This document outlines a federal contract solicitation for transformer installation services at the Albeni Falls Dam in Idaho. The U.S. Army Corps of Engineers, Seattle District is seeking a contractor to remove three existing transformers rated at 20 MVA and install three new similarly rated transformers that are currently on site. Additional work includes removing and replacing electrical panels and cables, modifying tubular bus connections, installing new transformer pads and supports, and commissioning gas analysis and lighting equipment. Bidders must coordinate work closely with the government and during scheduled outages to complete the work which involves concrete placement and transformer movements. The solicitation number is W912DW21R0021 and responses are due based on the dates specified in the attached solicitation document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W912DW21R0027R0002
AFD Main Unit Transformer Installation, Oldtow n, Idaho
(see continuation page)
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Jun-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW21R0021
X 9B. DATED (SEE ITEM 11)
17-May-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Jun-2021
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW21R0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
The following items are applicable to this modification:
R0002
1. This amendment two (0002) provides for the following:
a. Provision of Site Visit List of Attendees
b. Provision of Site Visit Photos
c. Provision of AFD XFMR OIL_Rainbow Report in response to a bidder inquiry.
2. The proposal submittal time and date of June 16, 2021 at 10:00:00 a.m. LOCAL TIME remains the same.
3. NOTICE TO OFFERORS: Offerors must acknowledge reeipt of this amendment by number and date on offer.
Encl:
Site Visit List of Attendees Site Visit Photos AFD XFMR OIL_Rainbow Report
W912DW21R0021
Company Name Attendee Name E-mail Phone TransFluid Services Inc. Dorcy Dixon angelamatheson@starkoil.com 208-329-2373 Koontz Electric Company, Inc. Racy Garis Racy.Garis@koontzelectric.com 501-242-6120 Gardner Zemke Hector Reyes hreyes@gardnerzemke.com 575-571-1781 Power City Electric Doug Gehring DGehring@PowerCityElectric.com 509-939-1065 Barnhart Crane Daniel Zimmerman DGehring@PowerCityElectric.com 208-277-7447
AFD Main Unit Transformer Install - Site Visit List of Attendees mailto:angelamatheson@starkoil.com mailto:Racy.Garis@koontzelectric.com mailto:hreyes@gardnerzemke.com mailto:DGehring@PowerCityElectric.com mailto:DGehring@PowerCityElectric.com
480V STATION SERVICE SWITCHGEAR
CONTROL ROOM
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D R
A W
IN
G N
O
F
IL
E N
A M
E
C H
E C
K E
D B
Y
®of Engineers
US Army Corps ®of Engineers
US Army Corps
D R
A W
IN
G N
O
F
IL
E N
A M
E
A L
B E
N I F
A L L S P
R O J E
C T
G -1
.d g n
G-101
P O
R T
L A
N D
O R
E G
O N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
P O
W E
R H
O U
S E
P E
N D O
R E
IL
L E R
IV
E R
S T
E V
E N R
M
IL
E S P .E
H D
C M
G
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
S L
A U
G H
L
IN
PLAN - ELEVATION 2042.00 & 2047.00
0 8' 32'16'
NOTES:
N
PLAN - CONTROL ROOM EL 2060.00
0 8' 32'16'
