Site_Visit_Slides_10-17-2019.pdf
PDF 580 KB Posted
- Attached to
- Information Systems Facility, Joint Base Lewis-McChord (JBLM), WA Federal contract opportunity
- Solicitation number
- W912DW19R0025
About this file
This document provides details on a forthcoming federal contract opportunity for the construction of an Information Systems Facility at Joint Base Lewis-McChord in Washington state. The solicitation will request the construction of a new 44,832 square foot facility including administrative offices, open office space, meeting rooms, and technical spaces for equipment testing, telecommunications infrastructure, and secure spaces. Supporting facilities will include site development, utilities, parking, and landscaping. Construction is estimated between $25-100 million. The solicitation will utilize a two-part bifurcated process, initially requesting technical proposals and later price proposals from qualifying offerors. The solicitation number is W912DW19R0025 and will be available on September 26, 2019 on FBO.gov. Proposals will be due no sooner than 30 days after issue. The NAICS code is 236220 and it is unrestricted. The point of contact for questions is John Scola by email.
Site Visit Slides
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Roster_Sheet_10-17-2019.pdf | ||
| Amendment_R0001.pdf | ||
| ISF_Watermarked_Specs.pdf | ||
| RFP_W912DW19R0025.pdf | ||
| ISF_Watermarked_Specs.pdf | ||
| ISF_Drawings_VOL_I.pdf | ||
| Attachment_1.docx | DOCX document | |
| ISF_Drawings_VOL_III.pdf | ||
| ISF_Drawings_VOL_II.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10/16/2019
US Army Corps of Engineers
BUILDING STRONG®
Site Visit
John Scola/John Dudgeon
USACE Seattle District
17 October 2019
BUILDING STRONG®
Request for Proposal (RFP)
W912DW19R0025
Information System Facility at JBLM, WA
BUILDING STRONG®
Introduction
The slides from this site visit will be posted to the FBO.gov.
This site visit is for informational purposes only.
Comments/clarifications made today WILL NOT change the RFP in any way.
Changes to the RFP shall ONLY be made by written Amendments.
3 BUILDING STRONG®
Site Visit Questions Any and all questions from this Site Visit should be submitted to www.ProjNet.org using the Bidder Inquiry Key and instructions provided in the RFP.
No technical-specific questions will be answered today.
Instead, all questions should be asked on www.ProjNet.org.
The deadline for submitting questions in www.ProjNet.org is three (3) business days prior to the proposal due date.
BUILDING STRONG®
Questions During Proposal Stage
Contracting Web Address for RFP Documents:
www.FBO.gov.
Search for RFP Number:
► W912DW19R0025
Technical Questions: www.ProjNet.org For Any Other Administrative Questions, please contact
John Scola (Contract Specialist) at:
► Email: John.P.Scola@usace.army.mil
Federal Acquisition Regulation: https://acquisition.gov
5 BUILDING STRONG®
UNRESTRICTED
Responses to this RFP will be Unrestricted – open to both large and small businesses.
NAICS Code is 236220.
For specific small business related questions, please contact the Deputy for Small Business Programs at:
► Email: John.S.Solomon@usace.army.mil
BUILDING STRONG®
RFP
General Information
RFP NUMBER: W912DW19R0025
This RFP is a Bifurcated, Design Bid Build (DBB), Trade- Off procurement.
Amendments will be issued when changes to RFP is necessary.
Magnitude of Construction is estimated between $25M to $100M.
Bid Guarantee is required in the amount of 20% of the Price or $3M, whichever is less.
► Please see FAR 52.228-1 for more details.
7 BUILDING STRONG®
RFP
General Information, continued Please see 00 21 00, 00 22 00 and Bifurcated Sections for required documents to be included with your proposal submittals for Part One and Part Two.
Your Part One “Technical proposal” is due at the U.S.
Army Corps of Engineers, Seattle District Office, no later than 1:00:00 PM (Seattle Time), on 29 October 2019.
► Please refer to Block 13 on SF 1442.
NO offers will be accepted after the noted time and date.
PLEASE DO NOT BE LATE.
BUILDING STRONG®
RFP
General Information
Read descriptions of all evaluation factors thoroughly.
Ensure your proposal is complete and reflects all elements required by the RFP.
Part One:
► Volume 1 - Factor 1, 2 and 3.
Part Two:
► Volume 2 - Factor 4 and Subcontracting Plan (if applicable)
► Volume 3 – Factor 5
(See Bifurcated Section for Details)
9 BUILDING STRONG®
Conclusion Part One: Continue to check FBO.gov for new
Amendments to the RFP. Check regularly up until the due date and time for receipt of Part One Technical proposals.
Part Two: Continue to check your emails for RFP Amendments.
Ensure you have completed ALL information required by the RFP and submit those items with your Proposals.
Ensure compliance with the RFP requirements.
This RFP shall ONLY be changed by written Amendment.
The Government intends to award on initial offers, to the Proposal which offers the Best Value to the Government.
BUILDING STRONG®
Site Visit Information
USACE POC: John Dudgeon
File details come from the government source that posted it. Updated .