W912DW23B0005 - Yakima River at Union Gap Ecosystem Restoration ABSTACT (final).pdf

PDF 809 KB Posted

Attached to
Yakima River at Union Gap Ecosystem Restoration Project
Solicitation number
W912DW23B0005
Issued by

About this file

This solicitation is for a construction project to restore ecosystems along the Yakima River between Terrace Heights and Union Gap in Washington state. The project involves excavating channels, removing existing levees, constructing embankments and berms, installing drainage culverts, and hauling and processing on-site borrow materials. The work is divided into a base contract and two optional phases to accommodate annual federal and non-federal funding. The base contract focuses on areas west and south of Yakima Sportsman State Park intersected by State Route 24 and the Yakima Authorized Left Bank Federal Levee. Option 1 involves designing and installing a new headgate at the Blue Slough culvert within the existing federal levee and reconfiguring Blue Slough. Option 2 is located south of the base work area near Route 24 along levees that will be degraded and set back with a new levee constructed. The estimated value is between $10-25 million to be awarded as a firm-fixed-price contract. The solicitation number is W912DW23B0005 and bids are due on January 23, 2023 with Yakima County serving as the non-federal sponsor. The NAICS code is 237990 and it has a 100% total small business set-aside.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Solicitation No. W912DW23B0005

2. Date Issued:

3. Date Opened:

4. Issuing Office:

Department of the Army Corps of Engineers, Seattle District P.O. Box 3755 Seattle, WA 98124-2255

5. Project Title

Yakima River at Union Gap Ecosystem Restoration Project

6. Number of Amendments issues 7

1st Apparent low: S.E.A. Construction, LLC

% Difference from GE

2nd Apparent low: Nisqually Construction Services, LLC

% Difference from GE

3rd Apparent low: Pipkin Construction

% Difference from GE

SIGNATURE Bid Opening Officer:

ABSTRACT OF OFFERS - CONSTRUCTION

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

-34.90%

-28%

-12.70%

29-Nov-22

20-Jan-23

Charles Idle

8. GOVERNMENT ESTIMATE

(Check A, B or C and Complete D, E F) A. Hired Labor B. Reasonable Contract (w/out profit) XX C. Reasonable Contract (w/ profit)

7A. ITEM 7B. DESCRIPTION OF OFFERED ITEM 7C. EST 7D. UNIT 7E. UNIT 7F. AMOUNT

NUMBER QTY PRICE

BASE ITEMS

0001 Mobilization and Demobilization 1 JOB 142,540.00$ 142,540.00$

Construct, deconstruct and area restoration of other disturbed areas, seeding, and permanent erosion control at all work areas 1 JOB 1,050,350.00$ 1,050,350.00$

0002.5 All work associated with clearing of vegetation and LWD placement. 61 AC 2,826.00$ 172,386.00$

All Site work at Sportsman Park associated with large wood structures 1 JOB 129,970.00$ 129,970.00$

All site work at Sportsman Park including channels, berms, and upstream groin removals

0004AA Excavation 110,600 CY 7.11$ 786,366.00$ 0004AB Excavation 11,000 CY 7.11$ 78,210.00$

0004AC

Berm and groin onsite fill placement and compaction 18,400 CY 23.85$ 438,840.00$

0004AD

Berm and groin onsite fill placement and compaction 1,800 CY 23.85$ 42,930.00$

Hauling and all work to place material in Newland Pond Fill Sites 1,4, 5, and 6.

0005AA

Onsite disposal, fill placement and compaction 92,200 CY 6.65$ 613,130.00$

0005AB

Onsite disposal, fill placement and compaction 9,200 CY 6.65$ 61,180.00$

All work for O&M manuals as specified in Section 01 78 23 Operations and Maintenance Manuals from preparation to final approval 1 JOB 20,000.00$ 20,000.00$

All work for As-Built drawins as specified in Section 01 78 00 Closeout submittals from preparation to final approval 1 JOB 10,000.00$ 10,000.00$

3,545,902.00$

0008 Mobilization and Demobilization 1 JOB 143,400.00$ 143,400.00$

Construct, deconstruct and area restoration of other disturbed areas, seeding, and permanent erosion control at all work areas 1 JOB 554,600.00$ 554,600.00$

