W912DW18R0017_YTC_Fire_Station_-_Site_Visit_Slides_and_Attendance.pdf
PDF 2 MB Posted
- Solicitation number
- W912DW18R0017
About this file
W912DW18R0017 Site Visit Slides and Record of Attendance
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
BUILDING STRONG®
Pre-Proposal Conference and Site Visit
Scott Long
Seattle District
25 July 2018
Request for Proposal (RFP)
W912DW18R0017
Fire Station Yakima Training Center, WA
Introduction The slides from this conference will be posted with the
RFP on the FedBizOpps website at www.FBO.gov.
This conference is for informational purposes only.
Comments/clarifications made today WILL NOT change the RFP in any way.
Changes to the RFP shall ONLY be made by written
Amendments.
http://www.fbo.gov/
Questions Any and all questions from this Pre-Proposal Conference and Site Visit should be submitted to www.ProjNet.org using the Bidder Inquiry Key and instructions provided in the RFP, Section 00 21 16.
No technical questions will be answered today. Instead, all questions should be asked on www.ProjNet.org.
The cutoff for submitting questions in www.ProjNet.org is five (5) business days prior to the Offer due date.
http://www.projnet.org/ http://www.projnet.org/
Questions During Proposal Stage
Contracting Web Address for RFP Documents:
www.FBO.gov.
Search for RFP Number:
► W912DW18R0017
Technical Questions: www.ProjNet.org For Any Other Administrative Questions, please contact
Shawna West (Contract Specialist) at:
► Email: shawna.west@usace.army.mil http://www.fbo.gov/ mailto:John.P.Scola@usace.army.mil
RFP General Information
RFP NUMBER: W912DW18R0017
This RFP is advertised as a Firm Fixed-Price (FFP),one phase, Design-Bid-Build (DBB), Lowest Price Technically Acceptable (LPTA) procurement.
Amendments will be issued when changes to RFP is necessary.
Magnitude of Construction is between $10M to $25M.
Bid Guarantee is required in the amount of 20% of the
Price or $3M, whichever is less.
► Please see FAR 52.228-1 for more details.
RFP
General Information, continued This RFP is set-aside 100% for Small Business
Concerns under NAICS 236220.
Please read Sections 00 21 16 and 00 22 16 for required documents to be included with your proposal submittal.
The proposals are required to be delivered to the U.S.
Army Corps of Engineers, Seattle District Office, no later than 1:00:00 PM (Seattle Time), on 13 August 2018.
► Please refer to Block 13 on SF 1442 as the date and time may be revised via Amendment.
Please ensure you allow enough time for a timely proposal delivery
RFP
General Information, continued Read descriptions of all evaluation factors thoroughly.
Ensure proposal is complete and reflects all elements required by the RFP.
Proposals must be submitted in 2 Volumes (See Section
00 21 16 and 00 22 16).
► Volume 1 – Technical (Non- Price) ► Volume 2 – Price and Pro Forma Information
Wage Determinations Davis-Bacon wage rates shall be used on this contract.
The Department of Labor (DoL) establishes minimum monetary wages/fringe benefits to be paid in performance of this contract.
The Wage Determination (WD) incorporated into this RFP may be updated/modified during the solicitation period.
Your price proposal, and if necessary, revised price proposal, must always reflect the latest update to the
WD.
Conclusion
Continue to check FBO for new Amendments to the RFP.
Check regularly up until the due date and time for receipt of Proposals.
Ensure you have completed ALL information required by the RFP and submit those items with your Proposal.
Ensure compliance with the RFP requirements.
This Solicitation shall ONLY be changed by written
Amendment.
The Government intends to award on initial offers, to the technically acceptable responsible Offeror submitting the lowest priced offer.
Directions to Site Visit
USACE POC: Scott Long
| Pre-Proposal Conference and�Site Visit |
| Request for Proposal (RFP) |
| Introduction |
| Questions |
| Questions During�Proposal Stage |
| RFP General Information |
| RFP�General Information, continued |
| RFP �General Information, continued |
| Wage Determinations |
| Conclusion |
| Directions to Site Visit |
File details come from the government source that posted it.