ISF_Drawings_VOL_III.pdf
PDF 12 MB Posted
- Attached to
- Information Systems Facility, Joint Base Lewis-McChord (JBLM), WA Federal contract opportunity
- Solicitation number
- W912DW19R0025
About this file
This document includes a federal contract opportunity solicitation and related engineering drawings and schedules. The solicitation is for the construction of a new 44,832 square foot Information Systems Facility at Joint Base Lewis-McChord in Washington. The facility will include administrative offices, meeting rooms, technical spaces for equipment testing and secure communications systems. Highest classification level will be Secret. Supporting site work includes utilities, parking, landscaping and signage. Heating and air conditioning will use self-contained systems. The estimated value is between $25-100 million. Responses are requested through a two-part solicitation on the FBO website, with technical proposals due initially and price proposals later. The point of contact is provided for questions. The engineering drawings and schedules provide layouts and details for the plumbing systems in the proposed facility.
ISF Drawings VOL III
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Slides_10-17-2019.pdf | ||
| Site_Visit_Roster_Sheet_10-17-2019.pdf | ||
| Amendment_R0001.pdf | ||
| ISF_Watermarked_Specs.pdf | ||
| ISF_Drawings_VOL_I.pdf | ||
| Attachment_1.docx | DOCX document | |
| ISF_Drawings_VOL_II.pdf | ||
| RFP_W912DW19R0025.pdf | ||
| ISF_Watermarked_Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELECTRICAL
ROOM
DIRECTOR
FILE STORAGE
205BREAK AREA
WOMEN
NETWORK
OPERATIONS
CENTER (NOC) /
NOC STORAGE
STAIR 1
S1.2
ELEVATOR
E1.2
SIPR / TR
KS-1
WC-2LAV-1
FD-1/TP-1
4" VENT UP TO 4" VTR
4" SEWER DOWN TO
FLOOR BELOW
2-1/2" CW UP FROM FLOOR
BELOW TO FIXTURES
LAV-1
LAV-1
LAV-1
LAV-1
LAV-1
LAV-1
LAV-1
LAV-1
LAV-1
UR-1
WC-1
WC-1
UR-1
WC-2
WC-1
WC-1
WC-1
WC-1
FD-1/TP-1
EWC-1
STAIR 2
S2.2
EXECUTIVE
CONFERENCE
OFFICE SUITE
MEN
SS-1
2" HW DOWN TO
FLOOR BELOW
2" HW TO FIXTURES
CORRIDOR
3/4" CW
ABOVE
CEILING
OUTLINE OF
MECH EQUIPT IN
THE CATWALK
SK-1
1-1/2"CD
(PUMPED)
1-1/2"CD
(PUMPED)
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
1-1/2"CD
(PUMPED)
3/4"CD
(PUMPED)
1-1/2"CD
(PUMPED)
3/4"CD
(PUMPED)
1-1/2
"CD
(PUMPED)
1-1/4"CD
(PUMPED)
CO, TYP
CO, TYP
1-1/2"CD
(PUMPED)
1-1/4"CD
(PUMPED)
1-1/4"CD
(PUMPED)
3/4"HW
ABOVE
CEILING
1/2" CW FROM TOILETS
3/4" CW
TO EWC-1
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)3/4"CD
(PUMPED)
3/4"CW
ABOVE CEILING
3/4"CW
ABOVE CEILING
7 6 5 4 3 1
A
B
C
D
DEPUTY
DIRECTOR
NETWORK AND
SWITCH
TECHNICIANS
WORKSPACE
DIVISION CHIEF
OFFICE
BRANCH CHIEF
OFFICE
BRANCH CHIEF
OFFICE
STORAGE
FILES
NETWORK AND
SWITCH
TECHNICIANS
WORKSPACE
OTHER ADMIN /
CONTRACTORS
TRAINING AND
TESTING CENTER
LAB
DIVISION
COMPUTER AND
EQUIPMENT
STORAGE
NURSING
MOTHERS ROOM
CUSTODIAL
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
2"CD DOWN &
DISCHARGE ON SS-1
WITH AIRGAP
29 8
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:58:27 AM
P-102
ISF
SE
CO
ND
F
LO
O
R
PL
AN
BA
SE
B
ID
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
J.
D
ES
IG
N
ER
J.
D
R
AW
ER
J.
C
H
EC
KE
R
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
1/8" = 1'-0"A1 SECOND FLOOR PLUMBING PLAN - BASE BID OPTION BASE BID
KEY PLAN:
0 8' 16'8' 16'
SHEET NOTES
1. REFERENCE SHEET P-001 FOR PLUMBING SYMBOLS AND ABBREVIATIONS.
2. REFERENCE SHEET P-901 AND P-902 FOR SHUT OFF VALVES.
3. LOCATE COMMERCIAL WATER HAMMER ARRESTERS IN ACCORDANCE WITH
PDI RECOMMENDATIONS. WATER HAMMER ARRESTERS SHALL BE PISTON
TYPE, FACTORY AIR CHARGED, PERMANENTLY SEALED, AND APPROVED
FOR INSTALLATION WITH NO ACCESS PANEL REQUIRED.
4. COLD WATER, HOT WATER, HOT WATER RECIRC, AND CONDENSATE DRAIN
PIPING SHALL BE INSULATED.
5. COLD WATER, HOT WATER, HOT WATER RECIRC, AND CONDENSATE DRAIN
PIPING ARE ABOVE CEILING, UNLESS NOTED OTHERWISE.
6. SANITARY SEWER AND WASTE PIPING ARE UNDERGROUND, UNLESS NOTED
OTHERWISE.
N
KEYED NOTES
1 CONNECT CONDENSATE DRAIN ON DISCHARGE SIDE OF FAN COIL
UNIT CONDENSATE DRAIN PUMP.
CONNECT CONDENSATE DRAIN ON DISCHARGE SIDE OF CRAC UNIT
CONDENSATE DRAIN PUMP.
CONNECT CONDENSATE DRAIN ON DISCHARGE SIDE OF MAKE-UP
AIR UNIT CONDENSATE DRAIN PUMP.
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
ESIG
N
OUTLINE OF
MECH EQUIPT
ABOVE ON THE
CATWALK
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
1-1/4"CD
(PUMPED)
1-1/2"CD
(PUMPED)
1-1/4"CD
(PUMPED)
CO, TYP
CO, TYP
1-1/2"CD
(PUMPED)
1-1/4"CD
(PUMPED)
1-1/4"CD
(PUMPED)
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
3/4"CD
(PUMPED)
1-1/2"CD
(PUMPED)
14 12 11 10 7
A
B
C
D
CONTRACTOR
AREA
A238
IA TECHNICIAN
WORKSPACE
A231
DIVISION CHIEF
OFFICE
A237
BRANCH CHIEF
OFFICE
A236
BRANCH CHIEF
OFFICE
A235
IA SECURITY PKI
ROOM
A234
STAIR 3
AS3.2
GENERAL
PURPOSE TEAM
ROOM
A239
GENERAL
PURPOSE TEAM
ROOM
A240
ACAS SCANNERS
A232
COMSEC VAULT
A233
CORRIDOR
A226
CONFERENCE /
CLASSROOM B
A229
CONFERENCE /
CLASSROOM A
A228
REPRO / MEDIA
WORK ROOM
A227
CONFERENCE/
CLASSROOM C
A230
3/4"CD
(PUMPED)
13 9 8
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:58:32 AM
P-102A
ISF
SE
CO
ND
F
LO
O
R
PL
AN
O
PT
IO
N
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
J.
D
ES
IG
N
ER
J.
D
R
AW
ER
J.
C
H
EC
KE
R
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
1/8" = 1'-0"A1 SECOND FLOOR PLUMBING PLAN - OPTION
OPTION BASE BID
KEY PLAN:
0 8' 16'8' 16'
SHEET NOTES
1. REFERENCE SHEET P-001 FOR PLUMBING SYMBOLS AND ABBREVIATIONS.
2. REFERENCE SHEET P-901 AND P-902 FOR SHUT OFF VALVES.
3. LOCATE COMMERCIAL WATER HAMMER ARRESTERS IN ACCORDANCE WITH
PDI RECOMMENDATIONS. WATER HAMMER ARRESTERS SHALL BE PISTON
TYPE, FACTORY AIR CHARGED, PERMANENTLY SEALED, AND APPROVED
FOR INSTALLATION WITH NO ACCESS PANEL REQUIRED.
4. COLD WATER, HOT WATER, HOT WATER RECIRC, AND CONDENSATE DRAIN
PIPING SHALL BE INSULATED.
5. COLD WATER, HOT WATER, HOT WATER RECIRC, AND CONDENSATE DRAIN
PIPING ARE ABOVE CEILING, UNLESS NOTED OTHERWISE.
6. SANITARY SEWER AND WASTE PIPING ARE UNDERGROUND, UNLESS NOTED
OTHERWISE.N
KEYED NOTES
1 CONNECT CONDENSATE DRAIN ON DISCHARGE SIDE OF FAN COIL
UNIT CONDENSATE DRAIN PUMP.
CONNECT CONDENSATE DRAIN ON DISCHARGE SIDE OF CRAC UNIT
CONDENSATE DRAIN PUMP.
CONNECT CONDENSATE DRAIN ON DISCHARGE SIDE OF MAKE-UP
AIR UNIT CONDENSATE DRAIN PUMP.
