W912DW24B0YY2 Amendment 0004.pdf

PDF 568 KB Posted

Attached to
Repairs to McChord Bridge - Perimeter Road
Solicitation number
W912DW24B0YY2
Issued by

About this file

This document provides details on Amendment 0004 to Solicitation W912DW24B0YY2 for repairs to the Perimeter Road Bridge on Joint Base Lewis-McChord in Washington State. The Army Corps of Engineers seeks to award a contract for bridge repairs between $5-10 million through an 8(a) small business set-aside. Bids are due by March 19, 2024. The amendment updates safety officer requirements and removes a section on concrete grouting from the specifications. It maintains formatting for removed pages. Bidders must acknowledge all amendments by number and date on the bid form.

View the file

Other files

File Type Posted
OF1419 Abstract of Bids for Perimeter Bridge Repairs.pdf PDF
W912DW24B0YY2 - Repair Perimeter Rd. Bridge - IFB Amendment 0007.pdf PDF
W912DW24B0YY2 Amendment 0007.pdf PDF
W912DW24B0YY2 Amendment 0001.pdf PDF
W912DW24B0YY2 Amendment 0005.pdf PDF
W912DW24B0YY2 Amendment 0002.pdf PDF
W912DW24B0YY2 Amendment 0003.pdf PDF
W912DW24B0YY2 Amendment 0004.pdf PDF
W912DW24B0YY2 Amendment 0006.pdf PDF
Attachment 1 - 2024-03-15 Perimeter Bridge McChord IFC Specifications.pdf PDF
W912DW24B0YY2 - Repair Perimeter Rd. Bridge - IFB Amendment 0006.pdf PDF
W912DW24B0YY2 Amendment 0005.pdf PDF
W912DW24B0YY2 - Repair Perimeter Rd. Bridge - IFB Amendment 0005.pdf PDF
Attachment 1 - 2024-03-05 Perimeter Bridge McChord IFC Specifications.pdf PDF
W912DW24B0YY2 - Repair Perimeter Rd. Bridge - IFB Amendment 0004.pdf PDF
W912DW24B0YY2 - Repair Perimeter Rd. Bridge - IFB Amendment 0003.pdf PDF
Attachment 1 - 2024-02-26 Perimeter Bridge McChord IFC Specifications.pdf PDF
W912DW24B0YY2 Amendment 0003.pdf PDF
W912DW24B0YY2 Amendment 0002.pdf PDF
Site Visit Sign-In Sheet - Perimeter Rd. Bridge.pdf PDF
W912DW24B0YY2 - Repair Perimeter Rd. Bridge - IFB Amendment 0002.pdf PDF
Attachment 1 - 2024-02-09 Perimeter Bridge McChord IFC Specifications.pdf PDF
W912DW24B0YY2 - Repair Perimeter Rd. Bridge - IFB Amendment 0001.pdf PDF
W912DW24B0YY2 Amendment 0001.pdf PDF
Attachment 10 - SWMMWW Dispersion Trench.pdf PDF
Attachment 1 - 2023-12-15 Perimeter Bridge McChord IFC Specifications.pdf PDF
Attachment 7 - Utility Contacts Fees Responsiblities.pdf PDF
Submittal Register - Perimeter Bridge McChord.xlsx XLSX spreadsheet
Attachment 12 - McChord Airfield Explosive Arc.pdf PDF
Attachment 11 - Property Perimeter Bridge 2021-10-12_Form DD 1354 Draft.pdf PDF
Attachment 5 - Stream Work to follow Nationwide USACE Permit 2021-NWP14-Enclosure-20220511.pdf PDF
Attachment 8 - Temp Stockpile Lining Diagram.pdf PDF
Attachment 4 - 2021-12-22 McChord Geotech Bridge Foundation Report.pdf PDF
Attachment 2 - 2024-01-05 300 Series - IFC Plans 11x17 (1).pdf PDF
Attachment 9 - 2021-11-11 McChord H-H Analysis Report.pdf PDF
Attachment 13 - FAA Form 7460-1 052026.pdf PDF
W912DW24B0YY2 - Repair Perimeter Rd. Bridge - IFB.pdf PDF
Attachment 3 - 2023-11-14 McChord Field Bridges Stormwater Drainage Plan (Rev 1).pdf PDF
Attachment 6 - Standard Operating Procedures for use of Grays Army Airfield Borrow Source Pit.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0004 to Solicitation W912DW24B0YY2 for project entitled, “Repair Perimeter Bridge (J84018)” on Joint Base Lew is-McChord (JBLM), Washington.

See Continuation Page for Amendment details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Mar-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW24B0YY2

X 9B. DATED (SEE ITEM 11)

01-Feb-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Mar-2024

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW24B0YY2

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

Amendment 0004:

The purpose of Amendment 0004 is to is to incorporate the following into Solicitation W912DW24B0YY2, for project entitled, “Repair Perimeter Bridge (J84018)” on Joint Base Lewis-McChord (JBLM), Washington.

1. Update Attachment 1, Paragraph 1.6.1.1 Site Safety and Health Officer (SSHO) and Paragraph 3.4.2 CQC

System Manager.

2. Update Attachment 1, Section 31 43 13.13, Concrete Pressure Grouting; section has been removed from the

Perimeter Rd. Bridge Repair requirement; pages were maintained for formatting purposes.