P O
W E
R H
O U
S E P
L A
N V
IE
W S
1. EXISTING ELEVATIONS AND PLAN VIEWS.
E L
.0
.0
.0
W
D W
R
A F
D M
A
IN
U
N
IT
T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
E
V A
U G
H N
E -5
-4 -7
/2
G3ECNBRB
Callout Photo #1
G3ECNBRB
Callout Photo #2
G3ECNBRB
Callout Photo #3
G3ECNBRB
Callout Photo #4
G3ECNBRB
Callout Photo #5 and $6
Customer 0073320 U S ARMY CORP OF ENGINEERS City NEWPORT, ID Location OUTDOOR/GROUND
Sub-Name ALBENI FALLS DAM Unit No. 1 Other ACCESS: PRESS RLF DVC
Date Printed 8/5/2013 TC# 9001
Manufacturer PENNSYLVANIA Equipment Type TRANSFORMER Manufacture Date 01/01/1951 Transformer Class OA/FA
Serial No. 23525-1 Impedance % 7.90
KVA Rating 18,333 Phase/Cycle 3/60
High Voltage 115,000 Y Liquid Type OIL
Low Voltage 13,200 D Gallons 6,525
Weight 136,300 Other Access TOP INSPECTION PLATE
Radiators Yes Conservator Tank No
Fans Yes LTC Compartment No
Water Cooled No Bushing Location Top
Oil Pumps No Breather N2 Blanket
Top FPV (inch) 0.00 Hose Length (feet)
Bottom FPV (inch) 0.00 Service Online
InsulationType 55C Power Available
NAMEPLATE DATA ADDITIONAL EQUIPMENT
LIQUID SCREEN TEST DATA
DATE SERVICE ACID IFT DIEL 877 DIEL 1816 GAP COLOR SP. GRAV. VISUAL SEDIMENT
07/26/07 0.020 AC 38.6 AC 35 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
09/17/08 0.020 AC 38.4 AC 50 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
10/08/09 0.030 AC 37.9 AC 47 AC 1.50 AC 0.870 AC CLEAR AC NONE AC
03/11/10 0.020 AC 37.3 AC 46 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
10/19/10 0.020 AC 37.7 AC 47 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
10/31/11 0.020 AC 37.9 AC 49 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
12/13/11 0.020 AC 38.0 AC 50 AC 1.50 AC 0.875 AC CLEAR AC NONE AC
07/17/13 0.020 AC 39.6 AC 38 AC 1.50 AC 0.870 AC CLEAR AC NONE AC
VISUAL INSPECTION
DATE LEVEL
SAMPLE
TEMP
TOP
TEMP P/V PAINT LEAKS
10/19/10 NORMAL 40 40 0.50 GOOD NONE
10/31/11 NORMAL 22 38 0.75 FAIR NONE
12/13/11 NORMAL 9 30 0.50 FAIR NONE
07/17/13 NORMAL 35 55 0.75 FAIR NONE
FIELD SERVICE
DATE SERVICE
10/26/10 DRYMAX INSTALL
Additional Information
Reason Not Tested
INHIBITOR CONTENT
DATE PCT. BY WEIGHT
03/11/10 0.303% AC
10/19/10 0.302% AC
10/31/11 0.300% AC
12/13/11 0.300% AC
07/17/13 0.280% AC
NOTE - STUDIES SHOW THAT A LEVEL OF 0.3% INHIBITOR IS
OPTIMUM FOR PRESERVATION OF IN-SERVICE TRANSFORMER
OILS. OILS WITH A LEVEL BELOW 0.08% ARE CONSIDERED TO BE
UNINHIBITED.
LIQUID POWER FACTOR
DATE 25 C 100 C
03/11/10 0.071 AC 2.946 AC
10/19/10 0.080 AC 1.623 AC
10/31/11 0.101 QU 2.916 AC
12/13/11 0.083 AC 1.919 AC
07/17/13 0.102 QU 2.053 AC
KEY TO ABBREVIATIONS: AC - ACCEPTABLE QU - QUESTIONABLE UN - UNACCEPTABLE RS - RESAMPLE
NOTE: * After a test result indicates that this test was performed by an outside lab.
8/5/2013 TC# 9001Page 2 Date Printed
Customer 0073320 U S ARMY CORP OF ENGINEERS S/N 23525-1
Sub-Name ALBENI FALLS DAM Mfg. PENNSYLVANIA Gallons 6,525 High Volt. 115,000
Location OUTDOOR/GROUND Unit No. 1 KVA 18,333 Low Volt. 13,200
KARL FISCHER TESTING MOISTURE CONTENT EXPRESSED IN PPM
AVG. PCT. MOIST./DRY WGT.
DATE TEMP PPM SATURATION PCT. GRADE
10/08/09 20 15 26.3 UN 3.12 F
03/11/10 15 5 11.2 QU 1.37 C
10/19/10 45 16 10.7 QU 0.82 A
10/31/11 27 7 8.8 QU 0.99 B
12/13/11 14 3 7.0 AC 0.86 B
07/17/13 40 13 10.3 QU 0.89 B
RECOMMENDATION SEE KF DATA / RETEST 6 MONTHS
FURAN ANALYSIS EXPRESSED IN PPB
DATE 5H2F 2FOL 2FAL 2ACF 5M2F TOTAL
10/08/09 ND ND 76 ND 3 79
03/11/10 ND ND 56 ND 6 62
10/19/10 ND ND 87 ND 5 92
10/31/11 ND ND 7 ND ND 7
12/13/11 ND ND 3 ND ND 3
07/17/13 ND ND 5 ND ND 5
RECOMMENDATION RETEST 1 YEAR
NO DIAGNOSTIC CHANGES ARE NOTED IN FURAN LEVELS SINCE
THE PREVIOUS ANALYSIS. THE CELLULOSIC INSULATION APPEARS
TO BE IN GOOD CONDITION.
CALCULATED DP <750 EST. LIFE REMAINING <95%
ICP METALS-IN-OIL EXPRESSED IN PPM
DATE ALUMINUM IRON COPPER
07/26/07 ND ND ND
09/17/08 ND ND 0.090
10/08/09 ND ND 0.457
03/11/10 ND ND 0.478
10/19/10 ND ND 0.419
10/31/11 ND ND 0.494
12/13/11 ND ND 0.388
07/17/13 ND ND 0.306
RECOMMENDATION RETEST 1 YEAR
THERE HAS BEEN NO DIAGNOSTIC CHANGE SINCE
THE PREVIOUS ANALYSIS. THESE DATA INDICATE
NORMAL OPERATION.
PCB CONTENT EXPRESSED IN PPM
DATE 1242 1254 1260 OTHER TOTAL
09/21/99 ND
COLOR LABEL: Green CLASS:
Results in mg/kg ND means None Detected (<2 mg/kg per ASTM D4059)
NOTE: * After a test result indicates that this test was performed by an outside lab.
GAS-IN-OIL ANALYSIS GAS CHROMATOGRAPHY EXPRESSED IN PPM
DATE HYDROGEN OXYGEN NITROGEN METHANE
CARBON
MONOXIDE
CARBON
DIOXIDE ETHANE ETHYLENE ACETYLENE
TOTAL
COMBUST.
TOTAL
GAS
07/26/07 9 2,161 84,584 28 23 1,182 12 1 ND 73 88,000
09/17/08 11 17,267 63,117 4 262 1,684 1 6 ND 284 82,352
10/08/09 4 18,227 61,698 4 361 2,189 1 16 ND 386 82,500
03/11/10 2 25,045 68,573 5 264 2,343 1 18 ND 290 96,251
10/19/10 ND 10,398 71,763 1 11 534 ND 4 ND 16 82,711
10/31/11 ND 4,933 73,416 2 5 152 ND ND ND 7 78,508
12/13/11 ND 10,611 79,628 2 2 222 ND ND ND 4 90,465
07/17/13 7 9,202 77,338 2 15 320 1 ND ND 25 86,885
RECOMMENDATION RETEST 1 YEAR
B-THE ANALYSIS OF THIS SAMPLE SHOWS NO SIGNIFICANT INCREASE IN THE COMBUSTIBLE GAS VOLUME.
THIS INDICATES NORMAL OPERATION.
Sub-Name ALBENI FALLS DAM Unit No. 2 Other ACCESS: PRESS RLF DVC
Date Printed 8/5/2013 TC# 9003
Manufacturer PENNSYLVANIA Equipment Type TRANSFORMER Manufacture Date 01/01/1951 Transformer Class OA/FA
Serial No. 23525-2 Impedance % 7.80
KVA Rating 18,333 Phase/Cycle 3/60
High Voltage 115,000 Y Liquid Type OIL
Low Voltage 13,200 D Gallons 6,525
Weight 136,300 Other Access TOP INSPECTION PLATE
Radiators Yes Conservator Tank No
Fans Yes LTC Compartment No
Water Cooled No Bushing Location Top
Oil Pumps No Breather N2 Blanket
Top FPV (inch) 0.00 Valve Hose Length (feet) 25
Bottom FPV (inch) 0.00 Valve Service Online Yes
InsulationType 55C Power Available No
NAMEPLATE DATA ADDITIONAL EQUIPMENT
LIQUID SCREEN TEST DATA
DATE SERVICE ACID IFT DIEL 877 DIEL 1816 GAP COLOR SP. GRAV. VISUAL SEDIMENT
07/27/06 0.030 AC 38.5 AC 46 AC 2.0mm 1.00 AC 0.870 AC CLEAR AC NONE AC
07/26/07 0.030 AC 37.9 AC 49 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
09/17/08 0.030 AC 37.8 AC 50 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
10/08/09 0.020 AC 37.4 AC 46 AC 1.50 AC 0.880 AC CLEAR AC NONE AC
03/11/10 0.030 AC 39.2 AC 44 AC 1.00 AC 0.880 AC CLEAR AC NONE AC
10/19/10 0.020 AC 39.9 AC 47 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
10/31/11 0.020 AC 39.6 AC 50 AC 1.00 AC 0.880 AC CLEAR AC NONE AC
07/17/13 0.020 AC 39.9 AC 41 AC 0.75 AC 0.870 AC CLEAR AC NONE AC
VISUAL INSPECTION
DATE LEVEL
SAMPLE
TEMP
TOP
TEMP P/V PAINT LEAKS
03/11/10 NORMAL 10 25 3.00 GOOD NONE
10/19/10 NORMAL 40 40 1.50 FAIR NONE
10/31/11 NORMAL 21 36 1.50 FAIR NONE
07/17/13 NORMAL 36 55 3.00 FAIR NONE
FIELD SERVICE
DATE SERVICE
Additional Information
Reason Not Tested
INHIBITOR CONTENT
DATE PCT. BY WEIGHT
10/08/09 0.308% AC
03/11/10 0.327% AC
10/19/10 0.318% AC
10/31/11 0.304% AC
07/17/13 0.300% AC
NOTE - STUDIES SHOW THAT A LEVEL OF 0.3% INHIBITOR IS
OPTIMUM FOR PRESERVATION OF IN-SERVICE TRANSFORMER
OILS. OILS WITH A LEVEL BELOW 0.08% ARE CONSIDERED TO BE
UNINHIBITED.
LIQUID POWER FACTOR
DATE 25 C 100 C
10/08/09 0.019 AC 0.821 AC
03/11/10 0.036 AC 1.322 AC
10/19/10 0.044 AC 1.033 AC
10/31/11 0.036 AC 1.008 AC
07/17/13 0.033 AC 1.017 AC
8/5/2013 TC# 9003Page 2 Date Printed
Customer 0073320 U S ARMY CORP OF ENGINEERS S/N 23525-2
Sub-Name ALBENI FALLS DAM Mfg. PENNSYLVANIA Gallons 6,525 High Volt. 115,000
Location OUTDOOR/GROUND Unit No. 2 KVA 18,333 Low Volt. 13,200
KARL FISCHER TESTING MOISTURE CONTENT EXPRESSED IN PPM
AVG. PCT. MOIST./DRY WGT.
DATE TEMP PPM SATURATION PCT. GRADE
09/17/08 32 17 19.0 UN 2.01 D
10/08/09 20 7 12.7 QU 1.51 C
03/11/10 15 1 2.2 AC 0.27 A
10/19/10 45 9 5.9 AC 0.45 A
10/31/11 27 8 10.2 QU 1.15 B
07/17/13 41 16 12.3 QU 1.05 B
RECOMMENDATION SEE KF DATA / RETEST 6 MONTHS
FURAN ANALYSIS EXPRESSED IN PPB
DATE 5H2F 2FOL 2FAL 2ACF 5M2F TOTAL
09/17/08 ND ND 72 ND ND 72
10/08/09 ND ND 80 ND ND 80
03/11/10 ND ND 66 ND 2 68
10/19/10 ND ND 111 ND 6 117
10/31/11 ND ND 91 ND 7 98
07/17/13 ND ND 21 ND ND 21
RECOMMENDATION RETEST 1 YEAR
NO DIAGNOSTIC CHANGES ARE NOTED IN FURAN LEVELS SINCE
THE PREVIOUS ANALYSIS. THE CELLULOSIC INSULATION APPEARS
TO BE IN GOOD CONDITION.
CALCULATED DP 800 EST. LIFE REMAINING 100%
ICP METALS-IN-OIL EXPRESSED IN PPM
DATE ALUMINUM IRON COPPER
07/27/06 ND ND 0.068
07/26/07 ND ND 0.043
09/17/08 ND ND 0.079
10/08/09 ND ND 0.066
03/11/10 ND ND 0.063
10/19/10 ND ND 0.054
10/31/11 ND ND 0.098
07/17/13 ND ND 0.057
RECOMMENDATION RETEST 1 YEAR
THERE HAS BEEN NO DIAGNOSTIC CHANGE SINCE
THE PREVIOUS ANALYSIS. THESE DATA INDICATE
NORMAL OPERATION.
PCB CONTENT EXPRESSED IN PPM
DATE 1242 1254 1260 OTHER TOTAL
09/21/99 ND
COLOR LABEL: Green CLASS:
Results in mg/kg ND means None Detected (<2 mg/kg per ASTM D4059)
NOTE: * After a test result indicates that this test was performed by an outside lab.
GAS-IN-OIL ANALYSIS GAS CHROMATOGRAPHY EXPRESSED IN PPM
DATE HYDROGEN OXYGEN NITROGEN METHANE
CARBON
MONOXIDE
CARBON
DIOXIDE ETHANE ETHYLENE ACETYLENE
TOTAL
COMBUST.
TOTAL
GAS
07/27/06 10 1,308 80,115 71 5 928 47 15 TRACE 148 82,499
07/26/07 10 2,340 84,421 70 11 1,094 48 6 TRACE 145 88,000
09/17/08 8 763 72,786 59 9 590 31 3 ND 110 74,249
10/08/09 7 816 72,496 58 6 822 40 4 ND 115 74,249
03/11/10 6 653 80,945 68 2 774 48 4 ND 128 82,500
10/19/10 ND 9,412 73,351 103 12 1,365 45 ND ND 160 84,288
10/31/11 ND 3,669 67,974 61 8 897 67 5 ND 141 72,681
07/17/13 5 9,950 79,300 62 27 482 73 10 ND 177 89,909
RECOMMENDATION RETEST 6 MONTHS
YH-ELEVATED LEVELS OF METHANE AND ETHANE INDICATE MILD OVERHEATING OF THE INSULATING LIQUID. THIS OVERHEATING CAN REACH LOCALIZED TEMPERATURES OF UP TO 300 DEGREES C. POSSIBLE CAUSES INCLUDE GENERAL OVERHEATING, DEGRADED
CONNECTIONS, OR ABNORMALITIES IN THE TAP CHANGER.
Sub-Name ALBENI FALLS DAM Unit No. 1 Other ACCESS: PRESS RLF DVC
Date Printed 8/5/2013 TC# 9001
Manufacturer PENNSYLVANIA Equipment Type TRANSFORMER Manufacture Date 01/01/1951 Transformer Class OA/FA
Serial No. 23525-1 Impedance % 7.90
KVA Rating 18,333 Phase/Cycle 3/60
High Voltage 115,000 Y Liquid Type OIL
Low Voltage 13,200 D Gallons 6,525
Weight 136,300 Other Access TOP INSPECTION PLATE
Radiators Yes Conservator Tank No
Fans Yes LTC Compartment No
Water Cooled No Bushing Location Top
Oil Pumps No Breather N2 Blanket
Top FPV (inch) 0.00 Hose Length (feet)
Bottom FPV (inch) 0.00 Service Online
InsulationType 55C Power Available
NAMEPLATE DATA ADDITIONAL EQUIPMENT
LIQUID SCREEN TEST DATA
DATE SERVICE ACID IFT DIEL 877 DIEL 1816 GAP COLOR SP. GRAV. VISUAL SEDIMENT
07/26/07 0.020 AC 38.6 AC 35 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
09/17/08 0.020 AC 38.4 AC 50 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
10/08/09 0.030 AC 37.9 AC 47 AC 1.50 AC 0.870 AC CLEAR AC NONE AC
03/11/10 0.020 AC 37.3 AC 46 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
10/19/10 0.020 AC 37.7 AC 47 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
10/31/11 0.020 AC 37.9 AC 49 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
12/13/11 0.020 AC 38.0 AC 50 AC 1.50 AC 0.875 AC CLEAR AC NONE AC
07/17/13 0.020 AC 39.6 AC 38 AC 1.50 AC 0.870 AC CLEAR AC NONE AC
VISUAL INSPECTION
DATE LEVEL
SAMPLE
TEMP
TOP
TEMP P/V PAINT LEAKS
10/19/10 NORMAL 40 40 0.50 GOOD NONE
10/31/11 NORMAL 22 38 0.75 FAIR NONE
12/13/11 NORMAL 9 30 0.50 FAIR NONE
07/17/13 NORMAL 35 55 0.75 FAIR NONE
FIELD SERVICE
DATE SERVICE
10/26/10 DRYMAX INSTALL
Additional Information
Reason Not Tested
INHIBITOR CONTENT
DATE PCT. BY WEIGHT
03/11/10 0.303% AC
10/19/10 0.302% AC
10/31/11 0.300% AC
12/13/11 0.300% AC
07/17/13 0.280% AC
NOTE - STUDIES SHOW THAT A LEVEL OF 0.3% INHIBITOR IS
OPTIMUM FOR PRESERVATION OF IN-SERVICE TRANSFORMER
OILS. OILS WITH A LEVEL BELOW 0.08% ARE CONSIDERED TO BE
UNINHIBITED.
LIQUID POWER FACTOR
DATE 25 C 100 C
03/11/10 0.071 AC 2.946 AC
10/19/10 0.080 AC 1.623 AC
10/31/11 0.101 QU 2.916 AC
12/13/11 0.083 AC 1.919 AC
07/17/13 0.102 QU 2.053 AC
8/5/2013 TC# 9001Page 2 Date Printed
Customer 0073320 U S ARMY CORP OF ENGINEERS S/N 23525-1
Sub-Name ALBENI FALLS DAM Mfg. PENNSYLVANIA Gallons 6,525 High Volt. 115,000
Location OUTDOOR/GROUND Unit No. 1 KVA 18,333 Low Volt. 13,200
KARL FISCHER TESTING MOISTURE CONTENT EXPRESSED IN PPM
AVG. PCT. MOIST./DRY WGT.
DATE TEMP PPM SATURATION PCT. GRADE
10/08/09 20 15 26.3 UN 3.12 F
03/11/10 15 5 11.2 QU 1.37 C
10/19/10 45 16 10.7 QU 0.82 A
10/31/11 27 7 8.8 QU 0.99 B
12/13/11 14 3 7.0 AC 0.86 B
07/17/13 40 13 10.3 QU 0.89 B
RECOMMENDATION SEE KF DATA / RETEST 6 MONTHS
FURAN ANALYSIS EXPRESSED IN PPB
DATE 5H2F 2FOL 2FAL 2ACF 5M2F TOTAL
10/08/09 ND ND 76 ND 3 79
03/11/10 ND ND 56 ND 6 62
10/19/10 ND ND 87 ND 5 92
10/31/11 ND ND 7 ND ND 7
12/13/11 ND ND 3 ND ND 3
07/17/13 ND ND 5 ND ND 5
RECOMMENDATION RETEST 1 YEAR
NO DIAGNOSTIC CHANGES ARE NOTED IN FURAN LEVELS SINCE
THE PREVIOUS ANALYSIS. THE CELLULOSIC INSULATION APPEARS
TO BE IN GOOD CONDITION.
CALCULATED DP <750 EST. LIFE REMAINING <95%
ICP METALS-IN-OIL EXPRESSED IN PPM
DATE ALUMINUM IRON COPPER
07/26/07 ND ND ND
09/17/08 ND ND 0.090
10/08/09 ND ND 0.457
03/11/10 ND ND 0.478
10/19/10 ND ND 0.419
10/31/11 ND ND 0.494
12/13/11 ND ND 0.388
07/17/13 ND ND 0.306
RECOMMENDATION RETEST 1 YEAR
THERE HAS BEEN NO DIAGNOSTIC CHANGE SINCE
THE PREVIOUS ANALYSIS. THESE DATA INDICATE
NORMAL OPERATION.
PCB CONTENT EXPRESSED IN PPM
DATE 1242 1254 1260 OTHER TOTAL
09/21/99 ND
COLOR LABEL: Green CLASS:
Results in mg/kg ND means None Detected (<2 mg/kg per ASTM D4059)
NOTE: * After a test result indicates that this test was performed by an outside lab.
GAS-IN-OIL ANALYSIS GAS CHROMATOGRAPHY EXPRESSED IN PPM
DATE HYDROGEN OXYGEN NITROGEN METHANE
CARBON
MONOXIDE
CARBON
DIOXIDE ETHANE ETHYLENE ACETYLENE
TOTAL
COMBUST.
TOTAL
GAS
07/26/07 9 2,161 84,584 28 23 1,182 12 1 ND 73 88,000
09/17/08 11 17,267 63,117 4 262 1,684 1 6 ND 284 82,352
10/08/09 4 18,227 61,698 4 361 2,189 1 16 ND 386 82,500
03/11/10 2 25,045 68,573 5 264 2,343 1 18 ND 290 96,251
10/19/10 ND 10,398 71,763 1 11 534 ND 4 ND 16 82,711
10/31/11 ND 4,933 73,416 2 5 152 ND ND ND 7 78,508
12/13/11 ND 10,611 79,628 2 2 222 ND ND ND 4 90,465
07/17/13 7 9,202 77,338 2 15 320 1 ND ND 25 86,885
RECOMMENDATION RETEST 1 YEAR
B-THE ANALYSIS OF THIS SAMPLE SHOWS NO SIGNIFICANT INCREASE IN THE COMBUSTIBLE GAS VOLUME.
THIS INDICATES NORMAL OPERATION.
Sub-Name ALBENI FALLS DAM Unit No. 3 Other ACCESS: PRESS RLF DVC
Date Printed 8/5/2013 TC# 9002
Manufacturer PENNSYLVANIA Equipment Type TRANSFORMER Manufacture Date 01/01/1951 Transformer Class OA/FA
Serial No. 23525-3 Impedance % 8.00
KVA Rating 18,333 Phase/Cycle 3/60
High Voltage 138,000 Y Liquid Type OIL
Low Voltage 13,200 D Gallons 6,525
Weight 136,300 Other Access TOP INSPECTION PLATE
Radiators Yes Conservator Tank No
Fans Yes LTC Compartment No
Water Cooled No Bushing Location Top
Oil Pumps No Breather N2 Blanket
Top FPV (inch) 0.00 Hose Length (feet)
Bottom FPV (inch) 0.00 Service Online
InsulationType 55C Power Available
NAMEPLATE DATA ADDITIONAL EQUIPMENT
LIQUID SCREEN TEST DATA
DATE SERVICE ACID IFT DIEL 877 DIEL 1816 GAP COLOR SP. GRAV. VISUAL SEDIMENT
07/27/06 0.020 AC 38.2 AC 49 AC 2.0mm 1.00 AC 0.870 AC CLEAR AC NONE AC
07/26/07 0.030 AC 38.2 AC 48 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
09/17/08 0.030 AC 38.3 AC 47 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
10/08/09 0.020 AC 38.2 AC 47 AC 1.50 AC 0.870 AC CLEAR AC NONE AC
03/11/10 0.030 AC 38.5 AC 45 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
10/19/10 0.020 AC 38.7 AC 45 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
10/31/11 0.020 AC 38.6 AC 49 AC 1.00 AC 0.870 AC CLEAR AC NONE AC
07/17/13 0.030 AC 39.7 AC 37 AC 0.75 AC 0.870 AC CLEAR AC NONE AC
VISUAL INSPECTION
DATE LEVEL
SAMPLE
TEMP
TOP
TEMP P/V PAINT LEAKS
03/11/10 NORMAL 12 28 3.00 GOOD NONE
10/19/10 NORMAL 40 40 1.00 FAIR NONE
10/31/11 NORMAL 22 36 1.50 FAIR NONE
07/17/13 NORMAL 36 50.00 FAIR NONE
FIELD SERVICE
DATE SERVICE
Additional Information
Reason Not Tested
INHIBITOR CONTENT
DATE PCT. BY WEIGHT
10/08/09 0.274% AC
03/11/10 0.309% AC
10/19/10 0.317% AC
10/31/11 0.308% AC
07/17/13 0.300% AC
NOTE - STUDIES SHOW THAT A LEVEL OF 0.3% INHIBITOR IS
OPTIMUM FOR PRESERVATION OF IN-SERVICE TRANSFORMER
OILS. OILS WITH A LEVEL BELOW 0.08% ARE CONSIDERED TO BE
UNINHIBITED.
LIQUID POWER FACTOR
DATE 25 C 100 C
10/08/09 0.020 AC 0.803 AC
03/11/10 0.034 AC 1.397 AC
10/19/10 0.046 AC 1.505 AC
10/31/11 0.056 AC 1.522 AC
07/17/13 0.047 AC 1.284 AC
8/5/2013 TC# 9002Page 2 Date Printed
Customer 0073320 U S ARMY CORP OF ENGINEERS S/N 23525-3
Sub-Name ALBENI FALLS DAM Mfg. PENNSYLVANIA Gallons 6,525 High Volt. 138,000
Location OUTDOOR/GROUND Unit No. 3 KVA 18,333 Low Volt. 13,200
KARL FISCHER TESTING MOISTURE CONTENT EXPRESSED IN PPM
AVG. PCT. MOIST./DRY WGT.
DATE TEMP PPM SATURATION PCT. GRADE
09/17/08 32 15 16.2 UN 1.71 D
10/08/09 20 6 10.9 QU 1.29 B
03/11/10 15 5 11.2 QU 1.37 C
10/19/10 45 7 4.8 AC 0.37 A
10/31/11 26 9 12.7 QU 1.44 C
07/17/13 41 11 8.7 QU 0.75 A
RECOMMENDATION SEE KF DATA / RETEST 6 MONTHS
FURAN ANALYSIS EXPRESSED IN PPB
DATE 5H2F 2FOL 2FAL 2ACF 5M2F TOTAL
09/17/08 ND ND 97 ND 6 103
10/08/09 ND ND 117 ND 5 122
03/11/10 ND ND 91 ND 5 96
10/19/10 ND ND 88 ND 5 93
10/31/11 ND ND 125 ND 8 133
07/17/13 ND ND 155 ND ND 155
RECOMMENDATION RETEST 1 YEAR
NO DIAGNOSTIC CHANGES ARE NOTED IN FURAN LEVELS SINCE
THE PREVIOUS ANALYSIS. THE CELLULOSIC INSULATION APPEARS
TO BE IN GOOD CONDITION.
CALCULATED DP 680 EST. LIFE REMAINING 88%
ICP METALS-IN-OIL EXPRESSED IN PPM
DATE ALUMINUM IRON COPPER
07/27/06 ND ND 0.063
07/26/07 ND ND 0.093
09/17/08 ND ND 0.103
10/08/09 ND ND 0.074
03/11/10 ND ND 0.091
10/19/10 ND ND 0.059
10/31/11 ND ND 0.114
07/17/13 ND ND 0.055
RECOMMENDATION RETEST 1 YEAR
THERE HAS BEEN NO DIAGNOSTIC CHANGE SINCE
THE PREVIOUS ANALYSIS. THESE DATA INDICATE
NORMAL OPERATION.
PCB CONTENT EXPRESSED IN PPM
DATE 1242 1254 1260 OTHER TOTAL
09/21/99 ND
COLOR LABEL: Green CLASS:
Results in mg/kg ND means None Detected (<2 mg/kg per ASTM D4059)
NOTE: * After a test result indicates that this test was performed by an outside lab.
GAS-IN-OIL ANALYSIS GAS CHROMATOGRAPHY EXPRESSED IN PPM
DATE HYDROGEN OXYGEN NITROGEN METHANE
CARBON
MONOXIDE
CARBON
DIOXIDE ETHANE ETHYLENE ACETYLENE
TOTAL
COMBUST.
TOTAL
GAS
07/27/06 13 2,077 78,935 87 15 1,338 33 3 ND 151 82,501
07/26/07 8 2,059 67,979 84 19 1,319 30 1 ND 142 71,499
09/17/08 11 1,282 69,037 80 16 1,043 29 1 ND 137 71,499
10/08/09 10 1,165 77,117 91 16 1,320 31 TRACE ND 148 79,750
03/11/10 8 511 77,849 98 12 1,239 33 ND ND 151 79,750
10/19/10 ND 9,961 74,556 68 4 890 64 5 ND 141 85,548
10/31/11 ND 2,794 62,702 100 13 1,418 52 ND ND 165 67,079
07/17/13 6 7,928 72,215 123 18 1,894 59 3 ND 209 82,246
RECOMMENDATION RETEST 6 MONTHS
YH-ELEVATED LEVELS OF METHANE AND ETHANE INDICATE MILD OVERHEATING OF THE INSULATING LIQUID. THIS OVERHEATING CAN REACH LOCALIZED TEMPERATURES OF UP TO 300 DEGREES C. POSSIBLE CAUSES INCLUDE GENERAL OVERHEATING, DEGRADED
CONNECTIONS, OR ABNORMALITIES IN THE TAP CHANGER.
| site visit list of attendees.pdf |
| AFD MUT |
| Site Visit Photos.pdf |
| Pages from Albeni Falls GSU Transformer Install - Pre Bid Site Visit Photo Locations |
| Pre Bid Site Visit Photo #1 |
| Pre Bid Site Visit Photo #2 |
| Pre Bid Site Visit Photo #3 |
| Pre Bid Site Visit Photo #4 |
| Pre Bid Site Visit Photo #5 |
| Pre Bid Site Visit Photo #6 |
| afd xfmr oil_rainbowreport.pdf |
| 2013-08-05_SDMyers_T1 XFMR OIL_RainbowReport |
| 2013-08-05_SDMyers_T2 XFMR OIL_RainbowReport |
| 2013-08-05_SDMyers_T3 XFMR OIL_RainbowReport |