Albeni Falls Dam Spillway Safety Barrier
Solicitation number
W912DW19Q0046
Issued by

About this file

Albeni Falls Dam Spillway Safety Barrier

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912DW19Q0046 30-Apr-2019

b. TELEPHONE NUMBER

206-764-6573

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 14 May 2019

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912DW9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

VINCENT E DANIELS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 960513 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

ALBENI FALLS DAM PROJECT OFFICE

2376 HIGHWAY 2

OLDTOWN ID 83822-9243

TEL: 208-437-3133 FAX: 206-764-3682

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

NAICS:

326199

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF43

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912DW19Q0046

Section SF 1449 - CONTINUATION SHEET

INSTRUCTIONS TO OFFERORS

1. The solicitation is 100 percent set-aside for small business concerns. All work shall be in accordance with the

Scope of Work (SOW), attachments, and all other terms and conditions herein.

2. Quotes shall be submitted per the following:

All emailed offers shall contain the RFQ No. W912DW19Q0046 and solicitation title in the subject line and emailed to the following email address: vincent.e.daniels@usace.army.mil. For questions call (206)-764-6573.

Faxed quotations will NOT be accepted.

Quotes must set forth full, accurate and complete information, as required by this RFQ.

3. PROSPECTIVE OFFERORS: Contractors shall be registered in the System for Awards Management (SAM) prior to award of a contract or agreement resulting from solicitations.

“Registered in the System for Award Management (SAM) database” means that –

(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14), into the SAM database;

(2) The offeror has completed the Core, Assertions, and Representations and Certification, and Points of contact sections of the registration in the SAM database;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process.

(4) The Government has marked the record “Active”.

This rule more efficiently implements the Debt Collection Improvement Act of 1996, as it requires contractors to be registered in SAM for consideration of future solicitations, awards, and payment. Registration is required prior to award of any contract, basic agreement, basic ordering agreement, or blanket purchase agreement from a solicitation. LACK OF REGISTRATION IN THE SAM DATABASE WILL MAKE AN OFFER INELIGIBLE FOR AWARD. The web site may be accessed at www.sam.gov.

SAM Priority Processing Request: The notarized letter must have both the vendor signature page AND the notary signature page signed. If missing a signature (or other required data) GSA will reject the letter. This will cause the review and activation of the account will be delayed further. Any prioritization requests received on Friday are subject to delays because of the weekend. For a request you send on Friday afternoon, you may not receive your response until Monday morning.

4. ELECTRONIC FUNDS TRANSFER (EFT): Effective 99 Jun 01, the Government will make all payments by

EFT (unless the Government VISA credit card is accepted). The only exceptions are: 1) Foreign Vendors, 2) Government Agencies, and 3) One time payments. The EFT forms and instructions are on the USACE Finance Center (UFC) Web Page; www.fc.usace.army.mil. The UFC point of contact for this action is Mr. Michael Rye,

(901) 874-8543.

5. Award will be made to the lowest priced responsible quoter whose quote conforms to the requirements of the solicitation.

6. Required Submittals:

Signed and dated STANDARD FORM 1449 (Solicitation / Contract / Order for Commercial Items).

Signed and dated STANDARD FORM 30, if applicable, for any Amendments to the solicitation.

Completed provisions, including: 52.212-3 - OFFEROR REPRESENTATIONS AND

CERTIFICATIONS--COMMERCIAL ITEMS (NOV 2017) ALTERNATE I (OCT 2014)

Completed pricing information Bid Schedule for all CLIN items.

The information in Item #7 below.

7. The contractor is required to provide the following information with your quote:

Federal Taxpayer’s ID Number:

DUNS Number:

Cage Code Number This requires registration in SAM, web site for registration is www.sam.gov.

Remit to Address:

Company Name:

Address:

City/State/Zip:

Phone & Fax Numbers:

Point of Contact:

E-Mail Address:

All quoted items must meet the requirements of the Request for Quote (RFQ) including specifications stated in all attachments.

Multiple quotes are not accepted for this RFQ. If multiple quotes are received only one quote (as determined by the Contracting Officer) will be evaluated by the Government. The quote shall be determined acceptable based on the date and time received.

The contractor should list any special features or warranty information applicable to the quoted product(s).

