W912DW24B0YY2 Amendment 0003.pdf

PDF 562 KB Posted

Attached to
Repairs to McChord Bridge - Perimeter Road
Solicitation number
W912DW24B0YY2
Issued by

About this file

This document is Amendment 0003 to Solicitation W912DW24B0YY2 for the project "Repair Perimeter Bridge (J84018)" on Joint Base Lewis-McChord in Washington. The amendment extends the bid due date to March 19, 2024 and revises the table of contents and specifications related to PFAS testing and treatment of groundwater.

The underlying federal contract opportunity is a 100% Small Business 8(a) set-aside for highway, street, and bridge construction services valued between $5,000,000 and $10,000,000. The Department of the Army Corps of Engineers Seattle District is the contracting agency. Key requirements include furnishing labor, equipment, materials, and supervision to perform tasks per the plans and specifications. The NAICS code is 237310 with a $45 million small business size standard.

View the file

Other files

File Type Posted
OF1419 Abstract of Bids for Perimeter Bridge Repairs.pdf PDF
W912DW24B0YY2 - Repair Perimeter Rd. Bridge - IFB Amendment 0007.pdf PDF
W912DW24B0YY2 Amendment 0007.pdf PDF
W912DW24B0YY2 Amendment 0001.pdf PDF
W912DW24B0YY2 Amendment 0005.pdf PDF
W912DW24B0YY2 Amendment 0002.pdf PDF
W912DW24B0YY2 Amendment 0004.pdf PDF
W912DW24B0YY2 Amendment 0006.pdf PDF
Attachment 1 - 2024-03-15 Perimeter Bridge McChord IFC Specifications.pdf PDF
W912DW24B0YY2 - Repair Perimeter Rd. Bridge - IFB Amendment 0006.pdf PDF
W912DW24B0YY2 Amendment 0005.pdf PDF
W912DW24B0YY2 - Repair Perimeter Rd. Bridge - IFB Amendment 0005.pdf PDF
Attachment 1 - 2024-03-05 Perimeter Bridge McChord IFC Specifications.pdf PDF
W912DW24B0YY2 - Repair Perimeter Rd. Bridge - IFB Amendment 0004.pdf PDF
W912DW24B0YY2 Amendment 0004.pdf PDF
W912DW24B0YY2 - Repair Perimeter Rd. Bridge - IFB Amendment 0003.pdf PDF
Attachment 1 - 2024-02-26 Perimeter Bridge McChord IFC Specifications.pdf PDF
W912DW24B0YY2 Amendment 0003.pdf PDF
W912DW24B0YY2 Amendment 0002.pdf PDF
Site Visit Sign-In Sheet - Perimeter Rd. Bridge.pdf PDF
W912DW24B0YY2 - Repair Perimeter Rd. Bridge - IFB Amendment 0002.pdf PDF
Attachment 1 - 2024-02-09 Perimeter Bridge McChord IFC Specifications.pdf PDF
W912DW24B0YY2 - Repair Perimeter Rd. Bridge - IFB Amendment 0001.pdf PDF
W912DW24B0YY2 Amendment 0001.pdf PDF
Attachment 10 - SWMMWW Dispersion Trench.pdf PDF
Attachment 1 - 2023-12-15 Perimeter Bridge McChord IFC Specifications.pdf PDF
Attachment 7 - Utility Contacts Fees Responsiblities.pdf PDF
Submittal Register - Perimeter Bridge McChord.xlsx XLSX spreadsheet
Attachment 12 - McChord Airfield Explosive Arc.pdf PDF
Attachment 11 - Property Perimeter Bridge 2021-10-12_Form DD 1354 Draft.pdf PDF
Attachment 5 - Stream Work to follow Nationwide USACE Permit 2021-NWP14-Enclosure-20220511.pdf PDF
Attachment 8 - Temp Stockpile Lining Diagram.pdf PDF
Attachment 4 - 2021-12-22 McChord Geotech Bridge Foundation Report.pdf PDF
Attachment 2 - 2024-01-05 300 Series - IFC Plans 11x17 (1).pdf PDF
Attachment 9 - 2021-11-11 McChord H-H Analysis Report.pdf PDF
Attachment 13 - FAA Form 7460-1 052026.pdf PDF
W912DW24B0YY2 - Repair Perimeter Rd. Bridge - IFB.pdf PDF
Attachment 3 - 2023-11-14 McChord Field Bridges Stormwater Drainage Plan (Rev 1).pdf PDF
Attachment 6 - Standard Operating Procedures for use of Grays Army Airfield Borrow Source Pit.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0003 to Solicitation W912DW24B0YY2 for project entitled, “Repair Perimeter Bridge (J84018)” on Joint Base Lew is-McChord (JBLM), Washington.

