DRAFT_ATTACHMENT_2.pdf
PDF 564 KB Posted
- Attached to
- Utility Monitoring and Control Systems - RFI
- Solicitation number
- W912DY-17-R-0014
About this file
This document provides details regarding a Virtual Industry Day for the fifth generation of multiple Indefinite Delivery/Indefinite Quantity contracts in support of the Utility Monitoring and Control Systems program. The Virtual Industry Day will take place on April 4, 2017 from 1-5 pm Central Time Zone at www.webmeeting.att.com. The U.S. Army Corps of Engineers Engineering and Support Center, Huntsville seeks to award contracts with a total program capacity of approximately $2.75 billion to procure and install Utility Monitoring and Control Systems and similar automated control systems worldwide. This includes systems such as Heating, Ventilating, and Air Conditioning; Building Automation Systems; Supervisory Control and Data Acquisition; Fire Alarm Safety; chemical/biological/radiological detection and response; utilities metering; Electronic Security Systems; and security/force protection measures. Effective testing to meet regulatory standards is required. Pre-registration by March 31, 2017 is required to attend the Virtual Industry Day.
Request for Information Only
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI_Draft_RFP.pdf | ||
| DRAFT_ATTACHMENT_1.pdf | ||
| DRAFT_ATTACHMENT_3.pdf | ||
| DRAFT_ATTACHMENT_6.pdf | ||
| DRAFT_ATTACHMENT_4.pdf | ||
| DRAFT_ATTACHMENT_5.pdf | ||
| DRAFT_ATTACHMENT_7.pdf | ||
| UMCS_V_Industry_Day_Q&As.pdf | ||
| UMCS-V_PWS_(28Feb2017).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
ATTACHMENT 2
LETTER OF COMMITMENT FOR KEY SUBCONTRACTOR
TO: Contracting Officer
SUBJECT: Letter of Commitment for Proposed Contract for
Dear Sir or Madam:
I hereby make the unequivocal commitment that, in the event of an award of a contract to (Fill in name of offeror), that (insert name of key subcontractor) will fulfill the duties of (state role on a project).
Sincerely, (Authorized Official from Key Subcontractor) Title of Official
Date:
File details come from the government source that posted it. Updated .