This document provides details for a forthcoming solicitation for the construction of an Information Systems Facility at Joint Base Lewis-McChord in Washington State. The project involves constructing a new 44,832 square foot facility for $25 million to $100 million. Technical spaces will include an equipment test lab, telephone switch rooms, a telecommunications cable vault, classified and unclassified communications systems spaces, a Network Operations Center, Communications Security vault, Secure Video Teleconferencing Center, and a dedicated Uninterruptable Power Supply Room. Supporting facilities include site development, utilities, lighting, and vehicle parking. The facility must be designed for a 40-year life in accordance with DoD criteria. The solicitation will use a two-part proposal process, initially requesting technical proposals and later price proposals from qualifying offerors. The solicitation is expected to be available on September 26, 2019 via FBO. Proposals will be due at least 30 days later. The NAICS code is 236220 and the small business size standard is $39.5 million. The resulting contract will be firm-fixed price.
Duplicate ISF Watermarked Specs. No changes from same file posted with RFP on 9-26-2019
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Slides_10-17-2019.pdf | ||
| Site_Visit_Roster_Sheet_10-17-2019.pdf | ||
| Amendment_R0001.pdf | ||
| ISF_Drawings_VOL_I.pdf | ||
| Attachment_1.docx | DOCX document | |
| ISF_Drawings_VOL_III.pdf | ||
| ISF_Drawings_VOL_II.pdf | ||
| RFP_W912DW19R0025.pdf | ||
| ISF_Watermarked_Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY20 Information Systems Facility 18007 Joint Base Lewis-McChord, WA W912DW19R0025
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 10 SUPPLEMENTARY REQUIREMENTS FOR JOINT BASE LEWIS-MCCHORD
01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 33 39.00 27 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS (JBLM)
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00.00 27 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 00 ASBESTOS REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 50 14 STRUCTURAL METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
PROJECT TABLE OF CONTENTS Page 1 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
ESIG
N
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 11 13 BITUMINOUS DAMPPROOFING
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 19 00 WATER REPELLENTS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 26 FLUID-APPLIED VAPOR PERMEABLE AIR/MOISTURE BARRIER
07 42 13 METAL WALL PANELS
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 13 COILING COUNTER DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 59 VAULT DOORS AND DAY GATES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 51 13 ALUMINUM WINDOWS
08 51 23 STEEL WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 72 00 WALLCOVERINGS
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 39 FOLDING PANEL PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
PROJECT TABLE OF CONTENTS Page 2 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
10 51 13 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 36 00 COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 SITE FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 19.00 20 [DELUGE] [PREACTION] FIRE SPRINKLER SYSTEMS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER LOCAL BUILDING
SYSTEMS
23 11 25 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - HVAC
BUILDING LEVEL CONTROLS ONLY
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - FIRE
REPORTING BUILDING LEVEL CONTROLS ONLY
25 05 11.03 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS -
UNINTERRUPTED POWER SUPPLY/POWER MANAGEMENT SYSTEM
DIVISION 26 - ELECTRICAL
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 23 00 SWITCHBOARDS AND SWITCHGEAR
26 27 13.10 30 ADVANCED UTILITY METERS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 15.00 10 DIESEL-GENERATOR SET STATIONARY 100-2500 KW, WITH
PROJECT TABLE OF CONTENTS Page 3 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
AUXILIARIES
26 33 53 STATIC UNINTERRUPTIBLE POWER SUPPLY (UPS)
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 49 CARBON MONOXIDE DETECTORS
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.71 COLD MILLING ASPHALT PAVING
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSE
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 23 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 31 19 DECORATIVE FENCES AND GATES
32 84 24 IRRIGATION SPRINKLER SYSTEMS
32 92 19 SEEDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERS
33 31 23.00 10 SANITARY SEWER FORCE MAIN PIPING
33 32 13.13 PACKAGED SEWAGE LIFT STATIONS, WET WELL TYPE
33 40 00 STORM DRAINAGE UTILITIES
33 40 05 SUBSURFACE DRAINAGE (LEACHING) CHAMBER
33 46 20 BIORETENTION CELL
33 51 15 NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00.00 50 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
PROJECT TABLE OF CONTENTS Page 4 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
1.1.2 Location
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes construction of an Information Systems Facility (ISF) primary facility of approximately 44,348 gsf and incidental related work. The building will consist of departmental workspaces, offices, storage, and specialized rooms. Site development includes providing a new personally-owned vehicle (POV) parking lot, a new secured Government Organizational vehicle (GOV) parking lot with a Covered Storage Shelter (2,400 gsf),and an Auxiliary Structure. Exterior envelope will be in compliance with JBLM Area Development Plan and represent the Miller Hill Design Guide and reflect materials and forms compatible with nearby architecture.
1.1.2 Location
The work is located at Joint Base Lewis McChord, approximately as indicated. The exact location will be shown on the drawings.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 14 10
SUPPLEMENTARY REQUIREMENTS FOR JOINT BASE LEWIS-MCCHORD
PART 1 GENERAL
1.1 1.1 REFERENCES
1.2 DEFINITIONS
1.3 SUBMITTALS
1.4 PERMITS OBTAINED BY GOVERNMENT AND CONTRACTOR RESPONSIBILITIES
1.5 PROTECTION OF GOVERNMENT PROPERTY
1.6 COMMERCIAL VEHICLE ACCESS TO JOINT BASE LEWIS-MCCHORD - REGISTERED
AND PREVIOUSLY ID'D (RAPID) GATE PROGRAM
1.7 IDENTIFICATION OF EMPLOYEES AND MILITARY REGULATIONS
1.7.1 Compliance with Regulations
1.7.2 Specific Requirement for Vehicle Registration
1.7.3 Employee Access and Identification
1.7.3.1 Issuance of RAPID Identification Badge
1.7.4 Compliance with Rules, Regulations, and Statutes
1.7.5 Work Hours
1.7.6 Firearms
1.7.7 Entrance Denial by Military Police
1.8 Base Design Standards
1.9 SUPPLEMENTAL ANTITERRORISM/OPERATIONS SECURITY REQUIREMENTS
1.9.1 AT Level 1 Training
1.9.2 Access and General Protection/Security Policy and Procedures
1.9.3 iWATCH Training
1.9.4 Access to Government Information Systems
1.9.5 OPSEC Standing Operating Procedure/Plan
1.9.6 OPSEC Training
1.9.7 Information Assurance (IA)/Information Technology (IT) training
1.9.8 Information Assurance (IA)/Information Technology (IT)
certification
1.9.9 Handling or Access to Classified Information
1.9.10 Escort in Sensitive or Restricted Areas
1.9.11 Contractor Company Facility Clearance
1.9.12 E-Verify Pre-Screening
1.10 RADIATION PERMIT APPLICATION (RPA)
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 14 10 Page 1 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
SECTION 01 14 10
SUPPLEMENTARY REQUIREMENTS FOR JOINT BASE LEWIS-MCCHORD
PART 1 GENERAL
1.1 1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY (DA)
AR 380-49 (2013) Industrial Security Program
AR 380-67 (2014) Personnel Security Program
U.S. DEPARTMENT OF DEFENSE (DOD)
NISPOM DOD 5220.22-M (2006) National Industrial Security Program Operating Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
32 CFR 655 Radiation Sources on Army Land
1.2 DEFINITIONS
The work covered by this section of the specifications consists of work common to more than one section of these TECHNICAL SPECIFICATIONS.
"SUPPLEMENTARY REQUIREMENTS" shall be read to pertain to any of the sections of the DIVISION 1 as required by the content of the section or paragraph containing the reference.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Training Plan; G, CX
SD-07 Certificates
Qualifications of the Trainer; G, CX
1.4 PERMITS OBTAINED BY GOVERNMENT AND CONTRACTOR RESPONSIBILITIES
It will be the responsibility of the Contractor to obtain all other
SECTION 01 14 10 Page 2 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D permits/licenses required for this project. See the Contract Clause Paragraph entitled PERMITS AND RESPONSIBILITIES.
1.5 PROTECTION OF GOVERNMENT PROPERTY
In addition to requirements of the CONTRACT CLAUSES, protect all Government property within the buildings in which the Contractor is working, except for such property as is required to be demolished.
Property which is to be demolished shall be protected until its scheduled demolition time. Protection shall include, but not be limited to, protection from construction generated dust, debris, water, and vibration.
1.6 COMMERCIAL VEHICLE ACCESS TO JOINT BASE LEWIS-MCCHORD - REGISTERED AND
PREVIOUSLY ID'D (RAPID) GATE PROGRAM
Procedures for commercial vehicle access to Joint Base Lewis-McChord are subject to change without prior notice. The following requirements apply.
a. Unless the Contractor voluntarily participates in the RAPID Gate Program, commercial vehicle access to Joint Base Lewis-McChord will be allowed only at the Logistics Center Gate (Exit 123 from I-5) and through the D Street Commercial Vehicle Inspection Point on JBLM-North. Both gates are open Monday through Friday, excluding federal holidays. These gates will be open for inbound commercial vehicle access and inspection between 0530 hours and 2100 hours.
These gates are closed on weekends (Saturdays and Sundays) and federal holidays. On Saturdays, Sundays and federal holidays, commercial vehicles must use the Main Gate (Exit 120 from I-5). Main Gate is open 24 hours per day everyday. A visitor pass must be obtained. All commercial vehicles will be searched. Anticipate delays in getting commercial vehicles on post. Also allow additional time for commercial vehicles to reach their destination by driving through Joint Base Lewis-McChord.
1. If the commercial vehicle is carrying a load of cement concrete or hot asphalt concrete for delivery, the driver shall notify the gate guard as soon as possible and request that the vehicle be given priority for being searched; however, the Government does not guarantee that the vehicle will be given priority.
2. On weekends large vehicles (needing greater than 12'-5" clearance) will require a time-stamped "searched" label to gain access to JBLM-North. "Searched" labels will be issued at the Main Gate, as appropriate. Drivers needing access to JBLM-North must inform the gate guard that their vehicle is over 12'-5" in height and that they will require access to JBLM-North. The driver will receive a briefing on proper procedures and a "searched" label. Ensure that drivers, including drivers of Subcontractors at any tier, comply with the procedures as explained to them for access to JBLM-North.
b. If the Contractor participates in the RAPID Gate Program, Contractor vehicles may enter the installation through any RAPID gate lane except at Force Protection Level Charlie or Delta. During Force Protection Level Charlie or Delta, all Contractor vehicles must enter through the Logistics Center gate or, if the Logistics Center Gate is closed, through the Main Gate. All passengers in the Contractor vehicle must have a RAPID identification card; otherwise, the Contractor vehicle must enter through the Logistics Center Gate or the Main Gate, as appropriate and obtain visitor passes. Once the RAPID Gate Program is
SECTION 01 14 10 Page 3 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D fully implemented, RAPID gate lanes will be at the Main (Liberty) Gate, the East Gate, the DuPont Gate, the D Street Gate, the Logistics Center Gate, the Madigan Army Medical Center Gate, and the JBLM-North Gate. Use only those lanes specifically marked as RAPID lanes.
1.7 IDENTIFICATION OF EMPLOYEES AND MILITARY REGULATIONS
1.7.1 Compliance with Regulations
The Contractor shall be responsible for compliance with all regulations and orders of the Commanding Officer of the Military Installation, respecting identification of employees, movements on installation, parking, truck entry, and all other military regulations which may affect the work.
1.7.2 Specific Requirement for Vehicle Registration
The Commanding Officer of Joint Base Lewis-McChord, Washington, has initiated the following specific requirement regarding vehicle registration for this contract:
a. Contractors performing work on Joint Base Lewis-McChord shall, after award, register all vehicles to be used on the installation with the Vehicle Registration Section of the Law Enforcement Command.
Contractor employees entering the installation in privately owned vehicles (POVs) shall also register their vehicles. A copy of contract award, proof of liability insurance, current driver's license and state vehicle registration shall be required to register Contractor, Subcontractor, and employee vehicles.
b. Upon completion of the contract, it shall be the prime Contractor's responsibility to collect all vehicle decals issued under the contract including those issued to employees and Subcontractors. Decals are to be carefully removed from the vehicle, placed in an envelope and attached to the original documentation (i.e., post vehicle registration document) received with the decal. Decals, with documentation, must be returned to Vehicle Registration, Building 2140. Proof of decal clearance for all vehicles registered under this contract will be issued to the prime Contractor and shall be returned to the Contracting Officer prior to final payment.
c. In the event of contract extension, it shall be the prime Contractor's responsibility to report time extension to Vehicle Registration, with evidence of same. For further information, contact Vehicle Registration at Waller Hall, Building 2140, Telephone: (253) 967-5065, Joint Base Lewis-McChord, Washington 98433-9500.
1.7.3 Employee Access and Identification
a. Each employee who requires access to Joint Base Lewis-McChord to perform work under any contract, at any tier, must obtain either a RAPID identification badge or a visitor's pass to obtain access to Joint Base Lewis-McChord. A RAPID identification badge will only be issued to an employee, at any tier, if the employee requires access to Joint Base Lewis-McChord more than twice per week. Contractor employees, at any tier, who require access to Joint Base Lewis-McChord twice per week or less often or who do not participate in the RAPID Gate Program shall obtain a visitor's pass at the Main (Liberty) Gate, the Logistics Center Gate or the D Street Gate. The visitor's pass
SECTION 01 14 10 Page 4 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D will be issued for a maximum of 30 days at a time. A RAPID identification badge will only be issued to Contractor employees if the Contractor participates in the RAPID Gate Program. The RAPID Gate Program is a voluntary program. The production of RAPID badges has been contracted out and the cost of the identification card shall be borne by the Contractor. Current established costs are: $99 for company start-up and $99 per individual.
b. If an employee no longer needs an identification badge for any reason (e.g., quits his/her job or no longer performs work under the contract), return the identification badge to Eid within two calendar days of such change. If the identification badge cannot be returned within the required time frame for any reason, immediately notify both Eid and the Contracting Officer verbally, followed up in writing the next work day. An employee's inability to obtain entrance to a Government installation because he/she does not have the required identification badge or visitor's pass shall not excuse timely performance of the requirements of this contract. Eid or the Government may change the location at which identification badges are issued or returned, with or without advance notice to the Contractor.
Any such changes shall not be a basis for adjusting the contract price under any clause of this contract.
c. RAPID identification badges shall not be reproduced or copied by the Contractor, its Subcontractors, or their employees. If an employee's identification badge is lost, stolen, or reproduced, verbally report the loss, theft, or reproduction to both Eid and the Contracting Officer on the day such loss, theft, or reproduction is discovered, followed by a written report of the circumstances to both Eid and the Contracting Officer within one calendar day after the loss, theft, or reproduction is discovered.
d. Each Contractor employee shall wear the RAPID identification badge while performing work under the contract. The identification badge shall be worn on the upper front of the outer garment unless precluded by OSHA regulation(s). The identification badge shall not be used for access to any Government installation except for performance of work under the contract for which it was issued.
e. Upon expiration or termination of the contract, collect all identification badges and turn them in to Eid. The final invoice will not be considered proper for purposes of the Prompt Payment Act (FAR 52.232-25 or FAR 52.212-4(i)) until all identification badges have been accounted for.
1.7.3.1 Issuance of RAPID Identification Badge
Provide information as required by Eid Passport, Inc. (Eid), to enable Eid to conduct a criminal history background check (CHBC) on Contractor employees who are to have access to Joint Base Lewis-McChord. The Contractor is responsible for paying Eid the fee per employee for conducting the CHBC and issuing the RAPID identification card. If the CHBC is not adverse, a RAPID identification badge will be issued by Eid to the Contractor employee. If the CHBC is adverse, Eid is prohibited from issuing a RAPID identification badge to the Contractor employee. If a RAPID identification badge is denied for any reason, the Contractor employee may only enter the installation by obtaining a visitor’s pass;
however, if the Contractor employee does not meet the criteria for being issued a RAPID identification badge, the Government may, in its sole
SECTION 01 14 10 Page 5 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D discretion, decide not to issue a visitor’s pass to the Contractor employee.
1.7.4 Compliance with Rules, Regulations, and Statutes
All Contractor employees shall observe and comply with all applicable local, State, and Federal rules, regulations, and statutes including those concerning fire, safety, sanitation, security, vehicle safety, and hazardous material handling.
1.7.5 Work Hours
Work hours in the construction area shall be restricted to 7:30 a.m. to 4:30 p.m. daily, Monday through Friday, excluding Federal holidays. Work hours other than as specified above shall be coordinated with and approved by the Contracting Officer.
1.7.6 Firearms
Contractor personnel while performing work under this contract shall not carry any firearms.
1.7.7 Entrance Denial by Military Police
Contractor employees may be denied entry to the Installation by Military Police if it is determined that such entry may be contrary to good order, discipline, or the security of the Installation.
1.8 Base Design Standards
Ensure that this project is constructed in compliance with the following design standards:
a. Fort Lewis Installation Design Guide (October 2007)
b. Joint Base Lewis-McChord Guide to Green Procurement for Construction
1.9 SUPPLEMENTAL ANTITERRORISM/OPERATIONS SECURITY REQUIREMENTS
The Contractor shall be responsible for compliance with all applicable Antiterrorism/Operations Security Items as outlined below.
1.9.1 AT Level 1 Training
All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level 1 awareness training within 30 calendar days after contract start date. Submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level 1 awareness training is available at the following website: https://atlevel1.dtic.mil/at.
1.9.2 Access and General Protection/Security Policy and Procedures
Contractor and all associated subcontractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). Also provide all information required for background checks to meet installation access requirements to be accomplished by
SECTION 01 14 10 Page 6 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.9.3 iWATCH Training
The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards will be provided by the requiring activity Antiterrorism Officer(ATO)). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR.
This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 45 calendar days after contract award.
1.9.4 Access to Government Information Systems
All contractor employees with access to a government info system must be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the information systems and then annually thereafter.
1.9.5 OPSEC Standing Operating Procedure/Plan
Develop an OPSEC Standing Operating Procedure (SOP)/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1, Operations Security.
This SOP/Plan will include the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. In addition, identify an individual who will be an OPSEC Coordinator. The contractor will ensure this individual becomes OPSEC Level II certified per AR 530-1.
1.9.6 OPSEC Training
All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training.
Submit certificates of completion for each affected contractor and subcontractor employee to the COR or to the contracting officer (if a COR is not assigned) within 5 calendar days after completion of training.
OPSEC awareness training is available at the following websites:
https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.
1.9.7 Information Assurance (IA)/Information Technology (IT) training
All contractor employees and associated subcontractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoD 8570.01, DoD 8570.01-M and AR 25-2 within six months of employment.
SECTION 01 14 10 Page 7 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
1.9.8 Information Assurance (IA)/Information Technology (IT) certification
Per DoD 8570.01-M , DFARS 252.239.7001 and AR 25-2, the contractor employees supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.
1.9.9 Handling or Access to Classified Information
Comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified "Confidential," "Secret," or "Top Secret" and requires contractors to comply with (1) The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M); any revisions to DOD 5220.22-M, notice of which has been furnished to the contractor.
1.9.10 Escort in Sensitive or Restricted Areas
All contract employees,including subcontractor employees who are not in possession of the appropriate security clearance, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas. The contractor will coordinate with the COR and/or the facility security office for access when required.
1.9.11 Contractor Company Facility Clearance
The Prime Contractor Company must have a Facility Clearance (FCL) at the appropriate level in accordance with the NISPOM DOD 5220.22-M and AR 380-49 prior to the start of the contract awarded period of performance.
Contractor personnel performing work under this contract must have the required security clearance, per AR 380-67 , at the appropriate level at the start of the period of performance. Security Clearances and FCL requirements are required to be maintained for the life of the contract in accordance with the DD254 attached to the contract. If no FCL, the supporting Government Contracting Activity will sponsor the Prime Contractor Company in obtaining the FCL.
1.9.12 E-Verify Pre-Screening
Pre-screen Candidates using the E-verify Program (http://www.dhs.gov/E-Verify) website to meet the established employment eligibility requirements. Ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible candidates must be provided to the COR no later than 3 business days after the initial contract award.
1.10 RADIATION PERMIT APPLICATION (RPA)
A Radiation Permit is required to use, store, or possess ionizing radiation sources on Federal installations in accordance with 32 CFR 655 .
An RPA shall be reviewed by the Radiation Protection Officer (RPO) and approved via the Contracting Officer. Remove all permitted sources from installation by the end of the permitted period. RPA shall specify start and stop dates for the Radiation Permit and describe the intended use of the radioactive material. For sealed sources, an affirmation that leak
SECTION 01 14 10 Page 8 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D test requirements are current shall be included in the RPA.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 14 10 Page 9 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 10
PRICE AND PAYMENT PROCEDURES
08/15
PART 1 GENERAL
1.1 SUBMITTALS
1.2 SINGLE JOB PAYMENT ITEMS
1.3 UNIT PRICE PAYMENT ITEMS
1.4 BASE ITEMS
1.4.1 Item No. 0001
1.4.1.1 Payment
1.4.1.2 Unit of Measure
1.4.2 Item No. 0002
1.4.2.1 Payment
1.4.2.2 Unit of Measure
1.4.3 Item No. 0003 Contaminated Soil Removal (On JBLM Disposal)
1.4.3.1 Item No. 0003A
1.4.3.2 Unit of Measure
1.4.3.3 Item No. 0003B
1.4.3.4 Unit of Measure
1.4.4 Item No. 0004 Operations and Maintenance (O&M) Manual
1.4.4.1 Payment
1.4.4.2 Unit of Measure
1.4.5 Item No. 0005 As-Builts
1.4.5.1 Payment
1.4.5.2 Unit of Measure
1.4.6 Item No. 0006 Form DD 1354 Checklist and Equipment in Place
List
1.4.6.1 Payment
1.4.6.2 Unit of Measure
1.5 OPTIONAL ITEMS
1.5.1 Item No. 0007
1.5.2 Unit of Measure
1.5.3 Item No. 0008
1.5.4 Unit of Measure
1.5.5 Item No. 0009
1.5.6 Unit of Measure
1.5.7 Item No. 0010
1.5.8 Unit of Measure
1.5.9 Item No. 0011 Contaminated Soil Removal (Off JBLM Disposal)
1.5.9.1 Item No. 0011A
1.5.9.2 Unit of Measure
1.5.9.3 Item No. 0011B
1.5.9.4 Unit of Measure
1.6 ELECTRONIC SOFTWARE SYSTEM FOR SUBMITTING CERTIFIED LABOR PAYROLLS
AND RECORDS
PART 2 PRODUCTS
SECTION 01 22 00.00 10 Page 1 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 22 00.00 10 Page 2 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
SECTION 01 22 00.00 10
PRICE AND PAYMENT PROCEDURES
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Weight Certificates
1.2 SINGLE JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.3 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.4 BASE ITEMS
1.4.1 Item No. 0001
1.4.1.1 Payment
Payment will be made at the Contract job price for: All work associated with the construction of Information Systems Facility (BASE Building) and all associated site work within 5-feet of the building.
SECTION 01 22 00.00 10 Page 3 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
1.4.1.2 Unit of Measure
Unit of measure: job.
1.4.2 Item No. 0002
1.4.2.1 Payment
Payment will be made at the Contract job price for: All work associated with site preparation (BASE Site) including demolition and construction of site work, site utilities, and all other improvements from the construction limits to 5-feet from the building.
1.4.2.2 Unit of Measure
Unit of measure: job.
1.4.3 Item No. 0003 Contaminated Soil Removal (On JBLM Disposal)
1.4.3.1 Item No. 0003A
Payment will be made at the Contract unit price for: All work associated with Contaminated Lead Soil Removal up to and including 5,100 cubic yards
(CY).
1.4.3.2 Unit of Measure
Unit of measure: Cubic Yards.
1.4.3.3 Item No. 0003B
Payment will be made at the Contract unit price for: All work associated with Contaminated Lead Soil Removal in excess of 5,100 CY.
1.4.3.4 Unit of Measure
Unit of measure: Cubic Yards.
1.4.4 Item No. 0004 Operations and Maintenance (O&M) Manual
1.4.4.1 Payment
Payment will be made at the Contract job price for: All work associated with O&M manuals as specified in Section 01 78 23 OPERATIONS AND MAINTENANCE MANUALS from preparation to final approval.
1.4.4.2 Unit of Measure
Unit of measure: job.
1.4.5 Item No. 0005 As-Builts
1.4.5.1 Payment
Payment will be made at the Contract job price for: All work associated with As-Built drawings as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.
SECTION 01 22 00.00 10 Page 4 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
1.4.5.2 Unit of Measure
Unit of measure: job.
1.4.6 Item No. 0006 Form DD 1354 Checklist and Equipment in Place List
1.4.6.1 Payment
Payment will be made at the Contract job price for: All work associated with DD 1354 as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.
1.4.6.2 Unit of Measure
Unit of measure: job.
1.5 OPTIONAL ITEMS
1.5.1 Item No. 0007
Payment will be made at the Contract job price for: All work associated with additional landscaping (BASE Landscaping) including plant soil preparation, plant selections and all other improvements from the construction limits to 5-feet from the building.
1.5.2 Unit of Measure
Unit of measure: job.
1.5.3 Item No. 0008
Payment will be made at the Contract job price for: All work associated with Construction of Information Systems Facility (OPTION A Building) and all associated site work within 5-feet of the building.
1.5.4 Unit of Measure
Unit of measure: job.
1.5.5 Item No. 0009
Payment will be made at the Contract job price for: All work associated with Site preparation (OPTION A Site) including demolition and construction of site work, site utilities, and all other improvements from the construction limits to 5-feet from the building.
1.5.6 Unit of Measure
Unit of measure: job.
1.5.7 Item No. 0010
Payment will be made at the Contract job price for: All work associated with Site preparation (OPTION B Site) including demolition and construction of site work, site utilities, and all other improvements from the construction limits to 5-feet from the building.
SECTION 01 22 00.00 10 Page 5 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
1.5.8 Unit of Measure
Unit of measure: job.
1.5.9 Item No. 0011 Contaminated Soil Removal (Off JBLM Disposal)
1.5.9.1 Item No. 0011A
Payment will be made at the Contract unit price for: All work associated with Contaminated Lead Soil Removal up to and including 320 cubic yards
(CY).
1.5.9.2 Unit of Measure
Unit of measure: Cubic Yards.
1.5.9.3 Item No. 0011B
Payment will be made at the Contract unit price for: All work associated with Contaminated Lead Soil Removal in excess of 300 CY.
1.5.9.4 Unit of Measure
Unit of measure: Cubic Yards.
1.6 ELECTRONIC SOFTWARE SYSTEM FOR SUBMITTING CERTIFIED LABOR PAYROLLS AND
RECORDS
The Contractor is required to use a commercially available software system to process and submit certified payrolls electronically to the Government.
The requirements for preparing, processing, and submitting certified labor payrolls are established by the requirements as stated in FAR 52.222-8 PAYROLLS AND BASIC RECORDS, and FAR 52.222-13 COMPLIANCE WITH CONSTRUCTION
WAGE RATE REQUIREMENTS AND RELATED REGULATIONS.
Provide all access, licenses, and other services required for the receipt, processing, certifying, and electronically transmitting payrolls to the Government, and storing weekly payroll and other data required to comply with Construction Wage Rate Requirements and related regulations. The payroll software system shall be capable of preserving submitted payroll documents and related records for a minimum of three years after contract completion. Provide system access to the Government for the duration of this construction contract. Government access shall include online review by the Government's contract administration office of all electronic payroll records of the Contractor.
The payroll processing software system shall also meet the following functional criteria. It shall:
a. Be compliant with appropriate Construction Wage Rate Requirement payroll provisions in applicable Federal Acquisition Regulations,
b. Be able to accommodate the required number of employees and subcontractors employed under the contract,
c. Be capable of producing an MS Excel compatible spreadsheet to be uploaded into the Quality Control System (QCS), which in turn shall exported to the Resident Management System (RMS), SECTION 01 22 00.00 10 Page 6 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
d. Provide demonstrated security of data storage, data entry, and data access rights,
e. Be able to produce Contractor certified electronic versions of weekly payroll data,
f. Be able to identify erroneous entries and track data/time of all versions of the Construction Wage Rate certified payrolls submitted to the Government over the life of the contract, and
g. Be capable of generating a durable record copy; that is, a CD or DVD of records in PDF format from the system database. This durable record copy shall be provided to the Government during contract closeout.
All incurred costs related to the provision and use of an electronic payroll processing system shall be included in the price for the work under the contract. All costs for providing and using the electronic payroll processing system and services shall not be a separately billed or reimbursed item under the contract.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used -- End of Section --
SECTION 01 22 00.00 10 Page 7 75% Design
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
Information Systems Facility 18007
01 22 00.00 10-A - 1
ATTACHMENT 00 22 00.00 10-A
AWARD SCENARIO 1 - BASE BID ONLY, MINIMAL LANDSCAPE DESIGN
INDEX OF DRAWINGS
PLATE NUMBER TITLE
01 GENERAL
G-001 TITLE, LOCATION AND VICINITY MAPS
G-002 DRAWING INDEX 1 OF 2
G-003 DRAWING INDEX 2 OF 2
G-004 GENERAL SCOPE SUMMARY & GUIDELINES
04 GEOTECHNICAL
B-100 EXPLORATION SITE PLAN - BASE BID
B-101 BORING LOGS
B-102 BORING LOGS
B-103 BORING LOGS
B-104 BORING LOGS & TEST PITS
B-105 TEST DATA
05 CIVIL
C-001 CIVIL LEGEND AND ABBREVIATIONS
C-002 CIVIL GENERAL NOTES 1
C-003 CIVIL GENERAL NOTES 2
C-004 ACCESS AND HAUL ROUTE
C-005 LEAD CONTAMINATION AREAS - BASE BID
C-006 OVERALL SITE PLAN - BASE BID
CD101 CIVIL DEMOLITION PLAN - BASE BID
CS101 SITE PLAN 1 - BASE BID
CS102 SITE PLAN 2 - BASE BID
CG101 GRADING VIEW 1 - BASE BID
CG102 GRADING VIEW 2 - BASE BID
CU101 STORM DRAIN VIEW 1 - BASE BID
CU102 STORM DRAIN VIEW 2 - BASE BID
CU104 UTILITY VIEW 1 - BASE BID
CU105 UTILITY VIEW 2 - BASE BID
C-301 SANITARY SEWER PROFILES
CP401 JOINT LAYOUT PLAN - BASE BID
CJ401 JOINT ELEVATION PLAN - BASE BID
C-501 STORM DRAINAGE DETAILS 1
C-502 STORM DRAINAGE DETAILS 2
C-503 STORM DRAINAGE DETAILS 3
C-504 PAVEMENT SECTIONS
C-505 PAVEMENT JOINT DETAILS
C-506 UTILITY DETAILS 1
C-507 UTILITY DETAILS 2
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
01 22 00.00 10-A - 2
C-508 UTILITY DETAILS 3
C-509 SITE DETAILS
C-510 DECORATIVE FENCE DETAILS 1
C-511 DECORATIVE FENCE DETAILS 2
C-512 LIFT GATE DETAIL
C-513 CHAIN LINK FENCE DETAILS
C-514 MISCELLANEOUS DETAILS 1
C-515 MISCELLANEOUS DETAILS 2
C-516 MISCELLANEOUS DETAILS 3
C-517 MISCELLANEOUS DETAILS 4
C-518 MISCELLANEOUS DETAILS 5
06 LANDSCAPE
L-001 LANDSCAPE LEGEND, ABBREVIATIONS & GENERAL
NOTES
L-101 LANDSCAPE SITE PLAN - BASE BID
L-501 LANDSCAPE DETAILS 1
L-502 LANDSCAPE DETAILS 2
L-503 LANDSCAPE DETAILS 3
07 STRUCTURAL
S-001 STRUCTURAL GENERAL NOTES
S-002 STRUCTURAL GENERAL NOTES
S-003 STRUCTURAL TESTS AND INSPECTIONS
S-004 STRUCTURAL SYMBOLS, OBSERVATIONS AND
ABBREVIATIONS
S-005 CFS TRUSS LOADING DIAGRAM AND NOTES
S-006 COMPONENT CLADDING AND WIND LOAD DIAGRAM
S-101 FOUNDATION PLAN - BASE BID
S-121 SECOND FLOOR FRAMING - BASE BID
S-131 CATWALK FRAMING PLAN - BASE BID
S-141 ROOF FRAMING PLAN - BASE BID
S-142 CANOPY FRAMING PLANS - BASE
S-150 PARKING STRUCTURE
S-160 DUMPSTER ENCLOSURE - FOUNDATION PLAN
S-170 AUXILLARY STRUCTURE
S-201 NORTH AND SOUTH ELEVATIONS -BASE BID
S-202 EAST AND WEST ELEVATIONS - BASE BID
S-203 INTERIOR SHEARWALL ELEVATIONS - BASE BID
S-301 BUILDING SECTIONS - BASE BID
S-310 SECTIONS AND DETAILS BASE BID 1
S-311 SECTIONS AND DETAILS BASE BID 2
S-501 TYPICAL FOUNDATION DETAILS
S-502 TYPICAL CMU DETAILS
S-503 TYPICAL CONCRETE DETAILS
S-504 TYPICAL STEEL DETAILS
S-505 TYPICAL STEEL DECK DETAILS
08 ARCHITECTURAL
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
01 22 00.00 10-A - 3
A-001 ABBREVIATIONS, SYMBOLS, & GENERAL NOTES
A-002 LIFE SAFETY CODE SUMMARY
A-003 FIRST FLOOR LIFE SAFETY PLAN- BASE BID
A-004 SECOND FLOOR LIFE SAFETY PLAN - BASE BID
A-011 FIRST FLOOR ACCESS CONTROL PLAN - BASE BID
A-012 SECOND FLOOR ACCESS CONTROL PLAN - BASE BID
A-013 CATWALK ACCESS CONTROL PLAN - BASE BID
A-021 AIR BARRIER PLANS AND SECTIONS - BASE BID
A-101 FIRST FLOOR PLAN - BASE BID
A-103 SECOND FLOOR PLAN - BASE BID
A-105 CATWALK FLOOR PLAN - BASE BID
A-107 FIRST FLOOR REFLECTED CEILING PLAN - BASE BID
A-109 SECOND FLOOR REFLECTED CEILING PLAN - BASE
BID
A-111 ROOF PLAN - BASE BID
A-113 PARTIAL ROOF PLANS
A-150 PARKING STRUCTURE
A-160 DUMPSTER ENCLOSURE - PLANS, ELEVATIONS AND
SECTIONS
A-170 AUXILLARY STRUCTURE
A-201 NORTH AND SOUTH ELEVATION - BASE BID
A-202 EAST AND WEST ELEVATIONS - BASE BID
A-301 BUILDING SECTIONS - BASE BID
A-311 WALL SECTIONS
A-312 WALL SECTIONS
A-313 WALL SECTIONS
A-401 ENLARGED FLOOR PLANS & STAIR SECTION
A-402 ENLARGED FLOOR PLANS & STAIR SECTION
A-403 ENLARGED FLOOR PLANS & ELEVATOR SECTION
A-404 ENLARGED FLOOR PLANS
A-405 ENLARGED FLOOR PLANS
A-501 EXTERIOR DETAILS I
A-502 EXTERIOR DETAILS II
A-503 ROOF DETAILS I
A-504 ROOF DETAILS II
A-505 ROOF DETAILS III
A-506 EXTERIOR WINDOW DETAILS
A-511 INTERIOR BUILDING DETAILS
A-512 INTERIOR BUILDING DETAILS
A-601 PARTITION TYPES
A-601A ROOM FINISH SCHEDULE - FIRST & SECOND FLOOR -
OPTION
A-603 DOOR SCHEDULE, DOOR AND FRAME TYPES
A-604 WINDOW TYPES
A-801 ISOMETRIC VIEWS
09 INTERIORS
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
01 22 00.00 10-A - 4
I-101 FIRST FLOOR ELEMENTS PLAN - BASE BID
I-102 SECOND FLOOR ELEMENTS PLAN - BASE BID
I-201 INTERIOR ELEVATIONS - BASE BID
I-202 INTERIOR ELEVATIONS - BASE BID
I-203 INTERIOR ELEVATIONS - BASE BID
I-401 ENLARGED FLOOR PLANS
I-501 RESTROOM DETAILS
I-601 INTERIOR FINISH MATERIALS LEGEND
I-701 FIRST FLOOR FINISH PLAN - BASE BID
I-702 SECOND FLOOR FINISH PLAN - BASE BID
IF101 FIRST FLOOR FURNITURE PLAN - BASE BID
IF102 SECOND FLOOR FURNITURE PLAN - BASE BID
11 FIRE PROTECTION
F-001 GENERAL NOTES AND SYMBOLS
FA101 FIRST FLOOR FIRE ALARM PLAN - BASE BID
FA102 SECOND FLOOR FIRE ALARM PLAN - BASE BID
FA501 FIRE ALARM DETAILS - PART 1
FA502 FIRE ALARM DETAILS - PART 2
FP101 FIRST FLOOR FIRE PROTECTION PLAN - BASE BID
FP102 SECOND FLOOR FIRE PROTECTION PLAN - BASE BID
FP301 BUILDING SECTIONS
FP401 ENLARGED RISER DETAILS
FP501 FIRE PROTECTION DETAILS - PART 1
12 PLUMBING
P-001 GENERAL NOTES AND ABBREVIATIONS
P-101 FIRST FLOOR PLAN - BASE BID
P-102 SECOND FLOOR PLAN - BASE BID
P-401 ENLARGED PLANS
P-501 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-901 SCHEMATIC DIAGRAMS - BASE BID
P-902 NATURAL GAS SCHEMATIC DIAGRAM
14 MECHANICAL
M-001 GENERAL NOTES, ABBREVIATIONS
M-011 FIRST FLOOR PLAN - ZONING - BASE BID
M-012 SECOND FLOOR PLAN - ZONING - BASE BID
M-101 FIRST FLOOR PLAN - BASE BID
M-102 SECOND FLOOR PLAN - BASE BID
M-103 CATWALK FLOOR PLAN- BASE BID
M-401 ENLARGED PLANS
M-501 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-603 MECHANICAL SCHEDULES
M-604 MECHANICAL SCHEDULES
15 ELECTRICAL
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
01 22 00.00 10-A - 5
E-001 ELECTRICAL LEGEND, ABBREVIATIONS, AND
GENERAL NOTES
ES101 ELECTRICAL SITE PLAN
EG101 GROUNDING PLAN - BASE BID
EG102 LIGHTNING PROTECTION PLAN - BASE BID
E-101 FIRST FLOOR LIGHTING PLAN - BASE BID
E-102 SECOND FLOOR LIGHTING PLAN - BASE BID
E-103 CATWALK LIGHTING PLAN - BASE BID
E-111 FIRST FLOOR POWER PLAN - BASE BID
E-112 SECOND FLOOR POWER PLAN - BASE BID
E-113 CATWALK POWER PLAN - BASE BID
E-121 FIRST FLOOR MECH. POWER PLAN - BASE BID
E-122 SECOND FLOOR MECH. POWER PLAN - BASE BID
E-123 CATWALK MECH. POWER PLAN - BASE BID
E-401 ENLARGED PLANS
E-501 DUCT BANK DETAILS
E-502 VAULT AND TRANSFORMER DETAILS
E-503 GENERATOR DETAILS
E-504 ELECTRICAL LIGHTING DETAILS
E-505 LIGHTING DETAILS 2
E-506 LIGHT POLE DETAILS
E-507 LIGHTING CONTROLS
E-508 ELECTRICAL SYSTEM GROUNDING DETAILS
E-509 LIGHTNING PROTECTION DETAILS
E-510 ELECTRICAL DETAILS
E-601 ONE LINE DIAGRAM
E-602 PANEL SCHEDULES 1
E-603 PANEL SCHEDULES 2
E-604 PANEL SCHEDULES 3
E-605 PANEL SCHEDULES 4
E-606 PANEL SCHEDULES 5
E-607 PANEL SCHEDULES 6
E-608 PANEL SCHEDULES 7
E-609 PANEL SCHEDULES 8
E-610 PANEL SCHEDULES 10
EY001 SECURITY LEGEND, ABBREVIATIONS, AND GENERAL
NOTES
EY101 FIRST FLOOR SECURITY PLAN - BASE BID
EY102 SECOND FLOOR SECURITYPLAN - BASE BID
EY501 SECURITY - DOOR DETAILS
EY503 SECURITY - RACEWAY SURFACE MOUNTED
TELECOMMUNICATIONS
T-001 LEGENDS, ABBREVIATIONS AND GENERAL NOTES
T002 TELECOMMUNICATIONS SITE PLAN
T-101 FIRST FLOOR DATA OUTLET PLAN - BASE BID
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
01 22 00.00 10-A - 6
T-102 SECOND FLOOR DATA OUTLET PLAN - BASE BID
T-103 FIRST FLOOR CABLE TRAY PLAN - BASE BID
T-104 SECOND FLOOR CABLE TRAY PLAN - BASE BID
T-301 ENLARGED FLOOR PLANS
T-302 ENLARGED FLOOR PLANS 2
T-401 TELECOMMUNICATION DUCT BANK DETAILS
T-402 TELECOMMUNICATIONS VAULT DETAILS
T-403 TELECOMMUNICATIONS CABLE/DATA OUTLET
DETAILS
T-404 CABLE TRAY DETAILS
T-501 TELECOMMUNICATIONS RISER DIAGRAM
T-502 TELECOMMUNICATIONS MTR ONE-LINE
T-503 TELECOMMUNICATIONS ONE-LINE DIAGRAMS
T-504 TELECOMMUNICATIONS SIPR CX-K GAIT ONE-LINE
T-506 TELECOMMUNICATIONS FACEPLATE DETAILS
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
01 22 00.00 10-B - 1
ATTACHMENT 00 22 00.00 10-B
AWARD SCENARIO 2 - BASE BID ONLY, FULL LANDSCAPE DESIGN
G-001 TITLE, LOCATION AND VICINITY MAPS
G-002 DRAWING INDEX 1 OF 2
G-003 DRAWING INDEX 2 OF 2
G-004 GENERAL SCOPE SUMMARY & GUIDELINES
04 GEOTECHNICAL
B-100 EXPLORATION SITE PLAN - BASE BID
B-101 BORING LOGS
B-102 BORING LOGS
B-103 BORING LOGS
B-104 BORING LOGS & TEST PITS
B-105 TEST DATA
05 CIVIL
C-001 CIVIL LEGEND AND ABBREVIATIONS
C-002 CIVIL GENERAL NOTES 1
C-003 CIVIL GENERAL NOTES 2
C-004 ACCESS AND HAUL ROUTE
C-005 LEAD CONTAMINATION AREAS - BASE BID
C-006 OVERALL SITE PLAN - BASE BID
CD101 CIVIL DEMOLITION PLAN - BASE BID
CS101 SITE PLAN 1 - BASE BID
CS102 SITE PLAN 2 - BASE BID
CG101 GRADING VIEW 1 - BASE BID
CG102 GRADING VIEW 2 - BASE BID
CU101 STORM DRAIN VIEW 1 - BASE BID
CU102 STORM DRAIN VIEW 2 - BASE BID
CU104 UTILITY VIEW 1 - BASE BID
CU105 UTILITY VIEW 2 - BASE BID
C-301 SANITARY SEWER PROFILES
CP401 JOINT LAYOUT PLAN - BASE BID
CJ401 JOINT ELEVATION PLAN - BASE BID
C-501 STORM DRAINAGE DETAILS 1
C-502 STORM DRAINAGE DETAILS 2
C-503 STORM DRAINAGE DETAILS 3
C-504 PAVEMENT SECTIONS
C-505 PAVEMENT JOINT DETAILS
C-506 UTILITY DETAILS 1
C-507 UTILITY DETAILS 2
NOT FOR C
ONSTRUCTIO
N - 7 5%
D
01 22 00.00 10-B - 2
C-508 UTILITY DETAILS 3
C-509 SITE DETAILS
C-510 DECORATIVE FENCE DETAILS 1
C-511 DECORATIVE FENCE DETAILS 2
C-512 LIFT GATE DETAIL
C-513 CHAIN LINK FENCE DETAILS
C-514 MISCELLANEOUS DETAILS 1
C-515 MISCELLANEOUS DETAILS 2
C-516 MISCELLANEOUS DETAILS 3
C-517 MISCELLANEOUS DETAILS 4
C-518 MISCELLANEOUS DETAILS 5
06 LANDSCAPE
L-001…
This is the start of the file's text. The full file is on GovTribe.