ISF_Drawings_VOL_III.pdf

PDF 12 MB Posted

Attached to
Information Systems Facility, Joint Base Lewis-McChord (JBLM), WA Federal contract opportunity
Solicitation number
W912DW19R0025
Issued by
Department of the Army Corps of Engineers Engineering District Seattle

About this file

This document includes a federal contract opportunity solicitation and related engineering drawings and schedules. The solicitation is for the construction of a new 44,832 square foot Information Systems Facility at Joint Base Lewis-McChord in Washington. The facility will include administrative offices, meeting rooms, technical spaces for equipment testing and secure communications systems. Highest classification level will be Secret. Supporting site work includes utilities, parking, landscaping and signage. Heating and air conditioning will use self-contained systems. The estimated value is between $25-100 million. Responses are requested through a two-part solicitation on the FBO website, with technical proposals due initially and price proposals later. The point of contact is provided for questions. The engineering drawings and schedules provide layouts and details for the plumbing systems in the proposed facility.

ISF Drawings VOL III

View the file

Other files for this federal contract opportunity

Other files attached to Information Systems Facility, Joint Base Lewis-McChord (JBLM), WA, newest first.
File Type Posted
Site_Visit_Slides_10-17-2019.pdf PDF
Site_Visit_Roster_Sheet_10-17-2019.pdf PDF
Amendment_R0001.pdf PDF
ISF_Watermarked_Specs.pdf PDF
ISF_Drawings_VOL_I.pdf PDF
Attachment_1.docx DOCX document
ISF_Drawings_VOL_II.pdf PDF
RFP_W912DW19R0025.pdf PDF
ISF_Watermarked_Specs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELECTRICAL

ROOM

DIRECTOR

FILE STORAGE

205BREAK AREA

WOMEN

NETWORK

OPERATIONS

CENTER (NOC) /

NOC STORAGE

STAIR 1

S1.2

ELEVATOR

E1.2

SIPR / TR

KS-1

WC-2LAV-1

FD-1/TP-1

4" VENT UP TO 4" VTR

4" SEWER DOWN TO

FLOOR BELOW

2-1/2" CW UP FROM FLOOR

BELOW TO FIXTURES

LAV-1

LAV-1

LAV-1

LAV-1

LAV-1

LAV-1

LAV-1

LAV-1

LAV-1

UR-1

WC-1

WC-1

UR-1

WC-2

WC-1

WC-1

WC-1

WC-1

FD-1/TP-1

EWC-1

STAIR 2

S2.2

EXECUTIVE

CONFERENCE

OFFICE SUITE

MEN

SS-1

2" HW DOWN TO

FLOOR BELOW

2" HW TO FIXTURES

CORRIDOR

3/4" CW

ABOVE

CEILING

OUTLINE OF

MECH EQUIPT IN

THE CATWALK

SK-1

1-1/2"CD

(PUMPED)

1-1/2"CD

(PUMPED)

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

1-1/2"CD

(PUMPED)

3/4"CD

(PUMPED)

1-1/2"CD

(PUMPED)

3/4"CD

(PUMPED)

1-1/2

"CD

(PUMPED)

1-1/4"CD

(PUMPED)

CO, TYP

CO, TYP

1-1/2"CD

(PUMPED)

1-1/4"CD

(PUMPED)

1-1/4"CD

(PUMPED)

3/4"HW

ABOVE

CEILING

1/2" CW FROM TOILETS

3/4" CW

TO EWC-1

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)3/4"CD

(PUMPED)

3/4"CW

ABOVE CEILING

3/4"CW

ABOVE CEILING

7 6 5 4 3 1

A

B

C

D

DEPUTY

DIRECTOR

NETWORK AND

SWITCH

TECHNICIANS

WORKSPACE

DIVISION CHIEF

OFFICE

BRANCH CHIEF

OFFICE

BRANCH CHIEF

OFFICE

STORAGE

FILES

NETWORK AND

SWITCH

TECHNICIANS

WORKSPACE

OTHER ADMIN /

CONTRACTORS

TRAINING AND

TESTING CENTER

LAB

DIVISION

COMPUTER AND

EQUIPMENT

STORAGE

NURSING

MOTHERS ROOM

CUSTODIAL

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

2"CD DOWN &

DISCHARGE ON SS-1

WITH AIRGAP

29 8

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:58:27 AM

P-102

ISF

SE

CO

ND

F

LO

O

R

PL

AN

BA

SE

B

ID

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

J.

D

ES

IG

N

ER

J.

D

R

AW

ER

J.

C

H

EC

KE

R

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

1/8" = 1'-0"A1 SECOND FLOOR PLUMBING PLAN - BASE BID OPTION BASE BID

KEY PLAN:

0 8' 16'8' 16'

SHEET NOTES

1. REFERENCE SHEET P-001 FOR PLUMBING SYMBOLS AND ABBREVIATIONS.

2. REFERENCE SHEET P-901 AND P-902 FOR SHUT OFF VALVES.

3. LOCATE COMMERCIAL WATER HAMMER ARRESTERS IN ACCORDANCE WITH

PDI RECOMMENDATIONS. WATER HAMMER ARRESTERS SHALL BE PISTON

TYPE, FACTORY AIR CHARGED, PERMANENTLY SEALED, AND APPROVED

FOR INSTALLATION WITH NO ACCESS PANEL REQUIRED.

4. COLD WATER, HOT WATER, HOT WATER RECIRC, AND CONDENSATE DRAIN

PIPING SHALL BE INSULATED.

5. COLD WATER, HOT WATER, HOT WATER RECIRC, AND CONDENSATE DRAIN

PIPING ARE ABOVE CEILING, UNLESS NOTED OTHERWISE.

6. SANITARY SEWER AND WASTE PIPING ARE UNDERGROUND, UNLESS NOTED

OTHERWISE.

N

KEYED NOTES

1 CONNECT CONDENSATE DRAIN ON DISCHARGE SIDE OF FAN COIL

UNIT CONDENSATE DRAIN PUMP.

CONNECT CONDENSATE DRAIN ON DISCHARGE SIDE OF CRAC UNIT

CONDENSATE DRAIN PUMP.

CONNECT CONDENSATE DRAIN ON DISCHARGE SIDE OF MAKE-UP

AIR UNIT CONDENSATE DRAIN PUMP.

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

ESIG

N

OUTLINE OF

MECH EQUIPT

ABOVE ON THE

CATWALK

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

1-1/4"CD

(PUMPED)

1-1/2"CD

(PUMPED)

1-1/4"CD

(PUMPED)

CO, TYP

CO, TYP

1-1/2"CD

(PUMPED)

1-1/4"CD

(PUMPED)

1-1/4"CD

(PUMPED)

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

3/4"CD

(PUMPED)

1-1/2"CD

(PUMPED)

14 12 11 10 7

A

B

C

D

CONTRACTOR

AREA

A238

IA TECHNICIAN

WORKSPACE

A231

DIVISION CHIEF

OFFICE

A237

BRANCH CHIEF

OFFICE

A236

BRANCH CHIEF

OFFICE

A235

IA SECURITY PKI

ROOM

A234

STAIR 3

AS3.2

GENERAL

PURPOSE TEAM

ROOM

A239

GENERAL

PURPOSE TEAM

ROOM

A240

ACAS SCANNERS

A232

COMSEC VAULT

A233

CORRIDOR

A226

CONFERENCE /

CLASSROOM B

A229

CONFERENCE /

CLASSROOM A

A228

REPRO / MEDIA

WORK ROOM

A227

CONFERENCE/

CLASSROOM C

A230

3/4"CD

(PUMPED)

13 9 8

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:58:32 AM

P-102A

ISF

SE

CO

ND

F

LO

O

R

PL

AN

O

PT

IO

N

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

J.

D

ES

IG

N

ER

J.

D

R

AW

ER

J.

C

H

EC

KE

R

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

1/8" = 1'-0"A1 SECOND FLOOR PLUMBING PLAN - OPTION

OPTION BASE BID

KEY PLAN:

0 8' 16'8' 16'

SHEET NOTES

1. REFERENCE SHEET P-001 FOR PLUMBING SYMBOLS AND ABBREVIATIONS.

2. REFERENCE SHEET P-901 AND P-902 FOR SHUT OFF VALVES.

3. LOCATE COMMERCIAL WATER HAMMER ARRESTERS IN ACCORDANCE WITH

PDI RECOMMENDATIONS. WATER HAMMER ARRESTERS SHALL BE PISTON

TYPE, FACTORY AIR CHARGED, PERMANENTLY SEALED, AND APPROVED

FOR INSTALLATION WITH NO ACCESS PANEL REQUIRED.

4. COLD WATER, HOT WATER, HOT WATER RECIRC, AND CONDENSATE DRAIN

PIPING SHALL BE INSULATED.

5. COLD WATER, HOT WATER, HOT WATER RECIRC, AND CONDENSATE DRAIN

PIPING ARE ABOVE CEILING, UNLESS NOTED OTHERWISE.

6. SANITARY SEWER AND WASTE PIPING ARE UNDERGROUND, UNLESS NOTED

OTHERWISE.N

KEYED NOTES

1 CONNECT CONDENSATE DRAIN ON DISCHARGE SIDE OF FAN COIL

UNIT CONDENSATE DRAIN PUMP.

CONNECT CONDENSATE DRAIN ON DISCHARGE SIDE OF CRAC UNIT

CONDENSATE DRAIN PUMP.

CONNECT CONDENSATE DRAIN ON DISCHARGE SIDE OF MAKE-UP

AIR UNIT CONDENSATE DRAIN PUMP.

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

B

C

9 8

MEN

WOMEN

UNISEX

LAV-2

SS-1

FD-1/TP-1

3" VENT UP

AND DOWN

4" SEWER UP LAV-1

LAV-1

LAV-1

UNISEX

WC-2

WC-2

WC-1 WC-1

WC-1

UR-2

WC-2

FD-1/TP-1

1 1/2" HW UP TO

FLOOR ABOVE

TO FIXTURES

1 1/2" HW

2" HW

ABOVE

CEILING

1-1/2"CD

(PUMPED)

1-1/4"CD

(PUMPED)

LAV-2WC-2

LAV-1

LAV-1

LAV-1

2"CD DOWN &

DISCHARGE

ON SS-1 WITH

AIRGAP

2-1/2" CW UP

3/4" HWC ABOVE

CEILING

4" SEWER,

UNDERGROUND

@ 2% SLOPE

EWC-1

CORRIDOR

CORRIDOR

VESTIBULE

HB-2

FCO,

I.E.-2'-0"

B

C

9 8

WOMEN

WC-2

LAV-1

FD-1/TP-1

4" VENT UP TO 4" VTR

4" SEWER DOWN TO

FLOOR BELOW

2-1/2" CW DOWN TO

FLOOR BELOW

LAV-1

LAV-1

LAV-1

LAV-1

LAV-1

LAV-1

LAV-1

LAV-1

LAV-1

UR-2

WC-1

WC-1

UR-1

WC-2

WC-1

WC-1

WC-1

WC-1

FD-1/TP-1

EWC-1

MEN

SS-1

1 1/2" HW DOWN TO

FLOOR BELOW

CORRIDOR

3/4" CW

ABOVE

CEILING

1-1/2"CD

(PUMPED)

1-1/4"CD

(PUMPED)

1/2" CW

TO EWC-1

3/4"CW

ABOVE CEILING

CUSTODIAL

2"CD DOWN &

DISCHARGE ON SS-1

WITH AIRGAP

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:58:38 AM

P-401

ISF

EN

LA

RG

ED

P

LA

NS

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

D es ig ne r

Au th or

C he ck er

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

1/4" = 1'-0"C1 FIRST FLOOR ENLARGED PLUMBING PLAN - BASE BID

1/4" = 1'-0"C6 SECOND FLOOR PLUMBING PLAN - BASE BID

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

B

C

KS-1

3/4" CW

ABOVE

CEILING

FCO

I.E.-1'-6"

FCO,

I.E.-2'-0"

1-1/4"CD

(PUMPED)

2" WASTE,

UNDERGROUND

@ 2% SLOPE

3/4" HWC

ABOVE

CEILING

2" WASTE,

UNDERGROUND

@ 2% SLOPE

CORRIDOR

A137

BREAK AREA

A134

LOCKER /

SHOWER ROOM

A136

SH-1

SHD-1

TP-2

SH-1

SHD-1

TP-2FD-1

TP-2

LOCKER /

SHOWER ROOM

A135

SH-1

SHD-1

TP-2

SH-1

SHD-1

TP-2

FD-1

TP-2

FD-1

TP-2

FD-1

TP-2

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:58:41 AM

P-401A

ISF

EN

LA

RG

ED

P

LA

NS

O

PT

IO

N

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

D es ig ne r

Au th or

C he ck er

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

1/4" = 1'-0"B1 FIRST FLOOR PLUMBING PLAN - OPTION

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

STACK SUPPORT.

COMBINATION TEMPERATURE/

PRESSURE RELIEF VALVE.

FINISHED FLOOR

T

CP

CIRCUIT

SETTER

HEAT TRAP

28" DROP

RUN RELIEF PIPING FULL

SIZE AND TERMINATE DIRECTLY

SURFACE MOUNT ADJACENT

TO GWH.

T

CIRCUIT

SETTER

GWH

G

CONTROL

PANEL

G PVC

PVC

DIRT LEG

6" MINIMUM

CONCRETE BASE (TYP.)

SEISMIC

STRAP

2 1/2" CW

ABOVE FD-2. (TYPICAL)RESET SET POINT TO 120^F.

2 1/2" TEMPERED HW (120°F)

T

CONDENSATE PIPE; PROVIDE

CONDENSATE NEUTRALIZER KIT

PRIOR TO DISCHARGE TO FD (TYPICAL)

P PHIGH-LOW FLOW

THERMOSTATIC MIXING VALVES.

PLUMBING

EXPANSION

TANK

(PET)

EXHAUST AIR

3/4" HWC

2"

3/4" 2 1/2"

T

NOTE:

1. USING CONTROLLER INTERFACE CARD, MONITOR GWH'S THRU DDC.

IN ADDITION, MONITOR HOT WATER TEMPERATURE THRU TEMPERATURE SENSORS

CONNECTED TO DDC AT LOCATIONS OF ALL TEMPERATURE GAUGES SHOWN

ABOVE.

M M

2"

2 1/2" 2"

2"

WALL

CONCENTRIC VENT KIT

FOR WALL, INSTALL

PER MANUFACTURER'S

RECOMMENDATIONS. US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:58:43 AM

P-501

ISF

PL

UM

BI

NG

D

ET

AI

LS

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

D es ig ne r

Au th or

C he ck er

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

NOT TO SCALED1 NATURAL GAS DOMESTIC WATER HEATER

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:58:50 AM

P-601

ISF

PL

UM

BI

NG

S

CH

ED

UL

ES

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

D es ig ne r

Au th or

C he ck er

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

PLUMBING FIXTURE SCHEDULE - BASE BID

MARK DESCRIPTION MOUNTING C.W. (IN) H.W. (IN) WASTE (IN) VENT (IN) NOTES

EW-1 EMERGENCY EYEWASH FLOOR 1/2" 1/2" 1 1/2" 1 1/2" PEDESTAL MOUNTED; INCLUDES THERMOSTATIC MIXING VALVE

EWC-1 ELECTRIC WATER COOLER WALL 1/2" 1 1/2" 1 1/2" SPLIT-LEVEL ACCESSIBLE TYPE INCLUDES BOTTLE FILLER; 115V

FD-1 FLOOR DRAIN FLOOR 2" 2" INCLUDES TRAP PRIMER

FD-2 FLOOR DRAIN FLOOR 3" 2" INCLUDES TRAP PRIMER

FS-1 FLOOR SINK FLOOR 3" 2" INCLUDES TRAP PRIMER

HB-2 HOSE BIBB / WALL HYDRANT WALL 3/4" FREEZE-PROOF;

KS-1 KITCHEN SINK UNDERMOUNT COUNTER 1/2" 1/2" 1 1/2" 1 1/2" 1.5 GPM

LAV-1 LAVATORY (ABA) PREFABRICATED DECK 1/2" 1/2" 1 1/2" 1 1/2" 0.35 GPM; ELECTRONIC SENSOR; PROVIDE MFR'S TRANSFORMER LAV-2 LAVATORY (ABA) WALL 1/2" 1/2" 1 1/2" 1 1/2" 0.35 GPM; ELECTRONIC SENSOR; PROVIDE MFR'S TRANSFORMER

OB-1 ICE MAKER OUTLET BOX WALL 1/2"

P-15 MOP WORK SINK FLOOR 1/2" 1/2" 3" 2"

SK-1 SINGLE COMPARTMENT SINK UNDERMOUNT COUNTER 1/2" 1/2" 1 1/2" 1 1/2" 1.5 GPM

SS-1 MOP SERVICE SINK FLOOR 1/2" 1/2" 3" 2"

UR-1 URINAL WALL 3/4" 2" 2" 0.125 GPF; ELECTRONIC SENSOR; PROVIDE MFR'S TRANSFORMER UR-2 URINAL (ABA) WALL 3/4" 2" 2" 0.125 GPF; ELECTRONIC SENSOR; PROVIDE MFR'S TRANSFORMER WC-1 WATER CLOSET WALL 1" 4" 2" 1.28 GPF; ELECTRONIC SENSOR; PROVIDE MFR'S TRANSFORMER WC-2 WATER CLOSET (ABA) WALL 1" 4" 2" 1.28 GPF; ELECTRONIC SENSOR; PROVIDE MFR'S TRANSFORMER

PLUMBING EXPANSION TANK SCHEDULE

MARK NO. LOCATION SERVICE CONFIGURATION TYPE

VOLUME

(GAL)

ACCEPTANCE

VOLUME (GAL) NOTES

PET-1 MECH

ROOM

DOM HOT

WATER

VERTICAL DIAPHRAGM 6.4 3.2

WATER HAMMER ARRESTER SCHEDULE

MARK

FIXTURE UNIT

RATING SIZE NOTES

WHA-B

TRAP PRIMER SCHEDULE

MARK NO. SIZE

NUMBER OF FLOOR

DRAINS CONNECTED TYPE REMARKS

TP-1

TP-2

THERMOSTATIC MIXING VALVE SCHEDULE

MARK SERVICE

MIN

FLOW

(GPM)

MAX

FLOW

(GPM)

PRESSURE

DROP (PSI) @

MAX FLOW SETPOINT ACCURACY NOTES

TMV-1A DOM HOT

WATER

1 <5 120 °F +/- 5 °F HIGH-LOW FLOW TYPE

TMV-1B DOM HOT

WATER

47 10 120 °F +/- 5 °F HIGH-LOW FLOW TYPE

DOMESTIC HOT WATER HEATER SCHEDULE

MARK LOCATION

STORAGE

TANK

CAPACITY

(MINIMUM)

RECOVERY

RATE (GPH)

FUEL

SOURCE INLET

WATER

TEMP

OUTLET

WATER

TEMP

INPUT

(MBH)

NET

OUTPUT

(MBH)

MINIMUM

EFFICIENCY

PLUMBING DIRECT VENT (IN)

V/HZ/PH NOTESTYPE CW (IN) HW (IN) GAS (IN) FLUE

OUTDOOR

AIR

GWH-1 MECH

ROOM

119 349 NATURAL

GAS

40 140 300 288 96% 1 1/2" 1 1/2" 1 1/2" 4" 4" 115/60/1

DOMESTIC HOT WATER CIRCULATING PUMP SCHEDULE

MARK LOCATION TYPE

CAPACITY

(GPM)

TOTAL

HEAD (FT) HP V/HZ/PH RPM NOTES

CP-1 MECHANICAL

ROOM

INLINE 5 20 1/6 115/60/1 3400

CP-1d

BACKFLOW PREVENTER SCHEDULE

MARK NO. SERVICE LOCATION TYPE SIZE

PRESSURE

DROP (PSI)

MAX

FLOW

(GPM) NOTES

BFP-1 DOMESTIC SERVICE MECH ROOM DOUBLE CHECK 3"

BFP-2 HYDRONIC WATER

MAKEUP

MECH ROOM REDUCED

PRESSURE

1"

SUMP PUMP SCHEDULE

MARK SERVICE TYPE

CAPACITY

(GPM) HEAD (FT)

DISCHARGE

PIPE SIZE HP (MAX) V/HZ/PH RPM REMARKS

SP-1 ELEVATOR PIT

SUMP

SUBMERSIBLE

CENTRIFUGAL

50 14 1/2 115/60/1 3450 OIL-SENSING CONTROLS

1. PLUMBING FIXTURE SCHEDULE - IF THE BUILDING OPTION IS AWARDED, THIS SCHEDULE IS APPENDED BY PLUMBING FIXTURE SCHEDULE - OPTION SHOWN ON P-601A.

