This synopsis announces an anticipated Request for Proposal for the construction of an Information Systems Facility at Joint Base Lewis-McChord in Washington State. The U.S. Army Corps of Engineers, Seattle District intends to issue an unrestricted solicitation seeking a firm-fixed price contract for the construction of a new 44,832 square foot facility housing administrative offices, technical spaces, a network operations center, and secure areas up to the Secret level. Work includes site development, utilities, parking, and self-contained heating and air conditioning. The project value is estimated between $25-100 million. The solicitation will utilize a two-part bifurcated process, initially requesting technical proposals and later issuing an amendment solely to those offerors requesting priced proposals. The RFP is anticipated to be available on September 26, 2019 via FBO.gov. Proposals will be due no sooner than 30 days thereafter. John Scola of the Seattle District is the point of contact for questions.
ISF RFP Contracting Fronts
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Slides_10-17-2019.pdf | ||
| Site_Visit_Roster_Sheet_10-17-2019.pdf | ||
| Amendment_R0001.pdf | ||
| ISF_Watermarked_Specs.pdf | ||
| ISF_Drawings_VOL_I.pdf | ||
| Attachment_1.docx | DOCX document | |
| ISF_Drawings_VOL_III.pdf | ||
| ISF_Drawings_VOL_II.pdf | ||
| ISF_Watermarked_Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. W912DW19R0025
Seattle District
Information System Facility at Joint Base Lewis McChord (JBLM), Washington State
Construction Solicitation and Specifications
Part One - Request for Technical Proposal (Please see Bifurcated Section for details)
UNRESTRICTED
September 2019
W68MD991289813
INFORMATION SYSTEM FACILITY at JBLM, WA
This is an Unrestricted, Bifurcated Request for Proposal (RFP) Acquisition Using the Best Value, Trade-Off Procurement Process. (Please see section explaining the Bifurcated process).
Site Visit information, please see FAR provision 52.236-27 Alt 1, Site Visit (Construction).
For technical questions and the ProjNet Bidder Inquiry process, please see section 00 21 00.
As this is not a sealed bid, offers w ill not be opened publicly.
JOHN P SCOLA 206-762-2122
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
26-Sep-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________29 Oct 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______150 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW
PAGE OF PAGES
1 OF
CODE W912DW
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing offers
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
206-764-6817FAX:TEL: TEL: FAX:
W912DW19R0025 145
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912DW19R0025
Section 00 01 10 - Table of Contents
TABLE OF CONTENTS
SECTION TITLE
Cover Page
SF1442
00 01 10 Table of Contents
00 10 00 Caution to Offeror and Corporate Certificate.
00 21 00 Instructions to Proposers - Provisions
00 22 00 Supplementary Instructions
00 45 00 Representations and Certifications and Pre-Award Information
00 72 00 General Conditions - Contract Clauses
00 73 00 Supplementary Conditions:
Davis-Bacon General Wage Decision No: WA WA20190013 and WA20190001 Subcontracting Plan (sample) DRAFT Price Schedule (Do Not Submit with Technical Proposal) (For Informational
Planning Purposes Only).
Attachment 00 73 00-A – Index of Drawings
01 00 00 Technical Specifications: 01 11 00 thru 33 82 00.00 50
RETURN THE FOLLOWING WITH YOUR PROPOSAL:
Please see Submittal Requirements and Proposal Contents in Section 00 22 00.
Section 00 10 00 - Solicitation
! ! ! C A U T I O N TO O F F E R O R ! ! !
1. TELEPHONES: There are no public telephones at the Seattle District Corps of Engineers.
2. BUSINESS HOURS: For the Seattle District Corps of Engineers are from 7:30 A.M. to 4:00 P.M., Monday through Friday.
3. AVAILABILITY OF FUNDS: Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available from which payment for contract purposes can be made.
BEFORE SIGNING AND MAILING THIS OFFER, PLEASE TAKE NOTE OF THE FOLLOWING, AS
FAILURE TO PERFORM ANY ONE OF THESE ACTIONS MAY CAUSE YOUR OFFER TO BE
REJECTED
4. AMENDMENTS: Have you acknowledged receipt of ALL amendments?
5. AMENDED SECTIONS: If any of the amendments furnished amended sections, the amended sections must be used in submitting your offer.
