PN55199
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Request for Proposal (RFP) W912DW18R0017, Yakima Training Center Fire Station, Yakima, Washington Amendment No. 0001
Please see continuation page for the Amendment details
1. CONTRACT ID CODE PAGE OF PAGES
1 26
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Jul-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW18R0017
X 9B. DATED (SEE ITEM 11)
11-Jul-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Jul-2018
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW18R0017
Amendment No. 0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT NO. 0001
1. This Amendment No. 0001 provides for the following:
a. Revised Section 00 10 00, Price Schedule, which removes the reference to “LF = Linear Foot,” “CY=Cubic Yard,” and “EA=Each” at the end of the Price Schedule.
b. Revised Section 00 21 16, Instructions to Proposers.
c. Revised Section 00 22 16, Supplementary Instructions to Proposers.
d. Revised Section 00 72 00, General Conditions.
2. The proposal submittal time and date of 1:00:00 PM LOCAL TIME (Pacific Time), 13 August 2018 remains the same.
3. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.
4. NOTICE TO OFFERORS: Offerors must acknowledge receipt of all amendments including this amendment by number and date on SF1442.
5. All other terms and conditions remain unchanged.
Encl:
Secion 00 10 00 Price Schedule (Revised) Section 00 21 16 (Revised) Section 00 22 16 (Revised) Section 00 72 00 (Revised)
SECTION 00 10 00 - SOLICITATION
The following have been modified:
PRICE SCHEDULE
FY18 YTC Fire Station
W912DW18R0017
Yakima Training Center, Yakima WA PRICE SCHEDULE
CLIN
Item # Description of Item Quantity Unit Unit Price Amount
BASE ITEMS
0001 All work for Construction of Fire Station and all associated site work within 5-feet of the building.
1 JOB N/A $________________
0002 All work for Site preparation including demolition and construction of site work, site utilities, and all other improvements from the construction limits to 5-feet from the building. This does not include work associated with Item Number 0006.
1 JOB N/A $________________
0003 All work for O&M manuals as specified in Section
01 78 23 OPERATIONS AND MAINTENANCE
MANUALS from preparation to final approval.
1 JOB N/A $60,000
0004 All work for As-Built drawings as specified in
Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.
1 JOB N/A $25,000
All work for DD 1354 as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.
1 JOB N/A $12,000
TOTAL ALL BASE ITEMS 0001-0005 $_____________________
OPTIONAL ITEMS
0006 All work for demolition of the existing YTC Fire
Station, building number 346.
1 JOB $_________ $________________
TOTAL ALL ITEMS 0001-0006 $_____________________
NOTES:
1) 100% Design Projects cannot be altered, changed, or re-designed in any way. No alternate proposals will be accepted.
2) To better facilitate the receipt and proposal process, all modifications to proposals shall be submitted on copies of the latest Bid Schedule as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
3) Offerors must insert a price on all entry amount lines of numbered items of the Bid Schedule. Failure to do so will result in the offer being unacceptable.
4) The dollar amount established in Item Nos. 0003, 0004, and 0005 shall not be revised by Offerors.
5) Award of optional items will be made in accordance with Section 00 72 00 General Conditions, FAR
Clause 52.217-7 “OPTION FOR INCREASED QUANTITY—SEPARATELY PRICED LINE ITEM (MAR 1989)”. The Contracting Officer may exercise the option by written notice to the Contractor within 90 calendar days after receipt by Contractor of Notice to Proceed for the base items.
END PRICE SCHEDULE
SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS
INSTRUCTIONS TO PROPOSERS
1.0 GENERAL INFORMATION
1.1. GENERAL DESCRIPTION OF WORK
Construct a standard design two company headquarters fire station with three additional structural apparatus bays.
This facility will include apparatus bays, residential areas, administration areas, training areas, building information systems, fire protection and alarm systems, and Energy Monitoring Control Systems (EMCS) connection.
Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Heating and air conditioning will be provided by self-contained system. Measures in accordance with the Department of Defense (DOD) Minimum Antiterrorism for Building standards will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DOD's Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided. Cyber Security Measures will be incorporated into this project. Sustainability/Energy measures will be provided.
The completion date is 720 calendar days after the Contractor’s receipt of the Notice to Proceed.
1.2. DISCLOSURE OF MAGNITUDE
Proposed project will be a Firm Fixed-Price construction project. In accordance with DFARS 236.204 Disclosure of the magnitude of construction projects, the order of magnitude for this project is estimated to be in the range of $10,000,000 to $25,000,000. 100 percent payment and performance bonds will be required.
1.3. SUBJECT TO AVAILABILITY OF FUNDS
FAR Clause 52.232-18 Availability of Funds (APR 1984): Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
1.4. GOVERNMENT SECURITY REQUIREMENTS
The offeror(s) must ensure that ALL mail sent to the Seattle District (NWS) District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located at US Army Corps of Engineers, P.O. Box 3755, Seattle WA 98124-3755 if it does not contain a return mailing address. There will be no exceptions.
1.5. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the Federal Business Opportunities website at: www.fbo.gov W912DW18R0017.
It shall be the offeror’s responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
A list of interested vendors (potential offerors and subcontractors) is available on the Federal Business Opportunities web site (registration required) with the solicitation announcement.
1.6. OFFEROR'S QUESTIONS AND COMMENTS
Administrative questions and/or comments relative to these documents shall be submitted via e-mail or mailed to:
Contract Specialist U.S. Army Corps of Engineers, Seattle District ATTN: Shawna West Mailing Address:
PO Box 3755 Seattle, WA 98124-3755 Phone: 206-764-6575 Email: shawna.west@usace.army.mil
Note: All questions and/or comments should reach the above referenced Contracting Office no later than five (5) business days before proposal due date, in order that they may be given consideration or actions taken prior to receipt of offers.
1.6.1. Bidder Inquiry
1.6.1.1. Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder
Inquiry in ProjNet at http://www.projnet.org/projnet
1.6.1.1.1. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into the system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
1.6.1.1.2. From this page you may view all bidder inquiries or add inquiry.
1.6.1.1.3. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
1.6.1.1.4. The Solicitation Number is: W912DW18R0017
1.5.1.1.5. The Bidder Inquiry Key is: H3K3DF-U7AB2C
http://www.fbo.gov/ mailto:shawna.west@usace.army.mil http://www.projnet.org/projnet
1.6.1.2. The Bidder Inquiry System will be unavailable for new inquiries five business (5) days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
1.6.1.3. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
1.6.1.4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
1.6.1.5. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
1.7. SMALL BUSINESS SIZE STANDARD/NAICS CODE
See Section 00 45 00, FAR 52.204-8 for the small business size standard/NAICS Code.
1.8. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.9. SITE VISIT
1.9.1. Site visit meeting will be held at 0900 am PST on Wednesday, 25 July 2018 at the Yakima Training Center
Emergency Operations Center, Bldg 248, Yakima Training Center, Yakima, Washington.
1.9.2. Attendees are required to have picture identification (valid ID) to access the base.
1.9.3. Participants must provide their own transportation. USACE POC is Scott Long (Project Manager) at (206)
764-6697 or Scott.W.Long@usace.army.mil.
1.9.4. Please allow yourself enough time to find parking.
1.9.5. OFFERORS ARE URGED and expected to inspect the site where construction is to be performed and to satisfy themselves as to all general and local conditions which may affect the cost of performance of the contract, to the extent, such information is reasonably obtainable.
1.10. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments).
The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.11. PROPOSAL SUBMITTALS
Due to heightened security at Government installations, those offerors who have their proposals hand-delivered shall contact Procurement Technician, Sonia Frees at 206-764-3516 or Contract Specialist, Shawna West at 206-764-6575 prior to delivering to the address shown below. At the time specified below, it will be announced that receipt of proposals is closed.
Recent terrorist threats have resulted in more time-consuming sign-in and escort procedures and may impact the timely delivery of offers. See FAR 52.215-1 for rules concerning late proposals.
See Box 13 of the Standard Form 1442 for the time and date proposal(s) are due.
EMAIL: Emailed Proposal will NOT be accepted.
mailto:Scott.W.Long@usace.army.mil
FAX: Faxed Proposal will NOT be accepted.
FED-EX/UPS: Shawna West, Contract Specialist, Building 1202 U.S. Army Corps of Engineers, Seattle District
CENWS-CTA
4735 E. Marginal Way S., Bldg # 1202
Seattle, WA 98134-2385 Note: Commercial Carriers will not deliver to PO Boxes
MAIL: Shawna West, Contract Specialist, Building 1202 U.S. Army Corps of Engineers, Seattle District
CENWS-CTA
PO Box 3755 Seattle, WA 98124-3755
HAND DELIVERY: Shawna West, Contract Specialist, Building 1202 U.S. Army Corps of Engineers, Seattle District
CENWS-CTA
4735 E. Marginal Way S., Bldg # 1202
Seattle, WA 98134-2385
The method of Hand Deliver has changed and takes longer than the previous method of arriving at the Federal Center South building lobby to deliver your Offer. Please allow sufficient time to allow for heightened security at Government installations and to get to our new location in Building #1202. Allow time to park, pass through a metal detector, sign in, and receive a building pass at the Federal Center South Building. From there, you will be directed to the new USACE Oxbow Building (#1202) which sits behind the Federal Center South Building. Allow additional time.
Report to the Security Desk in the lobby of the USACE Oxbow Building and call Sonia Frees, Procurement Technician at 206-764-3516, or Shawna West, Contract Specialist at 206-764-6575. A Contracting representative will come down and accept your Proposal.
Note: If delivery is by any means other than Hand Delivery, please check prior to the due date and time to ensure that your Proposal arrives on time. The Packaging that contains the Proposals shall be marked:
”Proposals for Solicitation Number: W912DW18R0017, DO NOT OPEN”
1.12. PROPOSAL FORMAT
1.12.1. All proposal materials shall be submitted in binders or folders with a table of contents and tabbed section dividers. The sections should parallel the submission requirements identified. Each volume should be submitted in a clearly marked envelope separate from each other.
1.12.2. Please refer to Section 00 22 16 for submission requirements.
1.12.3. Number of copies: Offerors shall submit one (1) original and five (5) copies printed for Volume I and one
(1) original printed for Volume II. Volume II shall be completely separated from Volume I, sealed in an envelope, and appropriately marked. Offerors shall also submit one (1) CD in read-only format with the Volume I Technical Proposal copied on it, preferably using one (1) .pdf file. The CD should not have any Volume II Price Proposal information copied on it.
1.12.4. Volume I - Offeror’s Technical Proposal shall include the following sections, in the general format specified below:
• Table of Contents for Volume I - (Listing of all sections of the technical proposal)
• Tab A/Factor A – Relevant Experience of OFFEOR/PRIME (Or Affiliate as defined in Section 00 22 16 Paragraph 5.2), Attachment 1 & 2.
• Tab B/Factor B – Relevant Experience of TEAM, Attachment 1 & 3.
• Tab C/Factor C – Past Performance, Attachment 4.
1.12.5. Volume II – Offeror’s Price Proposal shall include the following, in the general format specified below:
• Price Proposal Format; Volume II
• SF 1442 and Price Schedule, Section 00 10 00 (filled out in its entirety)
• Bid Guarantee
• Corporate Certificate found in Section 00 01 05 (filled out in its entirety), if applicable
• Joint Venture Agreement, if applicable
• Pre-Award Information found at back of Section 00 45 00 (filled out in its entirety)
• Section 00 45 00 Representations and Certifications
1.12.6. The prime, consortium, or joint venture’s name, address, a signature of the official that can bind the firm and a telephone number shall appear in the lower left corner of the title page of any document/volume to be evaluated.
1.12.7. Volume number, section and date submitted shall appear in the bottom right corner of each page (along with the revision number for the amended page, if necessary).
1.13. JOINT VENTURE PROPOSAL REQUIREMENTS
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.
1.14. SYSTEM FOR AWARD MANAGEMENT
Prior to award of a contract, Contractors are required to be registered in the System for Award Management (SAM) and that all information required is current and up to date. NOTE: SAM has a new requirement that firms must submit a notarized letter appointing the authorized Entity Administrator within 30 days of activation. Failure to submit the notarized letter may result in the registration no longer being active. Please visit the SAM website as soon as possible for further information at https://sam.gov/portal/SAM/#1.
SECTION 00 22 16 - SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS
EVALUATION FACTORS FOR AWARD
1.0 BASIS OF AWARD
Award of this Contract will be made to the technically acceptable responsible Offeror submitting the lowest priced offer – Lowest Priced Technically Acceptable Offer (LPTA). This acquisition will result in the award of a firm-fixed price, construction contract.
https://sam.gov/portal/SAM/#1
The technical evaluation of each proposal will be solely on the basis of Technical Evaluation Factors found in this section.
The Government will evaluate each proposal on a technically acceptable/unacceptable basis only with respect to the technical evaluation factors (criteria) described herein. Award will be to the Offeror who presents the technically acceptable proposal with the overall total lowest price. It is the intent of the Government to award off initial offers without discussions.
2.1 PROPOSAL EVALUATION
2.2 Technical Evaluation:
Acceptability will be based on all factors receiving an acceptable rating. The proposal will be evaluated according to the CRITERIA for Non-Price Evaluation Factors of this section.