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:58:53 AM

P-601A

PL

UM

BI

NG

S

CH

ED

UL

ES

O

PT

IO

N

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

D es ig ne r

Au th or

C he ck er

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

PLUMBING FIXTURE SCHEDULE (OPTION)

MARK DESCRIPTION MOUNTING C.W. (IN) H.W. (IN) WASTE (IN) VENT (IN) NOTES

SH-1 SHOWER (ABA) WALL 1/2" 1/2" 2" 2" 1.1 GPM; HANDHELD SHOWER WITH HOSE; INCLUDES SHD-1

SHD-1 SHOWER DRAIN FLOOR 2" 2"

1. PLUMBING FIXTURE SCHEDULE - OPTION SUPPLEMENTS BASE BID PLUMBING FIXTURE SCHEDULE.

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

RESTROOMS

INCLUDING EWC-1

RESTROOMS

MECH RM

FROM SITE

POTABLE WATER

SOURCE

1ST FLOOR 257'-6"

2ND FLOOR 272'-6"

CATWALK 286'-6"

ROOF (VARIES DUE TO SLOPE)

3"CW

2"CW

1"ICW 3"CW

EWC-1

EWC-1

SOV, TYP

STRAINER

WM-1

PRV-1

BFP-1

BFP-2

1" ICW TO

MECH EQUIPT

3"CW

2"CW 3/4"HWC

1/2"CW

1 1/2"HW

1 1/2"HW

3"CW

2-1/2"CW

FIN GRADE 257'-6"

SK-1

1/2"HW 1/2"CW

1 1/2"HW

3/4"CW

2-1/2"CW

KS-1

1/2"HW 1/2"CW

2"HW

WH-1, ET-1,

TMV-1, CP-1

NOTES

1. PROVIDE SHUT OFF VALVE ON COLD WATER PIPING AT EACH GROUP OF FIXTURES.

2. THE NUMBER OF VALVES SHOWN ARE THE REQUIRED MINIMUM. ADDITIONAL VALVES

MAY BE REQUIRED DURING FINAL DESIGN.

3. HOT WATER SUPPLY PIPING SHALL LOOP AT EACH GROUP OF FIXTURES TO

ELIMINATE "DEAD LEGS".

4. SHUT OFF VALVES (SOV) SHALL BE LEAD-FREE, TWO-PIECE SILICON BRONZE ALLOY

BODY, FULL PORT (1/2" TO 2") OR CONVENTIONAL PORT (2-1/2" TO 3"), BLOWOUT-

ROOF STEM, STAINLESS STEEL TRIM, VENTED BALL, DEZINCIFICATION RESISTANT,

AND 600 PSI NON-SHOCK COLD WORKING PRESSURE.

2"CW

EWC-1

2" FCO 4" FCO 4" COTG

RESTROOMS

INCLUDING EWC-1

RESTROOMS

MECH RM

TO SITE

SANITARY

SEWER

4" VTR

2"W 4"W 4"S 4"S

4"S

2"V

3"V 2"V

2"V 2"V

4"W

2"V

2"V

2"V

4"V

1ST FLOOR 257'-6"

2ND FLOOR 272'-6"

CATWALK 286'-6"

ROOF (VARIES DUE TO SLOPE)

FIN GRADE 257'-6"

2"V 2"V

SK-1EWC-1

2"W

2"W

4"S

1-1/2"V

2"W

2"V

KS-1

2"W

1-1/2"V

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:58:55 AM

P-901

ISF

SC

HE

M

AT

IC

D

IA

G

RA

M

S -B

AS

E

BI

D

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

J.

D

ES

IG

N

ER

J.

D

R

AW

ER

J.

C

H

EC

KE

R

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

NTSD3 HOT & COLD WATER SCHEMATIC DIAGRAM - BASE BID

NTSA3 SANITARY SEWER, WASTE & VENT SCHEMATIC DIAGRAM - BASE BID

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

RESTROOMS

INCLUDING EWC-1

RESTROOMS

MECH RM

FROM SITE

POTABLE WATER

SOURCE

1ST FLOOR 257'-6"

2ND FLOOR 272'-6"

CATWALK 286'-6"

ROOF (VARIES DUE TO SLOPE)

3"CW

2"CW

1"ICW 3"CW

EWC-1

EWC-1

SOV, TYP

STRAINER

WM-1

PRV-1

BFP-1

BFP-2

1" ICW TO

MECH EQUIPT

3"CW

2"CW 3/4"HWC

1/2"CW

1 1/2"HW

1 1/2"HW

3"CW

2-1/2"CW

FIN GRADE 257'-6"

SK-1

1/2"HW 1/2"CW

3/4"CW

2-1/2"CW

KS-1

1/2"HW 1/2"CW

KS-1

1/2"HW

1/2"CW

1"CW1"HW

1/2"HWC

2"HW

WH-1, ET-1,

TMV-1, CP-1

NOTES

1. PROVIDE SHUT OFF VALVE ON COLD WATER PIPING AT EACH GROUP OF FIXTURES.

2. THE NUMBER OF VALVES SHOWN ARE THE REQUIRED MINIMUM. ADDITIONAL VALVES

MAY BE REQUIRED DURING FINAL DESIGN.

3. HOT WATER SUPPLY PIPING SHALL LOOP AT EACH GROUP OF FIXTURES TO

ELIMINATE "DEAD LEGS".

4. SHUT OFF VALVES (SOV) SHALL BE LEAD-FREE, TWO-PIECE SILICON BRONZE ALLOY

BODY, FULL PORT (1/2" TO 2") OR CONVENTIONAL PORT (2-1/2" TO 3"), BLOWOUT-

ROOF STEM, STAINLESS STEEL TRIM, VENTED BALL, DEZINCIFICATION RESISTANT,

AND 600 PSI NON-SHOCK COLD WORKING PRESSURE.

2"CW

SHOWER ROOMS

& BREAK ROOM

1 1/2"HW

EWC-1

2" FCO 4" FCO 4" COTG

RESTROOMS

INCLUDING EWC-1

RESTROOMS

MECH RM

TO SITE

SANITARY

SEWER

4" VTR

2"W 4"W 4"S 4"S

4"S

2"V

3"V 2"V

2"V 2"V

4"W

2"V

2"V

2"V

4"V

1ST FLOOR 257'-6"

2ND FLOOR 272'-6"

CATWALK 286'-6"

ROOF (VARIES DUE TO SLOPE)

FIN GRADE 257'-6"

2"V 2"V

SK-1EWC-1

2"W

2"W

4"S

1-1/2"V

2"W

2"V

KS-1

2"W

1-1/2"V

KS-1

1-1/2"V

2"W

2" FCO

SHOWER ROOMS

& BREAK ROOM

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:58:56 AM

P-901A

ISF

SC

HE

M

AT

IC

D

IA

G

RA

M

S -O

PT

IO

N

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

D es ig ne r

Au th or

C he ck er

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

NTSD2 HOT & COLD WATER SCHEMATIC DIAGRAM - OPTION

NTSA2 SANITARY SEWER, WASTE & VENT SCHEMATIC DIAGRAM - OPTION

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

MECH RM

FROM SITE

NATURAL GAS

SOURCE (PSE)

1ST FLOOR 257'-6"

2ND FLOOR 272'-6"

CATWALK 286'-6"

ROOF (VARIES DUE TO SLOPE)

2"MPG

1-1/2"G

2"G

PLUG VALVE

GM-1

GPR-1

DRIP LEG, TYP

3"G

WH-1

FIN GRADE 257'-6"

EQV-1

2"G

4"G, 14"w.c.

BOILERBOILER

NOTES

1. PLUG VALVES SHALL BE BLACK IRON BODY, BRASS FLATHEAD PLUG, RATED FOR

175 PSIG NATURAL GAS PRESSURE, AND TAMPER-RESISTANT.

2. SHUT OFF VALVES (SOV) SHALL BE FULL PORT THREADED END FORGED BRASS

BALL VALVES SUITABLE FOR NATURAL GAS USE, AND RATED FOR 600 CWP (1/2" TO

2") OR 400 CWP (2-1/2" TO 4").

3. THE NUMBER OF VALVES SHOWN ARE THE REQUIRED MINIMUM. ADDITIONAL

VALVES MAY BE REQUIRED DURING FINAL DESIGN.

SOV, TYP

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:58:58 AM

P-902

ISF

NA

TU

RA

L

G

AS

S

CH

EM

AT

IC

D

IA

G

RA

M

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

J.

D

ES

IG

N

ER

J.

D

R

AW

ER

J.