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
B
C
9 8
MEN
WOMEN
UNISEX
LAV-2
SS-1
FD-1/TP-1
3" VENT UP
AND DOWN
4" SEWER UP LAV-1
LAV-1
LAV-1
UNISEX
WC-2
WC-2
WC-1 WC-1
WC-1
UR-2
WC-2
FD-1/TP-1
1 1/2" HW UP TO
FLOOR ABOVE
TO FIXTURES
1 1/2" HW
2" HW
ABOVE
CEILING
1-1/2"CD
(PUMPED)
1-1/4"CD
(PUMPED)
LAV-2WC-2
LAV-1
LAV-1
LAV-1
2"CD DOWN &
DISCHARGE
ON SS-1 WITH
AIRGAP
2-1/2" CW UP
3/4" HWC ABOVE
CEILING
4" SEWER,
UNDERGROUND
@ 2% SLOPE
EWC-1
CORRIDOR
CORRIDOR
VESTIBULE
HB-2
FCO,
I.E.-2'-0"
B
C
9 8
WOMEN
WC-2
LAV-1
FD-1/TP-1
4" VENT UP TO 4" VTR
4" SEWER DOWN TO
FLOOR BELOW
2-1/2" CW DOWN TO
FLOOR BELOW
LAV-1
LAV-1
LAV-1
LAV-1
LAV-1
LAV-1
LAV-1
LAV-1
LAV-1
UR-2
WC-1
WC-1
UR-1
WC-2
WC-1
WC-1
WC-1
WC-1
FD-1/TP-1
EWC-1
MEN
SS-1
1 1/2" HW DOWN TO
FLOOR BELOW
CORRIDOR
3/4" CW
ABOVE
CEILING
1-1/2"CD
(PUMPED)
1-1/4"CD
(PUMPED)
1/2" CW
TO EWC-1
3/4"CW
ABOVE CEILING
CUSTODIAL
2"CD DOWN &
DISCHARGE ON SS-1
WITH AIRGAP
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:58:38 AM
P-401
ISF
EN
LA
RG
ED
P
LA
NS
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
D es ig ne r
Au th or
C he ck er
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
1/4" = 1'-0"C1 FIRST FLOOR ENLARGED PLUMBING PLAN - BASE BID
1/4" = 1'-0"C6 SECOND FLOOR PLUMBING PLAN - BASE BID
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
B
C
KS-1
3/4" CW
ABOVE
CEILING
FCO
I.E.-1'-6"
FCO,
I.E.-2'-0"
1-1/4"CD
(PUMPED)
2" WASTE,
UNDERGROUND
@ 2% SLOPE
3/4" HWC
ABOVE
CEILING
2" WASTE,
UNDERGROUND
@ 2% SLOPE
CORRIDOR
A137
BREAK AREA
A134
LOCKER /
SHOWER ROOM
A136
SH-1
SHD-1
TP-2
SH-1
SHD-1
TP-2FD-1
TP-2
LOCKER /
SHOWER ROOM
A135
SH-1
SHD-1
TP-2
SH-1
SHD-1
TP-2
FD-1
TP-2
FD-1
TP-2
FD-1
TP-2
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:58:41 AM
P-401A
ISF
EN
LA
RG
ED
P
LA
NS
O
PT
IO
N
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
D es ig ne r
Au th or
C he ck er
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
1/4" = 1'-0"B1 FIRST FLOOR PLUMBING PLAN - OPTION
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
STACK SUPPORT.
COMBINATION TEMPERATURE/
PRESSURE RELIEF VALVE.
FINISHED FLOOR
T
CP
CIRCUIT
SETTER
HEAT TRAP
28" DROP
RUN RELIEF PIPING FULL
SIZE AND TERMINATE DIRECTLY
SURFACE MOUNT ADJACENT
TO GWH.
T
CIRCUIT
SETTER
GWH
G
CONTROL
PANEL
G PVC
PVC
DIRT LEG
6" MINIMUM
CONCRETE BASE (TYP.)
SEISMIC
STRAP
2 1/2" CW
ABOVE FD-2. (TYPICAL)RESET SET POINT TO 120^F.
2 1/2" TEMPERED HW (120°F)
T
CONDENSATE PIPE; PROVIDE
CONDENSATE NEUTRALIZER KIT
PRIOR TO DISCHARGE TO FD (TYPICAL)
P PHIGH-LOW FLOW
THERMOSTATIC MIXING VALVES.
PLUMBING
EXPANSION
TANK
(PET)
EXHAUST AIR
3/4" HWC
2"
3/4" 2 1/2"
T
NOTE:
1. USING CONTROLLER INTERFACE CARD, MONITOR GWH'S THRU DDC.
IN ADDITION, MONITOR HOT WATER TEMPERATURE THRU TEMPERATURE SENSORS
CONNECTED TO DDC AT LOCATIONS OF ALL TEMPERATURE GAUGES SHOWN
ABOVE.
M M
2"
2 1/2" 2"
2"
WALL
CONCENTRIC VENT KIT
FOR WALL, INSTALL
PER MANUFACTURER'S
RECOMMENDATIONS. US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:58:43 AM
P-501
ISF
PL
UM
BI
NG
D
ET
AI
LS
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
D es ig ne r
Au th or
C he ck er
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
NOT TO SCALED1 NATURAL GAS DOMESTIC WATER HEATER
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:58:50 AM
P-601
ISF
PL
UM
BI
NG
S
CH
ED
UL
ES
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
D es ig ne r
Au th or
C he ck er
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
PLUMBING FIXTURE SCHEDULE - BASE BID
MARK DESCRIPTION MOUNTING C.W. (IN) H.W. (IN) WASTE (IN) VENT (IN) NOTES
EW-1 EMERGENCY EYEWASH FLOOR 1/2" 1/2" 1 1/2" 1 1/2" PEDESTAL MOUNTED; INCLUDES THERMOSTATIC MIXING VALVE
EWC-1 ELECTRIC WATER COOLER WALL 1/2" 1 1/2" 1 1/2" SPLIT-LEVEL ACCESSIBLE TYPE INCLUDES BOTTLE FILLER; 115V
FD-1 FLOOR DRAIN FLOOR 2" 2" INCLUDES TRAP PRIMER
FD-2 FLOOR DRAIN FLOOR 3" 2" INCLUDES TRAP PRIMER
FS-1 FLOOR SINK FLOOR 3" 2" INCLUDES TRAP PRIMER
HB-2 HOSE BIBB / WALL HYDRANT WALL 3/4" FREEZE-PROOF;
KS-1 KITCHEN SINK UNDERMOUNT COUNTER 1/2" 1/2" 1 1/2" 1 1/2" 1.5 GPM
LAV-1 LAVATORY (ABA) PREFABRICATED DECK 1/2" 1/2" 1 1/2" 1 1/2" 0.35 GPM; ELECTRONIC SENSOR; PROVIDE MFR'S TRANSFORMER LAV-2 LAVATORY (ABA) WALL 1/2" 1/2" 1 1/2" 1 1/2" 0.35 GPM; ELECTRONIC SENSOR; PROVIDE MFR'S TRANSFORMER
OB-1 ICE MAKER OUTLET BOX WALL 1/2"
P-15 MOP WORK SINK FLOOR 1/2" 1/2" 3" 2"
SK-1 SINGLE COMPARTMENT SINK UNDERMOUNT COUNTER 1/2" 1/2" 1 1/2" 1 1/2" 1.5 GPM
SS-1 MOP SERVICE SINK FLOOR 1/2" 1/2" 3" 2"
UR-1 URINAL WALL 3/4" 2" 2" 0.125 GPF; ELECTRONIC SENSOR; PROVIDE MFR'S TRANSFORMER UR-2 URINAL (ABA) WALL 3/4" 2" 2" 0.125 GPF; ELECTRONIC SENSOR; PROVIDE MFR'S TRANSFORMER WC-1 WATER CLOSET WALL 1" 4" 2" 1.28 GPF; ELECTRONIC SENSOR; PROVIDE MFR'S TRANSFORMER WC-2 WATER CLOSET (ABA) WALL 1" 4" 2" 1.28 GPF; ELECTRONIC SENSOR; PROVIDE MFR'S TRANSFORMER
PLUMBING EXPANSION TANK SCHEDULE
MARK NO. LOCATION SERVICE CONFIGURATION TYPE
VOLUME
(GAL)
ACCEPTANCE
VOLUME (GAL) NOTES
PET-1 MECH
ROOM
DOM HOT
WATER
VERTICAL DIAPHRAGM 6.4 3.2
WATER HAMMER ARRESTER SCHEDULE
MARK
FIXTURE UNIT
RATING SIZE NOTES
WHA-B
TRAP PRIMER SCHEDULE
MARK NO. SIZE
NUMBER OF FLOOR
DRAINS CONNECTED TYPE REMARKS
TP-1
TP-2
THERMOSTATIC MIXING VALVE SCHEDULE
MARK SERVICE
MIN
FLOW
(GPM)
MAX
FLOW
(GPM)
PRESSURE
DROP (PSI) @
MAX FLOW SETPOINT ACCURACY NOTES
TMV-1A DOM HOT
WATER
1 <5 120 °F +/- 5 °F HIGH-LOW FLOW TYPE
TMV-1B DOM HOT
WATER
47 10 120 °F +/- 5 °F HIGH-LOW FLOW TYPE
DOMESTIC HOT WATER HEATER SCHEDULE
MARK LOCATION
STORAGE
TANK
CAPACITY
(MINIMUM)
RECOVERY
RATE (GPH)
FUEL
SOURCE INLET
WATER
TEMP
OUTLET
WATER
TEMP
INPUT
(MBH)
NET
OUTPUT
(MBH)
MINIMUM
EFFICIENCY
PLUMBING DIRECT VENT (IN)
V/HZ/PH NOTESTYPE CW (IN) HW (IN) GAS (IN) FLUE
OUTDOOR
AIR
GWH-1 MECH
ROOM
119 349 NATURAL
GAS
40 140 300 288 96% 1 1/2" 1 1/2" 1 1/2" 4" 4" 115/60/1
DOMESTIC HOT WATER CIRCULATING PUMP SCHEDULE
MARK LOCATION TYPE
CAPACITY
(GPM)
TOTAL
HEAD (FT) HP V/HZ/PH RPM NOTES
CP-1 MECHANICAL
ROOM
INLINE 5 20 1/6 115/60/1 3400
CP-1d
BACKFLOW PREVENTER SCHEDULE
MARK NO. SERVICE LOCATION TYPE SIZE
PRESSURE
DROP (PSI)
MAX
FLOW
(GPM) NOTES
BFP-1 DOMESTIC SERVICE MECH ROOM DOUBLE CHECK 3"
BFP-2 HYDRONIC WATER
MAKEUP
MECH ROOM REDUCED
PRESSURE
1"
SUMP PUMP SCHEDULE
MARK SERVICE TYPE
CAPACITY
(GPM) HEAD (FT)
DISCHARGE
PIPE SIZE HP (MAX) V/HZ/PH RPM REMARKS
SP-1 ELEVATOR PIT
SUMP
SUBMERSIBLE
CENTRIFUGAL
50 14 1/2 115/60/1 3450 OIL-SENSING CONTROLS
1. PLUMBING FIXTURE SCHEDULE - IF THE BUILDING OPTION IS AWARDED, THIS SCHEDULE IS APPENDED BY PLUMBING FIXTURE SCHEDULE - OPTION SHOWN ON P-601A.