0009.5 All work associated with clearing of vegetation and LWD placement. 12 AC 2,300.00$ 27,600.00$

0010 Blue Slough Headwall and Headgate design 1 JOB 31,550.00$ 31,550.00$

All work associated with the construction of the Blue Slough Culvert and Headgate replacement 1 JOB 414,020.00$ 414,020.00$

All site work associated with Blue Slough Channel realignments

0012AA Excavation 7,000 CY 8.26$ 57,820.00$

TOTAL BASE ITEMS (0001-0007)

OPTIONAL ITEMS # 1 - Blue Slough Reconfiguation & Headgate + KOA Levee & Knob Degrade + Temporary staging area placement of fill material

0012AB Excavation 700 CY 8.20$ 5,740.00$

All site work associated with Blue Slough Channel planting and drainage structures 1 JOB 369,100.00$ 369,100.00$

All site work associated with the KOA Levee and KOA Knob degrades

0014AA Excavation 45,000 CY 7.61$ 342,450.00$ 0014AB Excavation 4,500 CY 7.60$ 34,200.00$

Hauling and all work to temporaily stockpile fill material in staging area(s)

0015AA Onsite disposal in staging area #3 52,000 CY 9.64$ 501,280.00$ 0015AB Onsite disposal in staging area #3 5,200 CY 9.60$ 49,920.00$

All work for O&M manuals as specified in Section 01 78 23 Operations and Maintenance Manuals from preparation to final approval 1 JOB 20,000.00$ 20,000.00$

All work for As-Built drawing as specified in Section 01 78 00 Closeout submittlals from preparation to final approval. 1 JOB 10,000.00$ 10,000.00$

2,561,680.00$

00018 Mobilization and Demobilization

1 JOB

145250 $ 145,250.00

Construct, deconstruct and area restoration of other disturbed areas, seeding, and permanent erosion control at all work areas

1 JOB

2150950 $ 2,150,950.00

0019.5 All work associated with clearing of vegetation and LWD placement.

144 AC

2320 $ 334,080.00

All site work associate with DID#1 Levee removal, SR-24 Cross Dike degrade, and SR-24 grade control sill, including on-site borrow of riprap

0020AA Excavation

145000 CY

7.55 $ 1,094,750.00

0020AB Excavation

14500 CY

7.5 $ 108,750.00

0020AC Onsite borrow Class V riprap placement

10000 CY

40.04 $ 400,400.00

0020AD

Class V riprap import and placement to supplement onsite borrow

5000 CY

87.2 $ 436,000.00

All site work associate with building the Blue Slough Levee and Backwater Extension including on-site borrow and levee embankment material processing

1 JOB

1462490 $ 1,462,490.00

Floodplain grading of the Newland Pond Cut Sites 1-14

0022AA Excavation

76000 CY

9.7 $ 737,200.00

0022AB Excavation

7600 CY

9.7 $ 73,720.00

Hauling and all work to place material at Fill Sites 2,3, and 7, including placement of material stockpiled in staging area 3.

Total Optional Items # 1 ( 0008-0017)

OPTIONAL ITEMS # 2 - DID#1 Removal + Building Blue Slough Levee + SR-24 Cross Dike Removal + Newland Pond Cut Sites 1-14 and Fill Sites 2, 3 and 7.

0023AA

Onsite disposal, fill placement and compaction

252000 CY

14.35 $ 3,616,200.00

0023AB

Onsite disposal, fill placement and compaction

25000 CY

14.35 $ 358,750.00

All work for O&M manuals as specified in Section 01 78 23 Operations and Maintenance Manuals from preparation to final approval

1 JOB

20,000.00$ $ 20,000.00

All work for As-Built drawing as specified in Section 01 78 00 Closeout submittlals from preparation to final approval.

1 JOB

10,000.00$ $ 10,000.00

10,948,540.00$

17,056,122.00$ TOTAL BASE & OPTIONAL 1&2

Total Optional Items # 2 ( 0018-0025)

12. OFFERS

NO. 1 NO. 2 NO. 3

A. Company: Central Enviromental, Inc A. Company: Pipkin Construction A. Company: Maloney-Odin JV

Address: 229 E. Whitney Rd Address: 4801 Contractors Drive Address: 74 Digital Dr Suite 6 City, State: Anchorage, AK 99501 City, State: East Wenatchee, WA 98802 City, State: Novato CA 94949 email: lisa@cei-alaska.com email: isaac@pipkininc.com email: tmangers@odinenv.com B. Bid Security Type/Amt : 20% Bid Bond B. Bid Security Type/Amt : 20% Bid Bond B. Bid Security Type/Amt : 20% Bid Bond Business Size: SDB Alaska Native Corp Yes Business Size: SB Yes Business Size: SB / HUBzone Yes

C. Amendments Acknowledged: Yes C. Amendments Acknowledged: Yes C. Amendments Acknowledged: Yes

D. ITEM 7C. EST E. UNIT F. AMOUNT D. ITEM 7C. EST E. UNIT F. AMOUNT D. ITEM 7C. EST E. UNIT F. AMOUNT

NO. QTY PRICE NO. QTY PRICE NO. QTY PRICE

BASE

ITEMS BASE ITEMS BASE ITEMS

0001 1 1,645,000.00$ 1,645,000.00$ 0001 1 2,080,000.00$ 2,080,000.00$ 0001 1 175,000.00$ 175,000.00$ 0002 1 641,000.00$ 641,000.00$ 0002 1 1,250,000.00$ 1,250,000.00$ 0002 1 1,000,000.00$ 1,000,000.00$

0002.5 61 19,700.00$ 1,201,700.00$ 0002.5 61 3,600.00$ 219,600.00$ 0002.5 61 11,400.00$ 695,400.00$ 0003 1 252,000.00$ 252,000.00$ 0003 1 150,000.00$ 150,000.00$ 0003 1 200,000.00$ 200,000.00$ 0004 -$ 0004 0 -$ 0004 0 -$

0004AA 110,600 25.50$ 2,820,300.00$ 0004AA 110,600 3.40$ 376,040.00$ 0004AA 110,600 21.35$ 2,361,310.00$ 0004AB 11,000 25.50$ 280,500.00$ 0004AB 11,000 2.98$ 32,780.00$ 0004AB 11,000 17.00$ 187,000.00$ 0004AC 18,400 10.50$ 193,200.00$ 0004AC 18,400 8.20$ 150,880.00$ 0004AC 18,400 46.50$ 855,600.00$ 0004AD 1,800 10.50$ 18,900.00$ 0004AD 1,800 5.73$ 10,314.00$ 0004AD 1,800 36.50$ 65,700.00$

0005 -$ 0005 0 -$ 0005 0 -$ 0005AA 92,200 7.60$ 700,720.00$ 0005AA 92,200 9.80$ 903,560.00$ 0005AA 92,200 21.00$ 1,936,200.00$ 0005AB 9,200 7.50$ 69,000.00$ 0005AB 9,200 8.69$ 79,948.00$ 0005AB 9,200 16.00$ 147,200.00$

0006 1 20,000.00$ 20,000.00$ 0006 1 20,000.00$ 20,000.00$ 0006 1 20,000.00$ 20,000.00$ 0007 1 10,000.00$ 10,000.00$ 0007 1 10,000.00$ 10,000.00$ 0007 1 10,000.00$ 10,000.00$

TOTAL BASE ITEMS 7,852,320.00$ TOTAL BASE ITEMS 5,283,122.00$ TOTAL BASE ITEMS 7,653,410.00$

OPTIONAL ITEMS#1 OPTIONAL ITEMS#1 OPTIONAL ITEMS#1

0008 1 1,318,000.00$ 1,318,000.00$ 0008 1 1,000,000.00$ 1,000,000.00$ 0008 1 100,000.00$ 100,000.00$ 0009 1 161,000.00$ 161,000.00$ 0009 1 180,000.00$ 180,000.00$ 0009 1 450,000.00$ 450,000.00$

0009.5 12 16,500.00$ 198,000.00$ 0009.5 12 2,400.00$ 28,800.00$ 0009.5 12 15,500.00$ 186,000.00$ 0010 1 42,000.00$ 42,000.00$ 0010 1 45,000.00$ 45,000.00$ 0010 1 15,000.00$ 15,000.00$ 0011 1 407,000.00$ 407,000.00$ 0011 1 211,500.00$ 211,500.00$ 0011 1 1,120,000.00$ 1,120,000.00$ 0012 -$ 0012 - -$ 0012 - -$

0012AA 7,000 24.00$ 168,000.00$ 0012AA 7,000 2.97$ 20,790.00$ 0012AA 7,000 36.00$ 252,000.00$ 0012AB 700 24.00$ 16,800.00$ 0012AB 700 2.97$ 2,079.00$ 0012AB 700 28.50$ 19,950.00$

0013 1 489,000.00$ 489,000.00$ 0013 1 420,000.00$ 420,000.00$ 0013 1 845,000.00$ 845,000.00$ 0014 0014 - -$ 0014 -

0014AA 45,000 8.00$ 360,000.00$ 0014AA 45,000 2.40$ 108,000.00$ 0014AA 45,000 15.00$ 675,000.00$ 0014AB 4,500 7.50$ 33,750.00$ 0014AB 4,500 2.40$ 10,800.00$ 0014AB 4,500 12.00$ 54,000.00$

0015 0015 - -$ 0015 - 0015AA 52,000 2.00$ 104,000.00$ 0015AA 52,000 4.06$ 211,120.00$ 0015AA 52,000 21.00$ 1,092,000.00$ 0015AB 5,200 2.50$ 13,000.00$ 0015AB 5,200 4.09$ 21,268.00$ 0015AB 5,200 16.00$ 83,200.00$

0016 1 20,000.00$ 20,000.00$ 0016 1 20,000.00$ 20,000.00$ 0016 1 20,000.00$ 20,000.00$ 0017 1 10,000.00$ 10,000.00$ 0017 1 10,000.00$ 10,000.00$ 0017 1 10,000.00$ 10,000.00$

3,340,550.00$ 2,289,357.00$ 4,922,150.00$ 00018 1 2,500,000.00$ 2,500,000.00$ 00018 1 2,500,000.00$ 2,500,000.00$ 00018 1 100,000.00$ 100,000.00$

0019 1 507,000.00$ 507,000.00$ 0019 1 960,000.00$ 960,000.00$ 0019 1 1,000,000.00$ 1,000,000.00$

0019.5 144 16,300.00$ 2,347,200.00$ 0019.5 144 1,280.00$ 184,320.00$ 0019.5 144 4,500.00$ 648,000.00$

0020 0020 - -$ 0020 - 0020AA 145,000 7.75$ 1,123,750.00$ 0020AA 145,000 2.81$ 407,450.00$ 0020AA 145,000 14.00$ 2,030,000.00$ 0020AB 14,500 8.00$ 116,000.00$ 0020AB 14,500 1.90$ 27,550.00$ 0020AB 14,500 10.00$ 145,000.00$ 0020AC 10,000 34.00$ 340,000.00$ 0020AC 10,000 16.08$ 160,800.00$ 0020AC 10,000 100.00$ 1,000,000.00$ 0020AD 5,000 93.00$ 465,000.00$ 0020AD 5,000 85.00$ 425,000.00$ 0020AD 5,000 180.00$ 900,000.00$

0021 1 1,595,000.00$ 1,595,000.00$ 0021 1 1,150,000.00$ 1,150,000.00$ 0021 1 2,000,000.00$ 2,000,000.00$ 0022 0022 - -$ 0022 - -$

0022AA 76,000 11.00$ 836,000.00$ 0022AA 76,000 3.27$ 248,520.00$ 0022AA 76,000 28.50$ 2,166,000.00$ 0022AB 7,600 9.00$ 68,400.00$ 0022AB 7,600 2.84$ 21,584.00$ 0022AB 7,600 21.50$ 163,400.00$

0023 0023 - -$ 0023 - -$ 0023AA 252,000 5.50$ 1,386,000.00$ 0023AA 252,000 4.85$ 1,222,200.00$ 0023AA 252,000 16.00$ 4,032,000.00$ 0023AB 25,000 5.50$ 137,500.00$ 0023AB 25,000 4.48$ 112,000.00$ 0023AB 25,000 12.00$ 300,000.00$

0024 1 20,000.00$ 20,000.00$ 0024 1 20,000.00$ 20,000.00$ 0024 1 20,000.00$ 20,000.00$ 0025 1 10,000.00$ 10,000.00$ 0025 1 10,000.00$ 10,000.00$ 0025 1 10,000.00$ 10,000.00$

TOTAL OPTIONAL ITEMS 11,451,850.00$ TOTAL OPTIONAL ITEMS 7,449,424.00$ TOTAL OPTIONAL ITEMS 14,514,400.00$ TOTAL BASE & OPTIONAL 22,644,720.00$ TOTAL BASE & OPTIONAL 15,021,903.00$ TOTAL BASE & OPTIONAL 27,089,960.00$

OPTIONAL ITEMS #1 Total OPTIONAL ITEMS #1 Total OPTIONAL ITEMS #1 Total

NO. 4 NO. 5 NO. 6

A. Company: SEA Construction, LLC A. Company: Nisqually Construction Services, LLC A. Company: Strider Construction Co, Inc

Address: 84 Elk Creek Road Address: 12820 Yelm Highway SE Suite H Address: 4721 Northwest Dr City, State: Raymond, WA 98577 City, State: Olympia, WA 98513 City, State: Bellingham, WA 98226 email: joelleb@seaconst.com email: doatman@nc-gc.com email: virginiaf@striderconstruction.com B. Bid Security Type/Amt : 20% Bid Bond B. Bid Security Type/Amt : 20% Bid Bond B. Bid Security Type/Amt : 20% Bid Bond Business Size: SB, WOSB, HUBzone, VOSB, SDVO Yes Business Size: SB Yes Business Size: SB Yes

C. Amendments Acknowledged: Yes C. Amendments Acknowledged: Yes C. Amendments Acknowledged: Yes

D. ITEM 7C. EST E. UNIT F. AMOUNT D. ITEM 7C. EST E. UNIT F. AMOUNT D. ITEM 7C. EST E. UNIT F. AMOUNT

NO. QTY PRICE NO. QTY PRICE NO. QTY PRICE

BASE

ITEMS BASE ITEMS BASE ITEMS

0001 1 545,000.00$ 545,000.00$ 0001 1 300,000.00$ 300,000.00$ 0001 1 1,000,000.00$ 1,000,000.00$ 0002 1 700,000.00$ 700,000.00$ 0002 1 2,490,000.00$ 2,490,000.00$ 0002 1 400,000.00$ 400,000.00$

0002.5 61 9,000.00$ 549,000.00$ 0002.5 61 671,000.00$ 0002.5 61 16,000.00$ 976,000.00$ 0003 1 35,000.00$ 35,000.00$ 0003 1 135,000.00$ 0003 1 175,000.00$ 175,000.00$ 0004 -$ 0004 0 -$ 0004 0 -$

0004AA 110,600 3.50$ 387,100.00$ 0004AA 110,600 1,106,000.00$ 0004AA 110,600 10.00$ 1,106,000.00$ 0004AB 11,000 3.50$ 38,500.00$ 0004AB 11,000 110,000.00$ 0004AB 11,000 9.00$ 99,000.00$ 0004AC 18,400 3.25$ 59,800.00$ 0004AC 18,400 103,040.00$ 0004AC 18,400 28.00$ 515,200.00$ 0004AD 1,800 3.25$ 5,850.00$ 0004AD 1,800 10,080.00$ 0004AD 1,800 28.00$ 50,400.00$

0005 -$ 0005 0 -$ 0005 0 -$ 0005AA 92,200 10.00$ 922,000.00$ 0005AA 92,200 207,450.00$ 0005AA 92,200 9.00$ 829,800.00$ 0005AB 9,200 10.00$ 92,000.00$ 0005AB 9,200 20,700.00$ 0005AB 9,200 7.00$ 64,400.00$

0006 1 20,000.00$ 20,000.00$ 0006 1 20,000.00$ 20,000.00$ 0006 1 20,000.00$ 20,000.00$ 0007 1 10,000.00$ 10,000.00$ 0007 1 10,000.00$ 10,000.00$ 0007 1 10,000.00$ 10,000.00$

TOTAL BASE ITEMS 3,364,250.00$ TOTAL BASE ITEMS 5,183,270.00$ TOTAL BASE ITEMS 5,245,800.00$

OPTIONAL ITEMS#1 OPTIONAL ITEMS#1 OPTIONAL ITEMS#1

0008 1 390,000.00$ 390,000.00$ 0008 1 100,000.00$ 100,000.00$ 0008 1 900,000.00$ 900,000.00$ 0009 1 600,000.00$ 600,000.00$ 0009 1 303,000.00$ 303,000.00$ 0009 1 82,500.00$ 82,500.00$

0009.5 12 12,500.00$ 150,000.00$ 0009.5 12 60,000.00$ 0009.5 12 17,000.00$ 204,000.00$ 0010 1 33,000.00$ 33,000.00$ 0010 1 57,000.00$ 57,000.00$ 0010 1 50,000.00$ 50,000.00$ 0011 1 160,000.00$ 160,000.00$ 0011 1 298,000.00$ 298,000.00$ 0011 1 700,000.00$ 700,000.00$ 0012 -$ 0012 - -$ 0012 - -$

0012AA 7,000 4.25$ 29,750.00$ 0012AA 7,000 54,600.00$ 0012AA 7,000 11.00$ 77,000.00$

0012AB 700 4.25$ 2,975.00$ 0012AB 700 5,460.00$ 0012AB 700 11.00$ 7,700.00$

0013 1 195,000.00$ 195,000.00$ 0013 1 725,000.00$ 0013 1 1,000,000.00$ 1,000,000.00$ 0014 0014 - -$ 0014 -

0014AA 45,000 3.35$ 150,750.00$ 0014AA 45,000 351,000.00$ 0014AA 45,000 9.00$ 405,000.00$ 0014AB 4,500 3.35$ 15,075.00$ 0014AB 4,500 35,100.00$ 0014AB 4,500 10.00$ 45,000.00$

0015 0015 - -$ 0015 - 0015AA 52,000 6.00$ 312,000.00$ 0015AA 52,000 88,400.00$ 0015AA 52,000 10.00$ 520,000.00$ 0015AB 5,200 6.00$ 31,200.00$ 0015AB 5,200 8,840.00$ 0015AB 5,200 6.00$ 31,200.00$

0016 1 20,000.00$ 20,000.00$ 0016 1 20,000.00$ 20,000.00$ 0016 1 20,000.00$ 20,000.00$ 0017 1 10,000.00$ 10,000.00$ 0017 1 10,000.00$ 10,000.00$ 0017 1 10,000.00$ 10,000.00$

2,099,750.00$ 2,116,400.00$ 4,052,400.00$ 00018 1 550,000.00$ 550,000.00$ 00018 1 200,000.00$ 200,000.00$ 00018 1 1,850,000.00$ 1,850,000.00$

0019 1 710,000.00$ 710,000.00$ 0019 1 965,000.00$ 965,000.00$ 0019 1 400,000.00$ 400,000.00$

0019.5 144 8,000.00$ 1,152,000.00$ 0019.5 144 838,080.00$ 0019.5 144 13,000.00$ 1,872,000.00$

0020 0020 - -$ 0020 - 0020AA 145,000 3.35$ 485,750.00$ 0020AA 145,000 1,131,000.00$ 0020AA 145,000 11.00$ 1,595,000.00$ 0020AB 14,500 3.35$ 48,575.00$ 0020AB 14,500 113,100.00$ 0020AB 14,500 9.00$ 130,500.00$ 0020AC 10,000 6.10$ 61,000.00$ 0020AC 10,000 156,000.00$ 0020AC 10,000 25.00$ 250,000.00$ 0020AD 5,000 39.00$ 195,000.00$ 0020AD 5,000 390,000.00$ 0020AD 5,000 125.00$ 625,000.00$

0021 1 1,300,000.00$ 1,300,000.00$ 0021 1 615,000.00$ 0021 1 1,750,000.00$ 1,750,000.00$ 0022 0022 - -$ 0022 - -$

0022AA 76,000 4.00$ 304,000.00$ 0022AA 76,000 592,800.00$ 0022AA 76,000 10.00$ 760,000.00$ 0022AB 7,600 4.00$ 30,400.00$ 0022AB 7,600 59,280.00$ 0022AB 7,600 12.00$ 91,200.00$

0023 0023 - -$ 0023 - -$ 0023AA 252,000 6.00$ 1,512,000.00$ 0023AA 252,000 428,400.00$ 0023AA 252,000 19.00$ 4,788,000.00$ 0023AB 25,000 6.00$ 150,000.00$ 0023AB 25,000 42,500.00$ 0023AB 25,000 17.00$ 425,000.00$