C

H

EC

KE

R

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

NTSD3 NATURAL GAS SCHEMATIC DIAGRAM

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:56:55 AM

M-001

ISF

G

EN

ER

AL

N O

TE

S, A

BB

RE

VI

AT

IO

NS

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

J.

D

ES

IG

N

ER

J.

D

R

AW

ER

J.

C

H

EC

KE

R

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

ABBREVIATIONS PIPING SYMBOLSHVAC SYMBOLS

DRAWING / DETAIL REFERENCE KEY

RE: 2 / M-XXX

SHEET NUMBER OF DRAWING/DETAIL

DEMOLITION NOTE

DRAWING/DETAIL NUMBER

REFER TO

EQUIPMENT IDENTIFICATION

EQUIPMENT TAG

DIFFUSER / REGISTER OR GRILLE

REVISION DESIGNATION

KEYED NOTE 1

M-XXX

P

A

AIR RISERAR

BLOW-DOWNB/D

BOILERB

CT COOLING TOWER,

DIFFERENTIAL PRESSURED/P

FIRE DAMPERFD

MAKE-UP (WATER)M/U

OF OVERFLOW

(COMBINATION) SMOKE-FIRE DAMPERSFD

TEMPERATURE

D

DOUBLE-POLE, DOUBLE-THROW

ENTERING WATER TEMPERATURE

FIRE ALARM CONTROL PANEL

DOUBLE-POLE, SINGLE-THROW

ELEC

EWB

EWT

EWC

ESP

EL

EFF

EQUIP

F

FCO

FA

FACP

EXIST, (E)

EXH

° F

FT

FIRE ALARM

FOOT, FEET

DEGREES FAHRENHEIT

FLOOR CLEANOUT

ELEVATION

EQUIPMENT

ELECTRICAL

EFFICIENCY

EXTERNAL STATIC PRESSURE

ELECTRIC WATER COOLER

ENTERING WET BULB

EXHAUST

EXISTING

DIA, Ø

DC

DEG

DESIG

DB

dB, dB(A)

DX

DS

DWG(S)

DPST

DIM

DN

DISC

DPDT

E

EA

ECC

EDB

EAT

D

DOWNSPOUT

ECCENTRIC

ENTERING AIR TEMPERATURE

ENTERING DRY BULB

DIRECT EXPANSION

EXHAUST AIR, EACH

DRAWING(S)

DRY BULB

DESIGNATION

DIMENSION

DISCONNECT

DIRECT CURRENT

DEGREES

DIAMETER

DOWN

DEPTH

DECIBEL

MANUFACTURERS ASSOCIATION

NATIONAL FIRE PROTECTION

ASSOCIATION

NOT IN CONTRACT

NUMBER

NORMALLY OPEN

OUTSIDE STEM AND YOKE

OCCUPATIONAL SAFETY AND

OPPOSED BLADE DAMPER

OUTSIDE DIAMETER

OUTSIDE AIR

ON CENTER

OPG

OH

OS&Y

OSHA

OVERHEAD

OPENING

O

NIC

NO.

N.O.

NFPA

OA

OC

OD

OBD

NATIONAL ELECTRICAL

NOISE CRITERIA, NORMALLY CLOSED

NATIONAL ELECTRICAL CODE

1000 BTU PER HOUR

MAIN CIRCUIT BREAKER

MOTOR CONTROL CENTER

MINIMUM CIRCUIT AMPACITY

NOT APPLICABLE

MOTOR GENERATOR

MOTORIZED DAMPER

MANUFACTURER

MECHANICAL

LEAVING WATER TEMPERATURE

MG

MTD

MIN

NEC

NC

N/A

NEMA

N

MINIMUM, MINUTE

MOUNTED

M

MCA

MCB

MBH

MAX

MD

MCC

MFR

MECH

LWT

MAXIMUM

U/G U/F

U/S

U

TYP

TSP TOTAL STATIC PRESSURE

UNDERFLOOR

UNDERGROUND

UNDERSLAB

TYPICAL

THERMOSTAT

RECIRC

SMACNA

SHT MTL

Q

HID HIGH INTENSITY DISCHARGE

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AMERICAN SOCIETY OF TESTING AND MATERIALS

AMERICAN SOCIETY OF HEATING, REFRIGERATION AND

C C

CCTV

CATV

BTU

CMU

CLG

CFS

CFM

CFH

, CL

CIRC

CKT

CI

CO

CU

°C

CW

COL

CIRCULATING

CENTERLINE

CLEANOUT

COLD WATER

DEGREES CELSIUS

CONCRETE MASONRY UNIT

COLUMN

CONDENSING UNIT

CEILING, COOLING

CIRCUIT

CAST IRON

CUBIC FEET PER HOUR

CUBIC FEET PER MINUTE

CUBIC FEET PER SECOND

CABLE TELEVISION SYSTEM

CLOSED CIRCUIT TELEVISION SYSTEM

BRITISH THERMAL UNIT

CONDUIT

B

AUX

ASTM

ASME

AWS

AV

AWG

AWWA

ASHRAE

BFW

BLDG

BOS

BOP

BOD

BKR

BD

BOTTOM OF STRUCTURE

BOTTOM OF DUCT

BOTTOM OF PIPE

BACKDRAFT DAMPER

BOILER FEED WATER

BUILDING

BREAKER

AUXILIARY

AIR CONDITIONING ENGINEERS

AMERICAN WIRE GAUGE

AMERICAN WELDING SOCIETY

AMERICAN WATER WORKS ASSOCIATION

AIR VENT

LOW PRESSURE STEAM (15 PSIG)

LOCKED ROTOR AMPS

LEAVING AIR TEMPERATURE

LEAVING WET BULB

LEAVING DRY BULB

LOW PRESSURE

LINEAR FEET

KILOVOLT-AMPS

KILOWATT-HOUR

JUNCTION BOX

LSTM

LWB

LTG

LB(S), #

LDB

LRA

LAT

LP

LF

L L

LIGHTING

POUND(S)

LENGTH

J-BOX

KW

KVA

KWH

KV

K

J

KILOVOLT

KILOWATT

SQ

T

TDH

THRU

TP

STD

STL

ST

SS

SUSP

SURF

SP

SPEC

SD

SECT

SA

SHT

SIM

SF

HEATING, VENTILATING AND AIR CONDITIONING

HIGH PRESSURE STEAM

HAND-OFF-AUTOMATIC

INVERT ELEVATION

INSIDE DIAMETER

HOT WATER, HEATING WATER

HUMIDISTAT

HORIZONTAL

HORSEPOWER, HEAT PUMP

INCHES WATER GAUGE

ISOLATED GROUND

(IN WG)

IG

IN

IE

ID

INCH

I

HSTAT

HTG

HTR

HVAC

HPS

HOA

HP

HORIZ

HZ

HYD

HW

HYDRANT

HERTZ

HEATER

HEATING

RLA

S

RM

RS

RPM

REQD

REV

RHG

RH

RGS

RL

RCP

RA

REINF

RE:

RD

R

QTY

AMERICAN NATIONAL STANDARDS INSTITUTE

AMPERE INTERRUPTING CURRENT

AIR COOLED CONDENSING UNIT

AF

ADJ

AFC

AC

ACCU

AMPS

ANSI

ARCH

AL

AIC

AFG

AFF

ADJUSTABLE

AMPERE FUSE

ALUMINUM

ARCHITECT, ARCHITECTURAL

ABOVE FINISHED CEILING

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

AMPERES

AIR PRESSURE DROP

ALTERNATING CURRENT,

GROUND FAULT RELAY

GALLONS PER MINUTE

GROUND FAULT INTERRUPTER

GENERAL CONTRACTOR

GALLONS PER HOUR

HEAD, HUB DRAIN

GALLONS PER DAY

GALVANIZED

GFI

GPD

GFR

GALV

GC

HD

GPM

GPH

H, HT

H

HEIGHT

G

GAL

GA

G,GND GROUND

GALLON

GAUGE

PV

PVC

PSV

PNL

PSI

PSF

PIV

PLBG

PSIG

PSIA

STAINLESS STEEL, SANITARY SEWER,

SQUARE

TOTAL DYNAMIC HEAD

TOTAL PRESSURE

SOUND TRAP, STEAM TRAP

THROUGH

STEEL

STANDARD

SUSPEND

SURFACE

SHEET METAL AND AIR

SMOKE DAMPER, STORM DRAIN

STATIC PRESSURE

NATIONAL ASSOCIATION

CONDITIONING CONTRACTORS

SHEET METAL

SPECIFICATION

SECTION

SHEET

SIMILAR

SUPPLY AIR

SQUARE FEET

RELATIVE HUMIDITY

REVISION, REVISE

RIGID GALVANIZED STEEL

REFRIGERANT HOT GAS

RATED LOAD AMPS

REFRIGERANT SUCTION

REFRIGERANT LIQUID

REVOLUTIONS PER MINUTE

ROOM

REQUIRED

REFERENCE, REFER

REFLECTED CEILING PLAN,

REINFORCED CONCRETE PIPE

RETURN AIR

RECIRCULATE

REINFORCING

ROOF DRAIN

QUANTITY

POUNDS PER SQUARE INCH ABSOLUTE

POUNDS PER SQUARE INCH GAUGE

POLYVINYL CHLORIDE

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

POST INDICATOR VALVE

PLUG VALVE

PANEL

PLUMBING

SYMBOLSYM

RADIANTRAD

DISCHARGEDISCH

APD

OUTSIDE AIROSA

EXTERNALEXT

PRESSUREPRESS

FINS PER INCHFPI

EXHAUST FANEF

ROOFTOP UNITRTU

FAN COILFC

GV GATE VALVE,

AIR HANDLING UNITAHU

CHILLED WATER SUPPLYCHWS

CHWR CHILLED WATER RETURN

HHWR HEATING HOT WATER RETURN

HEATING HOT WATER SUPPLYHHWS

POINT OF CONNECTIONPOC

POD POINT OF DISCONNECTION

STRUCTURALSTRUC

SERVICE SINK

IN WC INCHES OF WATER COLUMN

PRESSURE SAFETY VALVE, RELIEF VALVE

CONTROL DAMPERCD

TEMP

TSTAT

(SL) SOUND LINED

12"ø

20"x12"

DN

UP

S (ZONE)

T (ZONE)

MANUAL VOLUME DAMPER

POINT OF DISCONNECTION

COMBINATION SMOKE/FIRE DAMPER

SUPPLY AIR DIFFUSER - ARROWS INDICATE

PATTERN. NO PATTERN SHOWN EQUALS 4-WAY.

