This federal solicitation seeks construction services for an ecosystem restoration project along the Yakima River in Washington state. The project scope includes excavating channels, removing existing levees, constructing embankments, installing drainage culverts, and processing on-site borrow materials. The work is divided into a base contract and two option periods, allowing for annual federal and non-federal funding. The base contract area is west and south of Yakima Sportsman State Park, intersected by State Route 24 and an existing federal levee. Option 1 involves a new headgate at a culvert and reconfiguring a side channel. Option 2 is south of the base area along existing levees to be degraded and set back with a new levee. The estimated value is between $10-25 million to be awarded as a firm-fixed-price contract. The solicitation is a 100% total small business set-aside with a NAICS code of 237990 and size standard of $39.5 million. The U.S. Army Corps of Engineers district in Seattle is the contracting agency. The non-federal project sponsor is Yakima County, Washington.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

404465

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to include the follow ing:

1) Bid Due Date Extention to 19 JAN 2023

2) Incorporation of clauses 52.219-14 & 52.219-6

3) Removal Criteria from required document at bid opening, how ever the Definitie Responsibility Criteria is still required.

4) Change of ProjNet phone number

5) Changes to SPECs & PLANs

No other changes

1. CONTRACT ID CODE PAGE OF PAGES

1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Jan-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW23B0005

X 9B. DATED (SEE ITEM 11)

29-Nov-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Jan-2023

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW23B0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

SUMMARY OF CHANGE

Summary of changes in Amendment no. 4 (R0004) SPECs

1. 35 31 19 STONE SLOPE PROTECTION FOR STRUCTURES

Changes: Added Gradation Testing of River Cobbles requirement. Revised paragraph 2.2.4.

[Reference: Specification section 35 31 19 1.3.5 River Cobble states that material shall be 50% larger than 4 inch and less than 15% smaller than 1 to 2 inch but shall not require screening. Please clarify if the material will will need to be 15% or less passing the 1" sieve.

The same specifications states that once ground disturbing activities commence an area will be identified for this material to be borrowed from. In the event that there is no material found that has less than 15% passing the 1" sieve and processing is required will the Government pay for processing costs?]

2. 01 33 00-A SUBMITTAL REGISTER

Changes: Added Gradation Testing of River Cobbles from spec section 35 31 19 [Reference: Specification section 35 31 19 1.3.5 River Cobble states that material shall be 50% larger than 4 inch and less than 15% smaller than 1 to 2 inch but shall not require screening. Please clarify if the material will will need to be 15% or less passing the 1" sieve.

The same specifications states that once ground disturbing activities commence an area will be identified for this material to be borrowed from. In the event that there is no material found that has less than 15% passing the 1" sieve and processing is required will the Government pay for processing costs?]

3. 1-C-001 GENERAL SITE PLAN - CONTRACT OPTION #1

Changes: Revised control points.

4. 2-C-001 GENERAL SITE PLAN - CONTRACT OPTION #2

Changes: Revised control points.

5. 2-CS100 BLUE SLOUGH LEVEE - GENERAL SITE PLAN

Changes: Revised notes.

6. B-C-003 GENERAL SITE PLAN – BASE CONTRACT

Changes: Revised control points.

7. B-CS113 SPORTSMAN PARK CHANNELS - BERM SITE - A4 AND A5

Changes: Revised Details A5 and C1.

8. B-CS114 SPORTSMAN PARK CHANNELS - BERM SITE – B1 AND B2

Changes: Revised Details A5.

9. B-CS115 NEWLANDS PONDS FLOODPLAIN GRADING - SITE PLAN

Changes: Revised notes.

10. B-C-302 SECTION 2 - SPORTSMAN PARK IMPROVEMENTS - TYPICAL SECTIONS

Changes: Revised Details F1.

SECTION 00 01 10 - TABLE OF CONTENTS

The following have been modified:

TABLE OF CONTENTS

TABLE OF CONTENTS

SECTION TITLE

SF1442 Solicitation, Offer, and Award

00 21 00 Instructions

00 45 00 Representations and Certifications, Pre-Award Information

00 72 00 Contract Clauses

00 73 00 Special Clauses, which include the following:

a) Special Clauses

b) Davis-Bacon General Wage Decision No. WA20210079 rev.4 08/05/2022

c) 00 73 00-A, Index of Drawings

01 00 00 Technical Specifications: 01 11 00 thru 35 44 00

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 12-Jan-2023 02:00 PM to 19-Jan-2023 02:00 PM.

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

CAUTION AND INSTRUCTIONS

! ! ! C A U T I O N TO B I D D E R S ! ! !

1. BUSINESS HOURS: For the Seattle District Corps of Engineers are from 7:30 A.M. to 4:00 P.M., Monday through Friday.

BEFORE SIGNING AND MAILING THIS OFFER, PLEASE TAKE NOTE OF THE FOLLOWING, AS

FAILURE TO PERFORM ANY ONE OF THESE ACTIONS MAY CAUSE YOUR OFFER TO BE

REJECTED

2. AMENDMENTS: Have you acknowledged receipt of ALL amendments? If in doubt as to the number of amendments issued, please contact the representative listed on the Information Page.

3. AMENDED SECTIONS: If any of the amendments furnished amended sections, the amended sections must be used in submitting your offer.

4. MISTAKE IN OFFER: Have you reviewed your offer price for possible errors in calculation or work left out?

5. OFFER ACCEPTANCE PERIOD: The minimum offer acceptance period is specified in block 13D of SF1442, Solicitation, Offer and Award. Please ensure that you allow at least the stated number of calendar days for the Government to accept your offer.

6. SYSTEM FOR AWARD MANAGEMENT: Contractors are required, before receipt of contract award to ensure that their firm is registered in the government web site entitled System for Award Management (SAM) and that all information required is current and up to date.

https://www.sam.gov/portal/public/SAM/

7. GOVERNMENT SECURITY REQUIREMENTS:

The Offeror’s bid shall be submitted electronically, as described below in Item 9, Bid Submittals.

The IFB will provide the Government address and receipt date for bid submittal. The Offeror’s bid shall not contain classified data. The use of hyperlinks in bids in prohibited.

8. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS:

Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the U.S. Government’s Contract Opportunities website at: https://www.SAM.gov under Solicitation Number W912DW23B0005. A list of interested vendors (potential offerors and subcontractors) is available on the web site (registration required) with the solicitation announcement.

NOTE: www.SAM.gov is the new official U.S. Government website for Contract Opportunities.

It shall be the contractor’s responsibility to check the websites for any amendments. The Offeror shall submit in the bid all requested information specified in this solicitation.

Additional information regarding this solicitation and potential Offerors and/or subcontractors is available at http://www.nws.usace.army.mil/BusinessWithUs/Contracting.aspx.

9. Bid Submittals

In strict compliance with guidance relating to the current situation with COVID-19 and social distancing, the only authorized transmission method for bids in response to this solicitation is electronically via email online submission. NO OTHER TRANSMISSION METHODS (E-

MAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.

https://www.sam.gov/portal/public/SAM/ https://www.sam.gov/ http://www.nws.usace.army.mil/BusinessWithUs/Contracting.aspx

Please send bids to Contract Specialist Charles Idle charles.d.idle@usace.army.mil AND to Contracting Officer Robert Gonzalez at robert.l.gonzalez@usace.army.mil.

INSTRUCTIONS FOR SUBMITTING ELECTRONIC BIDS:

In an effort to reduce paperwork and cost, all bids shall be submitted electronically through email. Submission shall be in Adobe PDF format.

FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be included in the e-mail notice to each of the recipients you choose to have access your file(s). NOTE: Do NOT enter Privacy Act Data (Personal Identifiable Information (PII) in the File Description).

FILE NAMING CONVENTION: Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description. Please see examples below. To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:

W912DW23B0005-FIRMNAME-Bid W912DW23B0005-FIRMNAME-Amendments W912DW23B0005-FIRMNAME-Bid Bonds

A completed bid includes:

- Fully executed Form 1442-with amendments acknowledged

- Bid Bond

- Fully completed Bid Schedule

- Criteria

- Completed Reps and Certs from @SAM.GOV and any fill in FAR clause incorporated by reference or by full text. Submission shall be in Adobe PDF format.

Bid bond – The amount of the bid guarantee shall be 20 percent (20%) of the bid price or $3 Million, whichever is less. Bid Bonds (SF24) MUST BE ACCOMPANIED BY A Power of Attorney containing an original or electronic signature from the surety, which must be affixed to the Power of Attorney after the Power of Attorney has been generated. Computer generated and signed Powers of Attorney will be accepted if accompanied by a certification from a current officer of the surety attesting to its authenticity and continuing validity.

Current SF24 forms are available at the following website:

http://www.gsa.gov/portal/forms/type/TOP.

NOTE: Effective immediately, to respond to the Coronavirus Disease 2019 (COVID-19) national emergency- Electronic signatures and electronic, mechanically-applied, or printed dates may be used and shall be considered mailto:charles.d.idle@usace.army.mil mailto:robert.l.gonzalez@usace.army.mil http://www.gsa.gov/portal/forms/type/TOP original signatures and dates. The following FAR deviations are applicable to this procurement:

• 52.228-11, Pledges of Assets (DEVIATION 2020-O0016), which removes the requirement for the Standard Form 28 to be sworn and notarized.

• 52.228-15, Performance and Payment Bonds—Construction (DEVIATION 2020- O0016), which removes the requirements for seals on Standard Forms.

10. BID OPENING PROCEDURE- The virtual bid opening will occur 30 minutes after the due date and time for receipt of bids to allow for the downloading of emails. Virtual bid opening is scheduled for 19 January 2023 at 2:30 PM Pacific Standard Time. Please use the following information:

The link to join the meeting /view on-line is:

https://usace1.webex.com/meet/robert.l.gonzalez

NOTE: It has been reported the ‘Call Me’ function is the simplest way to connect audio to the meeting. Please use this function if it is provided. Instructions for the ‘Call Me’ function- 1) Enter your phone number. 2) The system will immediately call the number you entered. 3) Answer and follow the prompts to join the meeting.

Join by phone

1-8774029753 Call-in toll-free number (ATT Audio Conference) 1-6366513141 Call-in number (ATT Audio Conference) 594 362 5 Access Code

*** Please note the Access Code is also the Security Code so you will have to enter the Access Code twice when connecting by phone. The bid opening will begin promptly at 10:30 AM so please allow time for connecting by audio and/or resolving any technical difficulties before the beginning of proceedings.

11. BID EXPENSES AND PRE-CONTRACT COSTS

This Invitation for Bid (IFB) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a bid.

12. ACCURACY IN BIDS

Bids must set forth full, accurate, and complete information as required by this IFB, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C.

1001.

13. BASIS OF AWARD

https://usace1.webex.com/meet/robert.l.gonzalez

BASIS OF AWARD Bids will be evaluated without discussions. Award will be made to the responsible bidder whose bid, responsive to the invitation, will be most advantageous to the Government considering price and the price-related factors included in the invitation. In addition, the apparent low bidder must meet the Definitive Responsibility Criteria (DRC) as described in Section 00 22 00 in accordance with FAR 9.104-2. Award shall not be made until all required approvals have been obtained and the award otherwise conforms to FAR 14.103-2.

THIS PROCUREMENT IS:

100% Total Small Business Set Aside

SITE VISIT:

BIDDING DOCUMENTS: Register for solicitations at the Internet site:

http://www.SAM.gov/

FOR INQUIRIES AND ADMINISTRATIVE MATTERS: Contact the following individuals Monday through Friday between the hours of 8:00 a.m. and 4:00 p.m.:

Charles Idle, 206-316-3998, charles.d.idle@usace.army.mil AND Sonia Frees, 206-764-3516, Sonia.m.frees@usace.army.mil

TECHNICAL QUESTIONS:

All inquiries regarding this solicitation are to be submitted via ProjNet-Bidsm. Telephone and email inquiries will not be accepted. ProjNet-Bidsm is a web-based program that allows bidders to post questions regarding the solicitation and to view all questions by other bidders and answers by USACE. ProjNet-Bidsm can be accessed through ProjNetsm at https://www.projnet.org To access the ProjNet-Bidsm website the first time:

1) Click the Bid tab

• BIDDERS ARE URGED and expected to inspect the site where construction is to be performed and to satisfy themselves as to all general and local conditions which may affect the cost of performance of the contract, to the extent, such information is reasonably obtainable. In no event, will a failure to inspect the site constitute grounds for withdrawal of a bid after opening or for a claim after award of the contract.

• Please email Charles Idle at charles.d.idle@usace.army.mil and copy Stephen Osgood at stephen.m.osgood@usace.army.mil to RSVP for the site visit. We need a headcount prior to the day of, so please provided the names of up to two (2) attendees including their company/organization name, cell phone number and email address no later than 3:00 PM PT on FRIDAY, 9 Dec 2022.

• Site visit Date/Time: Tuesday, 13 Dec 2022, 11:00 AM – 3:00 PM local time.

• LOCATION: Attendees will meet at NC Machinery located on 2100 Terrance heights Dr Yakima, WA 98901

• Site Visit visual aid:

• https://usace-nws.maps.arcgis.com/apps/webappviewer/index.html?id=e489f0abefb544bbaf100a8bbd83fc62

• Username: Yakima_TempUser

• Password: Yakima1135!

http://www.sam.gov/ mailto:charles.d.idle@usace.army.mil mailto:Sonia.m.frees@usace.army.mil https://www.projnet.org/ mailto:charles.d.idle@usace.army.mil mailto:stephen.m.osgood@usace.army.mil https://usace-nws.maps.arcgis.com/apps/webappviewer/index.html?id=e489f0abefb544bbaf100a8bbd83fc62

2) Click Bidder Inquiry. (The Agency is USACE.)

3) Enter the following information for access:

1. The Bidder Inquiry Key: 4YPZSB-98H4C3

2. Valid business contact information (e.g. Company name, contact person, business address, phone number and email address). (required on first project only)

3. Establish Secret Question and Answer which will be used as a password (required on first project only)

For subsequent access use your email address, the Bid Inquiry Key and response to the Secret Question to access the ProjNet-Bidsm Module.

4) Submit technical questions. When an answer is posted to a question, the question and answer is then available for all other bidders to review.

5) For questions about the ProjNet-Bidsm, please contact the Call Center help desk toll free at 1-800-428- HELP (4357) 1-833-389-1097, which operates from 8AM to 5PM (Central US time zone).

No response will be posted to inquiries after the Close of Business on the third business day preceding the solicitation due date. All bidders will be held to have reviewed the questions and responses in ProjNet-Bidsm prior to bid submission. Nothing in the solicitation is changed unless an amendment is sent out.

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been added by full text:

52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)

(a) Definition. Small business concern, as used in this clause--

(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the size standards in this solicitation.

(2) Affiliates, as used in paragraph (a)(1) of this clause, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.

(b) Applicability. This clause applies only to--

(1) Contracts that have been totally set aside for small business concerns; and

(2) Orders set aside for small business concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).

(c) General. (1) Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.

(2) Any award resulting from this solicitation will be made to a small business concern.

(End of clause)

52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that--

(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and

(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.

(c) Applicability. This clause applies only to--

(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;

(4) Orders expected to exceed the simplified acquisition threshold and that are--

(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or

(ii) Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);

(5) Orders, regardless of dollar value, that are--

(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or

(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and

(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.

(d) Independent contractors. An independent contractor shall be considered a subcontractor.

(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for--

(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;

(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;

(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or

(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.

(f) The Contractor shall comply with the limitations on subcontracting as follows:

(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause--

[Contracting Officer check as appropriate.]

___ By the end of the base term of the contract and then by the end of each subsequent option period; or

___ By the end of the performance period for each order issued under the contract.

(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.

(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph

(e) of this clause will be performed by the aggregate of the joint venture participants.

(1) In a joint venture comprised of a small business protege and its mentor approved by the Small Business Administration, the small business protege shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protege in the joint venture must be more than administrative functions.

(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.

The following were previously included by reference and are now included by full text:

52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

(a) The Contractor shall make the following notifications in writing:

(1) When the Contractor becomes aware that a change in its ownership has occurred, or is certain to occur, that could result in changes in the valuation of its capitalized assets in the accounting records, the Contractor shall notify the Administrative Contracting Officer (ACO) within 30 days.

(2) The Contractor shall also notify the ACO within 30 days whenever changes to asset valuations or any other cost changes have occurred or are certain to occur as a result of a change in ownership.

(b) The Contractor shall--

(1) Maintain current, accurate, and complete inventory records of assets and their costs;

(2) Provide the ACO or designated representative ready access to the records upon request;

(3) Ensure that all individual and grouped assets, their capitalized values, accumulated depreciation or amortization, and remaining useful lives are identified accurately before and after each of the Contractor's ownership changes; and

(4) Retain and continue to maintain depreciation and amortization schedules based on the asset records maintained before each Contractor ownership change.

The Contractor shall include the substance of this clause in all subcontracts under this contract that meet the applicability requirement of FAR 15.408(k).

(End of Summary of Changes)

Yakima River Gap to Gap Section 1135 Ecosystem Restoration 19008 Yakima, WA W912DW22B0014

SECTION TABLE OF CONTENTS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

SECTION 35 31 19

STONE SLOPE PROTECTION FOR STRUCTURES

01/08

PART 1 GENERAL

1.1 UNIT PRICES

1.2 REFERENCES

1.3 DEFINITIONS

1.3.1 Stone Protection

1.3.2 Groins

1.3.3 Riprap

1.3.4 Grade Control Sill

1.3.5 River Cobble

1.3.6 Anchor Boulders

1.4 SUBMITTALS

1.5 QUALITY ASSURANCE

1.5.1 Stone

1.5.1.1 General

1.5.1.2 Sources

1.5.1.3 Evaluation Testing of Stone Source

1.5.1.4 Random Sampling

1.5.1.5 Drop Test

1.6 CONSTRUCTION TOLERANCES

PART 2 PRODUCTS

2.1 Laboratory Certificates

2.2 STONE

2.2.1 General

2.2.1.1 Evaluation Testing of Stone Investigation and Tests

2.2.1.2 Quarry Operations

2.2.1.3 Gradation Test at Quarry

2.2.1.4 Proportional Dimension Limitations

2.2.1.5 Riprap Stockpile

2.2.2 Quarry Spalls

2.2.3 Riprap

2.2.4 River Cobble

2.2.4.1 Gradation Testing of River Cobbles

2.2.5 Anchor Boulders

PART 3 EXECUTION

3.1 DEMONSTRATION SECTION

3.1.1 Methods and Equipment

3.1.2 Demonstration Section Evaluation

3.1.3 Removal of Demonstration Section

3.2 BASE PREPARATION

3.3 PLACEMENT OF RIPRAP

3.3.1 General

SECTION 35 31 19 Page 1

R0004

3.3.2 Placement

3.3.2.1 Above Water

3.4 TESTS AND INSPECTIONS

3.4.1 Pre-Production

3.4.1.1 Bulk Specific Gravity

3.4.1.2 Material Quality

3.4.1.3 Borderline Material Quality

3.4.1.4 Demonstration Stockpile at Source

3.4.1.5 Evaluation of Demonstration Stockpile at Source

3.4.1.6 Approval of Demonstration Stockpile at Source

3.4.1.7 Duration of Demonstration Stockpile at Source

3.4.2 Placement Control

3.4.2.1 Quality Control Measures

3.4.2.2 Check Surveys

3.4.3 Gradation Tests for Stone

3.4.3.1 Gradation Test Method for Riprap

3.4.3.2 Standard Test Method for Gradation of Imported Riprap

-- End of Section Table of Contents --

SECTION 35 31 19 Page 2

SECTION 35 31 19

STONE SLOPE PROTECTION FOR STRUCTURES

01/08

PART 1 GENERAL

This SECTION shall apply to the type and placement of the riprap and other armoring for stone slope protection on the riverward face of the new levee embankment, on the instream spurs, and on the grade control sill.

1.1 UNIT PRICES

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C 127 (2007) Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Coarse Aggregate

ASTM C 295 (2008) Petrographic Examination of Aggregates for Concrete

ASTM D 3740 (2010) Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction

ASTM D 4791 (2010) Flat Particles, Elongated Particles, or Flat and Elongated Particles in Coarse Aggregate

ASTM D 4992 (2007) Evaluation of Rock to be Used for Erosion Control

ASTM D 5312 (2004) Evaluation of Durability of Rock for Erosion Control Under Freezing and Thawing Conditions

ASTM D 5313 (2004) Evaluation of Durability of Rock for Erosion Control Under Wetting and Drying Conditions

ASTM D 5519 (2007) Particle Size Analysis of Natural and Man-Made Riprap Materials

U.S. ARMY CORPS OF ENGINEERS (USACE)

COE CRD-C 148 (1969) Method of Testing Stone for Expansive Breakdown on Soaking in Ethylene Glycol

SECTION 35 31 19 Page 3

EM 1110-2-1601 (1991; 1994 Change 1) Engineering and Design -- Hydraulic Design of Flood Control Channels

EM 1110-2-2302 (1990) Construction with Large Stone

1.3 DEFINITIONS

1.3.1 Stone Protection

Stone slope protection is defined as a layer of riprap or river cobbles.

1.3.2 Groins

Groins are defined as an elongated rock structure having one end attached to the bank and the other end protruding into the river flow. Groins act to reduce velocities along the bank and create a backwater upstream of the structure.

1.3.3 Riprap

Riprap is defined as a material having a gradation band similar to those specified in EM 1110-2-1601 , Chapter 3, uniform graded material or as noted in this specification. Riprap is normally produced by mechanical methods, with a jaw crusher and grizzly after the stone has been mined by blasting in a quarry. Riprap gradations have a maximum top size of 3.5 tons.

1.3.4 Grade Control Sill

A grade control sill is defined as a rock grade control structure to include the horizontal crest, the upstream and downstream slopes, and the heal and toe keys, and channel. Rock for the sill will originate from the onsite riprap armoring the SR 24 Cross Dike or other onsite sources with equivalent characteristics.

1.3.5 River Cobble

River Cobble consists on onsite granualar alluvium that includes 50% or more material in excess of 4-inches in diameter and no more than 15% of material finer than 1 to 2 inches. Material originates from channel excvation work and is not mechanically screened but should be mixed in stockpiles to produce an even gradation when placed. Material may include fines and boulders but is predominately gravel and cobble sized materials, similar to what would be found on the surface of the Yakima River bed or gravel bar. River cobble is used as armor stone in areas that have moderate to low velocities during floods. After ground disturbing activities commence submit locations that are suitable for River Cobble borrow.

1.3.6 Anchor Boulders

Anchor Boulders are large stone particles used for ballasting or holding down LWD and are of natural or quarry origin. Rounded to sub-rounded boulders are preferred over quarried boulders. See 35 44 00 for placement requirements.

SECTION 35 31 19 Page 4

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Placement Plan; G, DO

SD-03 Product Data

Riprap; G, DO

Quarry Spalls; G

River Cobble; G, DO

Anchor Boulders; G, DO

SD-04 Samples

Stone; G

SD-06 Test Reports

Bulk Specific Gravity; G, DO

Gradation Test at Quarry; G, DO

Drop test record; G, DO

Quarry Inspection Report; G, DO

Gradation Testing Of River Cobbles; G, DO

SD-07 Certificates

Stone; G

Laboratory; G

Weigh Scale Certification

Certified Weight Scale Ticket

1.5 QUALITY ASSURANCE

1.5.1 Stone

1.5.1.1 General

All stone shall be durable material as approved by the Contracting Officer and as required by EM 1110-2-2302 . The Contractor shall show that an adequate quantity of material is available and provide quality test data in accordance with this specification, EM 1110-2-2302 , and all other relevant standards and requirements. All stone shall be of a suitable

SECTION 35 31 19 Page 5 quality to ensure permanence in the structure and in the climate in which it is to be used. The stone shall be hard, durable, angular, and free from cracks, blast fractures, bedding, seams, vugs, veins, and other defects or discontinuities that would tend to increase its deterioration from natural causes. Inspections for cracks, fractures, seams and defects shall be made by visual examination. If, by visual examination, it is determined that 10 percent or more of the stone produced contains hairline cracks, or other defects, then all stone produced by the means and measures which caused the fractures shall be rejected. A hairline crack that is defined as being detrimental shall have a minimum width of 4 mil (0.004 inch)and shall be continuous for one-third the dimension of at least two sides of the stone. The stone shall be clean and free from all foreign matter for inspection. Any foreign material adhering to or combined with the stone as a result of stockpiling shall be removed prior to placement. The selected stone shall match as close as possible the color of the existing riprap on the upstream face of the embankment that shall be left in place adjacent to the work area when tested dry and wet.

1.5.1.2 Sources

The Contractor shall furnish the stone from the source to the Contracting Officer, subject to the conditions herein stated. The Government shall conduct a quarry investigation and evaluate the quality test data provided by the Contractor to determine whether acceptable stone can be produced from the proposed source after the Contractor has completed the Quarry Inspection and report as required in Paragraph Evaluation Testing of Stone

- Investigation and Testing. The Contractor shall be responsible for arranging the quarry inspection site visit and shall provide the Contracting Officer a minimum of 10 days notice of the time and location of the visit.

Satisfactory service records of the stone at other work shall be provided to the Contracting Officer. In order for stone to be acceptable on the basis of service records, stone of a similar size, and from similar formation or ledge, must have been placed in a similar thickness and exposed to weathering under similar conditions as are anticipated for this contract, and must have satisfactorily withstood such weathering for a minimum of 20 years. In addition to an acceptable 20 year service record, the Contracting Officer has the option to elect to have representative samples taken and tested.

a. Selection of Source. The Contractor shall designate in writing only one source for stone. The Contractor shall notify the Contracting Officer at least 60 workdays before the stone leaves the quarry. It is the Contractor's responsibility to determine that the stone source selected is capable of providing the quality, quantities and gradation needed and at the rate needed to maintain the scheduled progress of the work. Samples for acceptance testing shall be provided in accordance with this specification. If a source for stone so designated by the Contractor is not accepted for use by the Contracting Officer, the Contractor shall be required to find another source.

b. Acceptance of Materials. Acceptance of a source of stone is not to be construed as acceptance of all material from that source. The right is reserved to reject materials from certain localized areas, zones, strata, ledges, or channels, when such materials are unsuitable for stone as determined by the Contracting Officer. The Contracting Officer also reserves the right to reject individual units of produced

SECTION 35 31 19 Page 6 specified materials in stockpiles at the quarry, all transfer points, and at the project construction site, when such materials are determined to be unsuitable.

During the course of the work, the stone may be tested by the Government, if the Contracting Officer determines that testing is necessary. If such tests are determined necessary, the testing will be done in commercial laboratory selected by the Government.

Materials produced from a source shall meet all the requirements herein. The cost of testing will be at the Contractor's expense.

During the contract period, both prior to and after materials are delivered to the job site, visual inspections and measurements of the stone materials may be performed by the Contracting Officer. If the Contracting Officer, during the inspections, finds that the stone quality, gradation, or weights of stone being furnished are not as specified or are questionable, re-sampling and re-testing by the Contractor shall be required. Sampling of the delivered stone for testing and the manner in which the testing is to be performed shall be as directed by the Contracting Officer. This additional sampling and testing shall be performed at the Contractor's expense. When test results indicate that materials meet specified requirements, an equitable adjustment in the contract price will be made for the sampling and testing. Rejected material shall be removed from the Project site at no cost to the Government.

1.5.1.3 Evaluation Testing of Stone Source

The tests to which the stone may be subjected will include petrographic analysis, specific gravity, unit weight, absorption, wetting and drying, freezing and thawing, and such other tests as may be considered necessary to demonstrate that the stone is of a satisfactory quality. All tests shall be performed as described below or in PART 2. If the Contractor proposes a laboratory which is not validated to perform the tests specified (as described in paragraph Laboratory Certificates, all costs and time associated with validating the laboratory shall be borne by the Contractor.

a. Unit Weight, Bulk Specific Gravity, saturated surface dry (SSD) and Absorption.

Stone shall weigh more than 162 pounds per cubic foot shall have a bulk specific gravity, saturated surface dry, (SSD), greater than

2.6. The stone shall have an absorption less than 2 percent. The method of test for unit weight bulk specific gravity (SSD) and absorption will be ASTM C 127 , except the unit weight will be calculated using bulk specific gravity, saturated surface dry.

b. Samples. Samples of stone from a source shall be taken by a representative of the quarry to the approved laboratory under the supervision of the Contracting Officer for testing and acceptance prior to delivery of any stone from this source to the site of the work. The Contractor shall be responsible for arranging sampling and transport and shall notify the Contracting Officer a minimum of 10 days before the activity.

Samples shall consist of at least three pieces of stone, roughly cubical in shape and weighing not less than 150 pounds each from each unit that will be used in the production of the required stone. If the source is an undeveloped quarry, or if the operation has been

SECTION 35 31 19 Page 7 dormant for more than one year, such that fresh samples are not available, the Contractor shall expose fresh rock for 20 feet horizontally and for the full height of the face proposed for production, prior to the field evaluation. The Contracting Officer may also require documentation of subsurface exploration of an undeveloped quarry in order to determine whether or not sufficient reserves are available.

1.5.1.4 Random Sampling

The stone produced by each source may be sampled by the Government for Quality Assurance testing on the basis of a minimum once each year or once during the production of each 25,000 tons of stone produced each year for the Government. The samples will be evaluated based upon petrographic analysis, specific gravity, unit weight, bulk specific gravity (SSD), and absorption. All random sampling and testing costs shall be borne by the Contractor. Random sampling shall comply with Paragraph Evaluation Testing of Stone.

1.5.1.5 Drop Test

A drop test provides an immediate evaluation of the durability of very large stone during handling of the stone including placement into a structure. For comparability, the test stones shall be dropped from a bucket or by other means from a height of not less than half the average diameter of the stone onto a clean, rigid, nondeflecting surface or second stone of comparable size set on a nonyieldinig surface. Dumping from a truck is not acceptable.

The stone shall be examined carefully before as well as after the completion of the test. Failure criteria is the development of new cracks, opening of old cracks, and the loss of piece from the surface of the stone. Each stone shall be dropped a total of five times for evaluation purposes with examination after each drop. The Contractor shall provide all necessary equipment and operating personnel to perform the testing.

The drop test shall be performed in the presence of the Contracting Officer or representative and USACE Seattle District Geotechnical and Geological personnel at the stone production site. The Contractor shall arrange all testing and shall provide the Contracting Officer a minimum of 10 days notice before the tests are to be performed.

The testing shall require the selection of five suitable stones from each weight size listed for aggregate filter (if specified) and riprap by the Contractor and the USACE. Selected stones shall be approved by the USACE before testing. All stones shall be clean of dust, dirt, debris, or other material that may hinder inspection. Material shall be representative of the stone that shall be used for the work.

The Contractor shall record the results of each test and photograph the stone before the test and the resulting impact of each drop test on each stone. The Contractor shall provide this Drop test record to the Contracting Officer within 5 days of the completion of the tests.

Random drop tests of stone selected by the USACE shall be performed during construction. If the stone fails, the placed material shall be closely inspected. All material displaying hairline cracks shall be removed at no cost to the Government. An additional drop testing program shall be

SECTION 35 31 19 Page 8 conducted at the stone production site and the quarry stone source shall be inspected for quality. All costs of this additional testing shall be borne by the Contractor at no additional expense to the Government. All material that is rejected and requires removal at the work site shall be taken off the Project site and disposed of at no cost to the Government.

The Contractor shall provide suitable replacement stone to replace the rejected material at no cost to the Government.

1.6 CONSTRUCTION TOLERANCES

The finished surface and stone layer thickness shall not deviate from the lines and grades shown by more than the tolerances listed below.

Tolerances are measured perpendicular to the indicated neatlines. Extreme limits of the tolerances given shall not be continuous in any direction for more than five times the nominal stone dimension nor for an area greater than 100 square feet of the structure surface.

NEATLINE TOLERANCES

MATERIAL ABOVE NEATLINE (inches) BELOW NEATLINE (inches)

Riprap 2 2

The intention is that the work shall be built generally to the required elevations, slope and grade, and that the outer surfaces shall be even and present a neat appearance. Placed material not meeting these limits shall be removed or reworked as directed by the Contracting Officer. Payment shall not be made for excess material, which the Contracting Officer permits to remain in place.

PART 2 PRODUCTS

Products shall be as specified below. Materials shall not be amended at the quarry or other location with sand, silt, cuttings, or other quarry cleaning or material products to meet a desired weight for hauling. All materials shall be washed to removed fine particles and allow inspection. Loads arriving at the work site that have been amended with excess fines to meet weight or have not been washed shall be reject and returned to the source at no expense to the Government. All products which require Government approval, must be submitted and approved prior to staging or delivery of materials.

2.1 Laboratory Certificates

For each laboratory in which testing is conducted to meet the requirements as specified, submit Laboratory certificates, provided by the Materials Testing Center (MTC) at CEWES, that validates that the laboratory can perform the required tests. The individual tests shall be listed for which the validation covers along with the date of the inspection.

SECTION 35 31 19 Page 9

2.2 STONE

2.2.1 General

2.2.1.1 Evaluation Testing of Stone Investigation and Tests

The Contractor shall have evaluation tests performed on stone samples collected from the proposed source. The quarry investigation shall be performed by a registered geologist or registered engineer in Washington State. The investigation shall be performed in the presence of the Contracting Officer or representative and USACE Seattle District Geotechnical and Geological personnel. Submit a Quarry Inspection Report shall follow the following outline, at a minimum, all other Federal, State, and local requirements for quarry inspections and reports, and the information outline in ASTM D 4992 .

1. Executive Summary

2. Introduction

3. Test Quarry Design and Objectives

a. Discussion of objectives

b. Overview of site selection criteria

c. Thorough presentation of design including layout and slope stability

4. Geological Conditions in the Test Quarry

5. Description of Each Test Blast

a. Rock type and condition

b. Hole pattern

c. Delay pattern

d. Hole depths and loading design

e. Explosives, detonators, and delays

f. Blasted rock mass description

g. Quarry-run gradation

h. Laboratory test results

i. Conclusions

6. Drilling, Loading, and Hauling Equipment and Procedures

7. Description of the Results of Each Presplit Slope Blast

a. Rock type and condition

b. Presplit hole and explosive charge configuration

c. Presplit slope condition

d. Rock joint analysis and slope stability

e. Conclusions

8. Rock Processing Results

a. Description of processing objectives

b. Description of rock processing equipment

c. Results of processing each rock type and condition

d. Gradations and particle shapes

e. Degradation during each stage of processing

f. Laboratory test results

9. Conclusions and Recommendations

a. Conclusions including lessons learned

b. Recommendations

APPENDICES -- Laboratory Test Sheets, Boring Logs, Field Gradation Test Results, Description of Rock Processing Equipment, Photographic Documentation, Etc.

The tests to which the stone shall be subjected include petrographic examination ( ASTM C 295 ), bulk specific gravity (SSD),unit weight, absorption ( ASTM C 127 ), resistance of stone to freezing and thawing (

SECTION 35 31 19 Page 10

ASTM D 5312 ), and if argillaceous limestone and sandstone are used, resistance to wetting and drying ( ASTM D 5313 ). The laboratory to perform the required testing shall be validated based on relevant paragraphs of ASTM D 3740 , and certified USACE testing laboratory, and no work requiring testing shall be permitted until the laboratory has been inspected and validated. The first inspection of the facilities shall be at the expense of the Government and any subsequent inspections required because of failure of the first inspection shall be at the expense of the Contractor.

a. Bulk Specific Gravity Range. All stone shall have a minimum bulk specific gravity, saturated surface dry (SSD), of 2.6 based upon water having a unit weight of 62.4 pounds per cubic foot. The method of test for bulk specific gravity (SSD) shall be ASTM C 127 .

b. Unit Weight and Absorption. Stone shall weigh more than 165 pounds per cubic foot shall have a bulk specific gravity, saturated surface dry, greater than or equal to 2.6. The stone shall have an absorption less than 2 percent. The method of test for unit weight and absorption shall be ASTM C 127 , except the unit weight shall be calculated using bulk specific gravity, saturated surface dry.

c. Petrographic Examination. Stone shall be evaluated in accordance with ASTM C 295 , which shall include information required by ASTM D 4992 , paragraph 10. COE CRD-C 148 shall be used to perform Ethylene glycol tests required on rocks containing smectite as specified in ASTM D 4992 and on samples identified to contain swelling clays.

d. Resistance to Freezing and Thawing. Stone shall have a maximum loss of 5 percent after the number of cycles specified in ASTM D 5312 , Figure 1, when determining the durability of stone when subjected to freezing and thawing in accordance with ASTM D 5312 , except the surface area of one side of the sample shall be between 144 and 2,304 square inches.

e. Resistance of Rock to Wetting and Drying. Stone shall have a maximum loss of 2 percent when determining the durability of stone when subject to wetting and drying in accordance with ASTM D 5313 , except the surface area of one side of the sample shall be between 144 and 2,304 square inches.

f. Samples. Samples of stone from the designated source shall be taken by a representative of the Quarry under the supervision of the Contractor, Contracting Officer or representative, and USACE Seattle District Geotechnical and Geological personnel, for…