See Continuation Page for Amendment details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Mar-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW24B0YY2

X 9B. DATED (SEE ITEM 11)

01-Feb-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Mar-2024

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW24B0YY2

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

Amendment 0003:

The purpose of Amendment 0003 is to incorporate the following into Solicitation W912DW24B0YY2, for project entitled, “Repair Perimeter Bridge (J84018)” on Joint Base Lewis-McChord (JBLM), Washington:

1. Extend the bid due date, see Note to Bidders and Summary of Changes for specifics.

2. The table of contents has been revised to update Attachment 1 title date.

3. Update Attachment 1, Paragraph 3.21 – PFAS TESTING & TREATMENT - GROUND WATER (Section 01 57

19 - Page 32).

Note to Bidders: The due date for receipt of bids in response to this solicitation has been extended to 19 March 2024 at 10:00 A.M., the ProjNet window for questions will remain open for inquiries until the close of business on 12 March 2024.

All other terms and conditions of this Solicitation remain unchanged.

NOTICE TO BIDDERS: Bidders must acknowledge receipt of this amendment, and any previous amendments, by number and date on the Standard Form 1442, Back, Block 19.

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 11-Mar-2024 10:00 AM to 19-Mar-2024 10:00 AM.

The following have been modified:

- Contract Line Item Number (CLIN) Schedule

- Authority to Bind

Section 00 21 00 Instructions

- Provisions

Section 00 45 00 Representations and Certifications

- Pre-Award Information

Section 00 72 00 General Conditions

- Contract Clauses

Section 00 73 00 Supplementary Conditions

- Davis Bacon and Related Acts Wage Determination

Section 01 00 00 General Requirements

- Statement of Work Dated 11 January 2024

Submittal Register (PROVIDED UNDER SEPARATE COVER)

- 01 33 00_Submittal Register

W912DW24B0YY2

Attachments (PROVIDED UNDER SEPARATE COVER)

- Attachment 1 - 2024-02-26 Perimeter Bridge McChord IFC Specifications

- Attachment 1 - 2024-02-09 Perimeter Bridge McChord IFC Specifications

- Attachment 2 - 2024-01-05 300 Series - IFC Plans 11x17 (1)

- Attachment 3 - 2023-11-14 McChord Field Bridges Stormwater Drainage Plan (Rev 1)

- Attachment 4 - 2021-12-22 McChord Geotech Bridge Foundation Report

- Attachment 5 - Stream Work to follow Nationwide USACE Permit 2021-NWP14-Enclosure-20220511

- Attachment 6 - Standard Operating Procedures for use of Grays Army Airfield Borrow Source Pit

- Attachment 7 - Utility Contacts Fees Responsibilities

- Attachment 8 - Temp Stockpile Lining Diagram

- Attachment 9 - 2021-11-11 McChord H&H Analysis Report

- Attachment 10 - SWMMWW Dispersion Trench

- Attachment 11 - Property Perimeter Bridge 2021-10-12_Form DD 1354 Draft

- Attachment 12 - McChord Airfield Explosive Arc

- Attachment 13 - FAA Form 7460-1 052026

Attachment 1 - 2024-02-26 Perimeter Bridge McChord IFC Specifications

Attachment 1, Paragraph 3.21 – PFAS TESTING & TREATMENT - GROUND WATER (Section 01 57 19 - Page

32) changed from:

Excavation below the active stream grade to install pile caps is limited to a single annual instream period between August 1st and Sept 30th or as approved by the Contracting Officer to minimize the potential ground water interception period and the linked groundwater treatment period. Pile installation is seen as a separate operation and extracted ground water saturated soil requires treatment.

Provide PFAS treatment of ground water intercepted during excavation, trenching and isolation of the work area to non-detectable levels* combined for PFOS and PFOA. Additionally provide treatment of PFBS to non-detectable levels*. Non detectable levels currently defined as at or under PFOS = 4 ppt, PFOA = 6 ppt and PFBS = 601 ppt (ppt = parts per trillion = ng/L).

Begin any ground water capture and treatment immediately assuming PFOS and PFOA values are at 3000 ppt and PFBS values are at 1000 ppt. Treat water prior to discharge to Clover Creek. Sample at least once weekly at the influent and effluent and provide rapid (2 to 3 day) PFAS Test Results.

TO:

Excavation below the active stream grade to install pile caps is limited to a single annual instream period between August 1st and Sept 30th or as approved by the Contracting Officer to minimize the potential ground water interception period and the linked groundwater treatment period. Pile installation is seen as a separate operation and extracted ground water saturated soil requires treatment.

Provide PFAS treatment of ground water intercepted during excavation, trenching and isolation of the work area to non-detectable levels* combined for PFOS and PFOA. Additionally provide treatment of PFBS to non-detectable levels*. Non detectable levels currently defined as at or under PFOS = 4 ppt, PFOA = 4 ppt and PFBS = 345 ppt (ppt = parts per trillion = ng/L).

Begin any ground water capture and treatment immediately assuming PFOS and PFOA values are at 3000 ppt and PFBS values are at 1000 ppt. Treat water prior to discharge to Clover Creek. Sample at least once weekly at the influent and effluent and provide rapid PFAS test results.

(End of Summary of Changes)