RETURN AIR GRILLE

EXHAUST GRILLE

RELIEF OR EXHAUST AIR DUCT

RETURN AIR DUCT

SUPPLY OR OUTSIDE AIR DUCT

SUPPLY OR OUTSIDE AIR DUCT DOWN

RETURN AIR DUCT DOWN

SUPPLY OR OUTSIDE AIR DUCT UP

RETURN AIR DUCT UP

ROUND DUCT BRANCH TAKE-OFF FROM

RECTANGULAR MAIN WITH CONICAL TAP.

DUCTWORK SIZE TRANSITION

RECTANGULAR DUCTWORK. SIZE INDICATED IN

INCHES, FIRST NUMBER IS SIDE SHOWN.

ROUND DUCTWORK.DIAMETER INDICATED IN INCHES.

RELIEF OR EXHAUST AIR DUCT DOWN

IN-LINE 90 DEGREE DROP (RISE) IN DUCT

TURNING VANES

INCLINED DROP IN DUCT

INCLINED RISE IN DUCT

POINT OF CONNECTION

NEW DUCTWORK

EXISTING DUCTWORK (N/A)

RELIEF OR EXHAUST AIR DUCT UP

VAV ZONE TERMINAL

RETURN AIR BOOT

FLEXIBLE DUCT (SINGLE PIECE, 7 FEET MAX.)

TEMPERATURE SENSOR (MOUNT 46" AFF)

HHW (AS APPLICABLE)

BACKDRAFT DAMPER

ROOM THERMOSTAT (MOUNT 46" AFF)

VALVE IN DROP

ELBOW DOWN

ELBOW UP

VALVE IN DROP

DIRECTION OF SLOPE DOWN

ECCENTRIC REDUCER

CONCENTRIC REDUCER

DIRECTION OF FLOW

VALVE IN RISE

UNION

EXPANSION JOINT

TEE OUTLET UP

TEE OUTLET DOWN

PIPE ANCHOR

CHECK VALVE

GATE VALVE

BALL VALVE

CAP

PRESSURE REDUCING VALVE

STRAINER WITH BLOWDOWN VALVE

T&P RELIEF VALVE

MANUAL AIR VENT

AUTOMATIC AIR VENT

VACUUM BREAKER

THERMOMETER

PIPE FLANGE

FLEXIBLE CONNECTION

THERMOMETER WELL

PRESSURE GAUGE WITH BALL VALVE

DOUBLE CHECK VALVE

XFMR

X

WB

WPD

W

W/O W/ W

VAV

VCP

VERT

VTR

VEL

VD

V V

VA

VAC

UL

UPS

UON

TRANSFORMER

WATER PRESSURE DROP

WET BULB

WITHOUT

WATT, WIDTH

WITH

UNDERWRITERS LABORATORIES, INC.

VOLUME DAMPER

VARIABLE AIR VOLUME

VITRIFIED CLAY PIPE

VENT THROUGH ROOF

VELOCITY

VERTICAL

VACUUM

VOLT-AMPERE

VOLT, VENT

UNINTERRUPTIBLE POWER SUPPLY

UNLESS OTHERWISE NOTED

WEATHER PROOF

WATERTIGHT, WEIGHT

WP

WT

VARIABLE FREQUENCY DRIVEVFD

BUTTERFLY VALVE

UTR UP THROUGH ROOF

C CO2 SENSOR (MOUNT 46" AFF)(ZONE)

PETE'S PLUG

20"x12"ø OVAL DUCTWORK. SIZE INDICATED IN

INCHES, FIRST NUMBER IS SIDE SHOWN.

TWO-WAY CONTROL VALVE

THREE-WAY CONTROL VALVE

SH EMERGENCY AIR DISTRIBUTION SHUTOFF

GALLONS PER FLUSHGPF

FULL LOAD AMPSFLA

HEALTH ADMINISTRATION

GRAVITY VENTILATOR

UNO UNLESS NOTED OTHERWISE

MA MIXED AIR

PH, Ø PHASE

MOCP MAX OVERCURRENT PROTECTION

AIR CONDITIONING

CV VALVE COEFFICIENT

CURRENT TRANSFORMER

BTUH BRITISH THERMAL UNIT

PER HOUR

NATURAL GASNG

G GAS, NATURAL GAS

DDC DIRECT DIGITAL CONTROL

ECM ELECTRONICALLY COMMUTATED MOTOR

UH UNIT HEATER

AG ABOVE GROUND

EEDRS ENTERPRISE ENERGY DATA

REPORTING SYSTEM

NOT TO SCALENTS

NOMINALNOM

LEAVINGLVG

PPM PARTS PER MILLION

PRESSURE RELIEF/REDUCING VALVEPRV

DOAS DEDICATED OUTSIDE AIR SYSTEM

FV FACE VELOCITY

UFC UNIFIED FACILITIES CRITERIA

PG PROPYLENE GLYCOL

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

ELEVATOR

EQUIPMENT

ELEVATOR

E1.1

SIPR / TR

IMAGING CENTER

STAIR 1

S1.1

CLASSROOM A

SIPR CX-K / GAIT

MAIN TR

UPS ROOM

OUTSIDE PLANT

INSIDE STORAGE

DISTRIBUTION /

SHIPPING

RECYCLING AREA

LOADING DOCK

ELECTRICAL

ROOM

STORAGE

CUSTOMER

SERVICE CENTER

OTHER ADMIN.

DIVISION CHIEF

OFFICE

BRANCH CHIEF

OFFICE

BRANCH CHIEF

OFFICE

CUSTOMER

SERVICE CENTER

INTAKE

CORRIDOR

STAIR 2

S2.1

MECHANICAL

ROOM

FIRE RISER ROOM

UNISEX

UNISEX

WOMEN

MEN

6 5 4 3 1

A

B

C

D

VESTIBULE

CORRIDOR

CUSTOMER

SERVICE LOBBY

VESTIBULE

ZONE

1-7

ZONE

1-6

ZONE

1-2

ZONE

1-3

ZONE

1-1

FC

1-20

DX

DX

CRAC

3A

CRAC

3B

FC

1-21

DX

ZONE

1-9A

DX

ZONE

1-8

ZONE

1-5

ZONE

1-4

CORRIDOR

VESTIBULE

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:56:59 AM

M-011

ISF

FI

RS

T

FL

O O

R

PL

AN

ZO

NI

NG

BA

SE

B

ID

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

D es ig ne r

Au th or

C he ck er

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

1/8" = 1'-0"A1 FIRST FLOOR PLAN - ZONING - BASE BID

OPTION BASE BID

KEY PLAN:

08' 8' 16' 24'

N

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

14 12 11 10 7

A

B

C

D

MGMT / OPS

FREQUENCY

A138

DIVISION

CONFERENCE

A139

GENERAL

STORAGE /

OFFICE STORAGE

A140

CORRIDOR

A137

STAIR 3

AS3.1

BRANCH CHIEF

OFFICE

A149STORAGE

A150

BRANCH CHIEF

OFFICE

A148

DIVISION CHIEF

OFFICE

A147

MANAGEMENT

ANALYSIS

A144

OTHER ADMIN.

A146

SPECIALISTS

A145

CORRIDOR

A137

PLANS &

BLUEPRINT ROOM

A151

GENERAL

PURPOSE TEAM

ROOM

A141

REPRO / MEDIA

WORK ROOM

A142

BREAK AREA

A134

LOCKER /

SHOWER ROOM

A136

GENERAL

PURPOSE TEAM

ROOM

A143

ZONE

1-16

ZONE

1-17

ZONE

1-18

ZONE

1-11

ZONE

1-14 ZONE

1-15

ZONE

1-19

ZONE

1-13

ZONE

1-12

ZONE

1-10

LOCKER /

SHOWER ROOM

A135

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:57:02 AM

M-011A

ISF

FI

RS

T

FL

O O

R

PL

AN

ZO

NI

NG

O

PT

IO

N

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

D es ig ne r

Au th or

C he ck er

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

1/8" = 1'-0"A1 FIRST FLOOR PLAN - ZONING - OPTION

0 8' 16'8' 16' OPTION BASE BID

KEY PLAN:

N

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

E1.2

SIPR / TR

STAIR 1

S1.2

WOMEN

CUSTODIAL

MEN

ELECTRICAL

ROOM

OFFICE SUITE

DEPUTY

DIRECTOR

DIRECTOR

FILE STORAGE

EXECUTIVE

CONFERENCE

STAIR 2

S2.2

BREAK AREA

CORRIDOR

6 5 4 3 1

A

B

C

D

NURSING

MOTHERS ROOM

NETWORK

OPERATIONS

CENTER (NOC) /

NOC STORAGE

DIVISION CHIEF

OFFICE

BRANCH CHIEF

OFFICE

BRANCH CHIEF

OFFICE

STORAGE

FILES

OTHER ADMIN /

CONTRACTORS

TRAINING AND

TESTING CENTER

LAB

DIVISION

COMPUTER AND

EQUIPMENT

STORAGE

NETWORK AND

SWITCH

TECHNICIANS

WORKSPACE

ZONE

2-8

ZONE

2-7

ZONE

2-5

ZONE

2-16A

ZONE

2-9

FC

2-30

DX

ZONE

2-10

ZONE

2-11

ZONE

2-1

ZONE

2-2

ZONE

2-12

ZONE

2-4

ZONE

2-3

ZONE

2-14

ZONE

2-13

CORRIDOR

CORRIDOR

CRAC

16B

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:57:06 AM

M-012

ISF

SE

CO

ND

F

LO

O

R

PL

AN

ZO

NI

NG

BA

SE

B

ID

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

D es ig ne r

Au th or

C he ck er

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

OPTION BASE BID

KEY PLAN:

0 8' 16'8' 16'1/8" = 1'-0"A1 SECOND FLOOR PLAN - ZONING - BASE BID

N

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

14 12 11 10 7

B

C

D

CONFERENCE/

CLASSROOM C

A230

CONFERENCE /

CLASSROOM B

A229

CONFERENCE /

CLASSROOM A

A228

REPRO / MEDIA

WORK ROOM

A227

COMSEC VAULT

A233

ACAS SCANNERS

A232

GENERAL

PURPOSE TEAM

ROOM

A239

GENERAL

PURPOSE TEAM

ROOM

A240

BRANCH CHIEF

OFFICE

A235

BRANCH CHIEF

OFFICE

A236

DIVISION CHIEF

OFFICE

A237

IA TECHNICIAN

WORKSPACE

A231

CONTRACTOR

AREA

A238

STAIR 3

AS3.2

IA SECURITY PKI

ROOM

A234

ZONE

2-25

ZONE

2-20

ZONE

2-21

ZONE

2-29

ZONE

2-17

ZONE

2-24

ZONE

2-28

ZONE

2-27ZONE

2-26

ZONE

2-18

ZONE

2-19ZONE

2-23

ZONE

2-22

CORRIDOR

A226

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:57:09 AM

M-012A

ISF

SE

CO

ND

F

LO

O

R

PL

AN

ZO

NI

NG

O

PT

IO

N

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

D es ig ne r

Au th or

C he ck er

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

1/8" = 1'-0"A1 SECOND FLOOR PLAN - ZONING - OPTION

0 8' 16'8' 16'

OPTION BASE BID

KEY PLAN:

N

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

SIPR / TR

ELEVATOR

E1.1

ELEVATOR

EQUIPMENT

CRAC

3A

CRAC

3B

FC

1-21

DX

P

P

CH

P P

B

B

P

P

P P

IMAGING CENTER

STAIR 1

S1.1

CLASSROOM A

SIPR CX-K / GAIT

MAIN TR

UPS ROOM

OUTSIDE PLANT

INSIDE STORAGE

DISTRIBUTION /

SHIPPING

RECYCLING AREA

LOADING DOCK

ELECTRICAL

ROOM

DIVISION CHIEF

OFFICE

BRANCH CHIEF

OFFICE

BRANCH CHIEF

OFFICE

CUSTOMER

SERVICE CENTER

INTAKE

CORRIDOR

STAIR 2

S2.1

MECHANICAL

ROOM

FIRE RISER ROOM

UNISEX

UNISEX

WOMEN

MEN

CU

3B

DXCU

FC

1-2

FC

1-1

(TYP)

SH

EF

1 EF

EF

EF

EF

FC

1-3

FC

1-5

7 6 5 4 3 1

A

B

C

D

CUSTOMER

SERVICE CENTER

STORAGE

VESTIBULE

CUSTOMER

SERVICE LOBBY

CORRIDOR

OTHER ADMIN.

CORRIDOR

VESTIBULE

DX

FC

1-4

FC

1-7

FC

1-6

FC

1-9A

FC

1-8

DX

DX

3 FC

1-20

DXCU

DXCU

DXCU

CU

16B

DXCU

9 8

CUSTODIAL

UH

UH

UH

UH

UH

UH

UH

UH

UH

UH

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:57:15 AM

M-101

ISF

FI

RS

T

FL

O O

R

PL

AN

BA

SE

B

ID

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

J.

D

ES

IG

N

ER

J.

D

R

AW

ER

J.

C

H

EC

KE

R

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

1/8" = 1'-0"A1 FIRST FLOOR MECHANICAL PLAN - BASE BID

OPTION BASE BID

KEY PLAN:

0 8' 16'8' 16'

N

KEYED NOTES

1 SERVED BY 4-PIPE FAN COIL SYSTEM AND A DEDICATED OUTSIDE

AIR UNIT MAU-1

SERVED BY A HOT WATER UNIT HEATER AND CONNECTED TO

EMERGENCY POWER

NOT USED

NOT USED

CONDENSING UNIT SERVES FAN COIL LOCATED IN THE SECOND

FLOOR, REFER TO M-102

NOT USED

PROVIDE A TRENCH WITH REMOVABLE STEEL PLATES FOR CHWS&R

PIPING BETWEEN THE BUILDING AND CHILLER. THE TRENCH SHALL

BE DRAINABLE. CHWS&R SHALL BE INSULATED.

PROVIDE CO2 SENSOR MONITORING

OSA SUPPLY AND RETURN/ EXHAUST AIR FROM ABOVE.

GENERAL NOTES

PROVIDE SUPPLY DUCTING FROM MAKE UP AIR UNIT TO RETURN AIR

MIXING BOX OF EACH FAN COIL. PROVIDE DUCTED RELIEF AIR BACK TO

MAKE UP AIR UNIT. PROVIDE A MANUAL VOLUME DAMPER ON THE OSA

CONNECTION OF THE MIXING BOX.

AIR VENTS, DUCTS, OR ANY SIMILAR OPENINGS THAT BREACH THE WALLS,

FLOOR, OR CEILING OF THE SECURE AREAS MUST BE APPROPRIATELY

SECURED TO PREVENT PENETRATION. OPENINGS LESS THAN 96 INCHES

MUST HAVE APPROVED BAFFLES INSTALLED TO PREVENT AN AUDIO OR

ACOUSTICAL HAZARD. IF THE OPENING EXCEEDS 96 INCHES, ACOUSTICAL

BAFFLES MUST BE SUPPLEMENTED BY EITHER HARDENED STEEL BARS OR

AN APPROVED INTRUSION DETECTION SYSTEM. STC SOUND BAFFLES WILL

BE PROVIDED WHERE DUCTWORK WILL BE CROSSING AN STC RATED

WALL.

1.

2.

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

DXCU

DXCU

DXCU

FC

1-10

FC

1-11

FC

1-13

FC

1-14

FC

1-12

FC

1-19

FC

1-17

FC

1-16

(TYP)

SH

14 12 11

A

B

C

D

GENERAL

STORAGE /

OFFICE STORAGE

A140

DIVISION

CONFERENCE

A139

MGMT / OPS

FREQUENCY

A138

STAIR 3

AS3.1

PLANS &

BLUEPRINT ROOM

A151

GENERAL

PURPOSE TEAM

ROOM

A141

REPRO / MEDIA

WORK ROOM

A142

GENERAL

PURPOSE TEAM

ROOM

A143

BRANCH CHIEF

OFFICE

A148

DIVISION CHIEF

OFFICE

A147

MANAGEMENT

ANALYSIS

A144

OTHER ADMIN.

A146

SPECIALISTS

A145

BREAK AREA

A134

CORRIDOR

A137

LOCKER /

SHOWER ROOM

A136

LOCKER /

SHOWER ROOM

A135

FC

1-15

FC

1-18

DXCU

9 8

STORAGE

A150

BRANCH CHIEF

OFFICE

A149

UH

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:57:20 AM

M-101A

ISF

FI

RS

T

FL

O O

R

PL

AN

O

PT

IO

N

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

J.

D

ES

IG

N

ER

J.

D

R

AW

ER

J.

C

H

EC

KE

R

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

1/8" = 1'-0"A1 FIRST FLOOR MECHANICAL PLAN - OPTION

OPTION BASE BID

KEY PLAN:

0 8' 16'8' 16'

GENERAL NOTES

PROVIDE SUPPLY DUCTING FROM MAKE UP AIR UNIT TO RETURN

AIR MIXING BOX OF EACH FAN COIL. PROVIDE DUCTED RELIEF AIR

BACK TO MAKE UP AIR UNIT. PROVIDE A MANUAL VOLUME DAMPER

ON THE OSA CONNECTION OF THE MIXING BOX.

AIR VENTS, DUCTS, OR ANY SIMILAR OPENINGS THAT BREACH THE

WALLS, FLOOR, OR CEILING OF THE SECURE AREAS MUST BE

APPROPRIATELY SECURED TO PREVENT PENETRATION. OPENINGS

LESS THAN 96 INCHES MUST HAVE APPROVED BAFFLES INSTALLED

TO PREVENT AN AUDIO OR ACOUSTICAL HAZARD. IF THE OPENING

EXCEEDS 96 INCHES, ACOUSTICAL BAFFLES MUST BE

SUPPLEMENTED BY EITHER HARDENED STEEL BARS OR AN

APPROVED INTRUSION DETECTION SYSTEM. STC SOUND BAFFLES

WILL BE PROVIDED WHERE DUCTWORK WILL BE CROSSING AN STC

RATED WALL.

1.

2.

N

KEYED NOTES

1 SERVED BY 4-PIPE FAN COIL SYSTEM AND A DEDICATED OUTSIDE

AIR UNIT MAU-2

SERVED BY A HOT WATER UNIT HEATER

CONDENSING UNIT SERVES FAN COIL LOCATED IN THE SECOND

FLOOR, REFER TO M-102

NOT USED

OSA SUPPLY AND RETURN/ EXHAUST AIR FROM ABOVE.