3. Update the Table of Contents to display revised attachment(s).

Note to Bidders: The due date for receipt of bids in response to this solicitation remains unchanged, with bids due 19 March 2024 at 10:00 A.M., the ProjNet window for questions will remain open for inquiries until the close of business on 12 March 2024.

All other terms and conditions of this Solicitation remain unchanged.

NOTICE TO BIDDERS: Bidders must acknowledge receipt of this amendment, and any previous amendments, by number and date on the Standard Form 1442, Back, Block 19.

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

Attachment 1 – 2024-03-05 Perimeter Bridge McChord IFC Specifications

Attachment 1, Paragraph 1.6.1.1 Site Safety and Health Officer (SSHO) (SECTION 01 35 26 - Page 7) changed from:

Provide an SSHO that meets the requirements of EM 385-1-1 Section 1. The SSHO must ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Alternate SSHO must be at the work site at all times to implement and administer the Contractor's safety program and Government-accepted Accident Prevention Plan. The SSHO and Alternate SSHO must have the required training, experience, and qualifications in accordance with EM 385-1-1 Section 01.A.17, and all associated sub-paragraphs.

TO:

Provide an SSHO that meets the requirements of EM 385-1-1 Section 1. The SSHO must not be assigned to other duties and ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one person at each project site to function as the Site Safety and Health Officer (SSHO).

The SSHO or an equally-qualified Alternate SSHO must be at the work site at all times to implement and administer the Contractor's safety program and Government-accepted Accident Prevention Plan. The SSHO and Alternate SSHO must have the required training, experience, and qualifications in accordance with EM 385-1-1 Section 01.A.17, and all associated sub-paragraphs.

And:

Attachment 1, Paragraph 3.4.2 CQC System Manager (SECTION 01 45 00.00 10 - Page 4) changed from:

Identify as CQC System Manager an individual within the onsite work organization that is responsible for overall management of CQC and has the authority to act in all CQC matters for the Contractor. The CQC System Manager is required to be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years construction experience on construction similar to this Contract, or a construction person with a minimum of 10 years in related work. This CQC System Manager is on the site at all times during construction and is employed by the prime Contractor. The CQC System Manager may be allowed to have duties in addition to the CQS System Manager, with approval from the Contracting Officer. Identify in the plan an alternate to serve in the event of the CQC System Manager's absence. The requirements for the alternate are the same as the CQC System Manager.

TO:

Identify a CQC System Manager (an individual) within the onsite work organization not assigned to other duties that is responsible for overall management of CQC and has the authority to act in all CQC matters for the Contractor.

The CQC System Manager is required to be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years construction experience on construction similar to this Contract, or a construction person with a minimum of 10 years in related work. This CQC System Manager is on the site at all times during construction and is employed by the prime Contractor. The CQC System Manager may be allowed to have duties in addition to the CQS System Manager, with approval from the Contracting Officer. Identify in the plan an alternate to serve in the event of the CQC System Manager's absence. The requirements for the alternate are the same as the CQC System Manager.

And:

Attachment 1, Section 31 43 13.13 Concrete Pressure Grouting (SECTION 31 43 13.13 - Page 1 – 7) was removed and now reads:

This section has been removed from the Perimeter Rd. Bridge Repair requirement; pages were maintained for formatting purposes.

The following have been modified:

Section 00 10 00 Solicitation

- Contract Line Item Number (CLIN) Schedule

- Authority to Bind

Section 00 21 00 Instructions

- Provisions

Section 00 45 00 Representations and Certifications

- Pre-Award Information

Section 00 72 00 General Conditions

- Contract Clauses

Section 00 73 00 Supplementary Conditions

- Davis Bacon and Related Acts Wage Determination

Section 01 00 00 General Requirements

- Statement of Work Dated 11 January 2024

Submittal Register (PROVIDED UNDER SEPARATE COVER)

- 01 33 00_Submittal Register

Attachments (PROVIDED UNDER SEPARATE COVER)

- Attachment 1 - 2024-03-05 Perimeter Bridge McChord IFC Specifications

- Attachment 1 - 2024-02-26 Perimeter Bridge McChord IFC Specifications

- Attachment 2 - 2024-01-05 300 Series - IFC Plans 11x17 (1)

- Attachment 3 - 2023-11-14 McChord Field Bridges Stormwater Drainage Plan (Rev 1)

- Attachment 4 - 2021-12-22 McChord Geotech Bridge Foundation Report

- Attachment 5 - Stream Work to follow Nationwide USACE Permit 2021-NWP14-Enclosure-20220511

- Attachment 6 - Standard Operating Procedures for use of Grays Army Airfield Borrow Source Pit

- Attachment 7 - Utility Contacts Fees Responsibilities

- Attachment 8 - Temp Stockpile Lining Diagram

- Attachment 9 - 2021-11-11 McChord H&H Analysis Report

- Attachment 10 - SWMMWW Dispersion Trench

- Attachment 11 - Property Perimeter Bridge 2021-10-12_Form DD 1354 Draft

- Attachment 12 - McChord Airfield Explosive Arc

- Attachment 13 - FAA Form 7460-1 052026

(End of Summary of Changes)

File details come from the government source that posted it. Updated .