6. MISTAKE IN OFFER: Have you reviewed your offer price for possible errors in calculation or work left out?
7. OFFER ACCEPTANCE PERIOD: The minimum offer acceptance period is specified in block 13D of SF1442, page 00 11 00 -1, Solicitation, Offer and Award. Please ensure that you allow at least the stated number of calendar days for the Government to accept your offer.
8. SYSTEM FOR AWARD MANAGEMENT: Contractors are required, before receipt of contract award to ensure that their firm is registered in the government web site entitled, System for Award Management (SAM) and that all information required is current and up to date. https://www.sam.gov/portal/public/SAM/
9. FAR 52.204-4 - Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011) (b).
The Contractor is asked to submit paper documents, such as offers, letters, or reports that are printed or copied double-sided on paper containing at least 30 percent postconsumer fiber, whenever practicable, when not using electronic commerce methods to submit information or data to the Government.
10. IMPORTANT NOTE FOR OTHER THAN U.S. SMALL BUSINESSES ONLY:
Small Business Subcontracting Plan is required. Please see Section 00 22 00 for submittal requirements.
Separate from the Small Business Participation Plan discussed in Factor 4 of Section 00 22 00, other than U.S.
Small Business Offerors must also submit a subcontracting plan with its proposal. No award will be made to an Offeror until an approved subcontracting plan is in place. Subcontracting plans shall reflect and be consistent with the commitments offered in the Small Business Participation Plan – see DFARS 215.304(c)(i)(C) – however the subcontracting plan will not be considered in the evaluation of the Small Business Participation factor.
The Government will evaluate the subcontracting plan in accordance with AFARS Appendix DD (http://farsite.hill.af.mil/vmafara.htm) and with the requirements of FAR Clause 52.219-9 and DEVIATION 2018-O0018. The subcontracting plan must contain the mandatory requirements outlined in FAR 19.704 and the dollar amount for each socioeconomic category must match the dollar amount for each socioeconomic category that was proposed in the evaluated Small Business Participation Plan (Factor 4). The final approved subcontracting plan shall become a material part of the contract.
A sample Subcontracting Plan format which can be used as a guide is attached to Section 00 73 00. Use of this format is not mandatory and does not guarantee acceptance. The subcontracting plan must contain the mandatory plan requirements outlined in FAR 19.704 and the dollar amount for each socioeconomic category must match the dollar amount for each socioeconomic category which was proposed in the Small Business Participation Plan.
CORPORATE CERTIFICATE
IF THE CONTRACTOR IS A CORPORATION OR PARTNERSHIP, THE APPLICABLE PORTION OF THE
FORM LISTED BELOW MUST BE COMPLETED. IN THE ALTERNATIVE, OTHER EVIDENCE MUST BE
SUBMITTED TO SUBSTANTIATE THE AUTHORITY OF THE PERSON SIGNING THE CONTRACT. IF A
CORPORATION, THE SAME OFFICER SHALL NOT EXECUTE BOTH THE CONTRACT AND THE
CERTIFICATE.
CORPORATE CERTIFICATE
I, _______________________, certify that I am the _________________________ Secretary of the Corporation named as Contractor herein; that _________________________________, who signed this contract on behalf of the Contractor was then ___________________________of said corporation; that said contract was duly signed for and on behalf of said corporation by authority of its governing body and is within the scope of its corporate powers.
_____________________________ (CORPORATE
(Secretary) SEAL)
AUTHORITY TO BIND PARTNERSHIP/JOINT VENTURES
This is to certify that the names and signatures of all partners are listed below and that the person signing the contract has authority actually to bind the partnership/joint venture pursuant to its partnership/joint venture agreements. Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership/joint venture with the United States of America, except as follows: (state "none" or describe limitations, if any) ____________________________________________
This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to, and acknowledged by, the Contracting Officer.
(Names and Signatures)
NAME SIGNATURE
BIFURCATED SECTION
BIFURCATED, DESIGN BID BUILD (DBB) REQUEST FOR PROPOSAL (RFP) PROCUREMENT
PROCESS FOR THIS ACQUISITION FOLLOWS FAR PART 15
The acquisition of the Information System Facility at JBLM, WA will be a Bifurcated RFP, Best Value Tradeoff procurement process.
The Bifurcated (two part) process will be as follows:
PART ONE:
Solicitation (RFP) is issued on FedBizOpps (fbo.gov) at 75 percent specifications/plans for a minimum of 30 calendar days. RFP is a Request for Technical Proposal ONLY.
Submission of Volume 1 (Technical Proposal).
NOTE that Volume 2 - Factor 4 (Small Business Participation) and (Subcontracting Plan); if applicable, will not be requested at this time.
and Volume 3 - Factor 5 (Pricing) will not be requested at this time.
The Source Selection process commences with the review of Volume 1 submissions.
PART TWO:
RFP Amendment is issued with 100 percent specifications/plans and the Price Schedule for a minimum of
30 calendar days. Amendment is a request for Factor 4 (Small Business Participation Plan) and Subcontracting Plan (if applicable), Price Proposal, and other required documents.
Submission of Volume 2 (Factor 4 and Subcontracting Plan, if applicable) and Volume 3 (Price Proposal and associated items) is due no later than specified date/time.
NOTE 1: the Amendment will be issued SOLELY to Offerors who submitted a Technical Proposal and will not be posted to FedBizOpps.
NOTE 2: this Amendment will be issued on or about February 2020.
Upon receipt of both Volume 2 (Factor 4 and Subcontracting Plan, if applicable) and Volume 3 (Price
Proposal and associated items), Source Selection procedures continue in accordance with Best Value Tradeoff procedures.
Contract award and award announcement posted to FedBizOpps.
NOTE: Please see Table 4 and 5 of Section 00 22 00 for submittal details.
In summary, the bifurcated process will allow the Government to issue the RFP for the technical proposal while design specification is at 75%. At 100% design specifications, an Amendment to request the price proposal (and other submissions discussed above) will be issued directly to only those Offerors which submitted the technical proposal.
In between the submittal of the technical proposal and issuance of the Amendment for the price proposal, the Government will evaluate the technical proposals as per Section 00 22 00. After submittal of the price proposal and other required documents, the Government will complete its evaluation. While it is the intent of the Government to award without discussions, discussions may be conducted if it is in the best interest of the Government.
The purpose of the bifurcated process is allow the Government to concurrently issue the RFP and conduct technical evaluations while completing the design specifications. Award is estimated 3rd Quarter of FY2020.
Please use ProjNet to ask for clarification on this acquisition process. Details how to use this forum for the Vendor/Government interaction can be found in Section 00 21 00.
NOTE: The Government is not seeking Contractor’s input on the design (specifications and/or plans) between 75 and 100 percent. During PART ONE of the RFP, ProjNet Bidder inquiry will be open ONLY for those inquires related to the Technical proposal submission, as well as any administrative matters. Inquiries specific to the design itself will not be accepted at this time (unless they are directly related to an Offeror’s Technical proposal submission (Volume 1). Specific questions related to the design, specifications, plans, price schedule, small business participation plan (Evaluation Factor 4) and/or Subcontracting Plan may be asked to resubmit after the Amendment requesting price proposal (Volume 2 and 3) has been issued (PART TWO).
Section 00 21 00 - Instructions
SECTION 00 21 00
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK
1.2 MAGNITUDE OF CONSTRUCTION
1.3 SUBJECT TO AVAILABILITY OF FUNDS
1.4 GOVERNMENT SECURITY REQUIREMENTS
1.5 COPIES OF REQUEST FOR PROPOSAL (RFP) DOCUMENTS AND AMENDMENTS
1.6 OFFEROR'S QUESTIONS AND COMMENTS
1.7 SMALL BUSINESS SIZE STANDARD/NAICS CODE
1.8 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
1.9 SITE VISIT
1.10 ACCURACY IN PROPOSALS
1.11 PROPOSAL SUBMITTALS
1.12 PROPOSAL FORMAT
1.13 JOINT VENTURE PROPOSAL REQUIREMENTS
1.14 SUBCONTRACTING PLAN/SUBCONTRACTING GOALS REGARDING THE UTILIZATION OF
SMALL BUSINESS CONCERNS
1.15 RFP PROVISIONS
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK:
The scope of project includes all work required for the construction of Information System Facility at Joint Base Lewis McChord, Washington.
The work shall be in accordance with Request for Proposal (RFP) documents.