ANNOUNCEMENT TO OFFERORS

Due to recent national events Seattle District US Army Corps of Engineers shall be conducting business under heightened security for the foreseeable future.

Access to Federal Center South, 4735 E Marginal Way S, Building 1202, Seattle, WA 98124 will be through the front lobby only. The building is under Federal Protective Service, which means that persons entering the facility are subject to inspection; including purses, packages, etc. All deliveries shall be thoroughly inspected. In addition, visitors may be required to be escorted by Corps personnel while in the building.

For any questions please contact the Contract Specialist assigned to your project or check our website at www.nws.usace.army.mil for up-to-date information.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Spillway Safety Barrier w/ Installation

FOB: Destination

FFP

NET AMT

0002 1 Job Boat Gate w/ Installation

0003 1 Job Anchor Points w/ Installaiton

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 15-MAY-2019 TO

15-SEP-2019

N/A ALBENI FALLS DAM PROJECT OFFICE

2376 HIGHWAY 2

OLDTOWN ID 83822-9243

208-437-3133

960513

0002 POP 15-MAY-2019 TO

15-SEP-2019

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 15-MAY-2019 TO

15-SEP-2019

N/A (SAME AS PREVIOUS LOCATION)

ITEM(S) 0001, 0002, 0003 - STATEMENT OF WORK

STATEMENT OF WORK

Albeni Falls Dam Spillway Safety Barrier (Revised 29 April 2019)

1.0 The Project Purpose and Objective:

The objective of the Spillway Safety Barrier Project is to obtain an industry standard engineered, designed, tested and manufactured spillway safety barrier to be installed upstream of the dam in order to control boating traffic and to provide a last resort stopping point for boats and boaters to prevent them from passing through the spillway at the US Army Corps of Engineers Dam at Albeni Falls. Contractor will provide engineering, materials, labor, accessories and hardware, to deliver and installed in its entirety a fully functioning end product.

2.0 General Project Requirements:

2.1.1 The new Spillway Safety Barrier will be installed approximately 200 feet upriver from the spillway.

2.1.2 The barrier must provide boater protection for the entire span of the channel. The total estimated distance between shoreline anchor points is 515 feet.

2.1.3 The barrier design shall allow for debris to pass under the barrier.

2.1.4 The barrier shall be designed to remain in place during all seasons and site conditions.

2.1.5 The product service life should exceed 25 years with minimal maintenance.

2.1.6 Barrier floats shall contain high visibility frontal mold-in or flame spray graphics to read: “DANGER

KEEP OUT,” with all caps, black, bold faced, arial font. Graphics shall remain above the water line while barrier is in service.

2.1.7 Barrier must include a boat gate to allow small vessel access.

2.1.8 Installation window is limited to July 1st through September 15th due to the forebay’s water elevation.

2.1.9 The contractor is responsible for maintaining a safe work environment in accordance with State and local laws and regulations and shall comply with all applicable Occupational Safety and Health Act (OSHA) Standards, as well as the Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, current version.

2.1.10 Contractor shall take all reasonable actions to eliminate the generation of turbidity in the forebay during the entirety of this project. All activities on site will be suspended if turbidity is observed in the forebay and will not resume until corrective action is taken and/or is approved by the Government.

2.1.11 Contractor shall be responsible for the proper disposal of any cuttings, debris, and trash generated during the performance of this contract.

2.1.12. Onsite work at the Dam shall be performed during regular working hours of 0630-1700, Monday through Thursday. Deliveries shall be scheduled between 0730 and 1600, Monday through Thursday.

3.0 References:

The design of this spillway barrier shall follow the references below at a minimum; the publications listed below (latest revision applicable and should be reviewed by interested vendors for understanding) form a part of this specification to the extent referenced herein. The publications are referred to within the text by the designation only.

3.1 Federal Energy Regulatory Commission (FERC), Division of Dam Safety and Inspections Guidelines for

Public Safety at Hydropower Projects

3.2 American Society for Testing and Materials (ASTM) Test Methods

3.2.1 ASTM A 123/A 123M

3.2.2 ASTM A 153/A 153M

4.0 Project Specifications:

4.1 Spillway Safety Barrier

Vendor proposals shall provide a product that meets the following:

4.1.1 Booms sections shall be water tight, corrosion free, rot-resistant, UV-stable, and able to withstand temperatures to 40 degrees below freezing; material shall not be vulnerable to biological attack, provide low friction factors and resistance to fouling.

4.1.2 Booms shall offer the capacity for high deformation without fracture and be sized in a diameter and wall thickness with fittings and components that meet site specific strength requirements.

4.1.3 There shall be no wear or maintenance connections located below the waterline.

4.1.4 Boom shall be filled with closed cell non-water absorbing foam fill that must take up a minimum of 95% of the interior volume of the boom.

4.1.5 Boom sections shall be cylindrical bodies, minimum of 6 feet in length, and minimum of 36-inch diameter.

4.1.6 Color: Boom shell shall be International Orange color, as designated in U.S. Federal Standard

595 color #FS-12197, or RAL 2009 Orange.

4.1.7 Reparability: The boom sections shall be replaceable with required sections readily available from the boom manufacturer.

4.1.8 End-to-end boom spacing shall be 8 feet.

4.1.9 Boom connecting chain and chain used to connect to shoreline anchors shall be a minimum of

1-1/2”, Grade 3, Stud-Link galvanized steel chain.

4.1.10 Must be suitable for installation in site where peak design wind speed is 90 miles per hour.

4.1.11 Must withstand freezing over of the fore bay for approximately two weeks. The fore bay typically experiences melt-up versus break-up.

4.1.12 Must hold up to waves up to 3 feet.

4.1.13 Maximum water velocity is 13 feet per second in area of desired boom placement.

4.1.14 Must withstand pool fluctuation between 2045 feet to 2062.5 feet.

4.1.15 Design load must include a 20 feet wide, 2 feet deep debris pile, along the entire length of the barrier during peak water velocity. Assume turbulent water conditions.

4.1.16 Minimum safety factor of 2.0 must be used when determining the design loads based on site conditions.

4.1.17 All metallic parts to be hot dipped galvanized according to ASTM A 123/A 123M and ASTM

A 153/A 153M as applicable.

4.1.18 Boom shall be USA made. All metallic components, chains, wire rope, shackles, pins, and materials that bare appreciable load shall be domestic material only.

4.1.19 Booms shall be supplied by a manufacturer offering standard interchangeable sections with standard options for diameter, wall thickness, and connection fittings.

4.1.20 Boom, anchors, and boat gate shall be supplied with engineered drawings, stamped by a registered P.E.

4.2 Boat Gate

The Safety Barrier must include a boat gate that meets the following:

4.2.1 Boat gate must allow vessels operated by project staff periodic access to restricted areas and prevent passage of unauthorized vessels.

4.2.2 Boat gate must accommodate a 10 foot wide vessel with 4 feet of draft.

4.2.3 The boat access method must be designed as an integral part of the debris boom and be designed to allow for operation in up to 7 feet per second water velocity during emergency situation.

4.2.4 Minimum safety factor of 2.0 must be used when determining the design loads based on site conditions described in Section 4.1.

4.3 Anchor Points

The Safety Barrier must include anchor points that meet the following:

4.3.1 Existing anchor points are to be left in place and are not be re-used.

4.3.2 Contractor is responsible for supplying shoreline anchors that meet site and barrier specific strength requirements. Contractor must test new anchors and supply certificates of compliance certifying that anchors meet or exceed the calculated design loads to include a safety factor of 3.

4.3.3 Shoreline anchors must be designed to exceed barrier specific strength requirements. Anchor strength must include a minimum factor of safety of 3.0 over calculated design load. Anchors must be of the post tension anchored pad eye design or similar to allow for ease of repair and replacement as necessary. See Image 7 for sample image of desired post tension anchor.

4.3.4 New anchors should be installed near the location of existing anchors. See Image 1 for desired anchor locations. The North anchor point is a concrete pier that is accessible from the island between the powerhouse and the spillway. The South anchor point is a rock wall that is only accessible by boat or barge, at full pool during the months of July through September.

4.3.5 Boom shore anchor connections must include: galvanized chains, quick links, and any other hardware or materials required to connect the boom to the shore anchors

4.4 Installation:

Contractor shall install items identified in Sections 4.1 through 4.3. Installation shall include the following:

4.4.1 Installation must occur during full pool for full access to the South anchor point. Full pool is maintained July through September.

4.4.2 Contractor shall submit an Installation Plan for approval regarding the assembly and installation of debris booms, gate, and anchors. The plan shall include calculations performed to ensure sizing of components and the final positioning of the components will meet specifications. The plan shall have details of how the boom units will be stretched across the river and attached to the shore anchors and boat gate. Details of how the shore anchors will be installed must also be included.

4.4.3 Installation of Spillway Safety Barrier must be performed as indicated in the Installation Plan identified in Section 4.4.2, design drawings, and in accordance with the manufacturer's specifications.

4.4.4 Work shall be performed during the Projects regular working hours of 0630-1700, Monday through Thursday. Deliveries shall be scheduled between 0730 and 1600, Monday through Thursday.

4.4.5 Pre-Work Planning Meeting: Upon arrival at AFD, and prior to starting work, the contractor shall attend a pre work planning meeting. The intent of this meeting is to review and explain safety and general requirements specific to the US Army Corps of Engineers and AFD. This meeting will provide an opportunity to discuss schedule, work activities, evacuation plans, hazard analysis requirements, etc.

4.4.6 Laws, Rules, Regulations and Compliance: All Contractor and subcontractor employees shall observe and comply with all applicable local, State and Federal laws, rules and regulations, including those concerning fire, safety, sanitation, security, vehicle operation, and hazardous material handling while performing this contract. All construction shall meet or exceed applicable industry standards related to materials and workmanship. The Contractor shall be responsible for obtaining any permits, approvals or licenses required to perform the work.

4.4.7 A Site Specific Safety Plan including an Activity Hazard Analysis (AHA): An AHA shall be prepared by the contractor performing the work. The AHA shall define the steps performed within the activity, and identify the work sequences, specific anticipated hazards, site conditions, equipment, materials, personnel, and the control measures to be implemented. The names of the qualified person(s) required for a particular activity shall be identified and included in the AHA, as well as proof of their competency/qualification. The Contractor shall coordinate with the USACE technical POC to develop and provide the AHA, and host a pre-work safety briefing before safety barrier installation work commences. The AHA shall be developed to the extent possible with information available prior to the work activity and submitted to the USACE as a draft no less than two (2) days prior to the commencing work.

The AHA shall be completed on site by the Contractor with USACE and facility POC input, reviewed and signed by all applicable parties at the pre-work safety briefing prior to the commencing work. Samples of Site Specific Safety Plans and AHAs are available in the EM 385-1-1, current version.

4.4.8 Environmental Plan: An Environmental plan must be submitted an approved by the Government prior to the start of installation. The contents of the Environmental Plan shall include but is not limited to the following;

4.4.8.1 Name(s) of person(s) within the Contractor's organization who is/are responsible for ensuring adherence to the Environmental Plan.

4.4.8.2 Name(s) and qualifications of person(s) responsible for preparing manifests for hazardous waste to be removed from the site, if applicable.

4.4.8.3 Name(s) and qualifications of person(s) responsible for training the Contractor's environmental protection personnel.

4.4.8.4 Description of the Contractor's environmental protection personnel training program.

4.4.8.5 An erosion and sediment control plan which identifies the type and location of the erosion and sediment controls to be provided

4.4.8.6 A Spill Control plan that include the procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by 40 CFR 68, 40 CFR 302, 40 CFR 355. The Spill Control Plan supplements the requirements of EM 385-1-1.

4.4.8.7 A solid waste disposal plan identifying methods and locations for solid waste disposal including clearing debris and schedules for disposal.

4.4.8.8 An air pollution control plan detailing provisions to assure that dust, debris, materials, trash, etc., do not become air borne and travel off the project site.

4.4.8.9 A contaminant prevention plan that: identifies potentially hazardous substances to be used on the job site; identifies the intended actions to prevent introduction of such materials into the air, water, or ground; and details provisions for compliance with Federal, State, and local laws and regulations for storage and handling of these materials. In accordance with EM 385-1-1, a copy of the Safety Data Sheets (SDS) and the maximum quantity of each hazardous material to be onsite at any given time must be included in the contaminant prevention plan. Update the plan as new hazardous materials are brought onsite or removed from the site.

4.4.9 Contractor must provide a rescue boat as well as a Site Safety and Health Officer (SSHO) during all work being accomplished on or near the water.

4.4.10 Contractor must complete a float plan each day, prior to entering the boater restricted zone in the forebay, and submit the plan to the Government POC for coordination. See Image 8 for float plan.

4.4.11 No utilities, power and water, or restroom facilities will be supplied to the contractor by the government for this work.

5.0 Quality Assurance:

5.1 Goods shall be delivered to the Project site, and installed in accordance with the Contract Documents.

5.2 All boom components shall be new units not previously used for any other purpose. They shall be undamaged when delivered and be handled and stored so as to prevent damage. Booms shall be stored on level surface

5.3 All material and equipment shall be protected against loss, damage by corrosion, weather, overstressed components, or contamination by foreign materials.

5.4 Contractor shall repair or replace any material or equipment damaged during delivery, at no cost to the Government, and without impact to the installation schedule.

5.5 Rejection: Any boom components that are delivered to the site in a damaged condition or that are not in conformance with this specification shall be rejected. Any rejected materials shall be replaced with suitable materials, at no additional cost to the Government.

5.6 The surface of the boom and the boom end connections shall be free from cracks, burrs, warpage, checks, chipped or blistered surfaces, and shall have a smooth surface.

5.7 The stud link steel chain and shackles and all other connecting components used to connect the boom sections shall be free of cracks, burrs, and shall have a high quality and smooth surface.

6.0 Pre-bid Site Visit:

6.1 A pre-bid site visit is scheduled for 8 May 2019, at 0900. The site visit will take place at Albeni Falls Dam, Oldtown, Idaho, 83822.

6.2 Contractors must register their attendance with the contracting specialist at least 24 hours prior to the pre-bid site visit.

7.0 Warranty:

7.1 The warranty shall be issued directly to the Government and shall not be limited in dollar value.

7.2 The warranty period shall be no less than 5 years from the date of Government acceptance of the finished work.

7.3 The warranty shall include parts, materials and installation.

8.0 Submittals:

8.1 Prior to Installation:

The following documentation needs to be submitted and approved by the government:

8.1.1 Design Data: Component strength design calculations for boom, boom linkage components, chain, anchors, and boat gate strength with certificates of compliance certifying that all components that bare appreciable load meet or exceed the calculated design loads. Peak load shall be on design criteria shown in Contract Drawings. Worst case load scenarios and assumptions used shall be supplied with design data.

8.1.2 Engineered Drawings: Engineered drawings, stamped by a registered P.E., for the booms, anchors, and boat gate.

8.1.3 Installation Plan: Narrative describing installation procedures for items identified in Section 4.4.2.

8.1.4 Site Specific Safety Plan: Plan addressing items identified in Section 4.4.7.

8.1.5 Environmental Plan: Plan addressing items identified in Section 4.4.8.

8.1.6 Schedule: Should include milestones for this contract to include development of submittals, procurements of materials, delivery of material, and installation of components.

8.1.7 Product Data: Manufacturer's Literature and Equipment Data for (i) booms, (ii) foam fill (iii) hardware, including bolts, anchor bolts, inserts, nuts, washers, chains, turnbuckles, dimensions, material specifications, working loads and ultimate loads, as applicable. In addition, the product data shall include testing certificates from an independent laboratory verifying the strength of the connecting hardware and materials used.

8.2 Post Installation:

The following documents must be submitted to the government upon completion of the installation of the boom system in its entirety.

8.2.1 Warranty: Certificates of Warranty per specifications of Section 7.0.

8.2.2 Operation and Maintenance Manuals: Documents identifying operational procedures and maintenance activities required to be performed. Training shall be provided to government on maintenance requirements including inspection techniques as well as periodicity of required maintenance to comply with warranty requirements.

8.2.3 Anchor Strength Certificates: Documentation verifying strength of Anchors per criteria identified in Section 4.3.2

9.0 Security:

9.1 All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

9.2 Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

9.3 The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

10.0 Period of Performance:

After receipt of contract award, the contractor will have until 15 September 2019 to complete all work identified in this contract. The time stated for completion includes final cleanup of the premises and submission of all required close-out documentation. Award of this contract is anticipated to occur on or about 22 May 2019.

Installation window is limited to July 1st through September 15th due to the forebay’s water elevation.

11.0 Images:

Image 1: Existing Anchors.

Existing Anchor locations shown as red dots. Note that the South point is a rock wall, only accessible by boat or barge, and only at high pool. North anchor point is a concrete pier, accessible from the island between the powerhouse and the spillway.