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

E1.2

SIPR / TR

STAIR 1

S1.2

WOMEN

CUSTODIAL

MEN

NETWORK

OPERATIONS

CENTER (NOC) /

NOC STORAGE

ELECTRICAL

ROOM

OFFICE SUITE

DEPUTY

DIRECTOR

DIRECTOR

FILE STORAGE

EXECUTIVE

CONFERENCE

STAIR 2

S2.2

BREAK AREA

CORRIDOR

FC

2-3

FC

2-4

FC

2-5

CRAC

16B

(TYP)

FC

2-1

FC

2-2

7 6 5 4 3 1

A

B

C

D

BRANCH CHIEF

OFFICE

FILES

STORAGE

BRANCH CHIEF

OFFICE

DIVISION CHIEF

OFFICE

NETWORK AND

SWITCH

TECHNICIANS

WORKSPACE

OTHER ADMIN /

CONTRACTORS

TRAINING AND

TESTING CENTER

LAB

CORRIDOR

NURSING

MOTHERS ROOM

CORRIDOR

STAIR 1

S1.2

DIVISION

COMPUTER AND

EQUIPMENT

STORAGE

FC

2-16A

FC

2-30

DX

FC

2-6

FC

2-9

FC

2-7

FC

2-10

FC

2-11

FC

2-12

FC

2-13

FC

2-14

29 8

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:57:26 AM

M-102

ISF

SE

CO

ND

F

LO

O

R

PL

AN

BA

SE

B

ID

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

J.

D

ES

IG

N

ER

J.

D

R

AW

ER

J.

C

H

EC

KE

R

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

1/8" = 1'-0"A1 SECOND FLOOR MECHANICAL PLAN - BASE BID

OPTION BASE BID

KEY PLAN:

0 8' 16'8' 16'

GENERAL NOTES

PROVIDE SUPPLY DUCTING FROM MAKE UP AIR UNIT TO RETURN AIR

MIXING BOX OF EACH FAN COIL. PROVIDE DUCTED RELIEF AIR BACK TO

MAKE UP AIR UNIT. PROVIDE A MANUAL VOLUME DAMPER ON THE OSA

CONNECTION OF THE MIXING BOX.

AIR VENTS, DUCTS, OR ANY SIMILAR OPENINGS THAT BREACH THE WALLS,

FLOOR, OR CEILING OF THE SECURE AREAS MUST BE APPROPRIATELY

SECURED TO PREVENT PENETRATION. OPENINGS LESS THAN 96 INCHES

MUST HAVE APPROVED BAFFLES INSTALLED TO PREVENT AN AUDIO OR

ACOUSTICAL HAZARD. IF THE OPENING EXCEEDS 96 INCHES, ACOUSTICAL

BAFFLES MUST BE SUPPLEMENTED BY EITHER HARDENED STEEL BARS OR

AN APPROVED INTRUSION DETECTION SYSTEM. STC SOUND BAFFLES WILL

BE PROVIDED WHERE DUCTWORK WILL BE CROSSING AN STC RATED

WALL.

1.

2.

N

KEYED NOTES

1 SERVED BY 4-PIPE FAN COIL SYSTEM AND A DEDICATED OUTSIDE

AIR UNIT MAU-1

NOT USED

NOT USED

UTILITY CHASE (DUCT AND PIPES)

NOT USED

PROVIDE CO2 SENSOR MONITORING

OSA SUPPLY AND RETURN/ EXHAUST AIR DOWN

OSA SUPPLY AND RETURN/ EXHAUST AIR UP TO CATWALK

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

FC

2-18

FC

2-24

FC

2-23

FC

2-19FC

2-20

FC

2-21

FC

2-17

FC

2-26

FC

2-27

FC

2-28

FC

2-25

(TYP)

14 12 11 10 7

A

B

C

D

GENERAL

PURPOSE TEAM

ROOM

A239

GENERAL

PURPOSE TEAM

ROOM

A240

ACAS SCANNERS

A232

IA TECHNICIAN

WORKSPACE

A231

CONTRACTOR

AREA

A238

COMSEC VAULT

A233

STAIR 3

AS3.2

CORRIDOR

A226

DIVISION CHIEF

OFFICE

A237

BRANCH CHIEF

OFFICE

A236

BRANCH CHIEF

OFFICE

A235

IA SECURITY PKI

ROOM

A234

CONFERENCE /

CLASSROOM B

A229

CONFERENCE/

CLASSROOM C

A230

CONFERENCE /

CLASSROOM A

A228

REPRO / MEDIA

WORK ROOM

A227

FC

2-22

FC

2-29

5 5

13 9 8

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:57:30 AM

M-102A

ISF

SE

CO

ND

F

LO

O

R

PL

AN

O

PT

IO

N

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

J.

D

ES

IG

N

ER

J.

D

R

AW

ER

J.

C

H

EC

KE

R

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

1/8" = 1'-0"A1 SECOND FLOOR MECHANICAL PLAN - OPTION

OPTION BASE BID

KEY PLAN:0 8' 16'8' 16'

GENERAL NOTES

PROVIDE SUPPLY DUCTING FROM MAKE UP AIR UNIT TO RETURN AIR

MIXING BOX OF EACH FAN COIL. PROVIDE DUCTED RELIEF AIR BACK TO

MAKE UP AIR UNIT. PROVIDE A MANUAL VOLUME DAMPER ON THE OSA

CONNECTION OF THE MIXING BOX.

AIR VENTS, DUCTS, OR ANY SIMILAR OPENINGS THAT BREACH THE WALLS,

FLOOR, OR CEILING OF THE SECURE AREAS MUST BE APPROPRIATELY

SECURED TO PREVENT PENETRATION. OPENINGS LESS THAN 96 INCHES

MUST HAVE APPROVED BAFFLES INSTALLED TO PREVENT AN AUDIO OR

ACOUSTICAL HAZARD. IF THE OPENING EXCEEDS 96 INCHES, ACOUSTICAL

BAFFLES MUST BE SUPPLEMENTED BY EITHER HARDENED STEEL BARS OR

AN APPROVED INTRUSION DETECTION SYSTEM. STC SOUND BAFFLES WILL

BE PROVIDED WHERE DUCTWORK WILL BE CROSSING AN STC RATED

WALL.

1.

2.

N

KEYED NOTES

1 SERVED BY 4-PIPE FAN COIL SYSTEM AND A DEDICATED OUTSIDE

AIR UNIT MAU-2

NOT USED

UTILITY CHASE (DUCT AND PIPES)

NOT USED

PROVIDE CO2 SENSOR FOR MONITORING

OSA SUPPLY AND RETURN/ EXHAUST AIR DOWN

OSA SUPPLY AND RETURN/ EXHAUST AIR UP TO CATWALK

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

MAU

MAINTENANCE CATWALK

OSA SUPPLY DOWN

RETURN/ EXHAUST DOWN

7 6 5 4 3 1

A

B

C

D

29 8

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:57:33 AM

M-103

ISF

CA

TW

AL

K

FL

O

O R

PL

AN

-B

AS

E

BI

D

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

J.

D

ES

IG

N

ER

J.

D

R

AW

ER

J.

C

H

EC

KE

R

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

1/8" = 1'-0"A1 CATWALK MECHANICAL PLAN - BASE BID

OPTION BASE BID

KEY PLAN:

0 8' 16'8' 16'

GENERAL NOTES

PROVIDE SUPPLY DUCTING FROM MAKE UP AIR UNIT TO RETURN

AIR MIXING BOX OF EACH FAN COIL. PROVIDE DUCTED RELIEF AIR

BACK TO MAKE UP AIR UNIT.

AIR VENTS, DUCTS, OR ANY SIMILAR OPENINGS THAT BREACH THE

WALLS, FLOOR, OR CEILING OF THE SECURE AREAS MUST BE

APPROPRIATELY SECURED TO PREVENT PENETRATION. OPENINGS

LESS THAN 96 INCHES MUST HAVE APPROVED BAFFLES INSTALLED

TO PREVENT AN AUDIO OR ACOUSTICAL HAZARD. IF THE OPENING

EXCEEDS 96 INCHES, ACOUSTICAL BAFFLES MUST BE

SUPPLEMENTED BY EITHER HARDENED STEEL BARS OR AN

APPROVED INTRUSION DETECTION SYSTEM. STC SOUND BAFFLES

WILL BE PROVIDED WHERE DUCTWORK WILL BE CROSSING AN STC

RATED WALL.

1.

2.

N

KEYED NOTES

1 OVERSIZE LOUVER TO ALLOW MAKEUP AIR UNIT TO BE REMOVED

FROM CATWALK.

OSA FROM MAU SHALL BE DUCTED TO LOUVER.2

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

MAU

2MAINTENANCE CATWALK

OSA SUPPLY DOWN

RETURN/ EXHAUST DOWN

14 12 11 10 7

A

B

C

D

OSA SUPPLY DOWNRETURN/ EXHAUST DOWN

13 9 8

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:57:35 AM

M-103A

ISF

CA

TW

AL

K

FL

O

O R

PL

AN

O

PT

IO

N

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

J.

D

ES

IG

N

ER

J.

D

R

AW

ER

J.

C

H

EC

KE

R

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

1/8" = 1'-0"A1 CATWALK MECHANICAL PLAN - OPTION

OPTION BASE BID

KEY PLAN:

0 8' 16'8' 16'

GENERAL NOTES

PROVIDE SUPPLY DUCTING FROM MAKE UP AIR UNIT TO RETURN

AIR MIXING BOX OF EACH FAN COIL. PROVIDE DUCTED RELIEF AIR

BACK TO MAKE UP AIR UNIT.

AIR VENTS, DUCTS, OR ANY SIMILAR OPENINGS THAT BREACH THE

WALLS, FLOOR, OR CEILING OF THE SECURE AREAS MUST BE

APPROPRIATELY SECURED TO PREVENT PENETRATION. OPENINGS

LESS THAN 96 INCHES MUST HAVE APPROVED BAFFLES INSTALLED

TO PREVENT AN AUDIO OR ACOUSTICAL HAZARD. IF THE OPENING

EXCEEDS 96 INCHES, ACOUSTICAL BAFFLES MUST BE

SUPPLEMENTED BY EITHER HARDENED STEEL BARS OR AN

APPROVED INTRUSION DETECTION SYSTEM. STC SOUND BAFFLES

WILL BE PROVIDED WHERE DUCTWORK WILL BE CROSSING AN STC

RATED WALL.