0024 1 20,000.00$ 20,000.00$ 0024 1 20,000.00$ 20,000.00$ 0024 1 20,000.00$ 20,000.00$ 0025 1 10,000.00$ 10,000.00$ 0025 1 10,000.00$ 10,000.00$ 0025 1 10,000.00$ 10,000.00$

TOTAL OPTIONAL ITEMS 6,528,725.00$ TOTAL OPTIONAL ITEMS 5,561,160.00$ TOTAL OPTIONAL ITEMS 14,566,700.00$ TOTAL BASE & OPTIONAL 11,992,725.00$ TOTAL BASE & OPTIONAL 12,860,830.00$ TOTAL BASE & OPTIONAL 23,864,900.00$

Standard Form 1419 (2001)

COE SEATTLE DISTRICT (VERSION 3/01)

NO. 7 NO. 8 NO. 9

A. Company: BCI Contracting, Inc A. Company: RJS Construction, Inc A. Company:

Address: PO Box 231147 Address: 1618 Rudkin Road, Suite B Address:

City, State: Tigard, OR 97281 City, State: Yakima, WA 98901 City, State:

email: dave.porter@bcicontracting.com email: hannah.h@rjsconst.com email:

B. Bid Security Type/Amt : 20% Bid Bond B. Bid Security Type/Amt : 20% Bid Bond B. Bid Security Type/Amt : 20% Bid Bond Business Size: SB Yes Business Size: SDB, WOSB Yes Business Size:

C. Amendments Acknowledged: Yes C. Amendments Acknowledged: Yes C. Amendments Acknowledged:

D. ITEM 7C. EST E. UNIT F. AMOUNT D. ITEM 7C. EST E. UNIT F. AMOUNT D. ITEM 7C. EST E. UNIT F. AMOUNT

NO. QTY PRICE NO. QTY PRICE NO. QTY PRICE

BASE

ITEMS BASE ITEMS BASE ITEMS

0001 1 1,250,000.00$ 1,250,000.00$ 0001 1 743,425.79$ 743,425.79$ 0001 1 -$ 0002 1 290,000.00$ 290,000.00$ 0002 1 256,057.20$ 256,057.20$ 0002 1 -$

0002.5 61 2,200.00$ 134,200.00$ 0002.5 61 13,265.23$ 809,179.03$ 0002.5 61 -$ 0003 1 350,000.00$ 350,000.00$ 0003 1 66,968.81$ 66,968.81$ 0003 1 -$ 0004 -$ 0004 0 -$ 0004 0 -$

0004AA 110,600 16.00$ 1,769,600.00$ 0004AA 110,600 30.86$ 3,412,914.21$ 0004AA 110,600 -$ 0004AB 11,000 16.00$ 176,000.00$ 0004AB 11,000 36.77$ 404,439.07$ 0004AB 11,000 -$ 0004AC 18,400 23.00$ 423,200.00$ 0004AC 18,400 6.57$ 120,806.47$ 0004AC 18,400 -$

0004AD 1,800 23.00$ 41,400.00$ 0004AD 1,800 7.88$ 14,181.63$ 0004AD 1,800 -$

0005 -$ 0005 0 -$ 0005 0 -$

0005AA 92,200 9.00$ 828,000.00$ 0005AA 92,200 5.25$ 484,276.39$ 0005AA 92,200 -$

0005AB 9,200 9.00$ 82,800.00$ 0005AB 9,200 5.91$ 54,362.91$ 0005AB 9,200 -$

0006 1 20,000.00$ 20,000.00$ 0006 1 20,000.00$ 20,000.00$ 0006 1 -$ 0007 1 10,000.00$ 10,000.00$ 0007 1 10,000.00$ 10,000.00$ 0007 1 -$

TOTAL BASE ITEMS 5,375,200.00$ TOTAL BASE ITEMS 6,396,611.51$ TOTAL BASE ITEMS -$

OPTIONAL ITEMS#1 OPTIONAL ITEMS#1 OPTIONAL ITEMS#1

0008 1 950,000.00$ 950,000.00$ 0008 1 484,024.39$ 484,024.39$ 0008 1 -$ 0009 1 150,000.00$ 150,000.00$ 0009 1 389,202.20$ 389,202.20$ 0009 1 -$

0009.5 12 2,200.00$ 26,400.00$ 0009.5 12 12,616.22$ 151,394.64$ 0009.5 12 -$ 0010 1 45,000.00$ 45,000.00$ 0010 1 35,672.26$ 35,672.26$ 0010 1 -$ 0011 1 250,000.00$ 250,000.00$ 0011 1 303,214.21$ 303,214.21$ 0011 1 -$ 0012 -$ 0012 - -$ 0012 - -$

0012AA 7,000 28.00$ 196,000.00$ 0012AA 7,000 36.87$ 258,090.00$ 0012AA 7,000 -$

0012AB 700 28.00$ 19,600.00$ 0012AB 700 49.95$ 34,965.00$ 0012AB 700 -$

0013 1 990,000.00$ 990,000.00$ 0013 1 784,811.71$ 784,811.71$ 0013 1 -$ 0014 0014 - -$ 0014 -

0014AA 45,000 18.00$ 810,000.00$ 0014AA 45,000 15.46$ 695,700.00$ 0014AA 45,000 -$

0014AB 4,500 18.00$ 81,000.00$ 0014AB 4,500 32.70$ 147,150.00$ 0014AB 4,500 -$

0015 0015 - -$ 0015 -

0015AA 52,000 8.00$ 416,000.00$ 0015AA 52,000 2.38$ 123,760.00$ 0015AA 52,000 -$

0015AB 5,200 8.00$ 41,600.00$ 0015AB 5,200 2.68$ 13,936.00$ 0015AB 5,200 -$

0016 1 20,000.00$ 20,000.00$ 0016 1 20,000.00$ 20,000.00$ 0016 1 -$ 0017 1 10,000.00$ 10,000.00$ 0017 1 10,000.00$ 10,000.00$ 0017 1 -$

4,005,600.00$ 3,451,920.41$ -$ 00018 1 1,250,000.00$ 1,250,000.00$ 00018 1 1,208,445.26$ 1,208,445.26$ 00018 1 -$ 0019 1 190,000.00$ 190,000.00$ 0019 1 346,432.74$ 346,432.74$ 0019 1 -$

0019.5 144 2,200.00$ 316,800.00$ 0019.5 144 12,818.77$ 1,845,902.88$ 0019.5 144 -$ 0020 0020 - -$ 0020 -

0020AA 145,000 15.00$ 2,175,000.00$ 0020AA 145,000 15.70$ 2,276,500.00$ 0020AA 145,000 -$ 0020AB 14,500 15.00$ 217,500.00$ 0020AB 14,500 18.41$ 266,945.00$ 0020AB 14,500 -$ 0020AC 10,000 44.00$ 440,000.00$ 0020AC 10,000 12.08$ 120,800.00$ 0020AC 10,000 -$

0020AD 5,000 90.00$ 450,000.00$ 0020AD 5,000 102.61$ 513,050.00$ 0020AD 5,000 -$

0021 1 1,400,000.00$ 1,400,000.00$ 0021 1 2,030,777.30$ 2,030,777.30$ 0021 1 -$ 0022 0022 - -$ 0022 - -$

0022AA 76,000 15.00$ 1,140,000.00$ 0022AA 76,000 15.70$ 1,193,200.00$ 0022AA 76,000 -$

0022AB 7,600 15.00$ 114,000.00$ 0022AB 7,600 18.41$ 139,916.00$ 0022AB 7,600 -$

0023 0023 - -$ 0023 - -$ 0023AA 252,000 7.00$ 1,764,000.00$ 0023AA 252,000 3.81$ 960,120.00$ 0023AA 252,000 -$

0023AB 25,000 7.00$ 17,500.00$ 0023AB 25,000 6.04$ 151,000.00$ 0023AB 25,000 -$

0024 1 20,000.00$ 20,000.00$ 0024 1 20,000.00$ 20,000.00$ 0024 1 -$ 0025 1 10,000.00$ 10,000.00$ 0025 1 10,000.00$ 10,000.00$ 0025 1 -$

TOTAL OPTIONAL ITEMS 9,504,800.00$ TOTAL OPTIONAL ITEMS 11,083,089.18$ TOTAL OPTIONAL ITEMS -$ TOTAL BASE & OPTIONAL 18,885,600.00$ TOTAL BASE & OPTIONAL 20,931,621.10$ TOTAL BASE & OPTIONAL -$

Standard Form 1419 (2001)