Proposals will receive either an ACCEPTABLE or an UNACCEPTABLE rating for each of the evaluation factors. Find the description of these ratings in Table 1.
TABLE 1: TECHNICAL ACCEPTABLE/UNACCEPTABLE RATINGS
Rating: Description:
Acceptable Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.
2.3 Pricing Evaluation:
In accordance with FAR provision 52.217-5, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Additionally, the prices for the base and option line items will be evaluated for fairness and reasonableness through the use of a price analysis. The prices for the base and option items will also be checked for unbalancing of line items.
The low offeror shall be determined as follows—
1) Those offerors whose non-priced proposals were determined to be technically acceptable and their offered prices determined fair and reasonable will be eligible for award consideration.
2) The Government will award to the technically acceptable lowest priced offeror and lowest price is determined by totaling the base items and option items.
3.1 EVALUATION PROCESS:
The evaluation process consists of three parts:
1) Proposal Compliance Review. This is an initial review to ensure that all required forms and certifications are complete and that a complete proposal is received. An initial review of each of the proposals will be conducted to check for apparent errors, omissions and areas that require clarification. The purpose of this preliminary review session is to eliminate minor irregularities or apparent clerical mistakes. This preliminary evaluation will ensure that each proposal contains the Price Volume II and the correct number of copies.
2) Relevant Experience and Past Performance. Relevant Experience and Past Performance will be evaluated according to the CRITERIA for Non-Price Evaluation Factors found in this section.
3) Price Evaluation. The Government will evaluate price for fairness and reasonableness through the use of price analysis. Price will also be verified for unbalancing of line items.
3.2 Definitions:
a) Clarification is a limited exchange with an Offeror for the sole purpose of eliminating minor irregularities, informalities, or apparent clerical mistakes in the proposal or to address adverse past performance not previously addressed with the Offeror. Clarifications do not give an Offeror the opportunity to revise or modify its proposal and are used, as necessary, when not opening discussions.
b) Communications are a limited exchange with an Offeror used to assist in determinations of the competitive range. Communications are limited to enhancing Government understanding of proposals and addressing adverse past performance information not previously addressed if said information is the determining factor preventing an Offeror from being included in the competitive range. Such communications shall not be used to cure proposal deficiencies or material omissions, or otherwise revise the proposal.
c) Discussions offer the opportunity to resolve deficiencies or weaknesses in the proposals, based on the requirement and the evaluations factors set forth in the solicitation. If the Contracting Officer determines it is necessary to open discussions, they must discuss with all Offerors in the competitive range. Offerors have the opportunity to revise their proposals at the conclusion of discussions.
d) Relevant: “Relevant” is defined as having a logical connection with the requirements in this request for technical proposals; that is, featuring work that is similar in nature, magnitude, and complexity to the current requirement. To be acceptable, there must be an explanation of how the provided project information is relevant to the proposed work.
e) Year: A “year” is 365 consecutive days.
3.3 Bid Guarantee:
The Offeror is required to submit a bid guarantee along with its proposal. The bid guarantee shall be included in Volume II of the proposal. Any proposal received without a bid guarantee will be rejected and is ineligible for review by the Government. The amount of the Bid Guarantee shall be twenty (20) percent of the Offeror’s proposed price or $3,000,000.00, whichever is less.
3.4 Submission Format: (Please refer to Section 00 21 16 for number of required copies)
All proposal materials shall be submitted in binders with a table of contents and tabbed section dividers. The sections should parallel the submission requirements identified below. In Volume I, Technical Proposal, there shall be a tabbed section for each Non-Price Evaluation factor. Volume II, Price Proposal, shall be submitted in a clearly marked envelope.
3.3.1 Volume I - Offeror’s Technical Proposal shall include the following sections, in the general format specified below:
• Table of Contents for Volume I - (Listing of all sections of the technical proposal)
• Tab A/Factor A – Relevant Experience of OFFEROR/PRIME (Or Affiliate as defined in Paragraph 5.2), Attachment 1 & 2.
• Tab B/Factor B – Relevant Experience of TEAM, Attachment 1 & 3.
• Tab C/Factor C– Past Performance, Attachment 4.
3.3.2 Volume II – Offeror’s Price Proposal shall include the following, in the general format specified below:
• Price Proposal Format; Volume II
• SF 1442 and Price Schedule, Section 00 10 00 (filled out in its entirety)
• Bid Guarantee
• Corporate Certificate found in Section 00 01 05 (filled out in its entirety), if applicable
• Joint Venture Agreement, if applicable
• Pre-Award Information found at back of Section 00 45 00 (filled out in its entirety)
• Section 00 45 00 Representations and Certifications
NOTE: Offeror’s Price Proposal is due AT THE SAME TIME as Technical Proposal.
4.0 EVALUATION CRITERIA
4.1 CRITERIA for Non-Price Evaluation Factors:
Proposals shall concisely, accurately, and completely provide the information required for each of the following non-price evaluation factors. NOTE: Absence of complete information will be deemed as if no support information was provided for that factor. Proposals that do not meet the minimum requirements of all of the non-price evaluation factors shall be determined to be UNACCEPTABLE and are not eligible for award consideration. NO assumptions may be made by the Government. Your proposal must CLEARLY demonstrate the requisite technical experience and qualifications to receive an ACCEPTABLE rating for each of the following criteria:
TABLE 2: EVALUATION
FACTORS: LOCATION: DESCRIPTION:
FACTOR A VOLUME 1, TAB A RELEVANT EXPERIENCE OF
OFFEROR/PRIME.
FACTOR B VOLUME 1, TAB B RELEVANT EXPERIENCE OF TEAM.
FACTOR C VOLUME 1, TAB C PAST PERFORMANCE.
5.0 FACTOR A– Relevant Experience of Offeror/Prime (Or Affiliate as defined in Paragraph 5.2):
5.1 Definitions for Factor A (Definitions for the purposes of this factor):
Complexity means new construction with many varied elements of work or sequencing of the work required for a project of this nature (not pre-engineered or pre-fabricated).
Function means construction of a fire station or a commercial building that has at least two functions contained in this proposed project, i.e., administrative offices, classrooms/training rooms, commercial kitchen, apparatus bay, locker room with showers, and sleeping quarters. For information only, examples of a commercial building include: administration building, airport terminal, cinema, medical clinic, dormitory, dry cleaning plant, educational building, commercial garage and service station, , health and athletic club, hospital, hotel, laboratory, library, motel, museum, radio and television broadcast studio, recreational facility building, religious building (church, synagogue, mosque or temple), school building, shopping mall, and theater.
Magnitude/Cost means projects equal to or greater than Contract amount of $5,000,000.
Relevant means the present or past performance effort involved with construction projects similar in function, scope, magnitude, and complexity.
Scope means containing many of the elements of work and of physical size of a vertical construction building, with the minimum of 16,500 square feet.
Similar means not identical but showing a resemblance in qualities or characteristics of the proposed project.
5.2 Submission Requirements for Factor A:
For this Factor, the Offeror shall submit examples of construction projects which illustrate the relevant experience on projects of similar function, scope, magnitude, and complexity as defined in paragraph 5.1, demonstrating its own experience as a prime contractor. The Offeror may submit construction projects performed by parent companies, affiliates, separate divisions, or other entities associated with the Offeror (hereinafter collectively referred to as Affiliate(s)). If the Affiliate(s) have the relevant experience, and the Offeror can show that this association will continue through the execution of this contract, then that experience may be deemed relevant, and will be considered for this Factor.
Restated, only those projects for which the Offeror or its Affiliate(s) (as long as it is demonstrated that said Affiliate(s) will affect the performance of the Offeror) were the prime contractor shall be submitted. If the experience of an Affiliate is submitted for evaluation, it shall be accompanied by a letter of commitment signed by the Affiliate and the Offeror binding affiliate resources to the performance of the project. This letter must be signed by a person authorized to bind the Affiliate to dedicate its resources—its workforce, management, facilities, or other resources—to the performance of the work under this solicitation.
The Offeror shall document the teaming arrangement with the Affiliate by utilizing the Letter of Commitment for Affiliate, Parent Company, Separate Division, or Other Entity (Attachment 2) found at the end of this Section 00 22 16, or of similar document.
Offeror shall submit at least one (1) project example, but no more than four (4) project examples which demonstrate Offeror’s (or that of an Affiliate specifically for the execution of this contract) relevant experience as the Prime Contractor, with a construction value of at least $5,000,000. Each submitted project shall be 100% complete within six (6) years from the date of issuance of this solicitation. If the Offeror submits more than four (4) project examples, only the first four will be evaluated, starting with the most recent and working backwards in time. The submitted project(s) shall also have elements matching the following:
5.2.1 At least one (1) project shall be new construction having achieved a U.S. Green Building Council’s LEED Silver certification or better.
5.2.2 At least one (1) project shall be new construction on a U.S. military installation.
Note: Project experience for Factor A must be submitted using Attachment 1.
The total of one (1) and up to four (4) submitted projects combined, must meet the two elements of the especially relevant construction experience areas listed above, although both elements do not necessarily need to be present in any one project. However, each project submitted must demonstrate at least one of the two elements indicated above and in the matrix below.
Using a Relevant Experience Matrix similar to that shown below, clearly identify to which experience area(s) each project example pertains (i.e. Project 1 demonstrates new construction on a U.S. military installation):
Relevant Experience Matrix for Factor A:
Submitted Projects:
New Construction having achieved a U.S. Green Building Council’s LEED Silver Certification or
Better Para. 5.2.1
New Construction on a U.S. Military Installation
Para. 5.2.2
1 X 2 X
5.3 Evaluation Method for Factor A:
Factor A will be evaluated to determine whether it meets the requirements of this factor. If any of the required information is not provided in the Offeror’s proposal, the Offeror will be evaluated as “Unacceptable.” The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Past Performance Information Retrieval system (PPIRS) which includes the CCASS/ACASS ratings, other DOD or Government appraisal systems. The Government may check any or all cited references to verify supplied information.
TABLE 3: FACTOR A - RELEVANT EXPERIENCE OF OFFEROR/PRIME
Acceptable The proposal clearly demonstrates how at least one of the project examples submitted meets the requirements of paragraph 5.2.
Unacceptable The proposal does not clearly demonstrate how at least one of the project examples submitted meets the requirements of paragraph 5.2.
6.0 FACTOR B – Relevant Experience of Team
6.1 Definitions for Factor B (Definitions for the purposes of this factor):
Electrical Systems means a network of electrical components deployed to supply, transfer, store, and use electrical power.
Magnitude/Cost means projects equal to or greater than Contract amount of $3,000,000.
Mechanical Systems means heating, ventilating, air-conditioning, refrigeration (HVAC-R), plumbing, fire protection, and noise reduction for the buildings.
Long span means 40 feet unsupported span in length.
Relevant means present or past performance effort involved with construction projects similar in scope and magnitude (note: different than Factor A).
Scope means containing many of the elements of work and of physical size in terms of square feet of the vertical construction building, with a minimum of 25,000 square feet (note: different than Factor A).
Similar means not identical but showing a resemblance in qualities or characteristics of the proposed project.
Team means the Prime Contractor/Offeror (including any Affiliates as defined in Paragraph 5.2, above) and/or its major/key subcontractors, taken as a whole.
6.2 Submission Requirements for Factor B:
For this Factor, the Offeror shall submit at least one (1) relevant project, but no more than four (4) relevant project examples with a construction value of at least $3,000,000, demonstrating its own experience as a prime or as a key subcontractor. The experience of a proposed team may be submitted as an example, subject to the additional submission of the Letter of Commitment of Key Subcontractor found at Attachment 3 to this Section. If the Offeror submits more than four (4) project examples, only the first four will be evaluated, starting with the most recent and working backwards in time. The project examples submitted for Factor A may also be submitted under this Factor B to meet the minimum requirements of this Section 6.0.
All project(s) submitted shall be 100% complete within the past six (6) years from the date of issuance of this solicitation. The submitted project(s) shall also have elements matching the following:
6.2.1 At least one (1) project shall be similar scope with steel and masonry construction, not pre-engineered, not prefabricated.
6.2.2 At least one (1) project shall be a construction project that includes mechanical systems and electrical systems similar in scope to a 2 company fire station.
6.2.3 At least one (1) project shall be a construction project with a long span structural roof system.
Please submit photos or construction drawings with labels or markings to document the especially relevant area or areas demonstrated.
The total of one (1) and up to four (4) submitted projects combined, must meet all three elements of the especially relevant construction experience areas listed above, although all three elements do not necessarily need to be present in any one project. However, each project submitted must demonstrate at least one of the three elements indicated above and in the matrix below.
Using a Relevant Experience Matrix similar to that shown below, clearly identify to which experience area(s) each project example pertains (i.e. Project 1 demonstrates Mechanical Systems and Electrical Systems):
Relevant Experience Matrix for Factor B:
Submitted Projects:
Similar Scope with Steel & Masonry Construction, Non Pre-Engineered, Non-
Prefabricated Para. 6.2.1
Mechanical Systems & Electrical Systems
Para. 6.2.2
Long Structural Roof Systems Para. 6.2.3
1 X 2 X 3 X
If the experience involving the types of construction areas listed above was not self-performed by the Prime, the Offeror shall submit relevant experience information for the Key Subcontractor that will be completing work for this project. The Offeror shall document the teaming arrangement with the Key Subcontractor(s) utilizing the Letter of Commitment of Key Subcontractor (Attachment 3) found at the end of this Section 00 22 16.)
Note: Project experience for Factor B must be submitted using Attachment 1.
6.3 Evaluation Method for Factor B:
Factor B will be evaluated to determine whether it meets the requirements of this factor. If any of the required information is not provided in the Offeror’s proposal, the Offeror will be evaluated as “Unacceptable.” The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Past Performance Information Retrieval system (PPIRS) which includes the CCASS/ACASS ratings, other DOD or Government appraisal systems. The Government may check any or all cited references to verify supplied information.
TABLE 4: FACTOR B - RELEVANT EXPERIENCE OF TEAM
Acceptable The proposal clearly demonstrates how at least one of the project examples submitted meets the requirements of paragraph 6.2.
Unacceptable The proposal does not clearly demonstrate how at least one of the project examples submitted meets the requirements of paragraph 6.2.
7.0 FACTOR C – Past Performance
7.1 Submission Requirements for Factor C:
The project examples submitted for Paragraph 5.2 and Paragraph 6.2 will be used for evaluation of Past Performance. DO NOT provide Past Performance references for projects other than those project examples provided for Factor A and Factor B.
If a completed interim and/or final Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal. Offeror shall not submit a Past Performance Questionnaire (PPQ) when a completed CPARS evaluation is available. If both are submitted, only the CPARS will be evaluated.
Completed PPQs should be submitted with your proposal ONLY if a CPARS evaluation is not available. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ (Attachment 4), which will provide contract and client information for the respective project(s). Offeror should follow-up with clients/references to ensure timely submittal of questionnaires.
If the client requests, PPQs may be submitted directly to the Government's point of contact, Shawna West, via email at shawna.west@usace.army.mil prior to the proposal closing date. The Offeror shall instruct the clients to refer to the solicitation number in the subject line. The PPQs are Source Selection materials. All successfully submitted PPQs will receive an e-mail confirmation upon receipt. If the Offeror does not receive the confirmation, it is their responsibility to follow up to ensure the Government has received the information.
Offeror shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other solicitations. However, this does not preclude the Government from utilizing previously submitted past performance information in the past performance evaluation.
Offeror may provide explanation on problems encountered on past projects and the corrective actions taken by the Offeror.
7.2 Evaluation Method for Factor C: The method of rating for Factor C shall be as follows:
The Government will evaluate past performance based on a demonstrated record of performance. Past performance information is an indicator of an Offeror’s ability to perform the contract successfully. The Government will evaluate the successful completion of all project examples submitted in the proposal for Factor A and Factor B. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction.
The Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System
(CPARS).
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
TABLE 5: FACTOR C – PAST PERFORMANCE EVALUATION RATING
Acceptable
Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.
Unacceptable
Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
NOTE: In the case of an Offeror without a record of past performance or for whom information on past performance is not available, the Offeror’s past performance may not be evaluated as favorable or unfavorable.
[Ref: FAR 15.305(a)(2)(iv)]. Therefore, the Offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”
8.0 REPRESENTATIONS AND CERTIFICATIONS:
The following representations and certifications apply to this solicitation. The Offeror submitting a proposal in mailto:shawna.west@usace.army.mil response to this solicitation shall fill in the appropriate information and/or check the appropriate boxes for each provision listed below and complete the Pre-Award Information which can be found in Section 00 45 00. This information shall be submitted with the Offerors Proposal.
Contractors are required to be registered in the System for Awards Management (SAM) for awards resulting from solicitations.
This rule more efficiently implements the Debt Collection Improvement Act of 1996, as it requires contractors to be registered in SAM for consideration of future solicitations, awards, and payment. Registration is required prior to award of any contract, basic agreement, basic ordering agreement, or blanket purchase agreement from a solicitation issued after May 31, 1998.
LACK OF REGISTRATION IN THE SAM DATABASE WILL MAKE AN OFFER INELIGIBLE FOR
AWARD.
The web site may be accessed at www.sam.gov.
http://www.sam.gov/
00 22 16 - 17
SECTION 00 22 16 - ATTACHMENT 1
OFFEROR or KEY SUBCONTRACTOR EXPERIENCE FORM
USE ONE FORM PER PROJECT
COMPLETE THE APPLICABLE ITEMS FOR FACTOR A AND FACTOR B
Note: A separate Word version of this document will be accessible on fedbizopps at fbo.gov
Provide the following information to show examples of projects your company constructed within the last six (6) years indicating experience with recent and relevant projects.
1. Type of Construction Represented: ______________________________________________________
2. Name of Offeror: ____________________________________________________________________
3. Project Title: _______________________________________________________________________
4. Contract/Project Number: _____________________________________________________________
5. Project Owner and Location: ___________________________________________________________
6. Total Contract Value: $ _____________________________
7. If Offeror performed as Subcontractor, the $-value of Subcontract: $ ___________________________
8. Construction Phase Start Date (Month/Day/Year): __________________________________________
9. Original Construction Phase Completion Date (Month/Day/Year): _____________________________
10. Actual Construction Phase Completion Date (Month/Day/Year): _____________________________ (Actual date if project has been completed)
11. Name of Owner/Client POC: __________________________________________________________
12. Telephone Number of Owner/Client POC: _______________________________________________
13. Email Address of Owner/Client POC: ___________________________________________________
14. General Scope of Construction Project: __________________________________________________
00 22 16 - 18
COMPLETE ONLY FOR FACTOR A – RELEVANT EXPERIENCE OF OFFEROR/PRIME:
15. Describe/demonstrate how the project is relevant to the solicitation in the following areas, as stated in the Factor A Definitions:
(a) Complexity: ____________________________________________________________________
(b) Function: ____________________________________________________________________
(c) Magnitude/Cost:_________________________________________________________________
(d) Similar:________________________________________________________________________
16. If applicable, explain how the project is relevant to the solicitation in the following areas, as defined in Factor A:
(a) U.S. Green Building Council LEED Silver Certification or Better:__________________________
(b) New Construction on U.S. Military Installation:________________________________________
00 22 16 - 19
COMPLETE ONLY FOR FACTOR B – RELEVANT EXPERIENCE OF TEAM:
17. Describe/demonstrate how the project is relevant to the solicitation in the following areas, as stated in the Factor B Definitions:
(a) Magnitude/Cost:_________________________________________________________________
(b) Scope:_________________________________________________________________________
(c) Similar:________________________________________________________________________
18. If applicable, explain how the project is relevant to the solicitation in the following areas, as defined in Factor B:
(a) Steel and Masonry Construction, Not Pre-Engineered, Not Prefabricated:____________________
(b) Mechanical Systems and Electrical Systems Similar to a 2 company fire station:_____________
(c) Long Span Structural Roof System:_________________________________________________
19. Describe your role and responsibility during construction of the project (indicate whether your firm performed as a prime or subcontractor and what percentage of work you self-performed and/or type of work you subcontracted out, if applicable):
20. Summarize your performance evaluation by Customer/Client, if known:
00 22 16 - 20
21. Were you issued a Cure Notice, Show Cause Letter, Terminated for Default and/or Assessed Liquidated Damages?
(If “Yes” provide an explanation):
00 22 16 - 21
ATTACHMENT 2
LETTER OF COMMITMENT OF AFFILIATE, PARENT COMPANY,
SEPARATE DIVISION, OR OTHER ENTITY
(USE COMPANY’S LETTERHEAD)
TO: Contracting Officer:
SUBJECT: Letter of Commitment for Proposed Contract for:
Dear Sir or Madam:
I hereby indicate my commitment that, in the event of an award of a contract to (Fill in name of Proposer), (insert name of affiliate, parent company, separate division, or other entity) will fulfill the duties of (state role on project).
Sincerely, (Signed by Authorized Official) Date:
00 22 16 - 22
ATTACHMENT 3
LETTER OF COMMITMENT OF KEY SUBCONTRACTOR
(USE SUBCONTRACTOR’S COMPANY LETTERHEAD)
TO: Contracting Officer:
SUBJECT: Letter of Commitment for Proposed Contract for:
Dear Sir or Madam:
I hereby indicate my commitment that, in the event of an award of a contract to (Fill in name of Proposer), (insert name of subcontractor) will fulfill the duties of (state role on project).
Sincerely, (Signed by Authorized Official) Date:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND
SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED
QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS
QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE
HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR.
HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. [PLEASE CONTACT
THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO
VERIFY ANY AND ALL INFORMATION ON THIS FORM.
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information:
Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yyyy):
Contract Completion Date (mm/dd/yyyy):
Actual…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.