General description of work:
Construct a new 44,832 square foot Information Systems Facility (ISF) for the Network Enterprise Center (NEC) on JBLM, WA. The ISF Project includes departmental workspaces divided into specified security zones that address special use spaces within the ISF. The ISF will include; administrative offices, open office space, multi-purpose meeting rooms, reception area, customer support center and loading/service areas. Technical spaces amounting to approximately 25% of the net square footage include: equipment test lab, telephone switch rooms, telecommunications cable vault, classified and unclassified communications systems and spaces, Network Operations Center (NOC), Communications Security (COMSEC) vault, Secure Video Teleconferencing Center (VTC), and dedicated Uninterruptable Power Supply (UPS) Room. Highest-level security classification for this building is SECRET. Construction also includes: covered storage shelter; pad-mounted redundant power generation;
secure organizational vehicle parking; fire protection and alarm systems; Intrusion Detection System (IDS) installation; and Energy Monitoring Control Systems (EMCS) connection. Facilities will be designed to a minimum 40-year life, in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02); including energy efficiencies, building envelope and integrated building systems performance. Supporting facilities include site development, utilities and connections, lighting, organizational and personal vehicle parking. General site work includes sidewalks, curbs, storm water management systems, landscaping, and signage. Heating and air conditioning will be by self-contained systems.
1.2 MAGNITUDE OF CONSTRUCTION:
In accordance with DFARS 236.204, Disclosure of Magnitude of Construction Projects, the Magnitude of Construction is estimated between $25,000,000 and $100,000,000.
1.3 SUBJECT TO AVAILABILITY OF FUNDS:
FAR Clause 52.232-18 “Availability of Funds,” (APR 1984) Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
1.4 GOVERNMENT SECURITY REQUIREMENTS:
The Offeror(s) must ensure that ALL mail sent to the Seattle District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to; bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., may be REJECTED by the US Army Corps of Engineers mail room facility located in Building 1202, at 4735 East Marginal Way South, Seattle, WA 98134 if it does not contain a return mailing address.
1.5 COPIES OF RFP DOCUMENTS AND AMENDMENTS:
Copies of the RFP and amendments are available by INTERNET ACCESS ONLY until the response date and time for Part One submissions. All RFP documents (except as indicated in the Bifurcated instructions section) will be posted to the Federal Business Opportunities website at http://www.fbo.gov under RFP number W912DW19R0025.
It shall be the contractor’s responsibility to check the websites for any RFP Part One amendments. There will be no public opening of the proposals received as a result of this RFP.
A list of interested vendors (potential Offerors and subcontractors) is available on the federal business opportunities web site (registration required) is available at: http://www.fbo.gov via Quick Search (RFP No. W912DW19R0025).
Additional information regarding this RFP and potential Offerors and/or subcontractors is available at http://www.nws.usace.army.mil/BusinessWithUs/Contracting.aspx.
1.6 OFFEROR'S QUESTIONS AND COMMENTS:
Questions and/or comments relative to these documents only, should be submitted via e-mail or mailed to:
Contract Specialist:
U.S. Army Corps of Engineers, Seattle District ATTN: John Scola Mailing Address:
P.O. Box 3755 Seattle, WA 98124-3755 Email: John.P.Scola@usace.army.mil
[ATTENTION: I prefer to be contacted by email because I’m hearing impaired]
Contracting Officer:
U.S. Army Corps of Engineers, Seattle District ATTN: Caroline B. Mueller Phone: (206) 764-6741 Email: Caroline.B.Mueller@usace.army.mil
1.6.1. BIDDER INQUIRY (ProjNet):
1.6.1.1. Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.
1.6.1.1.1. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this RFP listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and then click continue.
1.6.1.1.2. From this page you may view all bidder inquiries or add inquiry.
1.6.1.1.3. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
1.6.1.1.4. The RFP Number is: W912DW19R0025
1.6.1.1.5. The Bidder Inquiry Key is: 4XE7H2-3HGRAC
1.6.1.2. The Bidder Inquiry System will be unavailable for new inquires 3 business days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the RFP, if necessary.
1.6.1.3. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
1.6.1.4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
1.6.1.5. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
1.7. SMALL BUSINESS SIZE STANDARD/NAICS CODE:
See Section 00 45 00, FAR Provision, 52.204-8 for the small business size standard/NAICS Code.
1.8. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS:
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.9 Site Visit:
An organized site visit has been scheduled. See FAR provision 52.236-27 Alt 1, Site Visit (Construction).
1.10 ACCURACY IN PROPOSALS:
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments).
The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.11 PROPOSAL SUBMITTALS:
Due to heightened security at Government installations, those Offerors who have their proposals hand-delivered shall contact the Procurement Technician, Sonia Frees at 206-764-3516 prior to delivering to the address shown below.
Proposals delivered after the time specified in Block 13 of the SF 1442 will not be accepted. See FAR 52.215-1 for rules concerning late proposals.
See Box 13 of the Standard Form 1442 for the time and date your proposal is due.
NOTE: Box 8 of the Standard Form 1442 “Address Offer To” is revised as indicated below:
EMAIL: Emailed Proposal will NOT be accepted.
FAX: Faxed Proposal will NOT be accepted.
FED-EX/UPS: John Scola, Contract Specialist, Building 1202
CECT-NWS
4735 East Marginal Way S., Bldg. #1202 Seattle, WA 98134-2385 Note: Commercial Carriers will not deliver to PO Boxes
MAIL: John Scola, Contract Specialist, Building 1202
CECT-NWS
PO Box 3755 Seattle, WA 98124-3755
HAND
DELIVERY: John Scola, Contract Specialist, Building 1202
CECT-NWS
4735 East Marginal Way S., Bldg. #1202 Seattle, WA 98134-2385
Please allow sufficient time to allow for heightened security at Government installations and to get to our new location in Oxbow Building #1202. Allow time to park, pass through a metal detector, sign in, and receive a building pass at the Federal Center South Building (#1201). From there, you will be directed to the new USACE Oxbow Building (#1202) which sits behind the Federal Center South Building (#1201). Allow additional time to submit your proposal timely.
Report to the Security Desk in the lobby of the USACE Oxbow Building and call Sonia Frees, Procurement Technician, at 206-674-3516. A Contracting representative will come down and accept your Offer, Bid or Proposal.
A proposal is not received by the Government until it is in the physical possession of a representative of the Contracting office. Security guards and other non-contracting personnel are NOT authorized to accept proposals on behalf of the Government. Note that official receipt of a proposal shall be in accordance with FAR 52.215-1.
Note: If delivery is by any means other than Hand Delivery, please check prior to the due date and time to ensure that your Offer, Bid, or Proposal has arrived on time.
The Packaging that contains the Proposals shall be marked:
“Proposal for RFP Number: W912DW19R0025, DO NOT OPEN”
1.12 PROPOSAL FORMAT:
a) Please refer to Table 4 and Table 5 of Section 00 22 00 for Submission requirements.
b) PART ONE: Technical Proposal (Volume 1): Submit one (1) “Original” printed volume, one (1)
“Copy” of printed volume and one (1) “Electronic Copy” in PDF on a CD (assembled as one (1) document). Electronic Copy must be identical to Original printed volume. Ensure CD is labeled.
c) PART TWO: Small Business Participation Factor/Subcontracting Plan (if applicable) (Volume
2) and Price Proposal (Volume 3): Same instructions as above, but separate volumes.
DO NOT SUBMIT PRICE PROPOSAL YET. AN AMENDMENT WILL BE ISSUED AT
LATER DATE TO ASK FOR THE PRICE PROPOSAL AND OTHER DOCUMENTS.
PLEASE SEE BIFURCATED SECTION FOR DETAILS.
1.13 JOINT VENTURE PROPOSAL REQUIREMENTS:
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond, unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a), SDVOSB or HubZone joint venture, the Offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124, 13 CFR Part 125 and 13 CFR Part 126, respectively.
Any of the Joint Venture partners identified in the JV agreement can submit project(s) to meet the requirement in Section 00 22 00 for evaluation.
1.14 SUBCONTRACTING PLAN/SUBCONTRACTING GOALS REGARDING THE
UTILIZATION OF SMALL BUSINESS CONCERNS:
a) Application. The below clauses applies to all Offerors submitting a proposal for this requirement.
b) Federal Acquisition Regulations (FAR). Attention is directed to the following FAR and DFARS provisions contained in this solicitation: 52.219-8, Utilization of Small Business Concerns, 52.219-9 Alt II (Dev), Small Business Subcontracting Plan (applies only to other than small business) and 52.219-16, Liquidated Damages – Small Business Subcontracting Plan (applies only to other than small business).
c) Goals. The U.S. Army Corps of Engineers considers the following goals reasonable and achievable for the performance of the resultant contract:
1. 5% of total dollar amount of award is placed with Small Disadvantage Business concerns.
2. 5% of total dollar amount of award is placed with Woman Owned Small Business concerns.
3. 3% of total dollar amount of award is placed with Service Disabled Veteran Owned Small
Business concerns.
4. 3% of total dollar amount of award is placed with HubZone Small Business concerns.
5. 25% of total dollar amount of award is placed with “all small business concerns.”
NOTE: PLEASE SEE SECTION 00 22 00 FOR SUBMISSION OF SMALL BUSINESS PARTICIPATION
PLANAND SUBCONTRACTING PLAN (IF APPLICABLE).
1.15 RFP PROVISIONS:
Please see next page.
END OF SECTION 00 21 00
CLAUSES INCORPORATED BY REFERENCE
52.204-6 Unique Entity Identifier OCT 2016 52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.211-6 Brand Name or Equal AUG 1999 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.217-5 Evaluation Of Options JUL 1990 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.215-7008 Only One Offer JUL 2019 252.232-7010 Levies on Contract Payments DEC 2006
CLAUSES INCORPORATED BY FULL TEXT
52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN
FEDERAL TRANSACTIONS (SEP 2007)
(a) Definitions. As used in this provision--``Lobbying contact'' has the meaning provided at 2 U.S.C. 1602(8). The terms ``agency,'' ``influencing or attempting to influence,'' ``officer or employee of an agency,'' ``person,'' ``reasonable compensation,'' and ``regularly employed'' are defined in the FAR clause of this solicitation entitled ``Limitation on Payments to Influence Certain Federal Transactions'' (52.203-12).
(b) Prohibition. The prohibition and exceptions contained in the FAR clause of this solicitation entitled ``Limitation on Payments to Influence Certain Federal Transactions'' (52.203-12) are hereby incorporated by reference in this provision.
(c) Certification. The offeror, by signing its offer, hereby certifies to the best of its knowledge and belief that no Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress on its behalf in connection with the awarding of this contract.
(d) Disclosure. If any registrants under the Lobbying Disclosure Act of 1995 have made a lobbying contact on behalf of the offeror with respect to this contract, the offeror shall complete and submit, with its offer, OMB Standard Form LLL, Disclosure of Lobbying Activities, to provide the name of the registrants. The offeror need not report regularly employed officers or employees of the offeror to whom payments of reasonable compensation were made.
(e) Penalty. Submission of this certification and disclosure is a prerequisite for making or entering into this contract imposed by 31 U.S.C. 1352. Any person who makes an expenditure prohibited under this provision or who fails to file or amend the disclosure required to be filed or amended by this provision, shall be subject to a civil penalty of not less than $10,000, and not more than $100,000, for each such failure.
(End of provision)
52.204-20 Predecessor of Offeror (JUL 2016)
(a) Definitions. As used in this provision--
Commercial and Government Entity (CAGE) code means--
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;
or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
Predecessor means an entity that is replaced by a successor and includes any predecessors of the predecessor.
Successor means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name. The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.
(b) The Offeror represents that it [____] is or [____] is not a successor to a predecessor that held a Federal contract or grant within the last three years.
(c) If the Offeror has indicated “is” in paragraph (b) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order):
Predecessor CAGE code: ____ (or mark “Unknown”).
Predecessor legal name: ____.
(Do not use a “doing business as” name).
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm fixed price contract resulting from this solicitation.
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
6.2% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is:
Joint Base Lewis McChord, WA located within Pierce County.
52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3,000,000.00, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
Roger D. Williams Jr.
Chief, Contracting Division US Army Corps of Engineers – Seattle District P.O. Box 3755 Seattle, WA 98124-3755
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
Date: 17 OCT 2019 (Thursday) Time: 1230-1400 (Local Time) NOTE: Site Visit will start promptly at 1230 (Local Time)
(c) Participants will meet at:
JBLM ACCESS
Participants must provide their own transportation and gain JBLM Base Access per:
https://www.lewis-mcchord.army.mil/des/le_visitor.htm
Site Location:
Miller Hill Area. East of Garcia Boulevard, North of Colorado Avenue.
DIRECTIONS
Direction Summary from JBLM Main Gate (41St Division Dr.):
- After coming through the JBLM Main Gate take a Left on Colorado Ave.
- You will come to a Round About, take the 2 Right (Staying on Colorado Ave).
- The Site is on the Left (North Side) right after the Round About on Colorado Ave
Alternate Direction Summary from JBLM Main Gate (41St Division Dr.):
- Take 41st Division Dr for .8 miles to Pendleton Ave
- Take a Left onto Pendleton and go .7 miles
- Take a Left onto 2nd Division Dr. and go .2 miles
- Take a Left onto Colorado and go .5 miles.
- Site is on the Right (North Side) of Colorado Ave
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://acquisition.gov/
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Alterations, if necessary, will be via amendment.
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
Section 00 22 00 - Supplementary Instructions
SECTION 00 22 00
PROPOSAL SUBMISSION REQUIREMENTS EVALUATION CRITERIA AND BASIS OF AWARD
1. Evaluation Procedures:
The objective of this evaluation is to evaluate the proposals in accordance with the criteria described herein and award a firm fixed price, construction contract to the responsible Offeror whose proposal conforms to the terms and conditions of the RFP and whose proposal is determined to represent the overall “Best Value Tradeoff” to the Government in accordance with Federal Acquisition Regulation (FAR) 15.101-1.
All evaluation factors, other than price, when combined, are considered significantly more important than price. Award will be made to the Offeror whose proposal is most advantageous to the Government based upon an integrated assessment of the Evaluation Factors. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.
The Offeror’s technical proposal shall contain a response to the following non-price Factors (Company Experience, Past Performance and Management). Please see below for submission requirements and evaluation method. Your technical proposal (Volume 1) will be due at the specified date indicated in Standard Form 1442.
To clarify, this is a Bifurcated RFP Procurement Process. (Please see the Bifurcated Section within this RFP for more details). At a later date, an Amendment will be issued directly to only those Offerors which submitted the technical proposal. This Amendment (and all later Amendments) will NOT be posted to FBO.gov. This Amendment will provide the price schedule and submittal instructions for Factor 4 and Subcontracting Plan (if applicable) and the price proposal. (Volumes 2 and 3)
In accordance with FAR 15.306(a)(3) the Government intends to evaluate the proposals and make award without discussions. An Offeror’s initial proposal should contain the Offeror’s best terms from a technical (Volume 1) and factor 4/price (Volumes 2 and 3 at a later date). The Government reserves the right to accept other than the lowest priced offer, or to reject all offers. The Government will not award a contract to an Offeror whose proposal contains a deficiency, as defined in FAR 15.001. Penalty for making false statements in proposals is prescribed in 18 U.S.
Code § 1001.
Submit proposals in tabbed, three-ring binders. Note that the Government will not evaluate any material that exceeds the page limits, where indicated below.
2. Definitions:
Complexity: Complexity: Construction of a facility with sequencing of multiple work features. Examples of multiple work features include civil, mechanical, and electrical.
Deficiency: A material failure of a proposal to meet a Government’s requirement or a combination of significant weaknesses in a proposal which raises the risk of unsuccessful contract performance to an unacceptable level.
Recency: As it pertains to past performance information, is a measure of the time that has elapsed since the past performance reference occurred. Recency is generally expressed as a time period during which past performance references are considered relevant.
Relevancy: As it pertains to past performance information, is a measure of the extent of similarity between the service/support effort, complexity, dollar value, contract type, and subcontract/teaming or other comparable attributes of past performance examples and the source RFP requirements; and a measure of the likelihood that the past performance is an indicator of future performance.
Relevant: “Relevant” means having a logical connection with the requirements in this RFP; that is, featuring work that involved similar scope, magnitude, and complexity to the current requirement. Please also note any definitions for relevant within the evaluation criteria.
Risk: As it pertains to source selection, it is the potential for unsuccessful contract performance. The consideration of risk assesses the degree to which an Offeror’s proposed approach to achieving the technical factor or criterion may involve risk of disruption of schedule, degradation of performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance.
Shall: Indicates a mandatory requirement(s). If this requirement is not met in the Offeror’s proposal, it will be considered a deficiency.
Should: Indicates a RFP requirement(s) that are highly recommended to be included in the…