Image 2: North Anchor Point

Image 3: North Anchor Point Wear Surface.

Image 4: South Anchor Point.

Image 5: South Anchor Point in Rock Wall.

Image 6: Previous Barrier

Barrier Failed During Spring Runoff, After 3-1/2 Years of Service.

Image 7: Desired Post Tension Anchor Design

Image 8: Float Plan

Appendix A: FLOAT PLAN

U.S. Army Corps of Engineers Albeni Falls Project

(208) 437-3133 ext 220 or (208) 437-7220

Date

Time

Name and/or Number of Boat

Names of All Personnel on Board 1.

2.

3.

4.

5.

6.

Contact Phone Number

Launch Location

Destination & Tentative Itinerary

Estimate Time of Return

Time to Activate Search

Supervisor’s Name/Phone Number

Actual Float Plan Closing Time (completed by the supervisor or other)

Remarks:

Image 9: Forebay Bathymetry Data

CLAUSES INCORPORATED BY REFERENCE

52.203-11 Certification And Disclosure Regarding Payments To

Influence Certain Federal Transactions

SEP 2007

52.203-12 Limitation On Payments To Influence Certain Federal Transactions

OCT 2010

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-22 Alternative Line Item Proposal JAN 2017 52.204-23 Prohibition on Contracting for Hardware, Software, and

Services Developed or Provided by Kaspersky Lab and Other Covered Entities.

JUL 2018

52.207-4 Economic Purchase Quantity-Supplies AUG 1987 52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.212-1 (Dev) Instructions to Offerors - Commercial Items. (DEVIATION 2018-O0018)

OCT 2018

52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.212-5 (Dev) Contract Terms and Conditions Required to Implement

Statutes or Executive Orders--Commercial Items (Deviation 2018-O0021)

JAN 2019

52.219-6 (Dev) Notice of Total Small Business Set-Aside (DEVIATION 2019-O0003).

DEC 2018

52.222-3 Convict Labor JUN 2003 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records AUG 2018 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-19 Child Labor -- Cooperation with Authorities and Remedies JAN 2018 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-22 Previous Contracts And Compliance Reports FEB 1999 52.222-25 Affirmative Action Compliance APR 1984 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans FEB 2016 52.222-50 Combating Trafficking in Persons JAN 2019 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.

AUG 2018

52.232-1 Payments APR 1984 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-11 Extras APR 1984 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.243-1 Changes--Fixed Price AUG 1987 52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-16 Responsibility For Supplies APR 1984 52.247-34 F.O.B. Destination NOV 1991 52.249-8 Default (Fixed-Price Supply & Service) APR 1984 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

OCT 2016

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism

OCT 2015

252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.239-7017 Notice of Supply Chain Risk FEB 2019 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea FEB 2019

CLAUSES INCORPORATED BY FULL TEXT

52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (JUL 2016)

(a) Definitions. As used in this provision--

Commercial and Government Entity (CAGE) code means—

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;

or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

Highest-level owner means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

Immediate owner means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.

(b) The Offeror represents that it [ ___ ] has or [ ___ ] does not have an immediate owner. If the Offeror has more than one immediate owner (such as a joint venture), then the Offeror shall respond to paragraph (c) and if applicable, paragraph (d) of this provision for each participant in the joint venture.

(c) If the Offeror indicates ``has'' in paragraph (b) of this provision, enter the following information:

Immediate owner CAGE code:

Immediate owner legal name: ___

(Do not use a ``doing business as'' name)

Is the immediate owner owned or controlled by another entity?:

[ ___ ] Yes or [ ___ ] No.

(d) If the Offeror indicates ``yes'' in paragraph (c) of this provision, indicating that the immediate owner is owned or controlled by another entity, then enter the following information:

Highest-level owner CAGE code:

Highest-level owner legal name:

(Do not use a ``doing business as'' name)

(End of provision)

52.204-20 Predecessor of Offeror (JUL 2016)

(a) Definitions. As used in this provision--

Commercial and Government Entity (CAGE) code means--

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;

or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

Predecessor means an entity that is replaced by a successor and includes any predecessors of the predecessor.

Successor means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name. The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.

(b) The Offeror represents that it [____] is or [____] is not a successor to a predecessor that held a Federal contract or grant within the last three years.

(c) If the Offeror has indicated “is” in paragraph (b) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order):

Predecessor CAGE code: ____ (or mark “Unknown”).

Predecessor legal name: ____.

(Do not use a “doing business as” name).

52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS--

REPRESENTATION (NOV 2015)

(a) Definitions. Inverted domestic corporation and subsidiary have the meaning given in the clause of this contract entitled Prohibition on Contracting with Inverted Domestic Corporations (52.209-10).

(b) Government agencies are not permitted to use appropriated (or otherwise made available) funds for contracts with either an inverted domestic corporation, or a subsidiary of an inverted domestic corporation, unless the exception at 9.108-2(b) applies or the requirement is waived in accordance with the procedures at 9.108-4.

(c) Representation. The Offeror represents that--

(1) It [ ___ ] is, [ ___ ] is not an inverted domestic corporation; and

(2) It [ ___ ] is, [ ___ ] is not a subsidiary of an inverted domestic corporation.

52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A

FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)

(a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--

(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or

(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.

(b) The Offeror represents that--

(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and

(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (OCT 2018)

ALTERNATE I (OCT 2014)

The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically in the System for Award Management (SAM) accessed through https://www.sam.gov. If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (u)) of this provision.

(a) Definitions. As used in this provision--

“Economically disadvantaged women-owned small business (EDWOSB) concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.

“Forced or indentured child labor” means all work or service—

(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or

(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.

“Highest-level owner” means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

“Immediate owner” means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.

“Inverted domestic corporation,” means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).

“Manufactured end product” means any end product in product and service codes (PSCs) 1000-9999, except—

(1) PSC 5510, Lumber and Related Basic Wood Materials;

(2) Product or Service Group (PSG) 87, Agricultural Supplies;

(3) PSG 88, Live Animals;

(4) PSG 89, Subsistence;

(5) PSC 9410, Crude Grades of Plant Materials;

(6) PSC 9430, Miscellaneous Crude Animal Products, Inedible;

(7) PSC 9440, Miscellaneous Crude Agricultural and Forestry Products;

(8) PSC 9610, Ores;

(9) PSC 9620, Minerals, Natural and Synthetic; and

(10) PSC 9630, Additive Metal Materials.

“Place of manufacture” means the place where an end product is assembled out of components, or otherwise made or processed from raw materials into the finished product that is to be provided to the Government. If a product is disassembled and reassembled, the place of reassembly is not the place of manufacture.

“Restricted business operations” means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate—

(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;

(2) Are conducted pursuant to specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;

(3) Consist of providing goods or services to marginalized populations of Sudan;

(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;

(5) Consist of providing goods or services that are used only to promote health or education; or

(6) Have been voluntarily suspended.

“Sensitive technology”—

(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically—

(i) To restrict the free flow of unbiased information in Iran; or

(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and

(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).

“Service-disabled veteran-owned small business concern”—

(1) Means a small business concern—

(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and

(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.

(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).

“Small business concern” means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR Part 121 and size standards in this solicitation.

“Small disadvantaged business concern, consistent with 13 CFR 124.1002,” means a small business concern under the size standard applicable to the acquisition, that--

(1) Is at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124.105) by--

(i) One or more socially disadvantaged (as defined at 13 CFR 124.103) and economically disadvantaged (as defined at 13 CFR 124.104) individuals who are citizens of the United States; and

(ii) Each individual claiming economic disadvantage has a net worth not exceeding $750,000 after taking into account the applicable exclusions set forth at 13 CFR 124.104(c)(2); and

(2) The management and daily business operations of which are controlled (as defined at 13.CFR 124.106) by individuals, who meet the criteria in paragraphs (1)(i) and (ii) of this definition.

“Subsidiary” means an entity in which more than 50 percent of the entity is owned—

(1) Directly by a parent corporation; or

(2) Through another subsidiary of a parent corporation.

“Veteran-owned small business concern” means a small business concern—

(1) Not less than 51 percent of which is owned by one or more veterans(as defined at 38 U.S.C. 101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans; and

(2) The management and daily business operations of which are controlled by one or more veterans.

“Women-owned business concern” means a concern which is at least 51 percent owned by one or more women; or in the case of any publicly owned business, at least 51…