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:58:53 AM
P-601A
PL
UM
BI
NG
S
CH
ED
UL
ES
O
PT
IO
N
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
D es ig ne r
Au th or
C he ck er
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
PLUMBING FIXTURE SCHEDULE (OPTION)
MARK DESCRIPTION MOUNTING C.W. (IN) H.W. (IN) WASTE (IN) VENT (IN) NOTES
SH-1 SHOWER (ABA) WALL 1/2" 1/2" 2" 2" 1.1 GPM; HANDHELD SHOWER WITH HOSE; INCLUDES SHD-1
SHD-1 SHOWER DRAIN FLOOR 2" 2"
1. PLUMBING FIXTURE SCHEDULE - OPTION SUPPLEMENTS BASE BID PLUMBING FIXTURE SCHEDULE.
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
RESTROOMS
INCLUDING EWC-1
RESTROOMS
MECH RM
FROM SITE
POTABLE WATER
SOURCE
1ST FLOOR 257'-6"
2ND FLOOR 272'-6"
CATWALK 286'-6"
ROOF (VARIES DUE TO SLOPE)
3"CW
2"CW
1"ICW 3"CW
EWC-1
EWC-1
SOV, TYP
STRAINER
WM-1
PRV-1
BFP-1
BFP-2
1" ICW TO
MECH EQUIPT
3"CW
2"CW 3/4"HWC
1/2"CW
1 1/2"HW
1 1/2"HW
3"CW
2-1/2"CW
FIN GRADE 257'-6"
SK-1
1/2"HW 1/2"CW
1 1/2"HW
3/4"CW
2-1/2"CW
KS-1
1/2"HW 1/2"CW
2"HW
WH-1, ET-1,
TMV-1, CP-1
NOTES
1. PROVIDE SHUT OFF VALVE ON COLD WATER PIPING AT EACH GROUP OF FIXTURES.
2. THE NUMBER OF VALVES SHOWN ARE THE REQUIRED MINIMUM. ADDITIONAL VALVES
MAY BE REQUIRED DURING FINAL DESIGN.
3. HOT WATER SUPPLY PIPING SHALL LOOP AT EACH GROUP OF FIXTURES TO
ELIMINATE "DEAD LEGS".
4. SHUT OFF VALVES (SOV) SHALL BE LEAD-FREE, TWO-PIECE SILICON BRONZE ALLOY
BODY, FULL PORT (1/2" TO 2") OR CONVENTIONAL PORT (2-1/2" TO 3"), BLOWOUT-
ROOF STEM, STAINLESS STEEL TRIM, VENTED BALL, DEZINCIFICATION RESISTANT,
AND 600 PSI NON-SHOCK COLD WORKING PRESSURE.
2"CW
EWC-1
2" FCO 4" FCO 4" COTG
RESTROOMS
INCLUDING EWC-1
RESTROOMS
MECH RM
TO SITE
SANITARY
SEWER
4" VTR
2"W 4"W 4"S 4"S
4"S
2"V
3"V 2"V
2"V 2"V
4"W
2"V
2"V
2"V
4"V
1ST FLOOR 257'-6"
2ND FLOOR 272'-6"
CATWALK 286'-6"
ROOF (VARIES DUE TO SLOPE)
FIN GRADE 257'-6"
2"V 2"V
SK-1EWC-1
2"W
2"W
4"S
1-1/2"V
2"W
2"V
KS-1
2"W
1-1/2"V
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:58:55 AM
P-901
ISF
SC
HE
M
AT
IC
D
IA
G
RA
M
S -B
AS
E
BI
D
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
J.
D
ES
IG
N
ER
J.
D
R
AW
ER
J.
C
H
EC
KE
R
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
NTSD3 HOT & COLD WATER SCHEMATIC DIAGRAM - BASE BID
NTSA3 SANITARY SEWER, WASTE & VENT SCHEMATIC DIAGRAM - BASE BID
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
RESTROOMS
INCLUDING EWC-1
RESTROOMS
MECH RM
FROM SITE
POTABLE WATER
SOURCE
1ST FLOOR 257'-6"
2ND FLOOR 272'-6"
CATWALK 286'-6"
ROOF (VARIES DUE TO SLOPE)
3"CW
2"CW
1"ICW 3"CW
EWC-1
EWC-1
SOV, TYP
STRAINER
WM-1
PRV-1
BFP-1
BFP-2
1" ICW TO
MECH EQUIPT
3"CW
2"CW 3/4"HWC
1/2"CW
1 1/2"HW
1 1/2"HW
3"CW
2-1/2"CW
FIN GRADE 257'-6"
SK-1
1/2"HW 1/2"CW
3/4"CW
2-1/2"CW
KS-1
1/2"HW 1/2"CW
KS-1
1/2"HW
1/2"CW
1"CW1"HW
1/2"HWC
2"HW
WH-1, ET-1,
TMV-1, CP-1
NOTES
1. PROVIDE SHUT OFF VALVE ON COLD WATER PIPING AT EACH GROUP OF FIXTURES.
2. THE NUMBER OF VALVES SHOWN ARE THE REQUIRED MINIMUM. ADDITIONAL VALVES
MAY BE REQUIRED DURING FINAL DESIGN.
3. HOT WATER SUPPLY PIPING SHALL LOOP AT EACH GROUP OF FIXTURES TO
ELIMINATE "DEAD LEGS".
4. SHUT OFF VALVES (SOV) SHALL BE LEAD-FREE, TWO-PIECE SILICON BRONZE ALLOY
BODY, FULL PORT (1/2" TO 2") OR CONVENTIONAL PORT (2-1/2" TO 3"), BLOWOUT-
ROOF STEM, STAINLESS STEEL TRIM, VENTED BALL, DEZINCIFICATION RESISTANT,
AND 600 PSI NON-SHOCK COLD WORKING PRESSURE.
2"CW
SHOWER ROOMS
& BREAK ROOM
1 1/2"HW
EWC-1
2" FCO 4" FCO 4" COTG
RESTROOMS
INCLUDING EWC-1
RESTROOMS
MECH RM
TO SITE
SANITARY
SEWER
4" VTR
2"W 4"W 4"S 4"S
4"S
2"V
3"V 2"V
2"V 2"V
4"W
2"V
2"V
2"V
4"V
1ST FLOOR 257'-6"
2ND FLOOR 272'-6"
CATWALK 286'-6"
ROOF (VARIES DUE TO SLOPE)
FIN GRADE 257'-6"
2"V 2"V
SK-1EWC-1
2"W
2"W
4"S
1-1/2"V
2"W
2"V
KS-1
2"W
1-1/2"V
KS-1
1-1/2"V
2"W
2" FCO
SHOWER ROOMS
& BREAK ROOM
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:58:56 AM
P-901A
ISF
SC
HE
M
AT
IC
D
IA
G
RA
M
S -O
PT
IO
N
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
D es ig ne r
Au th or
C he ck er
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
NTSD2 HOT & COLD WATER SCHEMATIC DIAGRAM - OPTION
NTSA2 SANITARY SEWER, WASTE & VENT SCHEMATIC DIAGRAM - OPTION
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
MECH RM
FROM SITE
NATURAL GAS
SOURCE (PSE)
1ST FLOOR 257'-6"
2ND FLOOR 272'-6"
CATWALK 286'-6"
ROOF (VARIES DUE TO SLOPE)
2"MPG
1-1/2"G
2"G
PLUG VALVE
GM-1
GPR-1
DRIP LEG, TYP
3"G
WH-1
FIN GRADE 257'-6"
EQV-1
2"G
4"G, 14"w.c.
BOILERBOILER
NOTES
1. PLUG VALVES SHALL BE BLACK IRON BODY, BRASS FLATHEAD PLUG, RATED FOR
175 PSIG NATURAL GAS PRESSURE, AND TAMPER-RESISTANT.
2. SHUT OFF VALVES (SOV) SHALL BE FULL PORT THREADED END FORGED BRASS
BALL VALVES SUITABLE FOR NATURAL GAS USE, AND RATED FOR 600 CWP (1/2" TO
2") OR 400 CWP (2-1/2" TO 4").
3. THE NUMBER OF VALVES SHOWN ARE THE REQUIRED MINIMUM. ADDITIONAL
VALVES MAY BE REQUIRED DURING FINAL DESIGN.
SOV, TYP
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:58:58 AM
P-902
ISF
NA
TU
RA
L
G
AS
S
CH
EM
AT
IC
D
IA
G
RA
M
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
J.
D
ES
IG
N
ER
J.
D
R
AW
ER
J.
C
H
EC
KE
R
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
NTSD3 NATURAL GAS SCHEMATIC DIAGRAM
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:56:55 AM
M-001
ISF
G
EN
ER
AL
N O
TE
S, A
BB
RE
VI
AT
IO
NS
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
J.
D
ES
IG
N
ER
J.
D
R
AW
ER
J.
C
H
EC
KE
R
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
ABBREVIATIONS PIPING SYMBOLSHVAC SYMBOLS
DRAWING / DETAIL REFERENCE KEY
RE: 2 / M-XXX
SHEET NUMBER OF DRAWING/DETAIL
DEMOLITION NOTE
DRAWING/DETAIL NUMBER
REFER TO
EQUIPMENT IDENTIFICATION
EQUIPMENT TAG
DIFFUSER / REGISTER OR GRILLE
REVISION DESIGNATION
KEYED NOTE 1
M-XXX
P
A
AIR RISERAR
BLOW-DOWNB/D
BOILERB
CT COOLING TOWER,
DIFFERENTIAL PRESSURED/P
FIRE DAMPERFD
MAKE-UP (WATER)M/U
OF OVERFLOW
(COMBINATION) SMOKE-FIRE DAMPERSFD
TEMPERATURE
D
DOUBLE-POLE, DOUBLE-THROW
ENTERING WATER TEMPERATURE
FIRE ALARM CONTROL PANEL
DOUBLE-POLE, SINGLE-THROW
ELEC
EWB
EWT
EWC
ESP
EL
EFF
EQUIP
F
FCO
FA
FACP
EXIST, (E)
EXH
° F
FT
FIRE ALARM
FOOT, FEET
DEGREES FAHRENHEIT
FLOOR CLEANOUT
ELEVATION
EQUIPMENT
ELECTRICAL
EFFICIENCY
EXTERNAL STATIC PRESSURE
ELECTRIC WATER COOLER
ENTERING WET BULB
EXHAUST
EXISTING
DIA, Ø
DC
DEG
DESIG
DB
dB, dB(A)
DX
DS
DWG(S)
DPST
DIM
DN
DISC
DPDT
E
EA
ECC
EDB
EAT
D
DOWNSPOUT
ECCENTRIC
ENTERING AIR TEMPERATURE
ENTERING DRY BULB
DIRECT EXPANSION
EXHAUST AIR, EACH
DRAWING(S)
DRY BULB
DESIGNATION
DIMENSION
DISCONNECT
DIRECT CURRENT
DEGREES
DIAMETER
DOWN
DEPTH
DECIBEL
MANUFACTURERS ASSOCIATION
NATIONAL FIRE PROTECTION
ASSOCIATION
NOT IN CONTRACT
NUMBER
NORMALLY OPEN
OUTSIDE STEM AND YOKE
OCCUPATIONAL SAFETY AND
OPPOSED BLADE DAMPER
OUTSIDE DIAMETER
OUTSIDE AIR
ON CENTER
OPG
OH
OS&Y
OSHA
OVERHEAD
OPENING
O
NIC
NO.
N.O.
NFPA
OA
OC
OD
OBD
NATIONAL ELECTRICAL
NOISE CRITERIA, NORMALLY CLOSED
NATIONAL ELECTRICAL CODE
1000 BTU PER HOUR
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MINIMUM CIRCUIT AMPACITY
NOT APPLICABLE
MOTOR GENERATOR
MOTORIZED DAMPER
MANUFACTURER
MECHANICAL
LEAVING WATER TEMPERATURE
MG
MTD
MIN
NEC
NC
N/A
NEMA
N
MINIMUM, MINUTE
MOUNTED
M
MCA
MCB
MBH
MAX
MD
MCC
MFR
MECH
LWT
MAXIMUM
U/G U/F
U/S
U
TYP
TSP TOTAL STATIC PRESSURE
UNDERFLOOR
UNDERGROUND
UNDERSLAB
TYPICAL
THERMOSTAT
RECIRC
SMACNA
SHT MTL
Q
HID HIGH INTENSITY DISCHARGE
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AMERICAN SOCIETY OF TESTING AND MATERIALS
AMERICAN SOCIETY OF HEATING, REFRIGERATION AND
C C
CCTV
CATV
BTU
CMU
CLG
CFS
CFM
CFH
, CL
CIRC
CKT
CI
CO
CU
°C
CW
COL
CIRCULATING
CENTERLINE
CLEANOUT
COLD WATER
DEGREES CELSIUS
CONCRETE MASONRY UNIT
COLUMN
CONDENSING UNIT
CEILING, COOLING
CIRCUIT
CAST IRON
CUBIC FEET PER HOUR
CUBIC FEET PER MINUTE
CUBIC FEET PER SECOND
CABLE TELEVISION SYSTEM
CLOSED CIRCUIT TELEVISION SYSTEM
BRITISH THERMAL UNIT
CONDUIT
B
AUX
ASTM
ASME
AWS
AV
AWG
AWWA
ASHRAE
BFW
BLDG
BOS
BOP
BOD
BKR
BD
BOTTOM OF STRUCTURE
BOTTOM OF DUCT
BOTTOM OF PIPE
BACKDRAFT DAMPER
BOILER FEED WATER
BUILDING
BREAKER
AUXILIARY
AIR CONDITIONING ENGINEERS
AMERICAN WIRE GAUGE
AMERICAN WELDING SOCIETY
AMERICAN WATER WORKS ASSOCIATION
AIR VENT
LOW PRESSURE STEAM (15 PSIG)
LOCKED ROTOR AMPS
LEAVING AIR TEMPERATURE
LEAVING WET BULB
LEAVING DRY BULB
LOW PRESSURE
LINEAR FEET
KILOVOLT-AMPS
KILOWATT-HOUR
JUNCTION BOX
LSTM
LWB
LTG
LB(S), #
LDB
LRA
LAT
LP
LF
L L
LIGHTING
POUND(S)
LENGTH
J-BOX
KW
KVA
KWH
KV
K
J
KILOVOLT
KILOWATT
SQ
T
TDH
THRU
TP
STD
STL
ST
SS
SUSP
SURF
SP
SPEC
SD
SECT
SA
SHT
SIM
SF
HEATING, VENTILATING AND AIR CONDITIONING
HIGH PRESSURE STEAM
HAND-OFF-AUTOMATIC
INVERT ELEVATION
INSIDE DIAMETER
HOT WATER, HEATING WATER
HUMIDISTAT
HORIZONTAL
HORSEPOWER, HEAT PUMP
INCHES WATER GAUGE
ISOLATED GROUND
(IN WG)
IG
IN
IE
ID
INCH
I
HSTAT
HTG
HTR
HVAC
HPS
HOA
HP
HORIZ
HZ
HYD
HW
HYDRANT
HERTZ
HEATER
HEATING
RLA
S
RM
RS
RPM
REQD
REV
RHG
RH
RGS
RL
RCP
RA
REINF
RE:
RD
R
QTY
AMERICAN NATIONAL STANDARDS INSTITUTE
AMPERE INTERRUPTING CURRENT
AIR COOLED CONDENSING UNIT
AF
ADJ
AFC
AC
ACCU
AMPS
ANSI
ARCH
AL
AIC
AFG
AFF
ADJUSTABLE
AMPERE FUSE
ALUMINUM
ARCHITECT, ARCHITECTURAL
ABOVE FINISHED CEILING
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AMPERES
AIR PRESSURE DROP
ALTERNATING CURRENT,
GROUND FAULT RELAY
GALLONS PER MINUTE
GROUND FAULT INTERRUPTER
GENERAL CONTRACTOR
GALLONS PER HOUR
HEAD, HUB DRAIN
GALLONS PER DAY
GALVANIZED
GFI
GPD
GFR
GALV
GC
HD
GPM
GPH
H, HT
H
HEIGHT
G
GAL
GA
G,GND GROUND
GALLON
GAUGE
PV
PVC
PSV
PNL
PSI
PSF
PIV
PLBG
PSIG
PSIA
STAINLESS STEEL, SANITARY SEWER,
SQUARE
TOTAL DYNAMIC HEAD
TOTAL PRESSURE
SOUND TRAP, STEAM TRAP
THROUGH
STEEL
STANDARD
SUSPEND
SURFACE
SHEET METAL AND AIR
SMOKE DAMPER, STORM DRAIN
STATIC PRESSURE
NATIONAL ASSOCIATION
CONDITIONING CONTRACTORS
SHEET METAL
SPECIFICATION
SECTION
SHEET
SIMILAR
SUPPLY AIR
SQUARE FEET
RELATIVE HUMIDITY
REVISION, REVISE
RIGID GALVANIZED STEEL
REFRIGERANT HOT GAS
RATED LOAD AMPS
REFRIGERANT SUCTION
REFRIGERANT LIQUID
REVOLUTIONS PER MINUTE
ROOM
REQUIRED
REFERENCE, REFER
REFLECTED CEILING PLAN,
REINFORCED CONCRETE PIPE
RETURN AIR
RECIRCULATE
REINFORCING
ROOF DRAIN
QUANTITY
POUNDS PER SQUARE INCH ABSOLUTE
POUNDS PER SQUARE INCH GAUGE
POLYVINYL CHLORIDE
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POST INDICATOR VALVE
PLUG VALVE
PANEL
PLUMBING
SYMBOLSYM
RADIANTRAD
DISCHARGEDISCH
APD
OUTSIDE AIROSA
EXTERNALEXT
PRESSUREPRESS
FINS PER INCHFPI
EXHAUST FANEF
ROOFTOP UNITRTU
FAN COILFC
GV GATE VALVE,
AIR HANDLING UNITAHU
CHILLED WATER SUPPLYCHWS
CHWR CHILLED WATER RETURN
HHWR HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLYHHWS
POINT OF CONNECTIONPOC
POD POINT OF DISCONNECTION
STRUCTURALSTRUC
SERVICE SINK
IN WC INCHES OF WATER COLUMN
PRESSURE SAFETY VALVE, RELIEF VALVE
CONTROL DAMPERCD
TEMP
TSTAT
(SL) SOUND LINED
12"ø
20"x12"
DN
UP
S (ZONE)
T (ZONE)
MANUAL VOLUME DAMPER
POINT OF DISCONNECTION
COMBINATION SMOKE/FIRE DAMPER
SUPPLY AIR DIFFUSER - ARROWS INDICATE
PATTERN. NO PATTERN SHOWN EQUALS 4-WAY.
RETURN AIR GRILLE
EXHAUST GRILLE
RELIEF OR EXHAUST AIR DUCT
RETURN AIR DUCT
SUPPLY OR OUTSIDE AIR DUCT
SUPPLY OR OUTSIDE AIR DUCT DOWN
RETURN AIR DUCT DOWN
SUPPLY OR OUTSIDE AIR DUCT UP
RETURN AIR DUCT UP
ROUND DUCT BRANCH TAKE-OFF FROM
RECTANGULAR MAIN WITH CONICAL TAP.
DUCTWORK SIZE TRANSITION
RECTANGULAR DUCTWORK. SIZE INDICATED IN
INCHES, FIRST NUMBER IS SIDE SHOWN.
ROUND DUCTWORK.DIAMETER INDICATED IN INCHES.
RELIEF OR EXHAUST AIR DUCT DOWN
IN-LINE 90 DEGREE DROP (RISE) IN DUCT
TURNING VANES
INCLINED DROP IN DUCT
INCLINED RISE IN DUCT
POINT OF CONNECTION
NEW DUCTWORK
EXISTING DUCTWORK (N/A)
RELIEF OR EXHAUST AIR DUCT UP
VAV ZONE TERMINAL
RETURN AIR BOOT
FLEXIBLE DUCT (SINGLE PIECE, 7 FEET MAX.)
TEMPERATURE SENSOR (MOUNT 46" AFF)
HHW (AS APPLICABLE)
BACKDRAFT DAMPER
ROOM THERMOSTAT (MOUNT 46" AFF)
VALVE IN DROP
ELBOW DOWN
ELBOW UP
VALVE IN DROP
DIRECTION OF SLOPE DOWN
ECCENTRIC REDUCER
CONCENTRIC REDUCER
DIRECTION OF FLOW
VALVE IN RISE
UNION
EXPANSION JOINT
TEE OUTLET UP
TEE OUTLET DOWN
PIPE ANCHOR
CHECK VALVE
GATE VALVE
BALL VALVE
CAP
PRESSURE REDUCING VALVE
STRAINER WITH BLOWDOWN VALVE
T&P RELIEF VALVE
MANUAL AIR VENT
AUTOMATIC AIR VENT
VACUUM BREAKER
THERMOMETER
PIPE FLANGE
FLEXIBLE CONNECTION
THERMOMETER WELL
PRESSURE GAUGE WITH BALL VALVE
DOUBLE CHECK VALVE
XFMR
X
WB
WPD
W
W/O W/ W
VAV
VCP
VERT
VTR
VEL
VD
V V
VA
VAC
UL
UPS
UON
TRANSFORMER
WATER PRESSURE DROP
WET BULB
WITHOUT
WATT, WIDTH
WITH
UNDERWRITERS LABORATORIES, INC.
VOLUME DAMPER
VARIABLE AIR VOLUME
VITRIFIED CLAY PIPE
VENT THROUGH ROOF
VELOCITY
VERTICAL
VACUUM
VOLT-AMPERE
VOLT, VENT
UNINTERRUPTIBLE POWER SUPPLY
UNLESS OTHERWISE NOTED
WEATHER PROOF
WATERTIGHT, WEIGHT
WP
WT
VARIABLE FREQUENCY DRIVEVFD
BUTTERFLY VALVE
UTR UP THROUGH ROOF
C CO2 SENSOR (MOUNT 46" AFF)(ZONE)
PETE'S PLUG
20"x12"ø OVAL DUCTWORK. SIZE INDICATED IN
INCHES, FIRST NUMBER IS SIDE SHOWN.
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
SH EMERGENCY AIR DISTRIBUTION SHUTOFF
GALLONS PER FLUSHGPF
FULL LOAD AMPSFLA
HEALTH ADMINISTRATION
GRAVITY VENTILATOR
UNO UNLESS NOTED OTHERWISE
MA MIXED AIR
PH, Ø PHASE
MOCP MAX OVERCURRENT PROTECTION
AIR CONDITIONING
CV VALVE COEFFICIENT
CURRENT TRANSFORMER
BTUH BRITISH THERMAL UNIT
PER HOUR
NATURAL GASNG
G GAS, NATURAL GAS
DDC DIRECT DIGITAL CONTROL
ECM ELECTRONICALLY COMMUTATED MOTOR
UH UNIT HEATER
AG ABOVE GROUND
EEDRS ENTERPRISE ENERGY DATA
REPORTING SYSTEM
NOT TO SCALENTS
NOMINALNOM
LEAVINGLVG
PPM PARTS PER MILLION
PRESSURE RELIEF/REDUCING VALVEPRV
DOAS DEDICATED OUTSIDE AIR SYSTEM
FV FACE VELOCITY
UFC UNIFIED FACILITIES CRITERIA
PG PROPYLENE GLYCOL
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
ELEVATOR
EQUIPMENT
ELEVATOR
E1.1
SIPR / TR
IMAGING CENTER
STAIR 1
S1.1
CLASSROOM A
SIPR CX-K / GAIT
MAIN TR
UPS ROOM
OUTSIDE PLANT
INSIDE STORAGE
DISTRIBUTION /
SHIPPING
RECYCLING AREA
LOADING DOCK
ELECTRICAL
ROOM
STORAGE
CUSTOMER
SERVICE CENTER
OTHER ADMIN.
DIVISION CHIEF
OFFICE
BRANCH CHIEF
OFFICE
BRANCH CHIEF
OFFICE
CUSTOMER
SERVICE CENTER
INTAKE
CORRIDOR
STAIR 2
S2.1
MECHANICAL
ROOM
FIRE RISER ROOM
UNISEX
UNISEX
WOMEN
MEN
6 5 4 3 1
A
B
C
D
VESTIBULE
CORRIDOR
CUSTOMER
SERVICE LOBBY
VESTIBULE
ZONE
1-7
ZONE
1-6
ZONE
1-2
ZONE
1-3
ZONE
1-1
FC
1-20
DX
DX
CRAC
3A
CRAC
3B
FC
1-21
DX
ZONE
1-9A
DX
ZONE
1-8
ZONE
1-5
ZONE
1-4
CORRIDOR
VESTIBULE
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:56:59 AM
M-011
ISF
FI
RS
T
FL
O O
R
PL
AN
ZO
NI
NG
BA
SE
B
ID
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
D es ig ne r
Au th or
C he ck er
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
1/8" = 1'-0"A1 FIRST FLOOR PLAN - ZONING - BASE BID
OPTION BASE BID
KEY PLAN:
08' 8' 16' 24'
N
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
14 12 11 10 7
A
B
C
D
MGMT / OPS
FREQUENCY
A138
DIVISION
CONFERENCE
A139
GENERAL
STORAGE /
OFFICE STORAGE
A140
CORRIDOR
A137
STAIR 3
AS3.1
BRANCH CHIEF
OFFICE
A149STORAGE
A150
BRANCH CHIEF
OFFICE
A148
DIVISION CHIEF
OFFICE
A147
MANAGEMENT
ANALYSIS
A144
OTHER ADMIN.
A146
SPECIALISTS
A145
CORRIDOR
A137
PLANS &
BLUEPRINT ROOM
A151
GENERAL
PURPOSE TEAM
ROOM
A141
REPRO / MEDIA
WORK ROOM
A142
BREAK AREA
A134
LOCKER /
SHOWER ROOM
A136
GENERAL
PURPOSE TEAM
ROOM
A143
ZONE
1-16
ZONE
1-17
ZONE
1-18
ZONE
1-11
ZONE
1-14 ZONE
1-15
ZONE
1-19
ZONE
1-13
ZONE
1-12
ZONE
1-10
LOCKER /
SHOWER ROOM
A135
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:57:02 AM
M-011A
ISF
FI
RS
T
FL
O O
R
PL
AN
ZO
NI
NG
O
PT
IO
N
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
D es ig ne r
Au th or
C he ck er
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
1/8" = 1'-0"A1 FIRST FLOOR PLAN - ZONING - OPTION
0 8' 16'8' 16' OPTION BASE BID
KEY PLAN:
N
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
E1.2
SIPR / TR
STAIR 1
S1.2
WOMEN
CUSTODIAL
MEN
ELECTRICAL
ROOM
OFFICE SUITE
DEPUTY
DIRECTOR
DIRECTOR
FILE STORAGE
EXECUTIVE
CONFERENCE
STAIR 2
S2.2
BREAK AREA
CORRIDOR
6 5 4 3 1
A
B
C
D
NURSING
MOTHERS ROOM
NETWORK
OPERATIONS
CENTER (NOC) /
NOC STORAGE
DIVISION CHIEF
OFFICE
BRANCH CHIEF
OFFICE
BRANCH CHIEF
OFFICE
STORAGE
FILES
OTHER ADMIN /
CONTRACTORS
TRAINING AND
TESTING CENTER
LAB
DIVISION
COMPUTER AND
EQUIPMENT
STORAGE
NETWORK AND
SWITCH
TECHNICIANS
WORKSPACE
ZONE
2-8
ZONE
2-7
ZONE
2-5
ZONE
2-16A
ZONE
2-9
FC
2-30
DX
ZONE
2-10
ZONE
2-11
ZONE
2-1
ZONE
2-2
ZONE
2-12
ZONE
2-4
ZONE
2-3
ZONE
2-14
ZONE
2-13
CORRIDOR
CORRIDOR
CRAC
16B
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:57:06 AM
M-012
ISF
SE
CO
ND
F
LO
O
R
PL
AN
ZO
NI
NG
BA
SE
B
ID
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
D es ig ne r
Au th or
C he ck er
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
OPTION BASE BID
KEY PLAN:
0 8' 16'8' 16'1/8" = 1'-0"A1 SECOND FLOOR PLAN - ZONING - BASE BID
N
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
14 12 11 10 7
B
C
D
CONFERENCE/
CLASSROOM C
A230
CONFERENCE /
CLASSROOM B
A229
CONFERENCE /
CLASSROOM A
A228
REPRO / MEDIA
WORK ROOM
A227
COMSEC VAULT
A233
ACAS SCANNERS
A232
GENERAL
PURPOSE TEAM
ROOM
A239
GENERAL
PURPOSE TEAM
ROOM
A240
BRANCH CHIEF
OFFICE
A235
BRANCH CHIEF
OFFICE
A236
DIVISION CHIEF
OFFICE
A237
IA TECHNICIAN
WORKSPACE
A231
CONTRACTOR
AREA
A238
STAIR 3
AS3.2
IA SECURITY PKI
ROOM
A234
ZONE
2-25
ZONE
2-20
ZONE
2-21
ZONE
2-29
ZONE
2-17
ZONE
2-24
ZONE
2-28
ZONE
2-27ZONE
2-26
ZONE
2-18
ZONE
2-19ZONE
2-23
ZONE
2-22
CORRIDOR
A226
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:57:09 AM
M-012A
ISF
SE
CO
ND
F
LO
O
R
PL
AN
ZO
NI
NG
O
PT
IO
N
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
D es ig ne r
Au th or
C he ck er
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
1/8" = 1'-0"A1 SECOND FLOOR PLAN - ZONING - OPTION
0 8' 16'8' 16'
OPTION BASE BID
KEY PLAN:
N
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
SIPR / TR
ELEVATOR
E1.1
ELEVATOR
EQUIPMENT
CRAC
3A
CRAC
3B
FC
1-21
DX
P
P
CH
P P
B
B
P
P
P P
IMAGING CENTER
STAIR 1
S1.1
CLASSROOM A
SIPR CX-K / GAIT
MAIN TR
UPS ROOM
OUTSIDE PLANT
INSIDE STORAGE
DISTRIBUTION /
SHIPPING
RECYCLING AREA
LOADING DOCK
ELECTRICAL
ROOM
DIVISION CHIEF
OFFICE
BRANCH CHIEF
OFFICE
BRANCH CHIEF
OFFICE
CUSTOMER
SERVICE CENTER
INTAKE
CORRIDOR
STAIR 2
S2.1
MECHANICAL
ROOM
FIRE RISER ROOM
UNISEX
UNISEX
WOMEN
MEN
CU
3B
DXCU
FC
1-2
FC
1-1
(TYP)
SH
EF
1 EF
EF
EF
EF
FC
1-3
FC
1-5
7 6 5 4 3 1
A
B
C
D
CUSTOMER
SERVICE CENTER
STORAGE
VESTIBULE
CUSTOMER
SERVICE LOBBY
CORRIDOR
OTHER ADMIN.
CORRIDOR
VESTIBULE
DX
FC
1-4
FC
1-7
FC
1-6
FC
1-9A
FC
1-8
DX
DX
3 FC
1-20
DXCU
DXCU
DXCU
CU
16B
DXCU
9 8
CUSTODIAL
UH
UH
UH
UH
UH
UH
UH
UH
UH
UH
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:57:15 AM
M-101
ISF
FI
RS
T
FL
O O
R
PL
AN
BA
SE
B
ID
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
J.
D
ES
IG
N
ER
J.
D
R
AW
ER
J.
C
H
EC
KE
R
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
1/8" = 1'-0"A1 FIRST FLOOR MECHANICAL PLAN - BASE BID
OPTION BASE BID
KEY PLAN:
0 8' 16'8' 16'
N
KEYED NOTES
1 SERVED BY 4-PIPE FAN COIL SYSTEM AND A DEDICATED OUTSIDE
AIR UNIT MAU-1
SERVED BY A HOT WATER UNIT HEATER AND CONNECTED TO
EMERGENCY POWER
NOT USED
NOT USED
CONDENSING UNIT SERVES FAN COIL LOCATED IN THE SECOND
FLOOR, REFER TO M-102
NOT USED
PROVIDE A TRENCH WITH REMOVABLE STEEL PLATES FOR CHWS&R
PIPING BETWEEN THE BUILDING AND CHILLER. THE TRENCH SHALL
BE DRAINABLE. CHWS&R SHALL BE INSULATED.
PROVIDE CO2 SENSOR MONITORING
OSA SUPPLY AND RETURN/ EXHAUST AIR FROM ABOVE.
GENERAL NOTES
PROVIDE SUPPLY DUCTING FROM MAKE UP AIR UNIT TO RETURN AIR
MIXING BOX OF EACH FAN COIL. PROVIDE DUCTED RELIEF AIR BACK TO
MAKE UP AIR UNIT. PROVIDE A MANUAL VOLUME DAMPER ON THE OSA
CONNECTION OF THE MIXING BOX.
AIR VENTS, DUCTS, OR ANY SIMILAR OPENINGS THAT BREACH THE WALLS,
FLOOR, OR CEILING OF THE SECURE AREAS MUST BE APPROPRIATELY
SECURED TO PREVENT PENETRATION. OPENINGS LESS THAN 96 INCHES
MUST HAVE APPROVED BAFFLES INSTALLED TO PREVENT AN AUDIO OR
ACOUSTICAL HAZARD. IF THE OPENING EXCEEDS 96 INCHES, ACOUSTICAL
BAFFLES MUST BE SUPPLEMENTED BY EITHER HARDENED STEEL BARS OR
AN APPROVED INTRUSION DETECTION SYSTEM. STC SOUND BAFFLES WILL
BE PROVIDED WHERE DUCTWORK WILL BE CROSSING AN STC RATED
WALL.
1.
2.
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
DXCU
DXCU
DXCU
FC
1-10
FC
1-11
FC
1-13
FC
1-14
FC
1-12
FC
1-19
FC
1-17
FC
1-16
(TYP)
SH
14 12 11
A
B
C
D
GENERAL
STORAGE /
OFFICE STORAGE
A140
DIVISION
CONFERENCE
A139
MGMT / OPS
FREQUENCY
A138
STAIR 3
AS3.1
PLANS &
BLUEPRINT ROOM
A151
GENERAL
PURPOSE TEAM
ROOM
A141
REPRO / MEDIA
WORK ROOM
A142
GENERAL
PURPOSE TEAM
ROOM
A143
BRANCH CHIEF
OFFICE
A148
DIVISION CHIEF
OFFICE
A147
MANAGEMENT
ANALYSIS
A144
OTHER ADMIN.
A146
SPECIALISTS
A145
BREAK AREA
A134
CORRIDOR
A137
LOCKER /
SHOWER ROOM
A136
LOCKER /
SHOWER ROOM
A135
FC
1-15
FC
1-18
DXCU
9 8
STORAGE
A150
BRANCH CHIEF
OFFICE
A149
UH
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:57:20 AM
M-101A
ISF
FI
RS
T
FL
O O
R
PL
AN
O
PT
IO
N
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
J.
D
ES
IG
N
ER
J.
D
R
AW
ER
J.
C
H
EC
KE
R
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
1/8" = 1'-0"A1 FIRST FLOOR MECHANICAL PLAN - OPTION
OPTION BASE BID
KEY PLAN:
0 8' 16'8' 16'
GENERAL NOTES
PROVIDE SUPPLY DUCTING FROM MAKE UP AIR UNIT TO RETURN
AIR MIXING BOX OF EACH FAN COIL. PROVIDE DUCTED RELIEF AIR
BACK TO MAKE UP AIR UNIT. PROVIDE A MANUAL VOLUME DAMPER
ON THE OSA CONNECTION OF THE MIXING BOX.
AIR VENTS, DUCTS, OR ANY SIMILAR OPENINGS THAT BREACH THE
WALLS, FLOOR, OR CEILING OF THE SECURE AREAS MUST BE
APPROPRIATELY SECURED TO PREVENT PENETRATION. OPENINGS
LESS THAN 96 INCHES MUST HAVE APPROVED BAFFLES INSTALLED
TO PREVENT AN AUDIO OR ACOUSTICAL HAZARD. IF THE OPENING
EXCEEDS 96 INCHES, ACOUSTICAL BAFFLES MUST BE
SUPPLEMENTED BY EITHER HARDENED STEEL BARS OR AN
APPROVED INTRUSION DETECTION SYSTEM. STC SOUND BAFFLES
WILL BE PROVIDED WHERE DUCTWORK WILL BE CROSSING AN STC
RATED WALL.
1.
2.
N
KEYED NOTES
1 SERVED BY 4-PIPE FAN COIL SYSTEM AND A DEDICATED OUTSIDE
AIR UNIT MAU-2
SERVED BY A HOT WATER UNIT HEATER
CONDENSING UNIT SERVES FAN COIL LOCATED IN THE SECOND
FLOOR, REFER TO M-102
NOT USED
OSA SUPPLY AND RETURN/ EXHAUST AIR FROM ABOVE.
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
E1.2
SIPR / TR
STAIR 1
S1.2
WOMEN
CUSTODIAL
MEN
NETWORK
OPERATIONS
CENTER (NOC) /
NOC STORAGE
ELECTRICAL
ROOM
OFFICE SUITE
DEPUTY
DIRECTOR
DIRECTOR
FILE STORAGE
EXECUTIVE
CONFERENCE
STAIR 2
S2.2
BREAK AREA
CORRIDOR
FC
2-3
FC
2-4
FC
2-5
CRAC
16B
(TYP)
FC
2-1
FC
2-2
7 6 5 4 3 1
A
B
C
D
BRANCH CHIEF
OFFICE
FILES
STORAGE
BRANCH CHIEF
OFFICE
DIVISION CHIEF
OFFICE
NETWORK AND
SWITCH
TECHNICIANS
WORKSPACE
OTHER ADMIN /
CONTRACTORS
TRAINING AND
TESTING CENTER
LAB
CORRIDOR
NURSING
MOTHERS ROOM
CORRIDOR
STAIR 1
S1.2
DIVISION
COMPUTER AND
EQUIPMENT
STORAGE
FC
2-16A
FC
2-30
DX
FC
2-6
FC
2-9
FC
2-7
FC
2-10
FC
2-11
FC
2-12
FC
2-13
FC
2-14
29 8
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:57:26 AM
M-102
ISF
SE
CO
ND
F
LO
O
R
PL
AN
BA
SE
B
ID
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
J.
D
ES
IG
N
ER
J.
D
R
AW
ER
J.
C
H
EC
KE
R
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
1/8" = 1'-0"A1 SECOND FLOOR MECHANICAL PLAN - BASE BID
OPTION BASE BID
KEY PLAN:
0 8' 16'8' 16'
GENERAL NOTES
PROVIDE SUPPLY DUCTING FROM MAKE UP AIR UNIT TO RETURN AIR
MIXING BOX OF EACH FAN COIL. PROVIDE DUCTED RELIEF AIR BACK TO
MAKE UP AIR UNIT. PROVIDE A MANUAL VOLUME DAMPER ON THE OSA
CONNECTION OF THE MIXING BOX.
AIR VENTS, DUCTS, OR ANY SIMILAR OPENINGS THAT BREACH THE WALLS,
FLOOR, OR CEILING OF THE SECURE AREAS MUST BE APPROPRIATELY
SECURED TO PREVENT PENETRATION. OPENINGS LESS THAN 96 INCHES
MUST HAVE APPROVED BAFFLES INSTALLED TO PREVENT AN AUDIO OR
ACOUSTICAL HAZARD. IF THE OPENING EXCEEDS 96 INCHES, ACOUSTICAL
BAFFLES MUST BE SUPPLEMENTED BY EITHER HARDENED STEEL BARS OR
AN APPROVED INTRUSION DETECTION SYSTEM. STC SOUND BAFFLES WILL
BE PROVIDED WHERE DUCTWORK WILL BE CROSSING AN STC RATED
WALL.
1.
2.
N
KEYED NOTES
1 SERVED BY 4-PIPE FAN COIL SYSTEM AND A DEDICATED OUTSIDE
AIR UNIT MAU-1
NOT USED
NOT USED
UTILITY CHASE (DUCT AND PIPES)
NOT USED
PROVIDE CO2 SENSOR MONITORING
OSA SUPPLY AND RETURN/ EXHAUST AIR DOWN
OSA SUPPLY AND RETURN/ EXHAUST AIR UP TO CATWALK
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
FC
2-18
FC
2-24
FC
2-23
FC
2-19FC
2-20
FC
2-21
FC
2-17
FC
2-26
FC
2-27
FC
2-28
FC
2-25
(TYP)
14 12 11 10 7
A
B
C
D
GENERAL
PURPOSE TEAM
ROOM
A239
GENERAL
PURPOSE TEAM
ROOM
A240
ACAS SCANNERS
A232
IA TECHNICIAN
WORKSPACE
A231
CONTRACTOR
AREA
A238
COMSEC VAULT
A233
STAIR 3
AS3.2
CORRIDOR
A226
DIVISION CHIEF
OFFICE
A237
BRANCH CHIEF
OFFICE
A236
BRANCH CHIEF
OFFICE
A235
IA SECURITY PKI
ROOM
A234
CONFERENCE /
CLASSROOM B
A229
CONFERENCE/
CLASSROOM C
A230
CONFERENCE /
CLASSROOM A
A228
REPRO / MEDIA
WORK ROOM
A227
FC
2-22
FC
2-29
5 5
13 9 8
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:57:30 AM
M-102A
ISF
SE
CO
ND
F
LO
O
R
PL
AN
O
PT
IO
N
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
J.
D
ES
IG
N
ER
J.
D
R
AW
ER
J.
C
H
EC
KE
R
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
1/8" = 1'-0"A1 SECOND FLOOR MECHANICAL PLAN - OPTION
OPTION BASE BID
KEY PLAN:0 8' 16'8' 16'
GENERAL NOTES
PROVIDE SUPPLY DUCTING FROM MAKE UP AIR UNIT TO RETURN AIR
MIXING BOX OF EACH FAN COIL. PROVIDE DUCTED RELIEF AIR BACK TO
MAKE UP AIR UNIT. PROVIDE A MANUAL VOLUME DAMPER ON THE OSA
CONNECTION OF THE MIXING BOX.
AIR VENTS, DUCTS, OR ANY SIMILAR OPENINGS THAT BREACH THE WALLS,
FLOOR, OR CEILING OF THE SECURE AREAS MUST BE APPROPRIATELY
SECURED TO PREVENT PENETRATION. OPENINGS LESS THAN 96 INCHES
MUST HAVE APPROVED BAFFLES INSTALLED TO PREVENT AN AUDIO OR
ACOUSTICAL HAZARD. IF THE OPENING EXCEEDS 96 INCHES, ACOUSTICAL
BAFFLES MUST BE SUPPLEMENTED BY EITHER HARDENED STEEL BARS OR
AN APPROVED INTRUSION DETECTION SYSTEM. STC SOUND BAFFLES WILL
BE PROVIDED WHERE DUCTWORK WILL BE CROSSING AN STC RATED
WALL.
1.
2.
N
KEYED NOTES
1 SERVED BY 4-PIPE FAN COIL SYSTEM AND A DEDICATED OUTSIDE
AIR UNIT MAU-2
NOT USED
UTILITY CHASE (DUCT AND PIPES)
NOT USED
PROVIDE CO2 SENSOR FOR MONITORING
OSA SUPPLY AND RETURN/ EXHAUST AIR DOWN
OSA SUPPLY AND RETURN/ EXHAUST AIR UP TO CATWALK
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
MAU
MAINTENANCE CATWALK
OSA SUPPLY DOWN
RETURN/ EXHAUST DOWN
7 6 5 4 3 1
A
B
C
D
29 8
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:57:33 AM
M-103
ISF
CA
TW
AL
K
FL
O
O R
PL
AN
-B
AS
E
BI
D
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
J.
D
ES
IG
N
ER
J.
D
R
AW
ER
J.
C
H
EC
KE
R
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
1/8" = 1'-0"A1 CATWALK MECHANICAL PLAN - BASE BID
OPTION BASE BID
KEY PLAN:
0 8' 16'8' 16'
GENERAL NOTES
PROVIDE SUPPLY DUCTING FROM MAKE UP AIR UNIT TO RETURN
AIR MIXING BOX OF EACH FAN COIL. PROVIDE DUCTED RELIEF AIR
BACK TO MAKE UP AIR UNIT.
AIR VENTS, DUCTS, OR ANY SIMILAR OPENINGS THAT BREACH THE
WALLS, FLOOR, OR CEILING OF THE SECURE AREAS MUST BE
APPROPRIATELY SECURED TO PREVENT PENETRATION. OPENINGS
LESS THAN 96 INCHES MUST HAVE APPROVED BAFFLES INSTALLED
TO PREVENT AN AUDIO OR ACOUSTICAL HAZARD. IF THE OPENING
EXCEEDS 96 INCHES, ACOUSTICAL BAFFLES MUST BE
SUPPLEMENTED BY EITHER HARDENED STEEL BARS OR AN
APPROVED INTRUSION DETECTION SYSTEM. STC SOUND BAFFLES
WILL BE PROVIDED WHERE DUCTWORK WILL BE CROSSING AN STC
RATED WALL.
1.
2.
N
KEYED NOTES
1 OVERSIZE LOUVER TO ALLOW MAKEUP AIR UNIT TO BE REMOVED
FROM CATWALK.
OSA FROM MAU SHALL BE DUCTED TO LOUVER.2
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
MAU
2MAINTENANCE CATWALK
OSA SUPPLY DOWN
RETURN/ EXHAUST DOWN
14 12 11 10 7
A
B
C
D
OSA SUPPLY DOWNRETURN/ EXHAUST DOWN
13 9 8
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:57:35 AM
M-103A
ISF
CA
TW
AL
K
FL
O
O R
PL
AN
O
PT
IO
N
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
J.
D
ES
IG
N
ER
J.
D
R
AW
ER
J.
C
H
EC
KE
R
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
1/8" = 1'-0"A1 CATWALK MECHANICAL PLAN - OPTION
OPTION BASE BID
KEY PLAN:
0 8' 16'8' 16'
GENERAL NOTES
PROVIDE SUPPLY DUCTING FROM MAKE UP AIR UNIT TO RETURN
AIR MIXING BOX OF EACH FAN COIL. PROVIDE DUCTED RELIEF AIR
BACK TO MAKE UP AIR UNIT.
AIR VENTS, DUCTS, OR ANY SIMILAR OPENINGS THAT BREACH THE
WALLS, FLOOR, OR CEILING OF THE SECURE AREAS MUST BE
APPROPRIATELY SECURED TO PREVENT PENETRATION. OPENINGS
LESS THAN 96 INCHES MUST HAVE APPROVED BAFFLES INSTALLED
TO PREVENT AN AUDIO OR ACOUSTICAL HAZARD. IF THE OPENING
EXCEEDS 96 INCHES, ACOUSTICAL BAFFLES MUST BE
SUPPLEMENTED BY EITHER HARDENED STEEL BARS OR AN
APPROVED INTRUSION DETECTION SYSTEM. STC SOUND BAFFLES
WILL BE PROVIDED WHERE DUCTWORK WILL BE CROSSING AN STC
RATED WALL.
1.
2.
N
KEYED NOTES
1 OVERSIZE LOUVER TO ALLOW MAKEUP AIR UNIT TO BE REMOVED
FROM CATWALK.
OSA FROM MAU SHALL BE DUCTED TO LOUVER.2
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
7 6
C
D
P
P
CH
P
P
B
B
P
P
P
P
UPS ROOM
ELECTRICAL
ROOM
STAIR 2
S2.1
MECHANICAL
ROOM
EF
EF
DX
UH
5 UH
UH
ET
ET
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:57:38 AM
M-401
ISF
EN
LA
RG
ED
P
LA
NS
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
D es ig ne r
Au th or
C he ck er
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
1/4" = 1'-0"1 ENLARGED MECHANICAL ROOM PLAN
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
NOTES:
2 ENERGY RECOVERY WHEEL
1 OA FILTER SECTION
4 SUPPLY FAN SECTION
3 HW & CHW COIL SECTION
6 ACCESS DOOR
5 BASE RAIL
8 SUPPLY AIR DISCHARGE
7 OUTDOOR AIR INTAKE
9 EXHAUST AIR DISCHARGE
7 84
10 EXHAUST FAN SECTION
11 EXHAUST FILTER SECTION
12 EXHAUST AIR INTAKE
13 DAMPER
14 LOCATION & DIMENSION OF SERVICE
CLEARANCE PER
MANUFACTURER
WITH MINIMUM CLEARANCE THE
HEIGHT AND WIDTH OF THE UNIT
NOTE: SEE PLANS FOR ACTUAL
FAN
LOCATIONS AND DISCHARGES
(HORIZONTAL OR VERTICAL ).
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:57:40 AM
M-501
ISF
M
EC
HA
NI
CA
L
DE
TA
IL
S
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
D es ig ne r
Au th or
C he ck er
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
NTSC1 ENERGY RECOVERY MAKEUP AIR UNIT DETAIL
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:57:45 AM
M-601
ISF
M
EC
HA
NI
CA
L
SC
HE
DU
LE
S
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
D es ig ne r
Au th or
C he ck er
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
AIR COOLED CHILLER SCHEDULE - BASE BID
MARK
TOTAL
CAPACITY
CHILLED WATER
FLOW E.W.T. L.W.T.
PRESSURE
DROP NO. FANS CFM
NO.
COMPRESSORS
COMPRESSOR
TYPE REFRIG
FULL LOAD
EFFICIENCY ELECTRICAL V/HZ/PH MCA MOP REMARKS
CH-1B 60 TONS 160 GPM 54 44 6 55,000 4 SCROLL R-410a 460/60/3 125 125 2 ELECTRICAL CONNECTIONS
(NORMAL & EMERGENCY); 30%
PROPYLENE GLYCOL; BATTERY
BACKUP
CONDENSING BOILER SCHEDULE - BASE BID
MARK
FUEL
SOURCE
INPUT
(MBH)
OUTPUT
(MBH)
MIN
EFFICIENCY
(%) GPM
E.W.T.
(F) L.W.T.
(F) V/HZ/PH REMARKS
B-1B NAT. GAS 625 594 95 59 120 140 115/60/1
B-2B NAT. GAS 625 594 95 59 120 140 115/60/1
PUMP SCHEDULE (CHILLED / HEATING HOT WATER) - BASE BID
MARK LOCATION SERVICE
TYPE FLOW
RATE
(GPM) HEAD (FT) FLUID
MOTOR
HP (MAX) V/HZ/PH RPM NOTESMOUNTING CONFIGURATION
P-1 OUTSIDE
CHILLER
CHILLED WATER
(PRIMARY)
BASE FLANGE
SUPPORTS
VERTICAL 160 30% PG 460/60/3
P-2 OUTSIDE
CHILLER
CHILLED WATER
(PRIMARY)
BASE FLANGE
SUPPORTS
VERTICAL 160 30% PG 460/60/3
P-3 MECH
ROOM
CHILLED WATER
(SECONDARY)
BASE FLANGE
SUPPORTS
VERTICAL 30% PG 460/60/3
P-4 MECH
ROOM
CHILLED WATER
(SECONDARY)
BASE FLANGE
SUPPORTS
VERTICAL 30% PG 460/60/3
P-5 MECH
ROOM
HEATING HOT WATER
(PRIMARY)
BASE FLANGE
SUPPORTS
VERTICAL 59 WATER
P-6 MECH
ROOM
HEATING HOT WATER
(PRIMARY)
BASE FLANGE
SUPPORTS
VERTICAL 59 WATER
P-7 MECH
ROOM
HEATING HOT WATER
(SECONDARY)
BASE FLANGE
SUPPORTS
VERTICAL WATER 460/60/3
P-8 MECH
ROOM
HEATING HOT WATER
(SECONDARY)
BASE FLANGE
SUPPORTS
VERTICAL WATER 460/60/3
AIR SEPARATOR SCHEDULE
MARK SERVICE
CONNECTION
SIZE
MAX OPERATING
TEMPERATURE
(Deg F)
MAX
OPERATING
PRESSURE
(PSI)
MAX
PRESSURE
DROP (FT) REMARKS
AS-1 CHILLED
WATER
4" 54
AS-2 HEATING
HW
3" 140
EXPANSION TANK SCHEDULE
MARK SERVICE TYPE
CONFIGU
RATION VOLUME MIN ACCEPTANCE VOL TANK PRE-CHARGE REMARKS
ET-1 CHILLED
WATER
BLADDER VERTICAL
ET-2 HEATING
HW
BLADDER VERTICAL
1. CHILLER SCHEDULE - IF THE BUILDING OPTION IS AWARDED, THIS SCHEDULE IS REPLACED BY CHILLER SCHEDULE - OPTION SHOWN ON M-601A.
1. BOILER SCHEDULE - IF THE BUILDING OPTION IS AWARDED, THIS SCHEDULE IS REPLACED BY BOILER SCHEDULE - OPTION SHOWN ON M-601A.
1. PUMP SCHEDULE - IF THE BUILDING OPTION IS AWARDED, THIS SCHEDULE IS REPLACED BY PUMP SCHEDULE - OPTION SHOWN ON M-601A.
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
FI
LE
N U
M
BE
R
JO
H
N T
. D U
D G
EO
N
I:\AECDesigns\FY20_PN77728_ISF\02 Design\BIM_CAD\MEP\FY20_PN77728_ISF_MEP_CENTRAL.rvt
9/3/2019 11:57:49 AM
M-601A
ISF
M
EC
HA
NI
CA
L
SC
HE
DU
LE
S -O
PT
IO
N
JO
IN
T
BA
SE
L
EW
IS
M
CC
HO
RD
, W
AS
HI
NG
TO
N
SE
AT
TL
E
D
IS
TR
IC
T
E
AS
T
M
AR
G
IN
AL
W
AY
S
O U
TH
SE
AT
TL
E, W
AS
H
IN
G
TO
N
D es ig ne r
Au th or
C he ck er
A
U G
U
ST
NOT FOR CONSTRUCTION - 75% DESIGN
IN
FO
RM
AT
IO
N
SY
ST
EM
S
FA
CI
LI
TY
FY
P N
IS
F
AIR COOLED CHILLER SCHEDULE - OPTION
MARK
TOTAL
CAPACITY
CHILLED WATER
FLOW E.W.T. L.W.T.
PRESSUR
E DROP NO. FANS CFM
NO.
COMPRESSORS
COMPRESSOR
TYPE REFRIG
FULL LOAD
EFFICIENCY ELECTRICAL V/HZ/PH MCA MOP REMARKS
CH-1 100 267 GPM 54 44 8 72,750 4 SCROLL R-410a 460/60/3 206 225 2 ELECTRICAL CONNECTIONS
(NORMAL & EMERGENCY); 30%
PROPYLENE GLYCOL; BATTERY
BACKUP
CONDENSING BOILER SCHEDULE - OPTION
MARK
FUEL
SOURCE
INPUT
(MBH)
OUTPUT
(MBH)
MIN
EFFICIENCY
(%) GPM
E.W.T.
(F) L.W.T.
(F) V/HZ/PH REMARKS
B-1 NAT. GAS 800 760 95 76 120 140 115/60/1
B-2 NAT. GAS 800 760 95 76 120 140 115/60/1
PUMP SCHEDULE (CHILLED / HEATING HOT WATER) - OPTION
MARK LOCATION SERVICE
TYPE FLOW RATE
(GPM) HEAD (FT) FLUID
MOTOR
HP (MAX) V/HZ/PH RPM NOTESMOUNTING CONFIGURATION
P-1 OUTSIDE
CHILLER
CHILLED WATER
(PRIMARY)
BASE FLANGE
SUPPORTS
VERTICAL 267 30% PG 7.5 460/60/3
P-2 OUTSIDE
CHILLER
CHILLED WATER
(PRIMARY)
BASE FLANGE
SUPPORTS
VERTICAL 267 30% PG 7.5 460/60/3
P-3 MECH
ROOM
CHILLED WATER
(SECONDARY)
BASE FLANGE
SUPPORTS
VERTICAL 30% PG 15 460/60/3
P-4 MECH
ROOM
CHILLED WATER
(SECONDARY)
BASE FLANGE
SUPPORTS
VERTICAL 30% PG 15 460/60/3
P-5 MECH
ROOM
HEATING HOT WATER
(PRIMARY)
BASE FLANGE
SUPPORTS
VERTICAL 76 WATER 1
P-6 MECH
ROOM
HEATING HOT WATER
(PRIMARY)
BASE FLANGE
SUPPORTS
VERTICAL 76 WATER 1
P-7 MECH
ROOM
HEATING HOT WATER
(SECONDARY)
BASE FLANGE
SUPPORTS
VERTICAL WATER 7.5 460/60/3
P-8 MECH
ROOM
HEATING HOT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .