple award task order contract to provide facility reduction services including demolition, abatement, site restoration and related activities. Services will remove and dispose of asbestos and other regulated materials from small to very large facilities located in Northeast states. The contract type is firm-fixed-price and includes a two-year base period and three one-year options with a maximum value of $95 million shared across awardees. Task orders will be competed under fair opportunity procedures and awarded by the U.S. Army Corps of Engineers Engineering Support Center in Huntsville on an as-needed basis. The solicitation response date is July 8, 2020 with an anticipated award date of January 21, 2021.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 18 Estimated Quantities Rev 03.xlsx | XLSX spreadsheet | |
| W912DY-18-R-0063 Amendment 0004 18 Aug.pdf | ||
| W912DY-18-R-0063 Conformed Copy 18 Aug.pdf | ||
| CONFORMED COPY W912DY18R0063.pdf | ||
| W912DY-18-R-0063 0003.pdf | ||
| Attachment 18 - Estimated Quantities Rev 02.xlsx | XLSX spreadsheet | |
| Attachment 3 - Experience Reporting Form rev02.docx | DOCX document | |
| Attachment 19 - ProjNet Questions and Answers rev01.pdf | ||
| W912DY18R0063 AMENDMENT 0002.pdf | ||
| Attachment 20- SF33 Signature Page.pdf | ||
| Attachment 3 - Experience Reporting Form rev01.docx | DOCX document | |
| Attachment 19 - ProjNet Questions and Answers.pdf | ||
| Attachment 18 - Estimated Quantities rev01.xlsx | XLSX spreadsheet | |
| Attachment 16 - Sample Task Order rev01.docx | DOCX document | |
| W912DY18R0063 Amendment 0001.pdf | ||
| Attachment 20- SF33 Signature Page.pdf | ||
| Attachments 1-16.pdf | ||
| Attachment 17 - Sample Task Order Attachment B.xlsx | XLSX spreadsheet | |
| Attachment 18 - Estimated Quantities.xlsx | XLSX spreadsheet |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMBINED SYNOPSIS/SOLICITATION COVER PAGE
General Information
Action Code:
Solicitation Number:
Posted Date:
Response Date:
Contract Award:
Classification Code:
NAICS Code:
Set Aside:
Combined Synopsis/Solicitation
W912DY18R0063
3 June 2020
8 July 2020
21 January 2021
P400- Salvage- Demolition of buildings
238910 Site Preparation Contractors
Full and Open with Small Business Reserve
Contracting Office Address:
US Army Corps of Engineers P.O. Box 1600 Huntsville, AL 35807-4301
Point of Contacts:
Contracting Officer Kendra N. Taylor Office: 256-895-7704
Contract Specialist Yolanda McCray Office: 256-895-1096
Objective This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice.
This announcement constitutes the only solicitation. Proposals are requested, and a system-generated solicitation document will be issued.
This solicitation is a Request for Proposals (RFP). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-95, 13 Jan 2017. The associated North American Industrial Classification System (NAICS) code for this procurement is 238910 – Salvage- Demolition of Buildings. The Product Service Code (PSC) code is R400 – Salvage- Demolition of Buildings.
Description This acquisition is for services to remove, demolish and/or deconstruct small to very large facilities and the associated abatement of facility contaminates. Demolition services include facility reduction, removal of trees and vegetation, parking lots, drives, sidewalks, roadways, utility and electrical disconnections, removal and rerouting of utility connections, removal of outbuildings, site-assessments, removal of above or underground storage tanks, recycling of building materials, value engineering, site restoration, data collection, data analysis and reporting, and other activities pertaining to demolition, destruction, reduction and restoration.
Abatement services includes environmental assessments, abatement of facilities contaminants (i.e., lead, asbestos, chemicals, Polychlorinated biphenyls (PCBs), Petroleum byproducts), redirection of debris waste streams, hazardous and non-hazardous debris transportation, environmental sampling, and proper disposal of regulated materials.
Scope of Work This contract is for commercial facility reduction services, to include demolition, abatement, site restoration, and related services. General work activities performed under this contract include planning, coordination, and execution of building and facility removal/demolition.
Major features of work include, but are not limited to, removal, demolition, and/or deconstruction (when economically feasible) of small to very large buildings and structures and includes the removal of:
• Asbestos Containing Materials (ACM) by abatement;
• Other Regulated Materials (ORM) by the appropriate disposal procedure
• trees and vegetation;
• parking lots, drives, sidewalks, roadways, other paved surfaces;
• utility lines, services, connections;
• above or underground storage tanks;
• outbuildings such as sheds, gazebos, carports, barns; and other activities pertaining to abatement, demolition, destruction, reduction and site restoration.
Other Major features of work may include:
• site and building assessments and or characterizations;
• environmental assessments;
• environmental sampling;
• utility disconnects, terminations, cutting and capping, de-energizing;
• rerouting of utility lines, services, connections;
• recycling of materials and or redirection of debris waste streams;
• site restoration;
• data collection, analysis, and/or reporting;
• hazardous and non-hazardous debris transportation;
• value engineering; and
• other activities pertaining to abatement, demolition, destruction, reduction and site restoration.
Location
General work activities performed under this contract include planning, coordination, and execution of building and facility removal/demolition at multiple Department of Defense installations and other Federal Agency locations throughout Maine, Vermont, New Hampshire, Massachusetts, New York, Connecticut, New Jersey, Pennsylvania, Rhode Island, Delaware, Maryland, and the District of Columbia.
Security Considerations When work is performed at a military installation, the Contractor its Subcontractor employees shall comply with applicable installation, facility and area Commander Installation/Facility access and local security policies and procedures. The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. Additional security requirements may apply such as those required to fulfill United States Army OPORD 2013-74 (Integrating Antiterrorism (AT) and Operations Security (OPSEC).
Type of Contract and Period The Government intends to award a Firm Fixed Price (FFP) Indefinite Delivery/Indefinite Quantity (ID/IQ) Multiple Award Task Order Contract (MATOC), commercial services. The MATOC will have a two-year base and three one-year options; for a total of five (5) years. A six-month extension of services in accordance with FAR clause 52.217-8, Option to Extend Services, is also included. The minimum guarantee will be $2,500.00 and the Government does not offer a guarantee that the options will be exercised on any or all of the awarded contracts.
The maximum capacity, to be shared collectively, for this effort is $95M and the only authorized ordering office is CEHNC. Contract capacity may be moved forward and backward between the base and option years as required to support fluctuation in the demand, requirement and fund availability from one year to the next.
All task orders will be competed and awarded against the basic ID/IQ contracts using the fair opportunity procedures pursuant to Section 863 of the National Defense Authorization Act for FY 2009, Public Law 110-118 and FAR PART 16.5, in addition to the competitive source selection procedures identified in Section 863 of Public Law 110-417. Each order exceeding $2,500.00 will be awarded on a competitive basis in accordance with FAR 16.505, unless an exception described in FAR 16.505 (b)(2)(i) through (iv) applies. Each task order will be on an as-needed basis as requirements arise. Orders may be issued orally and followed up in writing by email or electronic commerce methods.
A warranted CEHNC Contracting Officer within the limits of their warrant may award and administer a task order for work covered by this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this solicitation any resultant contract you must not proceed with the change(s) and shall immediately notify the Contracting Officer.
Task Order Selection/Competition
Task orders will be awarded by CEHNC against the basic ID/IQ contract. The evaluation will be developed IAW the evaluation criteria identified in each TO RFP and documented IAW FAR, local policy, and procedures. The Government will provide a specific PWS describing at a minimum the work required to be performed, performance metrics, schedule requirements, and types and numbers of submittals.
Upon receipt and the technical team analysis of contractor proposals, the KO will make a determination as to which Contractor is best value given the specific requirements of the TO and the capabilities of the pool. Fair consideration will be given to each contractors’ capabilities in general and specifically in relation to the TO at hand.
The contractor shall, upon award of a TO, supply all personnel, tools, equipment, communications, transportation, materials, and supervision to integrate, manage, and execute all specified aspects of the TO.
Administration of Individual Task Orders Individual Task Orders will be placed under these contracts and will be a separate contract. Each Individual Task Order is separate to the extent that it will be initiated, performed, administered, completed and closed independently. Individual Task Orders may have separate Contracting Officers, Contracting Officer Representatives, and Inspectors. The Contractor shall refer all questions to the Contracting Officer if clarification is needed regarding the application of contract clauses to Individual Task Orders. Individual Task Orders will have separate payments.
Wage Determinations The majority of the individual task orders to be issued under this contract are services as defined by FAR 37.101 and will be subject to the Service Contract Act (See FAR 52.222-41).
In the event that individual service task orders contain more than incidental, segregable construction effort or for task orders where follow on construction is anticipated, the Davis- Bacon Act (See FAR 52.222-6) will apply to the construction portion in accordance with FAR
22.402. Wage Determinations for the geographic area where the work is to be performed will be incorporated by reference in each individual task order. A copy of the applicable determination will be available at www.wdol.gov. The labor rates in effect at the time a task order is awarded will remain in effect through completion of the project.
Terms and Conditions Clause 52.212-4, Contract Terms and Conditions- Commercial Items, applies to this acquisition
Clause 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Items, applies to this acquisition and a statement regarding which, if any, of the additional FAR clauses cited in the clause are applicable to the acquisition.
Offer due date Offerors shall deliver electronic proposals using DoD SAFE (https://safe.apps.mil/), a secure access file exchange. All submissions shall be in Adobe PDF format, with the exception of Volume IV-Price submitted in excel format. You are limited to 25 maximum files per upload, https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i52_212_5 and the total package size cannot exceed 8GB. It is the responsibility of the Offeror to ensure that all files are contained therein are readable, complete, and accessible without password.
REQUEST FOR DoD SAFE UPLOAD CODE: Offerors must email the FY20 FRP NE Region MATOC Inbox, CEHNC-NE-FRP@usace.army.mil, no later than five (5) working days prior to the proposal due date to receive a “Request Code” which will allow Offerors to upload their proposals via the SAFE site. Offerors that fail to request “Request Code” five (5) working days before proposal submission date may not be able to receive a request code in time to upload their submission.
Deadline for submission of Questions Interested offerors may submit technical inquiries and questions relating to the solicitation commencing 4:00 Central Standard Time (CST) on, 04 June 2020 through 19 June 2020 not later than 4:00 pm CST. Questions shall be submitted through www.projnet.org using Bidder Inquiring Key PA8VE2-4T7XX2. Answers to questions and inquiries will be posted no later than 26 June 2020.
http://www.projnet.org/
W912DY18R0063
Section A - Solicitation/Contract Form
EXECUTIVE SUMMARY
A1. Objective: The objective of the Facilites Reduction Program (FRP) Northeast MATOC acquisition is to provide a simplified process to respond to the Federal Government’s requirement for demolition and abatement of excess facilities. FRP uses streamlined processes that provide low-cost, quick response demolition and abatement service contracts to support excess facility removal, thereby saving energy and maintenance costs, eliminating safety hazards, nuisances and unsightly structures, maximizing landfill diversion and recycling credits, and freeing up valuable Government real estate for future development. General work activities performed under this contract include planning, coordination, and execution of building and facility removal/demolition at multiple Department of Defense installations and other Federal Agency locations throughout Maine, Vermont, New Hampshire, Massachusetts, New York, Connecticut, New Jersey, Pennsylvania, Rhode Island, Delaware, Maryland, and the District of Columbia. Projects may also include emergency response to disasters, such as hurricanes, floods, tornadoes, or terrorist activities. In response to this need, the Government will procure commercial demolition services on a regional basis. The North American Industry Classification Code (NAICS) for this contract is 238910.
A2. Contract Type: The contract is a FFP commercial service contract under FAR Part 12 and FAR Part 15.
A3. Contract Term: This contract has four ordering periods consisting of one 24-month base period and three (3) 12-month optional ordering periods. There is no guarantee that any optional ordering period will be exercised.
A4. Minimum Guarantee: The minimum guarantee for each award under this MATOC is $2,500.00. The KO will obligate the minimum guarantee against this contract line item at the time of the basic contract award. Upon issuance of task order awards with an aggregate value exceeding $2,500.00, the KO will deobligate the minimum guarantee from this contract line item. For each successful contractor, there will be a one time “minimum guarantee award amount” during the life of the contract, which includes all option years, if exercised.
A5. Contract Capacity: The shared capacity for this contract is $95,000,000 over 5 years (if all the options are exercised). The Government may move capacity performance periods as necessary. The MATOC pool total capacity will be shared among all awardees in the MATOC pool. There is no guarantee that capacity will be spread evenly within the pool.
A6. Ordering: The only authorized ordering office is the U.S. Army Engineering and Support Center, Huntsville, Alabama. Other agencies may be delegated this authority, in which case, an advance written notice will be given to the Contractor. In addition to, or in lieu of mailing an order, the Contracting Officer may issue an order orally, by facsimile or by electronic commerce methods, at his/her discretion. Task orders will be awarded against the basic ID/IQ contracts using the fair opportunity procedures pursuant to Section 863 of the National Defense Authorization Act for FY 2009, Public Law 110-118 and FAR PART 16.5, in addition to the competitive source selection procedures identified in Section 863 of Public Law 110-417. Each order exceeding $2,500.00 will be awarded on a competitive basis in accordance with FAR 16.505, unless an exception described in FAR 16.505 (b)(2)(i) through (iv) applies.
Task orders will be competed and awarded against the basic ID/IQ contract on an as-needed basis as requirements arise. The KO will use the FRP Small Business Decision Matrix (See Attachments 7, FRP Small Business Decision Matrix) to determine which task order requirements will be set aside for small Business MATOC Contractors.
There are two known situations in which a project under task order limitation may be solicited unrestricted and not set aside solely to the Small Business reserve
• A project’s anticipated value, risk and complexity are ranked and weighted utilizing the Small Business Decision Matrix. If the project is determined to be unsuitable for set aside to the Small Business reserve, the requirement will be competed as unrestricted, or
• The contracting officer determines that the Small Business reserve is working at its maximum capability and is unable to take on additional work
The Government will assess projects under task order limitation to determine whether the above criteria are met. If not, the task order will be competed as unrestricted. Small businesses in the MATOC pool may submit proposals under unrestricted task order competitions.
For task orders, the KO will document the determination and justification in the contract file IAW DFARS Subpart 215.101-2-70(a) Limitations and prohibitions. FRP uses performance based task orders whenever suitable and to the maximum extent practicable. Performance based task orders allow the Contractor to propose industry best practices and technical solutions that are both appropriate to the work site requirements and within the Contractor's capabilities. CEHNC will use lowest price, technically acceptable (LPTA) source selection procedures for task orders. For each LPTA task order award, the KO will determine that the lowest price reflects full life-cycle costs (as defined at FAR 7.101) and justify the use of the LPTA source selection process.
A7. Contracting Officers: Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO)), acting within specifically delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, the Contractor shall not proceed with the change and shall immediately notify the Contracting Officer.
A8. Wage Determinations: The majority of the individual task orders to be issued under this contract are services as defined by FAR 37.101 and will be subject to the Service Contract Act (See FAR 52.222-41). In the event that individual service task orders contain more than incidental, segregable construction effort or for task orders where follow on construction is anticipated, the Davis-Bacon Act (See FAR 52.222-6) will apply to the construction portion in accordance with FAR 22.402. Wage Determinations for the geographic area where the work is to be performed will be incorporated by reference in each individual task order. A copy of the applicable determination will be available at www.wdol.gov. The labor rates in effect at the time a task order is awarded will remain in effect through completion of the project.
A.9 Contract Years
BASE PERIOD: 21 January 2021 – 20 January 2023 OPTION YEAR 1: 21 January 2023 – 20 January 2024 OPTION YEAR 2: 21 January 2024 – 20 January 2025 OPTION YEAR 3: 21 January 2025 – 20 January 2026 6 Months Option: 21 January 2026 - 20 June 2026
The Government may extend the ordering period in accordance with terms in FAR 52.217-8, Option to Extend Services. The evaluated rates in effect during the last exercised option period will remain in effect during any extensions executed under the stated clauses; not to exceed six months. The Government may extend the term of the contract in FAR 52.217-9, Option to Extend the Term of the Contract. The Government shall provide a written notice to the Contractor within 30 calendar days before the expiration of the contract; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
Section B - Supplies or Services and Prices
SECTION B TEXT
B.1. Offerors shall not enter figures into any of the Contract Line Item Numbers (CLINs) for the base contract. These CLINs are placeholder to be used in awarding task orders. See Section L for instructions on information that shall be submitted by offerors in the proposal.
B.2. Awarded contracts will share an estimated capacity of $95,000,000.00. The Government reerves the right to move unused capacity between CLINs and performance periods as necessary.
B.2. Clause 52.217-8 will be included at the task order level and used if applicable.
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 UNDEFINED Unit General Project Support Services
FFP
Period of Performance: The Contractor shall provide General Project Support Services including demolition related services in accordance with applicable Performance Work Statements (PWS). General work activities performed under this contract will include planning, coordination, and execution of building and facility removal/demolition. Major aspects of the field work include, but are not limited to, facility abatement and hazardous material removal, demolition, debris management and disposition, and site restoration and cleanup. The Contractor will provide a full range of professional services in a proficient, productive, and knowledgeable manner to efficiently and effectively accomplish all contract work.
All quantities and amounts are estimated.
FOB: Destination
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 UNDEFINED
Contract Manpower Reporting
FFP
Base period: THIS CLIN IS FOR INFORMATION PURPOSE ONLY NOT PRICED. The contractor shall provide CMR IAW Section C-7. The reporting period for Contractor Manpower Reporting data will be the period of performance not to exceed twelve months ending 30 September of each Government Fiscal Year and must be reported by 31 October of each calendar year.
UNIT UNIT PRICE MAX AMOUNT
1001 UNDEFINED Unit OPTION General Project Support Services
FFP
Option Year 1: The Contractor shall provide General Project Support Services including demolition related services in accordance with applicable Performance Work Statements (PWS). General work activities performed under this contract will include planning, coordination, and execution of building and facility removal/demolition. Major aspects of the field work include, but are not limited to, facility abatement and hazardous material removal, demolition, debris management and disposition, and site restoration and cleanup. The Contractor will provide a full range of professional services in a proficient, productive, and knowledgeable manner to efficiently and effectively accomplish all contract work.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1002 UNDEFINED
OPTION Contract Manpower Reporting
FFP
Option Year 1: THIS CLIN IS FOR INFORMATION PURPOSE ONLY NOT PRICED. The contractor shall provide CMR IAW Section C-7. The reporting period for Contractor Manpower Reporting data will be the period of performance not to exceed twelve months ending 30 September of each Government Fiscal Year and must be reported by 31 October of each calendar year.
UNIT UNIT PRICE MAX AMOUNT
2001 UNDEFINED Unit OPTION General Project Support Services
FFP
Option Year 2: The Contractor shall provide General Project Support Services including demolition related services in accordance with applicable Performance Work Statements (PWS). General work activities performed under this contract will include planning, coordination, and execution of building and facility removal/demolition. Major aspects of the field work include, but are not limited to, facility abatement and hazardous material removal, demolition, debris management and disposition, and site restoration and cleanup. The Contractor will provide a full range of professional services in a proficient, productive, and knowledgeable manner to efficiently and effectively accomplish all contract work.
2002 UNDEFINED
OPTION Contract Manpower Reporting
FFP
Option Year 2: THIS CLIN IS FOR INFORMATION PURPOSE ONLY NOT PRICED. The contractor shall provide CMR IAW Section C-7. The reporting period for Contractor Manpower Reporting data will be the period of performance
UNIT UNIT PRICE MAX AMOUNT
3001 UNDEFINED Unit OPTION General Project Support Services
FFP
Option Year 3: The Contractor shall provide General Project Support Services including demolition related services in accordance with applicable Performance Work Statements (PWS). General work activities performed under this contract will include planning, coordination, and execution of building and facility removal/demolition. Major aspects of the field work include, but are not limited to, facility abatement and hazardous material removal, demolition, debris management and disposition, and site restoration and cleanup. The Contractor will provide a full range of professional services in a proficient, productive, and knowledgeable manner to efficiently and effectively accomplish all contract work.
3002 UNDEFINED
OPTION Contract Manpower Reporting
FFP
Option Year 3: THIS CLIN IS FOR INFORMATION PURPOSE ONLY NOT PRICED. The contractor shall provide CMR IAW Section C-7. The reporting period for Contractor Manpower Reporting data will be the period of performance
UNIT UNIT PRICE MAX AMOUNT
4001 UNDEFINED Unit OPTION 52.217-8 Option to Extend Service
FFP
6 Months Option CLIN
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
FACILITIES REDUCTION PROGRAM (FRP)
MULTIPLE AWARD TASK ORDER CONTRACT
20 April 2020
U.S. Army Corps of Engineers U.S. Army Engineering and Support Center, Huntsville Huntsville, Alabama
Table of Contents
1.0 GENERAL INFORMATION
1.1 Introduction
1.2 Objective
1.4. Service Contract Labor Standards and Construction Wage Rate Requirements
1.5 Contractor Quality Control
1.6 Government Quality Assurance
1.7 Contracting Officer Representative (COR)
1.8 Post Award Conference/Periodic Progress Meetings
1.9 Anti-Terrorism (AT) and Operation Security Requirements
1.10 Safety and Health
1.11 Contractor Travel
1.12 Data Rights
1.13 Ordering
1.14 Pre-Proposal Conference and Site Investigation
1.15 Prosecution of Work
1.16 Conditions Affecting the Work
1.17 Authorities/Technical Direction
1.18 Permits
1.19 Demolition Waste Management and Diversion
1.20 Licenses, Bonds, and Insurance
1.21 Deliverables/Submittals
1.22 Unforeseen Site Conditions and Execution Issues
1.24 Cleanup
1.25 Performance Schedule
1.26 Liquidated Damages
1.27 Weather Delays
1.28 Suspension of Field Activities
2.0 DEFINITIONS and ACRONYMS
2.1 Definitions
2.2 Acronyms
3.0 GOVERNMENT- FURNISHED PROPERTY, ITEMS, and SERVICES
3.1 Government-Furnished Facilities
3.2 Government-Furnished Information
3.3 Government-Furnished Landfill(s)/Borrow Pit(s)
3.4 Government-Furnished Utilities
4.0 CONTRACTOR-FURNISHED ITEMS and SERVICES
4.1 General. ........................................................................ Error! Bookmark not defined.
4.2 Contractor Responsibility ............................................ Error! Bookmark not defined.
5.0 Contractor Management and Personnel Requirements
5.1 Contractor Management
5.2 Personnel Duties, Qualifications, and Training
5.3 Identification of Contractor Employees
6.0 SPECIFIC TASKS
6.1 Task Order Proposals
6.2 Emergency Response
6.3 Summary of Work
7.0 REFERENCES
7.1 National Electrical Code (NEC)
7.2 National Fire Protection Association (NFPA) Codes
7.3 NFPA 101, Code for Safety to Life for Structures and Buildings
7.4 Army Installation Fire Prevention Standards
7.5 USACE Safety and Health Requirements Manual, EM 385-1-1
7.6 American National Standard for Construction and Demolition Operations – Safety and Health 54
7.7 Program Requirements for Demolition Operations – Reference ANSI/ASSE A10.6 –
2006 (R2016)
7.8 29 CFR 1910 – Occupational Safety and Health Administration Regulations
(Standards)
7.9 29 CFR 1925 – Safety and Health Standards for Federal Service Contracts
7.10 29 CFR 1926 –Safety and Health Regulations for Construction
7.11 National Demolition Association – Demolition Safety Manual
1.0 GENERAL INFORMATION
1.1 Introduction. This is a non-personal services Multiple Award Task Order Contract (MATOC) acquisition for the Northeast Region using performance-based task orders to provide facility reduction services. Army Engineering and Support Center, Huntsville (CEHNC) customers include U.S. Army, Army Material Command, U.S. Army Reserve Command, Defense Logistics Agency, U.S. Air Force, Missile Defense Agency, Joint Munitions Command, National Aeronautics and Space Administration, U.S. Marine Corps (USMC), various USACE Districts, and other Federal Departments or Agencies.
Projects under the Northeast Region MATOC will be located in states detailed at paragraph 1.3.5, Place of Performance. The contracts awarded will include performance based, firm-fixed price task orders for a wide range of demolition services, to include abatement of asbestos-containing materials (ACM), disposal of other regulated material (ORM), and facility demolition. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform demolition services as defined in this Performance Work Statement (PWS).
1.2 Objective. The purpose of this acquisition is to reduce the Federal Government’s inventory of excess (no longer needed) facilities, thereby saving energy and maintenance cost;
eliminating safety hazards, nuisances and unsightly structures, and freeing up valuable Government real estate for future development. General work activities performed under this contract include planning, coordination, and execution of building and facility removal/demolition. Projects may also include emergency response to disasters, such as hurricanes, floods, tornadoes, terrorist activities.
1.3 Scope. This contract is for commercial facility reduction services, to include demolition, abatement, site restoration, and related services. General work activities performed under this contract include planning, coordination, and execution of building and facility removal/demolition.
Major features of work include, but are not limited to, removal, demolition, and/or deconstruction (when economically feasible) of small to very large buildings and structures and includes the removal of:
• Asbestos Containing Materials (ACM) by abatement;
• Other Regulated Materials (ORM) by the appropriate disposal procedure
• trees and vegetation;
• parking lots, drives, sidewalks, roadways, other paved surfaces;
• utility lines, services, connections;
• above or underground storage tanks;
• outbuildings such as sheds, gazebos, carports, barns; and
• other activities pertaining to abatement, demolition, destruction, reduction and site restoration.
Other Major features of work may include:
• site and building assessments and or characterizations;
• environmental assessments;
• environmental sampling;
• utility disconnects, terminations, cutting and capping, de-energizing;
• rerouting of utility lines, services, connections;
• recycling of materials and or redirection of debris waste streams;
• site restoration;
• data collection, analysis, and/or reporting;
• hazardous and non-hazardous debris transportation;
• value engineering; and
• other activities pertaining to abatement, demolition, destruction, reduction and site restoration.
Task order PWS shall direct the required capabilities and/or performance characteristics of the supplies, services, and equipment provided under the proposed contracts. The Contractor determines how to meet the government objectives and how to achieve appropriate performance quality results. IAW FAR 37.102, this is a performance-based acquisition and uses performance based acquisition methods to the maximum extent practicable.
1.3.1. The Contractor shall provide a full range of professional services in a proficient, productive, and knowledgeable manner for efficient and effective accomplishment of all contract work. Each task order awarded under this contract is for firm fixed price (FFP) unless circumstances warrant an award based on Labor Hour reimbursement. In this case, the KO shall convert task order to FFP after the Government confirms the full extent of the project.
Contractor shall conduct all work pursuant to all applicable Federal, State, and local laws, regulations, and requirements. Required facility demolition/removal services may include, but are not limited to:
1.3.1.1. Securing the site and facilities;
1.3.1.2. Assessing and/or characterizing the complete facility prior to abatement and demolition via the execution of an environmental survey or assessment, which will include destructive sampling and laboratory testing of samples;
1.3.1.3. Developing and submitting a site-specific Demolition Work Plan (DWP), which will include and address a(n):
• Accident Prevention Plan
• Demolition Procedures and Engineering Controls
• Waste Management Plan
• Material Handling Procedures and Sampling Plan
• Engineering Assessment Determination of Demolition Viability
• Environmental Protection Plan
‒ ACM Abatement and Regulated Materials Removal Plan ‒ Environmental Compliance Plan
• Natural Resources and Wildlife Management
• Cultural and Historic Resources Management
‒ Clean Water Act
• Storm Water Pollution Prevention Plan
• Erosion and Sediment Control Plan
• Spill Pollution Prevention Plan
‒ Solid Waste Management ‒ Materials Handling, Packaging, Disposal, and Transportation
• Access/Egress and Security Controls
• Fire Protection and Prevention Plan, if applicable
• Quality Control Plan
• Project Schedule Detail Work Plan
1.3.1.4. Disconnecting electrical service and disconnecting and capping all other utilities;
1.3.1.5. Abating ACM, and its proper handling, storage, packaging, transport, and final disposal;
1.3.1.6. Removing ORM, and its proper handling, storage, packaging, transport, and disposal;
1.3.1.7. Removing and disposal of underground/above ground (UST/AST) storage tanks;
1.3.1.8. Demolition of facilities;
1.3.1.9. Transportation and disposal of demolition debris materials;
1.3.1.10. Site-restoration, as directed in the task order PWS; and
1.3.1.11. Tracking and submission of required submittals and reports.
1.3.2. The contractor shall not perform Munitions and Explosives of Concern (MEC) remediation activities. However, on a case-by-case basis, the Contractor may be required to assess the presence of explosives within a facility using an Expray, Dropex, or similar method of explosive constituent sampling. In addition, as directed in the task order PWS, the Contractor may be required to provide UXO avoidance support. Government EOD will dispose of any MEC discovered.
1.3.3. Period of Performance. The MATOC ordering period includes a 24-month base and three (3) 12-month optional ordering periods. The MATOC includes FAR clause 52.217-8, allowing an additional six (6) month extension. The Government will exercise contract option periods at Obtaining all required permits and making required notifications;
1.3.4. Contract Capacity. The shared contract capacity for this Northeast Region MATOC, including all subsequent task orders issued shall not exceed $95,000,000.00. The minimum guarantee for the base performance period of this IDIQ contract is $2,500.00. The KO will obligate the minimum guarantee against this contract line item at the time of the basic contract award. Upon issuance of task order awards with an aggregate value exceeding $2,500.00, the KO will deobligate the minimum guarantee from this contract line item. For each successful contractor, there will be a one time “minimum guarantee award amount” during the life of the contract, which includes all option years, if exercised.
1.3.5. Place of Performance. Contractor is responsible for performing the services required under this contract at various Federal facilities located in Connecticut, Delaware, District of Columbia, Maine, Maryland, Massachusetts, New Hampshire, New Jersey, New York, Pennsylvania, Rhode Island, and Vermont, as directed in the task order PWS.
1.3.6. Type of Contract. This MATOC is Firm Fixed-Price (FFP). CEHNC will issue FFP project specific performance-based task orders under the base contract.
1.3.6.1. Performance-based service tasks orders/contracts:
• Describe the requirements in terms of results required rather than methods of performing the work;
• Use measurable performance standards (e.g., terms of quality, timeliness, quantity, etc.); and
• Specify procedures for reductions in fee and/or price for deficient services.
1.3.6.2. By using performance-based contract methods, Contractors have the freedom to determine how best to meet the Government’s performance objectives. This maximizes Contractor control of work processes and allows for innovation in approaching various work requirements. This ensures Contractors achieve required performance quality levels. KO will issue performance-based task orders with a task order-specific Quality Assurance Surveillance Plan (QASP), in accordance with (IAW) Federal Acquisition Regulation (FAR) 37.102.
1.3.7. Work Week. For proposal preparation, Contractor shall assume that the work week encompasses Monday through Friday beginning at 0700 and concluding at 1700 excluding holidays unless otherwise directed/allowed in the task order PWS. For each task order awarded against this MATOC, the Contractor shall propose a work week schedule, detailing the number of days and hours/day per work week, for each phase of field activities. For each task order, the Contractor shall submit a schedule as part of the Work Plan and shall update as needed by letter for acceptance by the Contracting Officer's Representative (COR). If the COR rejects the proposed work week schedule, the Contractor will propose a new schedule and the same process will be repeated until an acceptable schedule is provided. Once the schedule is set, Contractor shall request changes in writing for acceptance of the KO.
1.3.8. Recognized Holidays. The following are Federal holidays. Government offices will not be open.
New Year's Day Labor Day Martin Luther King Jr.'s Birthday Columbus Day
President's Day Veteran's Day Memorial Day Thanksgiving Day Independence Day Christmas Day
NOTE: For this MATOC, the days between Christmas Day and New Year’s Day (26 December through 31 December) are non-working days. Contractor is responsible for accounting for all Holidays and non-working days in its schedules.
1.4. Service Contract Labor Standards and Construction Wage Rate Requirements.
Contractor services are subject to Federal Acquisition Regulation (FAR) 52.222-41, Service Contract Labor Standards, FAR 52.222-6, Construction Wage Rate Requirements, and/or 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts). In the task order Requests for Proposal, CEHNC will incorporate current wage determination tables applicable to the geographic area(s). Official wage determinations are located at https://beta.sam.gov.
1.5 Contractor Quality Control.
1.5.1 Quality Control Program (QCP). The Contractor shall develop and maintain an effective quality control program to ensure services are performed IAW this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that its work complies with the requirements of the contract. The Contractor shall develop quality control procedures that address the areas identified in Appendix A, Performance Requirements Summary (PRS).
1.5.2 Corporate Quality Control and Surveillance Plan. Contractor shall develop, document, and implement an effective quality control and surveillance program for this contract and document in a plan. The Contractor shall submit Quality Control (QC) Plan within 30 calendar days of task order award. Contractor QC Plan shall include at a minimum the following documents: (a) Corporate QC Manager appointment letter, (b) QC organizational structure (organization chart), (c) inspection procedures, (d) recordkeeping procedures, (e) report templates, and (f) any other information as required for describing its QC program. The Contractor shall follow the three-phase inspection process (preparatory, initial, and follow-up) or other Government-accepted inspection methodology and include sample forms for each definable feature. After acceptance of the QC Plan, the contractor shall submit any proposed changes to the Government through USACE’s Resident Management System (RMS) for acceptance by the COR.
1.6 Government Quality Assurance. The Government shall assess Contractor performance under this contract IAW the QASP. The QASP defines Government roles and responsibilities for quality assurance, types of work and required outcomes (as defined by the performance metrics), Government evaluation methods used for assessing Contractor performance, and the frequency of surveillance. In addition, the QASP provides Surveillance Activity Checklists and Corrective Action Request (CAR) forms the Government will use to https://beta.sam.gov/ document and evaluate Contractor’s performance to ensure compliance with accepted work and safety plans.
As directed in the task order QASP, the Government will evaluate the work performance in terms of how well the Contractor satisfies the requirements of the contract, the extent to which the Contractor performs work IAW its technical proposal, clarity of documentation, and Contractor’s timely accomplishment of work
The Government may conduct QA inspections at any time on all phases and types of work performed. If any Government QA review identifies a process/work product failure or identifies noncompliance with safety practices, the COR shall issue the Contractor a Contract Deficiency Report (CDR).
1.7 Contracting Officer Representative (COR). The COR shall be identified by separate letter for each task order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to ensure that the Contractor performs the technical requirements of the contract; perform necessary inspections of Contractor work;
maintain written and oral communications with the Contractor regarding technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notify the KO and Contractor of deficiencies; coordinate availability of Government Furnished Property (GFP); and coordinate site access for Contractor personnel. The COR’s designation letter from the KO will state the responsibilities and limitations of the COR, and highlight that the COR has no authority to accept changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract.
1.8 Post Award Conference/Periodic Progress Meetings. Contractor agrees to attend any post award conference convened by the KO or COR. The KO, COR, and other Government personnel, as appropriate, shall meet periodically with Contractor to review the Contractor’s performance. Government/Contractor shall take appropriate action(s) to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.9 Anti-Terrorism (AT) and Operation Security Requirements. Antiterrorism and Operations Security: Per the guidelines of OPORD 2013-74: Integrating Antiterrorism and Operations Security (OPSEC) into the USACE Acquisition Process, the following OPSEC provisions apply to this requirement:
1.9.1 AT Level I Training. All contractor and subcontractor employees who require access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date. Upon request, the contractor shall submit certificates of completion for each trained contractor and subcontractor employee to the COR within five (5) calendar days after completion of training.
AT Level I awareness training is available at the following website:
http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the Requesting Activity Anti-Terrorism Office in presentation form which will be documented via memorandum.
1.9.2 Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractor(s) employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures, as provided by COR and/or installation government representative. The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
1.9.2.1 Background Checks for Installation Access. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB), applicable installation, facility and area commander installation/facility access and local security policies and procedures. Installation personnel will conduct background checks on all visitors 18 years of age and older to determine if the person requesting unescorted access presents a potential threat to the good order, discipline, or health and safety on the installation. All access applicants will provide a valid and original form of ID (State driver’s license, passport, and so forth, which complies with Public Law 109-13 (The REAL ID Act of 2005)). Installation will check applicant’s background through NCIC-III and TSDB to identify wanted persons, known or appropriately suspected terrorists (KST), missing persons, foreign fugitives, wanted persons, gang affiliations, protection orders, immigration violators, identity theft, supervised releases, violent persons, and the National Sex Offender Registry. Failure to provide requested information will result in the denial of an authorized access pass (or equivalent) and denial of entry. Delays in gaining access to a facility shall not be a valid basis for delay charges.
1.9.2.2 Contractor personnel requiring access to the military installation in connection with the contract shall have access to only those parts of the installation or building(s) where their presence is required. While on the job, Contractor employees shall display identification as may be required under the Special Contract Requirements entitled "Identification of Employees."
Vehicles operating on the military installation are subject to search by security personnel at any time.
1.9.3 Suspicious Activity Reporting Training. Contractor and all associated sub-contractors shall receive a brief/training on the local suspicious activity reporting program (e.g., iWATCH, CorpsWatch, or See Something, Say Something). Locally developed training will inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the PM, security representative or law enforcement entity. Contractor and all associated sub-contractors shall complete this training within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT five (5) calendar days after the completion of the training.
1.9.4 Operations Security (OPSEC) Training. All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR within five (5) calendar days after completion of training. OPSEC awareness training is available at the following websites: https://www.iad.gov/ioss/or http://www.cdse.edu/catalog/operations-security.html. If provided by the Requiring Activity’s OPSEC Officer, Contractor shall document via memorandum to COR.
1.9.5 Sensitive or Restricted Areas. Government Designated Authority (GDA) shall escort all contract employees, including subcontractor employees, who are not in possession of the appropriate security clearance or access privileges in areas where exposure to classified and/or sensitive materials and/or sensitive or restricted areas may occur. The contractor will coordinate with the COR and/or the facility security office for access when required.
1.9.6 Pre-Screen Candidates Using E-Verify Program. Contractor shall pre-screen candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to ensure that they meet the established employment eligibility requirements. Contractor must ensure that candidates have two valid forms of Government-issued identification prior to enrollment to ensure correctness of information entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than three (3) business days after the initial contract award.
1.9.7 Transportation Worker Identification Credential (TWIC). Installation may grant TWIC holders unescorted access to the installation after completion of identity proofing and initial vetting through NCIC-III and TSDB and based on a valid purpose for entry to deliver commodities, provide services, or other actions approved by the commander or director.
Transportation workers shall provide additional documentation, e.g., commercial driver's license, government bill of lading, or other documentation, which identifies the requirement or need to enter the installation.
1.9.8 Physical Security. The Contractor shall provide site security (e.g. fencing or guard service) as directed in the task order PWS. However, at a minimum, the Contractor shall maintain the site and all other Contractor-controlled areas in such a manner as to minimize the risk of injury or accident to site personnel or others who may be in the area.