1.

2.

N

KEYED NOTES

1 OVERSIZE LOUVER TO ALLOW MAKEUP AIR UNIT TO BE REMOVED

FROM CATWALK.

OSA FROM MAU SHALL BE DUCTED TO LOUVER.2

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

7 6

C

D

P

P

CH

P

P

B

B

P

P

P

P

UPS ROOM

ELECTRICAL

ROOM

STAIR 2

S2.1

MECHANICAL

ROOM

EF

EF

DX

UH

5 UH

UH

ET

ET

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:57:38 AM

M-401

ISF

EN

LA

RG

ED

P

LA

NS

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

D es ig ne r

Au th or

C he ck er

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

1/4" = 1'-0"1 ENLARGED MECHANICAL ROOM PLAN

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

NOTES:

2 ENERGY RECOVERY WHEEL

1 OA FILTER SECTION

4 SUPPLY FAN SECTION

3 HW & CHW COIL SECTION

6 ACCESS DOOR

5 BASE RAIL

8 SUPPLY AIR DISCHARGE

7 OUTDOOR AIR INTAKE

9 EXHAUST AIR DISCHARGE

7 84

10 EXHAUST FAN SECTION

11 EXHAUST FILTER SECTION

12 EXHAUST AIR INTAKE

13 DAMPER

14 LOCATION & DIMENSION OF SERVICE

CLEARANCE PER

MANUFACTURER

WITH MINIMUM CLEARANCE THE

HEIGHT AND WIDTH OF THE UNIT

NOTE: SEE PLANS FOR ACTUAL

FAN

LOCATIONS AND DISCHARGES

(HORIZONTAL OR VERTICAL ).

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:57:40 AM

M-501

ISF

M

EC

HA

NI

CA

L

DE

TA

IL

S

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

D es ig ne r

Au th or

C he ck er

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

NTSC1 ENERGY RECOVERY MAKEUP AIR UNIT DETAIL

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:57:45 AM

M-601

ISF

M

EC

HA

NI

CA

L

SC

HE

DU

LE

S

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

D es ig ne r

Au th or

C he ck er

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

AIR COOLED CHILLER SCHEDULE - BASE BID

MARK

TOTAL

CAPACITY

CHILLED WATER

FLOW E.W.T. L.W.T.

PRESSURE

DROP NO. FANS CFM

NO.

COMPRESSORS

COMPRESSOR

TYPE REFRIG

FULL LOAD

EFFICIENCY ELECTRICAL V/HZ/PH MCA MOP REMARKS

CH-1B 60 TONS 160 GPM 54 44 6 55,000 4 SCROLL R-410a 460/60/3 125 125 2 ELECTRICAL CONNECTIONS

(NORMAL & EMERGENCY); 30%

PROPYLENE GLYCOL; BATTERY

BACKUP

CONDENSING BOILER SCHEDULE - BASE BID

MARK

FUEL

SOURCE

INPUT

(MBH)

OUTPUT

(MBH)

MIN

EFFICIENCY

(%) GPM

E.W.T.

(F) L.W.T.

(F) V/HZ/PH REMARKS

B-1B NAT. GAS 625 594 95 59 120 140 115/60/1

B-2B NAT. GAS 625 594 95 59 120 140 115/60/1

PUMP SCHEDULE (CHILLED / HEATING HOT WATER) - BASE BID

MARK LOCATION SERVICE

TYPE FLOW

RATE

(GPM) HEAD (FT) FLUID

MOTOR

HP (MAX) V/HZ/PH RPM NOTESMOUNTING CONFIGURATION

P-1 OUTSIDE

CHILLER

CHILLED WATER

(PRIMARY)

BASE FLANGE

SUPPORTS

VERTICAL 160 30% PG 460/60/3

P-2 OUTSIDE

CHILLER

CHILLED WATER

(PRIMARY)

BASE FLANGE

SUPPORTS

VERTICAL 160 30% PG 460/60/3

P-3 MECH

ROOM

CHILLED WATER

(SECONDARY)

BASE FLANGE

SUPPORTS

VERTICAL 30% PG 460/60/3

P-4 MECH

ROOM

CHILLED WATER

(SECONDARY)

BASE FLANGE

SUPPORTS

VERTICAL 30% PG 460/60/3

P-5 MECH

ROOM

HEATING HOT WATER

(PRIMARY)

BASE FLANGE

SUPPORTS

VERTICAL 59 WATER

P-6 MECH

ROOM

HEATING HOT WATER

(PRIMARY)

BASE FLANGE

SUPPORTS

VERTICAL 59 WATER

P-7 MECH

ROOM

HEATING HOT WATER

(SECONDARY)

BASE FLANGE

SUPPORTS

VERTICAL WATER 460/60/3

P-8 MECH

ROOM

HEATING HOT WATER

(SECONDARY)

BASE FLANGE

SUPPORTS

VERTICAL WATER 460/60/3

AIR SEPARATOR SCHEDULE

MARK SERVICE

CONNECTION

SIZE

MAX OPERATING

TEMPERATURE

(Deg F)

MAX

OPERATING

PRESSURE

(PSI)

MAX

PRESSURE

DROP (FT) REMARKS

AS-1 CHILLED

WATER

4" 54

AS-2 HEATING

HW

3" 140

EXPANSION TANK SCHEDULE

MARK SERVICE TYPE

CONFIGU

RATION VOLUME MIN ACCEPTANCE VOL TANK PRE-CHARGE REMARKS

ET-1 CHILLED

WATER

BLADDER VERTICAL

ET-2 HEATING

HW

BLADDER VERTICAL

1. CHILLER SCHEDULE - IF THE BUILDING OPTION IS AWARDED, THIS SCHEDULE IS REPLACED BY CHILLER SCHEDULE - OPTION SHOWN ON M-601A.

1. BOILER SCHEDULE - IF THE BUILDING OPTION IS AWARDED, THIS SCHEDULE IS REPLACED BY BOILER SCHEDULE - OPTION SHOWN ON M-601A.

1. PUMP SCHEDULE - IF THE BUILDING OPTION IS AWARDED, THIS SCHEDULE IS REPLACED BY PUMP SCHEDULE - OPTION SHOWN ON M-601A.

NOT FOR C

ONSTRUCTIO

N - 7 5%

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

FI

LE

N U

M

BE

R

JO

H

N T

. D U

D G

EO

N

I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt

9/3/2019 11:57:49 AM

M-601A

ISF

M

EC

HA

NI

CA

L

SC

HE

DU

LE

S -O

PT

IO

N

JO

IN

T

BA

SE

L

EW

IS

M

CC

HO

RD

, W

AS

HI

NG

TO

N

SE

AT

TL

E

D

IS

TR

IC

T

E

AS

T

M

AR

G

IN

AL

W

AY

S

O U

TH

SE

AT

TL

E, W

AS

H

IN

G

TO

N

D es ig ne r

Au th or

C he ck er

A

U G

U

ST

NOT FOR CONSTRUCTION - 75% DESIGN

IN

FO

RM

AT

IO

N

SY

ST

EM

S

FA

CI

LI

TY

FY

P N

IS

F

AIR COOLED CHILLER SCHEDULE - OPTION

MARK

TOTAL

CAPACITY

CHILLED WATER

FLOW E.W.T. L.W.T.

PRESSUR

E DROP NO. FANS CFM

NO.

COMPRESSORS

COMPRESSOR

TYPE REFRIG

FULL LOAD

EFFICIENCY ELECTRICAL V/HZ/PH MCA MOP REMARKS

CH-1 100 267 GPM 54 44 8 72,750 4 SCROLL R-410a 460/60/3 206 225 2 ELECTRICAL CONNECTIONS

(NORMAL & EMERGENCY); 30%

PROPYLENE GLYCOL; BATTERY

BACKUP

CONDENSING BOILER SCHEDULE - OPTION

MARK

FUEL

SOURCE

INPUT

(MBH)

OUTPUT

(MBH)

MIN

EFFICIENCY

(%) GPM

E.W.T.

(F) L.W.T.

(F) V/HZ/PH REMARKS

B-1 NAT. GAS 800 760 95 76 120 140 115/60/1

B-2 NAT. GAS 800 760 95 76 120 140 115/60/1

PUMP SCHEDULE (CHILLED / HEATING HOT WATER) - OPTION

MARK LOCATION SERVICE

TYPE FLOW RATE

(GPM) HEAD (FT) FLUID

MOTOR

HP (MAX) V/HZ/PH RPM NOTESMOUNTING CONFIGURATION

P-1 OUTSIDE

CHILLER

CHILLED WATER

(PRIMARY)

BASE FLANGE

SUPPORTS

VERTICAL 267 30% PG 7.5 460/60/3

P-2 OUTSIDE

CHILLER

CHILLED WATER

(PRIMARY)

BASE FLANGE

SUPPORTS

VERTICAL 267 30% PG 7.5 460/60/3

P-3 MECH

ROOM

CHILLED WATER

(SECONDARY)

BASE FLANGE

SUPPORTS

VERTICAL 30% PG 15 460/60/3

P-4 MECH

ROOM

CHILLED WATER

(SECONDARY)

BASE FLANGE

SUPPORTS

VERTICAL 30% PG 15 460/60/3

P-5 MECH

ROOM

HEATING HOT WATER

(PRIMARY)

BASE FLANGE

SUPPORTS

VERTICAL 76 WATER 1

P-6 MECH

ROOM

HEATING HOT WATER

(PRIMARY)

BASE FLANGE

SUPPORTS

VERTICAL 76 WATER 1

P-7 MECH

ROOM

HEATING HOT WATER

(SECONDARY)

BASE FLANGE

SUPPORTS

VERTICAL WATER 7.5 460/60/3

P-8 MECH

ROOM

HEATING HOT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .