PN445134_LWCV-00-COMPILATION-R0002_(3_of_3).pdf
PDF 30 MB Posted
- Attached to
- Stoney Gate Valve Repalcement
- Solicitation number
- W912DW18R0012
About this file
Plans R0002 (3 of 3)
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T M
P
N
L
W C
V -E -0
.d g n
E-001
D B
S
D
E L E
C T
R
IC
A L A
B B
R E
V
IA
T
IO
N S
A N
D L
E G
E N
D
LP-3
GENERATOR RECEPTACLE
4 WIRE-THREE PHASE WITH NEUTRAL
3 PHASE
PUSHBUTTON N.O.
PUSHBUTTON N.C.
EARTH GROUND
CONTROL RELAY
JUNCTION BOX
DUPLEX RECEPTACLE
ABBREVIATIONS
N. T. S.
GROUND ROD
HANDHOLE
ELECTRICAL
ABBREVIATIONS (CONT)
POTENTIAL TRANSFORMER
CURRENT TRANSFORMER
WATT HOUR METER
PM POWER METER
VOLT METER
MOTOR
PP - POWER
LP - LIGHTING
PANELBOARD
SWITCH
WITH DISCONNECT
WELDING RECEPTACLE
MONITOR
PHASE/VOLTAGE
GH GATE HEATER
WHM
VM
M
LP
PVM
H O
A
(XOO)
(OXO)
2P
SYMBOLS
DISCONNECT SWITCH
THREE PHASE
H1 H2H3 H4
X1X2
CR
ONE - LINE
DELTA - WYE CONNECTED
POWER TRANSFORMER
CONTROL TRANSFORMER
DUAL VOLTAGE
480V
120V
240V
120/240 VOLT SECONDARY
480 VOLT PRIMARY
DUAL VOLTAGE
POWER TRANSFORMER
THERMAL OVERLOADS
CIRCUIT BREAKER WITH
THREE PHASE
THERMAL OVERLOADS
MECHANICALLY INTERLOCKED
1P - ONE POLE
2P - TWO POLE
3P - THREE POLE
CIRCUIT BREAKERS
(OOX)
CLOSED CONTACT (STANDARD)
OPEN CONTACT (STANDARD)
C CONTACTOR
1 N.O. AND 1 N.C. CONTACT
DOUBLE CIRCUIT SWITCH
PUSHBUTTON
HELD OPEN
NORMALLY CLOSED
LIMIT SWITCH
NORMALLY CLOSED
LIMIT SWITCH
NORMALLY OPEN
LIMIT SWITCH
HELD CLOSED
NORMALLY OPEN
LIMIT SWITCH
T1
T2
T3
M1
480 VAC
4 HP
7 AMPS
480 VAC
7 AMPS, 4 HORSE POWER
3 PHASE MOTOR
AT - BREAKER TRIP SETTING
AF - BREAKER FRAME SIZE
INTERLOCKED
3 PHASE, MECHANICALLY
CIRCUIT BREAKER
5 kW - HEATER SIZE
HEATING ELEMENT
5 kW
30 AT
150 AF
5A - BREAKER TRIP SIZE
SINGLE PHASE
CIRCUIT BREAKER5A
1A
1A - FUSE SIZE
FUSE
TEMPERATURE
OPEN ON RISE OF
NORMALLY CLOSED
THERMAL SWITCH
CONNECTION
EXTERNAL
S WARNING STROBE
WARNING HORN
A - AMBER
G - GREEN
R - RED
PILOT LIGHT
EXTERIOR LIGHTS
BLOCK
POWER DISTRIBUTION
H. H1
S SWITCH, SINGLE POLE
S3 3-WAY SWITCH
WALL MOUNTED
THERMOSTATT
PP - POWER
LP - LIGHTING
PANELBOARD
LP
JB
TOGGLE SWITCH
DISCONNECT SWITCH
GENERAL NOTES
SYMBOLS (CONT) SYMBOLS (CONT)
CONDUIT UNLESS OTHERWISE NOTED.
4. ALL CONDUCTOR RUNS ARE CONCEALED AND INSTALLED IN
OVER THIS SHEET.
3. ITEMS CALLED OUT ON SPECIFIC DETAILS TAKE PRECEDENCE
SPECIFICATIONS.
UNLESS NOTED OTHERWISE ON THE DRAWINGS OR IN THE
FINISHED FLOOR, MOUNTING HEIGHTS SHOWN ARE TYPICAL,
2. ALL MOUNTING HEIGHTS ARE TO CENTER OF DEVICE ABOVE
SYMBOLS MAY APPEAR ON THIS PROJECT.
1. THESE SYMBOLS COMPRISE A STANDARD LIST, NOT ALL
S SMOKE DETECTOR
ELECTRICAL SYMBOLS AND ABBREVIATIONS
SURGE ARRESTOR
AUDIBLE ALARM
PANEL MOUNTED
CR
CR15
ALM 134
G
0.5A
FU52
CR25
CR15
HS72OP ST CL
(XOO)
(OOX)
SV
LT 132
O - OPEN CONTACT
X - CLOSED CONTACT
HAND-OFF-AUTO SWITCH
O - OPEN CONTACT
X - CLOSED CONTACT
PANEL SWITCH
OPEN-STOP-CLOSE
SOLENOID VALVE
INDICATE NUMBER OF PHASE
NUMBER OF ARROW HEADS
NUMBER.
CIRCUIT AND PANELBOARD
HOME RUM, "LP1-3" IS THE
ALM 134
- TRANSFER SWITCHXFSW
- TRANSFORMERXFMR
- WEATHER PROOFWP
- WHITEWHT
- WATT HOUR METERWHM
- WATTS/WIDTHW
- VOLT METERVM
- VOLTS DIRECT CURRENTVDC
- VOLTS ALTERNATING CURRENTVAC
- VOLT AMPEREVA
- VOLT/VERTICALV
- UNINTERRUPTED POWER SUPPLYUPS
- UNLESS OTHERWISE NOTEDUON
- UNDERWRITERS LABORATORYUL
- UNIT HEATERUH
- UNDER GROUNDUG
- TYPICALTYP
- TRANSMITTX
- TEMPERATURE SWITCHTS
- THERMOPLASTIC HIGH-HEAT RESISTANT NYLON COATEDTHHN
- TO BE DETERMINEDTBD
- SYMMETRICALSYM
- SWITCHEDSWD
- SWITCHBOARDSWB
- SWITCHSW
- STROBESTR
- SPARESP
- definition: A YOUNG SALMON FISHSMOLT
- SECONDARYSEC
- SURGE ARRESTORSA
- SOUTHS
- RECEIVERX
- ROOT MEAN SQUARERMS
- REDUCTED VOLTAGE STARTERRVS
- RIGID GALVANIZED STEELRGS
THE CENTRAL PLC)
- REMOTE INPUT - OUTPUT PANEL SYSTEM (CONTROLLED BY RIOPS
- REQUEST FOR INFORMATIONRFI
- RECEPTACLERECEPT
- RACEWAYR
- POLYVINYL CHLORIDEPVC
- PUSH-TO-TESTPTT
- POTENTIAL TRANSFORMERPT
- POWER SUPPLYPS
- PROXIMITYPROX
- PRIMARYPRI
- POWER PANELPP
- POSITIONPOS
- POWER OVER ETHERNETPOE
- PANELPNL
- POWER METERPM
- PROGRAMMABLE LOGIC CONTROLLERPLC
- PARKINGPKG
- PHASEPH
- POLYVINYL CHLORIDE GALVANIZED RIGID STEELPGRS
- POWER FACTOR CORRECTIONPF CORR
- POWER FACTOR CAPACITORPFC
- POWER DISTRIBUTION BLOCKPDB
- PHOTO CELLPC
- PUSHBUTTONPB
- POLEP
- UNLESS OTHERWISE NOTEDUON
- OVERLOADOL
- OPERATOR INTERFACE TERMINALOIT
- OVER HEADOH
- NOT TO SCALENTS
- NAME PLATENP
- NOMINALNOM
- NORMALLY OPENN.O.
- NUMBERNO.
- NON METALLIC CONDUITNMC
- NICKEL CADMIUMNI-CAD
ASSOCIATION
MANUFACTURERS
- NATIONAL ELECTRICAL NEMA
- NORTH DAKOTAND
- NORMALLY CLOSEDN.C.
- NEUTRAL/NORTHN
- MAIN STARTER RAISEMSR
- MAIN STARTER LOWERMSL
- MOTOR OPERATED DAMPERMOD
- MILLIMETERMM
- MISCELLANEOUSMISC
- MINIMUMMIN
- MOTOR CONTROL CENTERMCC
- LIGHTINGLTG
- LIGHTLT
- LIMIT SWITCHLS
- LIGHTING PANELLP
LINER FOOT
- LIGHTING FIXTURE/LF
- LIGHT EMITTING DIODELED
- LIGHTING CONTACTORLC
- LIGHTNING ARRESTORLA
- KILO-WATTkW
- KILO-VOLT-AMPERSkVA
- KILO-VOLTkV
- KEYED SWITCHKS
- THOUSAND CIRCULAR MILS (WIRE SIZE DESIGNATION)KCMIL
- JUNCTION BOXJB
- HEATERHTR
- HAND SWITCHHS
AND HYDRAULIC PUMP SYSTEM)
- HYDRAULIC POWER UNIT (ELECTRIC MOTORHPU
- HORSE POWERHP
- HANDS-OFF-AUTOHOA
- HAND HOLEH. H.
- HIGH DENSITY POLYETHYLENE HDPE
- HEIGHTH
- GROUNDGRD
- GATE OPEN OVERTRAVELGOOT
- GROUNDGND
INTERRUPTER
- GROUND FAULT CIRCUIT GFCI
- GATE CLOSED OVERTRAVELGCOT
- GENERATORGEN
- GAUGEGA
- FUSEFU
- FEET/FOOTFT
- FUSED SWITCHFS
- FIBER OPTICFO
- FIBER NETWORK SWITCHFNSW
- ELECTRIC UNIT HEATEREUH
- ELECTRICAL TESTING LABETL
- ENCLOSUREENCL
- EXHAUST FANEF
- EASTE
- DRAWINGDWG
- DISCONNECT SWITCHDS
- DISTRIBUTIONDIST
SIZE, I.E., ⅛ DIN
DENOTE DEVICE MOUNTING STANDARD
- EUROPEAN STANDARDS, USED HERE TODIN
- DIAMETERDIA
- DEPTH D
- CONTROLLERCTLR
- CURRENT TRANSFORMERCT
STEEL
- CORROSION RESISTANCE CRS
- COLOR RENDERING INDEXCRI
- CONTROL RELAYCR
- CONTINUED CONT
- CONCRETECONC
- COMPARTMENTCOMP
- COMMUNICATION or COMPARTMENTCOM
- CONTRACTING OFFICERCO
- CIRCUITCKT
COOPERATIVE
- CASS COUNTY ELECTRICAL CECC
- CLOSED CIRCUITCC
- CABLECBL
- CIRCUIT BREAKERCB
- CATEGORYCAT
POWER SUPPLY
- BATTERY UNIT BUPS
- BLACKBLK
- BATTERYBAT
- AMERICAN WIRE GAUGEAWG
- AVENUEAVE
- AUXILIARYAUX
- AMPERE TRIPAT
- AMPEREAMPS
- ALARM MODULEALM
CURRENT
- AMPERE INTERRUPTING AIC
- AMPERE HOURSAH
- AMPERE FRAMEAF
ASSOCIATION
- AMERICAN DISABILITY ADA
- ALTERNATING CURRENTAC
- AMPEREA
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
A
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:5
:4
P
M
P L
O T D
A T
E
P L
O T T
IM
E
/2
/2
DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-001 - ELECTRICAL ABBREVIATIONS AND LEGEND
F Y P
N L
W C
V
H
IR
A M M
C H
IT
T E
N D
E N L
O C
K S
W A
S H
IN
G T
O N
IDENTIFICATION
SHEET
SHEET OF 125
OF ENGINEERS
U.S. ARMY CORPS
C U
L V
E R
T G
A T
E V
A L
V E R
E P
L A
C E
M E
N T
B R
IA
N C
N E
L S
O N
M
A Y
RTA SUBMITTAL
C -2 -4 -3
R0002 (7/10/18)
L
W C
V -E -0
.d g n
E-002
D B
S
PLC SYSTEM GENERAL NOTES:
L
C S
Y S
T E
M G
E N
E R
A L N
O T
E S
ADDITIONAL COST TO THE GOVERNMENT.
FACTORY WITNESS TEST MAY BE REQUIRED AT NO
ARE MORE THAN 10% DEFECTS, AN ADDITIONAL
INSTALLING AND COMMISSIONING ON SITE. IF THERE
CORRECTED BY THE SYSTEM INTEGRATOR PRIOR TO
ANY FAULTS OR DISCREPANCIES SHALL BE NOTED AND 7.
DURING THE FACTORY WITNESS TEST.
GENERATED BY THE SYSTEM INTEGRATOR TO BE USED
A CHECKLIST OF ALL INPUTS AND OUTPUTS SHALL BE 6.
MUST DEMONSTRATE THE PLC LOGIC IN OPERATION.
TO BE PROVIDED AS PART OF THE CONTRACT AND
PROGRAMMING SOFTWARE RUNNING ON THE LAPTOP
THE SYSTEM INTEGRATOR SHALL HAVE PLC 5.
OUTPUT.
ANALOG OR DIGITAL METERS SHOWING 4-20 MA (0-100%)
RIOP ANALOG OUTPUTS SHALL BE MEASURED USING 4.
INDIVIDUAL 4-20 MA GENERATORS.
ANALOG INPUTS SHALL BE SIMULATED USING 3.
METHODS.
AND OUTPUTS BEING SIMULATED USING BEST PRACTICE
FACTORY WITNESS TEST WITH DISCRETE FIELD INPUTS
THE SYSTEM SHALL BE DEMONSTRATED DURING A 2.
TESTING.
COMPUTER, SIX RIOPS) ON A FIBER OPTIC LOOP FOR
CONTROL SYSTEM IN ITS ENTIRETY (MASTER PLC, HMI
THE CONTROL SYSTEM INTEGRATOR SHALL SET UP THE 1.
FACTORY SYSTEM INTEGRATION WITNESS TEST
NUMBER, AND THEIR P.O/F.O NUMBER.
THE PANEL SHOP NAME, ADDRESS, PHONE
THE PANEL SHALL CARRY THE UL 508 LABEL WITH C)
MACHINE PRINTED SELF-ADHESIVE TAPE LABEL
ALL COMPONENTS SHALL BE LABELED VIA A B)
SHRINK WIRE LABEL
ALL WIRES SHALL USE A MACHINE PRINTED HEAT A)
FOLLOWS:
THE SHOP SHALL USE GOOD LABELING PRACTICES AS 3.
RELATING TO THE RUNG NUMBER.
SYSTEM WITH COMPONENTS AND WIRE NUMBERS
BEST PRACTICES AND BE AN ORGANIZED RUNG BASED
ELECTRICAL DRAWINGS SHALL CONFORM TO INDUSTRY 2.
PRACTICES.
PANEL SHOP AND SHALL CONFORM TO INDUSTRY BEST
THE CONTROL PANEL SHALL BE BUILT BY A UL 508 1.
REQUIREMENTS
GENERAL CONTROL PANEL CONSTRUCTION
COMPUTER.
THE SAME HMI SOFTWARE FAMILY AS THE HMI
FUNCTIONALITY. THE OPERATOR DISPLAY SHALL HAVE
INDUSTRY STANDARD SOFTWARE TO ALLOW FULL HMI
THE SCREEN FOR THE OPERATOR. HMI WILL RUN
ARTICULATED ARM TO ALLOW OPTIMAL POSITIONING OF
COLOR, HAVE XGA RESOLUTION, AND ATTACHED TO AN
THE OPERATOR DISPLAY SCREEN (HMI) WILL BE FULL 5.
MESSAGING BUS.
CONNECTED USING A DEVICENET OR SERIAL
AND LEADING ZERO BLANKING. DISPLAYS WILL BE
READABLE, FOUR DIGIT WITH WRITABLE DECIMAL POINT,
DIGITAL DISPLAYS WILL BE 1/8 DIN, DAYLIGHT 4.
TO STEADY ON.
TRAVEL, THE OPEN/CLOSE INDICATOR LIGHT WILL GO
VALVE. ONCE THE GATE HAS REACHED THE END OF ITS
THE PLC SYSTEM IS ACTIVELY MOVING THE GATE OR
OPERATION TO VISUALLY CONFIRM TO THE OPERATOR
BLINK APPROXIMATELY EVERY SECOND DURING
GATE AND VALVE OPEN/CLOSE INDICATOR LIGHT WILL 3.
TESTING WILL BE DONE VIA THE PLC I/O.
LIGHTS WILL BE LED, NON-PUSH-TO-TEST, TYPE LIGHTS.
AND READING OPERATOR SWITCHES. INDICATOR
MASTER PLC I/O WILL BE USED FOR INDICATOR LIGHTS 2.
CONTAIN ALL PLC SYSTEM PROGRAMMING.
OPERATOR CONTROL PANEL. MASTER PLC WILL
THE MASTER PLC WILL BE HOUSED IN THE MAIN 1.
MAIN CONTROL PANEL:
ADDITIONAL FIBER OPTIC CABLING.
INTO THE NEW SYSTEM AND AUGMENTED WITH
EXISTING FIBER OPTIC CABLES WILL BE INCORPORATED 4.
LEVEL OF ROBUSTNESS AND FAILURE HANDLING.
RING NETWORK. THIS TOPOLOGY PROVIDES AN EXTRA
THE MASTER/RIOP SYSTEM WILL UTILIZE A FIBER OPTIC 3.
GATE OPERATIONS.
AND 2S WILL PROVIDE LOCALIZED CONTROL OF MITER
ASSOCIATED CULVERT VALVE, AND IN THE CASE OF 2N
RIOPS WILL PROVIDE LOCALIZED CONTROL OF THE 2.
GATE MACHINERY RECESS (1N, 2N, 3N, 1S, 2S, 3S).
REMOTE I/O PANELS (RIOPS) EACH LOCATED IN A MITER
THE NEW SYSTEM WILL UTILIZE A MASTER PLC AND SIX 1.
PROPOSED SYSTEM:
SYSTEM (I.E., LIGHTNING STRIKES)
ESPECIALLY VULNERABLE TO DISRUPTION IN THE
FEET IN LENGTH. THIS MAKES THE PLC SYSTEM
OF RUNS OF DATA CABLE UP TO SEVERAL HUNDRED
CURRENT PLC SYSTEM PHYSICAL TOPOLOGY CONSISTS 4.
READY FOR LIMIT SWITCHES.
MITER GATES. THE NEW SYSTEM SHALL BE FULLY
SYSTEM. NO LIMIT SWITCHES ARE UTILIZED ON THE
POTENTIOMETERS WILL BE UTILIZED WITH THE NEW
POTENTIOMETERS; CURRENT STRING
MITER GATE TRAVEL IS MEASURED USING STRING 3.
AND 2S MECHANICAL RECESSES.
HYDRAULIC CONTROL VALVES ARE LOCATED IN THE 2N
MITER GATE HYDRAULIC POWER UNITS (HPUS) AND 2.
GATE OPERATION.
INDICATORS. PLC SYSTEM PRIMARILY HANDLES MITER
WITH ADDITIONAL HARDWIRED CONTROLS AND
CURRENT CONTROL PANEL IS PARTIALLY PLC BASED 1.
BACKGROUND:
5-100 PERCENT BASELINE.
ACHIEVE AN EFFECTIVE CYLINDER SPEED RANGE OF
ENSURE THE PROPOSED CONTROL SCHEME CAN
SUPPLIER AND MANUFACTURER REPRESENTATIVES TO
INTEGRATOR SHALL WORK WITH THE APPROPRIATE 3.
AND VALVE POSITION.
DISPLAYS SHALL SHOW THE LOCAL VALUES OF GATE 2.
DIGITAL DISPLAYS.
INDICATOR LIGHTS, SWITCHES, PUSHBUTTONS, AND
ALL RIOPS SHALL HAVE THE SAME TYPE OF LED 1.
LOCK RIOP CONTROL PANELS
FAILURES, AND BATTERY ALARMS.
CONDITION, POWER LOSS EVENTS, 480V PHASE
RIOP COMMUNICATIONS MONITORING, PLC FAULT E)
EXPERIENCED.
VIBRATION OR CAVITATION COULD BE
OPERATION AVOIDANCE REGIONS WHERE EXCESS
VELOCITIES THROUGH LATERALS, AND GATE
HYDRAULIC DATA THAT: ATTEMPTS TO LIMIT FLOW
CULVERT VALVE POSITION PROFILES BASED ON D)
POINT.
TO THE OPENING PROFILE FOR THE POSITION SET
ALARMS, SPEED CONTROL, POSITION, AND A CALL
SHALL INCLUDE: HPU OPERATION, FAULTS AND
INDIVIDUAL CULVERT VALVE CONTROL MODULES C)
CYLINDER OPERATION.
HPU OPERATION, FAULTS AND ALARMS, AND GATE
MITER GATE CONTROL MODULES SHALL INCLUDE: B)
CONDITION DETECTION.
LEVELS, CALIBRATION, FILTERING, AND ALARM
GENERAL MODULES SHALL INCLUDE: LOCK A)
THE FOLLOWING MODULES AT MINIMUM:
ELEGANT, AND CONCISE MODULES, AND SHALL HAVE
PLC PROGRAMMING SHALL BE CODED IN SIMPLE, 7.
MITER GATE IS DETECTED AS BEING 120% OPEN)
ALARM IF OUTSIDE OF NORMAL PROCESS VALUES (I.E.
ALL ANALOG VALUES SHALL HAVE AN OUT OF LIMIT 6.
LEVEL.
ALERTING LOCK STAFF TO SUDDEN JUMPS OF POOL
TRANSMITTERS AND BE CAPABLE OF DETECTING AND
SHORT-TERM AVERAGING FOR THE POOL LEVEL
PLC PROGRAMMING SHALL HAVE USER DEFINABLE 5.
TO OPEN, YET NO TRAVEL DETECTED)
NON-STANDARD OUTCOMES (I.E. CALL FOR MITER GATE
PLC PROGRAMMING SHALL BE CAPABLE OF DETECTING 4.
FAILURE IN THE MASTER PLC
UPON A RIOPS COMMUNICATION FAILURE OR CRITICAL
PLC PROGRAMMING SHALL STOP ALL OPERATIONS 3.
HMI LANGUAGE SHALL BE AS SIMILAR AS IS POSSIBLE.
ALL PLC VARIABLE AND TAG NAMES SHARED WITH THE 2.
MITER_GATE_1N_POSITION_PCT).
STRUCTURE AND BE DESCRIPTIVE (I.E.,
ALL VARIABLE TAG NAMES SHALL BE CONSISTENT 1.
ITEMS:
CONSISTENT MANNER. THE FOLLOWING ARE SOME KEY
ALL PLC PROGRAMMING SHALL BE DONE IN A ROBUST
PLC PROGRAMMING REQUIREMENTS:
SPECIFICATIONS 40 95 00.
CYBERSECURITY IS PART OF THIS PROJECT, SEE 8.
TERMINAL AND HMI DESKTOP COMPUTER.
CAPABILITIES BETWEEN THE OPERATOR DISPLAY
E-003. THIS SHOWS THE DIFFERENCES AND
SEE THE MINIMUM LIST OF HMI SCREENS ON SHEET 7.
PUSHBUTTON.
CLICKING ON AN OPEN OR CLOSE SCREEN
SHALL PROPOSE A METHOD SUCH AS CONTINUED
OPENING AND CLOSING MITER GATES. THE SUPPLIER
“DEADMAN’S” OR OPERATOR SAFETY FEATURES WHEN
THE DESKTOP COMPUTER HMI SHALL HAVE A FORM OF 6.
AVAILABLE FOR LOCKING OPERATIONS.
PORTION OF THE MAIN CONTROL PANEL IS NOT
OPERATOR DISPLAY IS INOPERATIVE OR SOME
TO RUN THE LOCKING, BUT BE ONLY USED IF THE MAIN
THE DESKTOP COMPUTER HMI SHALL BE CONFIGURED 5.
SYMBOL.
THE CURSOR AND CLICKS ON THE DESIRED SCREEN
STANDARD MOUSE, WHERE THE OPERATOR MOVES
THE DESKTOP COMPUTER HMI SYSTEM SHALL USE A
FOR MAKING OPERATOR SETTINGS AND SELECTIONS.
MAIN CONTROL PANEL SHALL HAVE A TOUCH SCREEN
THE OPERATOR DISPLAY TERMINAL MOUNTED ON THE 4.
SYMBOLS, COLOR SCHEMES, AND ORGANIZATION.
WHERE POSSIBLE. USING THE SAME SET OF
COMPUTER SHALL HAVE THE SAME APPEARANCE
THE HMI DISPLAYS FOR THE PLC AND DESKTOP 3.
LIGHTS AND DISPLAYS.
DISPLAY NOT ON THE PANEL MOUNTED SWITCHES,
DESKTOP HMI. IT SHALL BE USED FOR SETTINGS AND
SOFTWARE FROM THE SAME MANUFACTURER AS THE
THE OPERATOR DISPLAY PANEL SHALL RUN HMI 2.
DATA CAPABILITIES.
SETUP, TRENDING, LOGGING AND HISTORICAL
AN HMI DESKTOP COMPUTER WITH ADDITIONAL B)
THE MAIN CONTROL PANEL, AND
THE OPERATOR DISPLAY TERMINAL MOUNTED ON A)
THE HMI SYSTEM WILL HAVE TWO MAIN COMPONENTS:1.
PLC HMI AND DESKTOP COMPUTER HMI:
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:5
:4
P
M
P L
O T D
A T
E
P L
O T T
IM
E
/2
/2
DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-002 - PLC SYSTEM GENERAL NOTES
P
N L
W C
V
H
IR
A M M
C H
IT
T E
N D
E N L
O C
K S
W A
S H
IN
G T
O N
IDENTIFICATION
SHEET
SHEET OF 125
OF ENGINEERS
U.S. ARMY CORPS
C U
L V
E R
T G
A T
E V
A L
V E R
E P
L A
C E
M E
N T
B R
IA
N C
N E
L S
O N
M
A Y
RTA SUBMITTAL
C -2 -4 -3
L
W C
V -E -0
.d g n
E-003
D B
S
IN
IM
U M L
IS
T O
F H
M I S
C R
E E
N S
GENERAL NOTES:
REQUIREMENTS
GENERAL PLC PROGRAMMING
PROGRAMMING
LEVEL DIFFERENTIAL
CULVERT VALVE OPEN VERSUS
MITER GATES:
LIMIT SWITCH ADDITION TO
SYSTEM
EMERGENCY STOP (E-STOP)
PROCEDURE TO BE DETERMINED.
CONDITION. THE EXACT SEQUENCE OR
CONTROL PANEL TO CLEAR THE E-STOP
A SEQUENCE OF MULTIPLE ACTIONS ON THE MAIN 2)
NORMAL UP POSITION.
(IF) USED TO INITIATE THE E-STOP, BACK TO
PULLING THE SPECIFIC HARDWIRE PUSHBUTTON 1)
CLEARED SYSTEM WIDE BY:
THE EMERGENCY STOP CONDITION WILL ONLY BE 4.
SUCH AS: “REMOTE IO PANEL 1S E-STOP INITIATE”.
SHOW THE INITIATING SITE AS AN ALARM MESSAGE.
GATES AND VALVES. THE HMI ALARM SYSTEM SHALL
LOCK ON ANY OPERATIONS SUCH AS OPENING/CLOSING
THE EMERGENCY STOP WILL SHUT DOWN THE ENTIRE 3.
PANEL SHALL INITIATE THE PLC E-STOP CODE MODULE.
HIGH PRIORITY. ANY E-STOP COMMAND FROM ANY
THIS MODULE SHALL BE CONTINUOUS RUNNING WITH A
CODE MODULE HANDLING JUST EMERGENCY STOP.
THE PLC PROGRAMMING SHALL HAVE A SEPARATE 2.
E-STOP BUTTON SHOWING ON ALL SCREENS.
COMPUTER AND PLC HMI SCREENS SHALL HAVE AN
OPERATOR CONTROL STATIONS. IN ADDITION THE
PANELS AND THE THREE ASSOCIATED CONTROL HOUSE
BE ON THE MAIN CONTROL PANEL, ALL REMOTE IO
AN EMERGENCY STOP PUSHBUTTION (E-STOP), SHALL 1.
EXPERIENCE IS GAINED.
PROVIDE PLC CODE TUNE UP AS OPERATING
THE SIX CULVERT VALVES. THE SUPPLIER SHALL
COURSE OF THREE CUTOVER PERIODS OF INSTALLING
WILL BE IMPROVED AND TUNED UP DURING THE
IT IS EXPECTED THAT THE CULVERT VALVE PLC LOGIC 6.
REGIONS OF EXCESSIVE VIBRATION ARE OBSERVED.
“AVOIDANCE ZONES” SETTINGS AND CONTROL IF
EXCESSIVE VIBRATION. THE SUPPLIER SHALL PROVIDE
HAVE REGIONS OF OPEN POSITION THAT LEAD TO
IT IS POSSIBLE THAT THE CULVERT VALVE SYSTEM WILL 5.
COMMAND TO ZERO.
DEADBAND, IT WILL DROP THE CYLINDER SPEED
DETERMINES THAT THE CULVERT VALVE IS WITHIN THE
DUE TO THE HDPE VALVE GUIDES. WHEN THE PLC
THE VALVE MAY JUMP IN POSITION DUE TO “STICTION”
HAVE A MINIMUM CYLINDER SPEED CLAMP. OTHERWISE
VALVE POSITION ERROR TO “SETPOINT” AND PROBABLY
CALCULATE A CYLINDER SPEED DEPENDING UPON THE
DITHERING AND OVER SHOOT. THE PLC WILL
DEAD BAND SETTING MAY BE REQUIRED TO AVOID
THE PLC WILL CONTROL THE CULVERT VALVE AND A 4.
POSITION, (SETPOINT).
WILL CALCULATE THE REQUIRED CULVERT VALVE OPEN
THE LEVEL DIFFERENTIAL IS BETWEEN SETTINGS. THIS
INTERPOLATION BETWEEN ADJACENT SETTINGS WHEN
REQUIRED OPEN POSITION. THE PLC WILL DO A LINEAR
AND THEN POSITION THE CULVERT VALVE TO THE
CONTINUOUSLY MONITOR THE LEVEL DIFFERENTIAL
WHEN OPENING A CULVERT VALVE, THE PLC WILL 3.
ALLOW ADJACENT SETTINGS TO BE EQUAL.
CULVERT VALVE SETTINGS. THE PROGRAMMING WILL
AND CONVERSELY MONOTONICALLY INCREASING FOR
MONOTONICALLY DECREASING IN THE LEVEL SETTINGS
THE PLC WILL ENSURE THAT THE SETTINGS ARE
AND 0 -100% FOR CULVERT VALVE OPEN SETTING. AND
PROCESS VARIABLE RANGE, E.G., 0-27 FT FOR LEVELS.
SETTINGS. ALL SETTINGS SHALL BE WITHIN THE
SETTINGS. AND DO A REASONABLENESS CHECK ON THE
THE PLC WILL MONITOR THE OPERATOR ENTERED 2.
NOT DEFINED YET.
SCENARIOS. THE NAMES OF THESE SCENARIOS ARE
POSITION SETTINGS ARE INPUT INTO VARIOUS
DIFFERENTIAL VERSUS CULVERT VALVE REQUIRED
GOING TO THE CULVERT. A SET OF LEVEL
MINIMIZE THE FLOW VELOCITY IN THE LOCK LATERALS
DURING “SMOLT SEASON”, THE REQUIREMENT IS TO 1.
MITER GATES.
THE WATER LEVELS ON BOTH SIDES OF CLOSED
LEVEL DIFFERENTIAL IS THE DIFFERENCE BETWEEN NOTE:
BE NECESSARY.
ADJUSTABLE “MOVEMENT DETECTED” TIME DELAYS MAY
AND WITH LOW SPEED COMMAND SIGNALS.
POTENTIALLY VERY SLOW MOVING CULVERT VALVES
ALARM. THIS MAY BE A BIT TRICKY FOR THE
OCCURS WITHIN A SET TIME, THEN IT GOES INTO
OPEN AND NO MOVEMENT IN THE OPEN DIRECTION
CHECK. SUCH AS IF THE MITER GATE IS COMMANDED TO
CULVERT VALVES, SHALL HAVE A NORMAL OPERATION
ANYTHING THAT IS SUPPOSED TO MOVE, GATES, 4.
THEY ARE ATTEMPTING AN UNSAFE LOCK SEQUENCE.
OPERATOR STILL SHALL BE WARNED BY THE ALARM, IF
WHEN THE INTERLOCKS ARE BYPASSED, THE
PREVENTED FROM DOING A PROHIBITED OPERATION.
OPERATOR SHALL BE WARNED BY AN ALARM AND
INCORPORATED INTO THE PLC PROGRAMMING. THE
SYSTEM PERFORMANCE REQUIREMENTS SHALL BE
SPECIFICATIONS. THIS STANDARD, MINIMUM INTERLOCK
STANDARD, OCT 2014. SEE ATTACHMENT IN
INTERLOCKED ACCORDING TO THE IMTS INTERLOCK
LOCK GATE, VALVE OPERATION SHALL NORMALLY BE 3.
WILL BE A LOGGED ALARM.
INTERLOCKS AND CONTINUE. BYPASSING INTERLOCKS
OPERATOR CAN THEN INTENTIONALLY BYPASS
DOING ANY FURTHER LOCKING OPERATIONS. THE
WILL BE ALARMED AND PREVENT THE OPERATOR FROM
WHEN ANY PROCESS VARIABLE IS OUT OF LIMITS, IT 2.
ALARM.
PRESSURES SHALL HAVE AN OUT OF LIMITS CHECK AND
ALL PROCESS VARIABLES, LEVELS, PERCENT OPEN, 1.
STRING POT GATE POSITION SENSORS.
GATE POSITION USING THE EXISTING SCHEME WITH THE
THE PLC WILL STILL ATTEMPT TO VERIFY THE MITER 6.
BYPASS”.
INTERLOCK SCREEN AND SELECTING, “INTERLOCK
PROXIMITY LIMIT SWITCHES BY GOING TO THE
THE OPERATOR CAN BYPASS THE USE OF THESE 5.
SENSING IS IN FAULT, (BOTH NO-NC ON OR BOTH OFF).
WILL SHOW A FLASHING RED DOT IF THE SWITCH
OR FULLY CLOSED RESPECTIVELY). THE HMI SCREENS
GREEN DOT WHEN THEY ARE MADE, (GATE FULLY OPEN
THE HMI SCREENS WILL SHOW THESE SWITCHES AS A 4.
(MITERED).
DETERMINE THAT THE GATE IS FULLY CLOSED,
SENSING PROXIMITY SWITCH ON THE OTHER LEAF TO
WILL BE A MAGNET ON THE TIP OF ONE LEAF AND
GATE LEAF IS FULLY OPEN (RETRACTED). AND THERE
OF THE LOCK TO SENSE THAT THE RESPECTIVE MITER
A PROXIMITY SWITCH WILL BE MOUNTED ON EACH SIDE 3.
FAULT.
BOTH ON OR BOTH OFF, THE PLC WILL ALARM A SWITCH
WHERE THE PLC SENSE THAT BOTH NO NC PAIR ARE
OPENED OR CLOSED. IF THERE IS A DISCREPANCY,
NC CONTACT TO DETERMINE THAT THE CONTACT HAS
PAIR. THE PLC SYSTEM WILL READ BOTH THE NO AND
THESE LIMIT SWITCHES SHALL BE FORM C, (NO-NC) 2.
AND THE CONTACTS CHANGE.
APPROACH EACH OTHER THE LIMIT SWITCH SENSES
AND A MAGNET. AS THE SWITCH AND MAGNET
MAGNETIC PROXIMITY TYPE WITH A SENSING SWITCH
PER THE DRAWINGS. THESE LIMIT SWITCHES ARE
LIMIT SWITCHES SHALL BE ADDED TO THE MITER GATES 1.
SYSTEM DESIGNER TO ADD SCREENS.
THIS SCREEN LIST DOES NOT PRECLUDE THE HMI 4.
CONCEPTS.
SEE SHEETS E-660 THROUGH E-676 FOR HMI SCREEN 3.
COMPUTER HMI SYSTEM, AS NOTED IN THE TABLE.
THESE SCREENS SHALL ONLY BE ON THE DESKTOP
AS SUMMARIZED IN THE TABLE BELOW. SOME OF
A MINIMUM LIST OF HMI SCREENS SHALL BE PROVIDED 2.
DETERMINE THE SYMBOL SET AND COLOR SCHEME.
SUBMIT OR MEET WITH THE CONTRACTING OFFICER TO
BY THE CONTRACTING OFFICER. THE SUPPLIER SHALL
WITH A SYMBOL SET AND COLOR SCHEME APPROVED
THE SUPPLIER SHALL PROVIDE A MODERN HMI SYSTEM 1.
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:5
:5
P
M
P L
O T D
A T
E
P L
O T T
IM
E
/2
/2
DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-003 - MINIMUM LIST OF HMI SCREENS
P
N L
W C
V
H
IR
A M M
C H
IT
T E
N D
E N L
O C
K S
W A
S H
IN
G T
O N
IDENTIFICATION
SHEET
SHEET OF 125
OF ENGINEERS
U.S. ARMY CORPS
C U
L V
E R
T G
A T
E V
A L
V E R
E P
L A
C E
M E
N T
B R
IA
N C
N E
L S
O N
M
A Y
RTA SUBMITTAL
C -2 -4 -3
C A
N D C
O N
T R
O L S
Y S
T E
M O
V E
R V
IE
W
P N
L
W C
V -E -0
.d g n
E-010
KEYED NOTES:
GENERAL NOTES:
(TYP.)3
(TYP.)1
3 5
N
D B
S
D D
SEE SHEET E-602, E-603
(TYP.)
(TYP.)
(TYP.)
SEE SHEETS E-621, E-653 SEE SHEETS E-621, E-622 SEE SHEETS E-621, E-651
(TYP.)8
SEE SHEETS E-620, E-622SEE SHEETS E-650, E-653 SEE SHEETS E-650, E-651
SEE SHEETS E-650, E-652SEE SHEETS E-640, E-641SEE SHEETS E-650, E-654
WIRING LINES LEGEND
CAT 6 ETHERNET CABLE
SINGLE MODE FIBER OPTIC PAIR
CONTROL STATION
IO PANEL AND LANDWALL
CABLES BETWEEN RECESS LOCK
FIELD WIRING
T M
P
THE RESPECTIVE HOUSE PANELS.
WITHIN THE PANEL AND FROM THE 1N, 2N, 3N PANELS TO
USED TO COMMUNICATE TO DIGITAL DISPLAYS. BOTH
A DEVICE NET OR EQUIVALENT SERIAL DATA SCHEME IS 8.
FIELD WIRING TO LOCAL EQUIPMENT7.
PANEL
CABLES BETWEEN LOCK IO PANEL AND CONTROL HOUSE 6.
TROUBLESHOOT THE PLC SYSTEM.
LOOP SWITCH AND BE OPERATIONAL TO PROGRAM AND
SHALL BE ABLE TO BE PLUGGED IN AT ANY ETHERNET
THE MAINTENANCE/PROGRAMMING LAPTOP COMPUTER 5.
CABLE WITH USB KEYBOARD AND USB MOUSE.
HMI COMPUTER CONNECTED VIA LOCAL CAT 6 ETHERNET 4.
CAT 6 ETHERNET COPPER CABLE TYPICAL.3.
OPTIC LOOP SYSTEM.
ACTUAL TOPOLOGY BUT SHOWS THE INTENT OF THE FIBER
THE FIBER OPTIC REPRESENTATION MAY NOT BE THE 2.
CONNECTORS.
FIBER OPTIC PAIR, SINGLE MODE TYPE WITH SC 1.
SPECIFICATIONS 40 95 00.
CYBERSECURITY IS PART OF THIS PROJECT, SEE 4.
SEE SHEET E-108 FOR SITE FIBER OPTIC LAYOUT.3.
SEE SHEET E-015 FOR CONDUIT AND CIRCUIT SCHEDULE.2.
THE DETAILS OF THE CONTROL DEVICES.
THIS DRAWING IS AN OVERVIEW AND DOES NOT SHOW ALL 1.
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:5
:0
P
M
P L
O T D
A T
E
P L
O T T
IM
E
/2
/2
DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-010 - PLC AND CONTROL SYSTEM OVERVIEW
P
N L
W C
V
H
IR
A M M
C H
IT
T E
N D
E N L
O C
K S
W A
S H
IN
G T
O N
IDENTIFICATION
SHEET
SHEET OF 125
OF ENGINEERS
U.S. ARMY CORPS
C U
L V
E R
T G
A T
E V
A L
V E R
E P
L A
C E
M E
N T
B R
IA
N C
N E
L S
O N
M
A Y
RTA SUBMITTAL
C -2 -4 -3
CONTROL HOUSE 3 CONTROL HOUSE 2 CONTROL HOUSE 1
3N LOCK IO PANEL 2N LOCK IO PANEL 1N LOCK IO PANEL
PLC REMOTE IO PLC REMOTE IO PLC REMOTE IO
ETHERNET
FIBER OPTIC
ETHERNET
FIBER OPTIC
ETHERNET
FIBER OPTIC
CULVERT VALVE 3N MITER GATES CTRL 1N, 2N, 3N CULVERT VALVE 2N CULVERT VALVE 1N
PLC CPU
ETHERNET
FIBER OPTIC
MAIN OPERATOR PANEL IN LOCK TOWER
3S LOCK IO PANEL 2S LOCK IO PANEL 1S LOCK IO PANEL
PLC REMOTE IO PLC REMOTE IO PLC REMOTE IO
ETHERNET
FIBER OPTIC
ETHERNET
FIBER OPTIC
ETHERNET
FIBER OPTIC
LAPTOP
PROGRAMMING
MAINTENANCE/
CULVERT VALVE 3S MITER GATES CTRL 1S, 2S, 3S CULVERT VALVE 2S CULVERT VALVE 1S
CONTROL HOUSE 3 PANEL CONTROL HOUSE 2 PANEL CONTROL HOUSE 1 PANEL
L
W C
V -E -0
.d g
E-015
B
S
D D
C O
N D
U
IT
A
N D C
IR
C U
IT
S
C H
E D
U L E
OPTIC
FIBER FXX
CAMERACATXX
CONTROLCXX
LIGHTINGLXX
POWERSPXX
CIRCUIT TYPES:1.
T M
P
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:5
:1
P
M
P L
O T D
A T
E
P L
O T T
IM
E
/2
/2
DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-015 - CONDUIT AND CIRCUIT SCHEDULE
P
N L
W C
V
H
IR
A M M
C H
IT
T E
N D
E N L
O C
K S
W A
S H
IN
G T
O N
IDENTIFICATION
SHEET
SHEET OF 125
OF ENGINEERS
U.S. ARMY CORPS
C U
L V
E R
T G
A T
E V
A L
V E R
E P
L A
C E
M E
N T
B R
IA
N C
N E
L S
O N
M
A Y
RTA SUBMITTAL
C -2 -4 -3
L
W C
V -E -1
.d g
E-100
B
S
D D
E L E
C T
R
IC
A L K
E Y P
L A
N
N E
W C
U L
V E
R T M
A C
H
IN
E R
Y
CULVERT VALVE #1 NORTH
NTS
E-101
#1N
CULVERT VALVE
UPSTREAM LANDWALL
DRAINAGE TUNNEL
FLOW
CULVERT VALVE #2 NORTH
NTS
E-103
CULVERT VALVE #3 NORTH
NTS
E-105
CULVERT VALVE #1 SOUTH
NTS
E-102
CULVERT VALVE #2 SOUTH
NTS
E-104
CULVERT VALVE #3 SOUTH
NTS
E-106
N
#2N
CULVERT VALVE
#3N
CULVERT VALVE
DRAINAGE TUNNEL
D/S LANDWALL MIDDLE LANDWALL
DRAINAGE TUNNEL
#1S
CULVERT VALVE
DRAINAGE TUNNEL
UPSTREAM RIVERWALL
#2S
CULVERT VALVE
MIDDLE RIVERWALL
DRAINAGE TUNNEL
D/S RIVERWALL
#3S
CULVERT VALVE
DRAINAGE TUNNEL
FLOWFLOW
FLOW FLOW FLOW
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:5
:4
P
M
P L
O T D
A T
E
P L
O T T
IM
E
/2
/2
DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-100 - NEW CULVERT MACHINERY ELECTRICAL KEY PLAN
P
N L
W C
V
H
IR
A M M
C H
IT
T E
N D
E N L
O C
K S
W A
S H
IN
G T
O N
IDENTIFICATION
SHEET
SHEET OF 125
OF ENGINEERS
U.S. ARMY CORPS
C U
L V
E R
T G
A T
E V
A L
V E R
E P
L A
C E
M E
N T
B R
IA
N C
N E
L S
O N
M
A Y
RTA SUBMITTAL
C -2 -4 -3
L
W C
V -E -1
.d g n
SCALE: 3/8" = 1'-0"
E-101
O
C K M
A C
H
IN
E R
Y R
E C
E S
S
N
O R
T H
E L E
C T
R
IC
A L L
A Y
O U
T
GENERAL NOTES:
KEYED NOTES:
D B
S
B R
S
LOCK MACHINERY RECESS #1 NORTH ELECTRICAL LAYOUT
N
ELEV=104.5
R E
S E
R V
O
IR
9JB
JB
HYDRAULIC CYLINDER
MITER GATE
EXISTING #1 NORTH
VALVE #1N
CYLINDER, CULVERT
NEW HYDRAULIC
PUMPS
DUAL HPU
P2
PANEL
EXIST
NEW RIOP 1N
BOXES
EXIST JUNCTION
R1
R8
R3
R3
R2
R8
R6
"64 331'-20""32
237'-97'-6""32 96'-5
"64 352'-11
CENTERLINE LOCK - MATCHLINE SHEET E-102
R16
R17
R18
R9
R5
R11
R13,R14,R15
R12
R2
R7
R19
R4
CODE CLEARANCES IN LAYOUT AND INSTALLATION.
MAINTAIN EQUIPMENT AND ELECTRICAL
IMPEDE ACCESS TO OR REMOVAL OF THE MACHINERY.
AND CABLE SHALL BE INSTALLED SO THAT THEY DO NOT
HAZARDS. SUBMIT ON CONDUIT/ CABLE ROUTING. CONDUIT
PATHWAYS, MAXIMIZE HEAD CLEARANCE, AND MINIMIZE TRIP
CONDUIT AND CABLE ROUTING SHALL BE OUT OF THE WAY OF 4.
COORDINATED TO ENSURE SCHEDULE IS MET.
PARTIAL WIRING AND CONDUIT INSTALLATION TO BE
INSTALLED PRIOR TO STONEY VALVE 1N CUTOVER.
NEW REMOTE I/O (RIOP-1N) PANEL IS REQUIRED TO BE 3.
CUTOVER AND INSTALLATION.
REFER TO THE CONTRACT DOCUMENTS ABOUT STAGED 2.
REQUIRE CHANGES.
OTHER TRADES, AND THE INSTALLATION SEQUENCE MAY
THE EQUIPMENT MAY BE CHANGED, AND COORDINATION WITH
THIS LAYOUT IS A STARTING BASIS, ACTUAL LOCATIONS OF 1.
TRENCH
CABLE
EXIST
STARTER PANEL
DUAL HPU
SEAL TIGHT
R22
PGRS
R22
LS144 (TYP) 16
SEE SHEET E-107.
EXISTING LEVEL TRANSMITTER LOCATION IN CRANE HOUSE,
TO NEW DUAL LASER LEVEL TRANSMITTERS LOCATED AT 13.
ROUTING TO THE CULVERT VALVE CYLINDER.
REMOVABLE ROOF AREA. EXCEPT FLEXIBLE CONDUITS
CONDUIT ROUTING IS EXCLUDED FROM THE CULVERT VALVE12.
MOTOR STARTER. USE JUNCTION BOX AT SPLICE.
STONEY GATE VALVE MOTOR AND EXTEND TO DUAL HPU
SPLICE EXISTING CONDUCTORS REMAINING FROM THE 11.
BE SUPPLIED BY THE HYDRAULIC SYSTEM SUPPLIER.
TRAVEL PRESSURE TRANSMITTERS. THESE WILL
MAGNETOSTRICTIVE POSITION TRANSMITTER, AND TWO
HAVE OPEN AND CLOSED LIMIT SWITCHES, BUILT-IN
THE DESIGN BASIS REQUIRES THE HYDRAULIC CYLINDER TO 10.
AS DETERMINED BY THE HYDRAULIC SYSTEM SUPPLIER.
THREE PHASE, AND 480V THREE PHASE. THE HP MAY VARY,
DUAL HPU PUMP MOTORS SHALL BE DUAL VOLTAGE 240V 9.
CONSOLE IN LAND WALL CONTROL HOUSE 1.
ROUTE TRAY CABLES AND SIGNAL CABLES TO NEW CONTROL 8.
REQUIRED FOR NORMAL SYSTEM OPERATION.
INTO EXISTING FIBER OPTIC CABLES. TWO ACTIVE PAIR
PROVIDE FIBER OPTIC EXTENSION CABLE TO RIOP-1N, AND TIE 7.
WIRING. PROVIDE READILY ACCESSIBLE JUNCTION BOX.
TIE INTO EXISTING STRING POT GATE POSITION TRANSMITTER 6.
BE TYPE 4X STAINLESS STEEL. MINIMUM 6" X 6" X 4" SIZE.
SHALL BE READILY ACCESSIBLE. JUNCTION BOXES SHALL
CONDUIT AND FLEXIBLE CONDUIT. THE JUNCTION BOXES
PROVIDE AND INSTALL JUNCTION BOXES BETWEEN HARD 5.
WITH HYDRAULIC SYSTEM SUPPLIER.
HYDRAULIC SYSTEM ALARMS AND STATUS INPUTS MAY VARY 4.
VARY WITH HYDRAULIC SYSTEM SUPPLIER.
ASSEMBLY. CONNECTIONS, VOLTAGE, AND LOCATION MAY
HYDRAULIC CYLINDER SPEED(FLOW) CONTROL VALVE 3.
LATER AT 480V THREE PHASE.
AND ABLE TO BE USED AND COORDINATED WITH HPU PUMPS
CONTROL TRANSFORMER. INITIALLY WIRED FOR 240V 3 PHASE,
NEW DUAL HPU STARTER PANEL, WITH DUAL INPUT VOLTAGE 2.
COMMUNICATION TO PLC SYSTEM.
NEW REMOTE IO PANEL RIOP-1N, CONNECTS VIA FIBER OPTIC 1.
SEE SPECIFICATIONS 40 95 00.
TO AVOID REPEATED USE WEAR. SUBMIT LAYOUT DETAILS.
HYDRAULIC CYLINDER OPERATION. PROVIDE SWEEP BENDS
CONDUIT TO ENSURE CLEARANCE WITH GATE AND
FOR MOUNTING DETAILS AND CONCEPTS. ROUTE ALL
(RECESSED) AND FULL CLOSED, (MITERED). SEE SHEET E-110
MAGNETIC PROXIMITY SWITCHES FOR MITER GATE OPEN, 16.
BREAKERS.
IS SQUARE D. VERIFY MATCHING TYPE AND RATING
CIRCUIT BREAKERS (1 SPARE) IN PANEL P2. EXISTING PANEL
THE CONTRACTOR TO PROVIDE AND INSTALL FOUR (4) 15 AMP 15.
REQUIREMENTS WITH HYDRAULIC SUPPLIER.
COORDINATE HPU OIL RESERVOIR HEATER ELECTRICAL 14.
R12,R20
R10,R11, R10,R20
JB
PGRS
R22
JB22
JB
R22
R21, JB20
POT
TO STRING
EXIST WIRING
SEAL TIGHT
R21 PGRS
LS142 (TYP)
R22 SEAL TIGHT
CYLINDER
OPENING FOR
1' 5'2'3'4'5' 0
LEGEND:
EXISTING
NEW
LT IN A, LT IN B
TO LEVEL TRANSMITTERS,
DUCT BANK
VIA EXIST
HOUSE 1N
TO CONTROL
R13,R14,R15
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:5
:4
P
M
P L
O T D
A T
E
P L
O T T
IM
E
/2
/2
DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-101 - LOCK MACHINERY RECESS #1 NORTH ELECTRICAL LAYOUT
P
N L
W C
V
H
IR
A M M
C H
IT
T E
N D
E N L
O C
K S
W A
S H
IN
G T
O N
IDENTIFICATION
SHEET
SHEET OF 125
OF ENGINEERS
U.S. ARMY CORPS
C U
L V
E R
T G
A T
E V
A L
V E R
E P
L A
C E
M E
N T
B R
IA
N C
N E
L S
O N
M
A Y
RTA SUBMITTAL
C -2 -4 -3
M
M
"64 342'-2
"32 237'-97'-6""32
96'-5
ELEV=104.5
ELEV=122.5
P N
L
W C
V -E -1
.d g
E-102
KEYED NOTES:
D B
S
B R
S
L O
C K M
A C
H
IN
E R
Y R
E C
E S
S
S
O U
T H
E L E
C T
R
IC
A L L
A Y
O U
T
EXISTING "JB"
LOCATION (NTS)
MITER GATE APPROX
R25
R27
R28 R29
R31 R30
JB5
JB4
R33
R32
- " = 1'-0"8
3SCALE:
LOCK MACHINERY RECESS #1 SOUTH ELECTRICAL LAYOUT
VALVE #1S
CYLINDER, CULVERT
NEW HYDRAULIC
N
PANEL P3
EXIST POWER
R41
R40
R39
CENTERLINE LOCK - MATCHLINE SHEET E-101
TO STRING POT
EXISTING WIRING
CYLINDER
HYDRAULIC
MITER GATE
#1 SOUTH
EXISTING
R38
OPTIC PANEL
NEW FIBER
R36
CODE CLEARANCES IN LAYOUT AND INSTALLATION.
MAINTAIN EQUIPMENT AND ELECTRICAL
HAZARDS. SUBMIT ON CONDUIT/ CABLE ROUTING.
PATHWAYS, MAXIMIZE HEAD CLEARANCE, AND MINIMIZE TRIP
CONDUIT AND CABLE ROUTING SHALL BE OUT OF THE WAY OF 4.
COORDINATED TO ENSURE SCHEDULE IS MET.
PARTIAL WIRING AND CONDUIT INSTALLATION TO BE
INSTALLED PRIOR TO CULVERT VALVE 1S CUTOVER.
NEW REMOTE I/O (RIOP-1S) PANEL IS REQUIRED TO BE 3.
CUTOVER AND INSTALLATION.
REFER TO THE CONTRACT DOCUMENTS ABOUT STAGED 2.
REQUIRE CHANGES.
OTHER TRADES, AND THE INSTALLATION SEQUENCE MAY
THE EQUIPMENT MAY BE CHANGED, AND COORDINATION WITH
THIS LAYOUT IS A STARTING BASIS, ACTUAL LOCATIONS OF 1.
R42
O
IL
R
E S
E R
V O
IR
R37
R26
R26,R38
R35,R36
R43
R35, R34, R34,R43
R43
R34, CYLINDER
OPENING FOR
R44 (PGRS)
R43
R44 SEALTIGHT
14.
REQUIREMENTS WITH HYDRAULIC SUPPLIER.
COORDINATE HPU OIL RESERVOIR HEATER ELECTRICAL13.
CABLE WAY.
LOCK RECESS SHAFT, SEE SHEET E-107. VIA EXISTING
TO NEW DUAL LASER LEVEL TRANSMITTERS LOCATED AT12.
HPU STARTER. USE JUNCTION BOX AT SPLICE.
STONEY GATE VALVE MOTOR AND EXTEND TO THE DUAL
SPLICE EXISTING CONDUCTORS REMAINING FROM THE 11.
ROUTING TO THE CULVERT VALVE CYLINDER.
REMOVABLE ROOF AREA. EXCEPT FLEXIBLE CONDUITS
CONDUIT ROUTING IS EXCLUDED FROM THE CULVERT VALVE 10.
BE SUPPLIED BY THE HYDRAULIC SYSTEM SUPPLIER.
TRAVEL PRESSURE TRANSMITTERS. THESE WILL
MAGNETOSTRICTIVE POSITION TRANSMITTER, AND TWO
HAVE OPEN AND CLOSED LIMIT SWITCHES, BUILT-IN
THE DESIGN BASIS REQUIRES THE HYDRAULIC CYLINDER TO 9.
AS DETERMINED BY THE HYDRAULIC SYSTEM SUPPLIER.
THREE PHASE, AND 480V THREE PHASE. THE HP MAY VARY,
DUAL HPU PUMP MOTORS SHALL BE DUAL VOLTAGE 240V 8.
FIBER OPTIC BACKBONE CABLE, SEE SHEET E-108.
PROVIDE NEW FIBER OPTIC PATCH PANEL. PROVIDE NEW7.
WIRING. PROVIDE READILY ACCESSIBLE JUNCTION BOX.
TIE INTO EXISTING STRING POT GATE POSITION TRANSMITTER 6.
SHALL BE READILY ACCESSIBLE.
CONDUIT AND FLEXIBLE CONDUIT. THE JUNCTION BOXES
PROVIDE AND INSTALL JUNCTION BOXES BETWEEN HARD5.
WITH HYDRAULIC SYSTEM SUPPLIER.
HYDRAULIC SYSTEM ALARMS AND STATUS INPUTS MAY VARY 4.
MAY VARY WITH HYDRAULIC SYSTEM SUPPLIER.
ASSEMBLY. CONNECTIONS, VOLTAGE, AND LOCATION
HYDRAULIC CYLINDER SPEED(FLOW) CONTROL VALVE 3.
LATER AT 480V THREE PHASE.
AND ABLE TO BE USED AND COORDINATED WITH HPU PUMPS
CONTROL TRANSFORMER. INITIALLY WIRED FOR 240V 3 PHASE,
NEW DUAL HPU STARTER PANEL, WITH DUAL INPUT VOLTAGE 2.
COMMUNICATION TO PLC SYSTEM.
NEW REMOTE IO PANEL RIOP-1S, CONNECTS VIA FIBER OPTIC 1.
SEE SPECIFICATIONS 40 95 00.
OPERATION. SUBMIT LAYOUT DETAILS.
CLEARANCE WITH GATE AND HYDRAULIC CYLINDER
AND CONCEPTS. ROUTE ALL CONDUIT TO ENSURE
(RECESSED). SEE SHEET E-110 FOR MOUNTING DETAILS
MAGNETIC PROXIMITY SWITCHES FOR MITER GATE OPEN, 15.
BREAKERS.
PANEL IS SQUARE D. VERIFY MATCHING TYPE AND RATING
AMP CIRCUIT BREAKERS (1 SPARE) IN PANEL P3. EXISTING
THE CONTRACTOR TO PROVIDE AND INSTALL FOUR (4) 15
LS142 (TYP)
JB43
1' 5'2'3'4'5' 0
LEGEND:
EXISTING
NEW
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:5
:5
P
M
P L
O T D
A T
E
P L
O T T
IM
E
/2
/2
DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-102 - LOCK MACHINERY RECESS #1 SOUTH ELECTRICAL LAYOUT
P
N L
W C
V
H
IR
A M M
C H
IT
T E
N D
E N L
O C
K S
W A
S H
IN
G T
O N
IDENTIFICATION
SHEET
SHEET OF 125
OF ENGINEERS
U.S. ARMY CORPS
C U
L V
E R
T G
A T
E V
A L
V E R
E P
L A
C E
M E
N T
B R
IA
N C
N E
L S
O N
M
A Y
RTA SUBMITTAL
C -2 -4 -3
M
M
"32 96'-57'-6""32
237'-9"64 320'-510'-9"
"64 352'-11
L
W C
V -E -1
.d g n
ELEV=122.5
RESERVOIR
HYDRAULIC
PUMPS
HYDRAULIC
E-103
L O
C K M
A C
H
IN
E R
Y R
E C
E S
S
N
O R
H
E
C T
R
IC
A L L
A Y
O U
T
GENERAL NOTES:
D B
S
B R
S
HYDRAULIC CYLINDER
#2 NORTH MITER GATE
LOCATION (NTS)
APPROXIMATE
MITER GATE
ELEV=104.5
CENTERLINE LOCK - MATCHLINE SHEET E-104
N
ELEV=122.5
JB2A
JB2
P2 HPU2HPU1TS1
JB4
JB5
7 11
R57
R64
R63
R58
R50
R53
R51
R55
R56
R54
R52
R58
R59,R60,R61
NEW R10P-2N
R66
R67
R58
TO STRING POT
EXISTING WIRING
R62
R63,R64
R48,R57,R62, R49
- " = 1'-0"8
3SCALE:
LOCK MACHINERY RECESS #2 NORTH ELECTRICAL LAYOUT
JB
R48,R69
R69
R48, R62
TO CONTROL HOUSE 2
EXIST DUCT BANK
R69
ELECTRICAL CODE CLEARANCES IN LAYOUT AND INSTALLATION.
MAINTAIN EQUIPMENT AND
ROUTING.
MINIMIZE TRIP HAZARDS. SUBMIT ON CONDUIT/ CABLE
WAY OF PATHWAYS, MAXIMIZE HEAD CLEARANCE, AND
CONDUIT AND CABLE ROUTING SHALL BE OUT OF THE 4.
COORDINATED TO ENSURE SCHEDULE IS MET.
PARTIAL WIRING AND CONDUIT INSTALLATION TO BE
INSTALLED PRIOR TO CULVERT VALVE 2N CUTOVER.
NEW REMOTE I/O (RIOP-2N) PANEL IS REQUIRED TO BE 3.
CUTOVER AND INSTALLATION.
REFER TO THE CONTRACT DOCUMENTS ABOUT STAGED 2.
MAY REQUIRE CHANGES.
WITH OTHER TRADES, AND THE INSTALLATION SEQUENCE
THE EQUIPMENT MAY BE CHANGED, AND COORDINATION
THIS LAYOUT IS A STARTING BASIS, ACTUAL LOCATIONS OF 1.
KEYED NOTES:
KEYED NOTES (CONTINUED):
HPU STARTER
DUAL
R70
JB70
CYLINDER
OPENING FOR
LS142 (TYP)
SEALTIGHT
R71 PGRS
SEALTIGHT
JB
R72 PGRS
PGRS
R72
SEALTIGHT
LS144 (TYP)
WITH HYDRAULIC SYSTEM SUPPLIER.
HYDRAULIC SYSTEM ALARMS AND STATUS INPUTS MAY VARY 4.
VARY WITH HYDRAULIC SYSTEM SUPPLIER.
ASSEMBLY. CONNECTIONS, VOLTAGE, AND LOCATION MAY
HYDRAULIC CYLINDER SPEED(FLOW) CONTROL VALVE 3.
PUMPS LATER AT 480V THREE PHASE.
PHASE, AND ABLE TO BE USED AND COORDINATED WITH HPU
CONTROL TRANSFORMER. INITIALLY WIRED FOR 240V 3
NEW DUAL HPU STARTER PANEL, WITH DUAL INPUT VOLTAGE 2.
COMMUNICATION TO PLC SYSTEM.
NEW REMOTE IO PANEL RIOP-2N, CONNECTS VIA FIBER OPTIC 1.
STARTER. USE JUNCTION BOX AT SPLICE.
STONEY GATE VALVE MOTOR AND EXTEND TO DUAL HPU
SPLICE EXISTING CONDUCTORS REMAINING FROM THE 13.
CONSOLE SYSTEM.
EXISTING JUNCTION BOXES FOR EXISTING PLC AND 12.
ROUTING TO THE CULVERT VALVE CYLINDER.
REMOVABLE ROOF AREA. EXCEPT FLEXIBLE CONDUITS
CONDUIT ROUTING IS EXCLUDED FROM THE CULVERT VALVE 11.
CONSOLE IN LAND WALL CONTROL HOUSE 2.
ROUTE TRAY CABLES AND SIGNAL CABLES TO NEW CONTROL 10.
SUPPLIED BY THE HYDRAULIC SYSTEM SUPPLIER.
TRAVEL PRESSURE TRANSMITTERS. THESE WILL BE
MAGNETOSTRICTIVE POSITION TRANSMITTER, AND TWO
HAVE OPEN AND CLOSED LIMIT SWITCHES, BUILT-IN
THE DESIGN BASIS REQUIRES THE HYDRAULIC CYLINDER TO 9.
AS DETERMINED BY THE HYDRAULIC SYSTEM SUPPLIER.
THREE PHASE, AND 480V THREE PHASE. THE HP MAY VARY,
DUAL HPU PUMP MOTORS SHALL BE DUAL VOLTAGE 240V 8.
REQUIRED FOR NORMAL SYSTEM OPERATION.
TIE INTO EXISTING FIBER OPTIC CABLES. TWO ACTIVE PAIR
PROVIDE FIBER OPTIC EXTENSION CABLE TO RIOP-2N, AND 7.
JUNCTION BOX.
TRANSMITTER WIRING. PROVIDE READILY ACCESSIBLE
TIE INTO EXISTING STRING POT GATE POSITION 6.
SHALL BE READILY ACCESSIBLE.
CONDUIT AND FLEXIBLE CONDUIT. THE JUNCTION BOXES
PROVIDE AND INSTALL JUNCTION BOXES BETWEEN HARD 5.
WEAR. SUBMIT LAYOUT DETAILS SEE SPECIFICATIONS 40 95 00.
OPERATION. PROVIDE SWEEP BENDS TO AVOID REPEATED USE
TO ENSURE CLEARANCE WITH GATE AND HYDRAULIC CYLINDER
FOR MOUNTING DETAILS AND CONCEPTS. ROUTE ALL CONDUIT
(RECESSED) AND FULL CLOSED, (MITERED). SEE SHEET E-110
MAGNETIC PROXIMITY SWITCHES FOR MITER GATE OPEN, 16.
BREAKERS.
IS SQUARE D. VERIFY MATCHING TYPE AND RATING
CIRCUIT BREAKERS (1 SPARE) IN PANEL P2. EXISTING PANEL
THE CONTRACTOR TO PROVIDE AND INSTALL FOUR (4) 15 AMP 15.
REQUIREMENTS WITH HYDRAULIC SUPPLIER.
COORDINATE HPU OIL RESERVOIR HEATER ELECTRICAL 14.
1' 5'2'3'4'5' 0
LEGEND:
EXISTING
NEW
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:5
:5
P
M
P L
O T D
A T
E
P L
O T T
IM
E
/2
/2
DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-103 - LOCK MACHINERY RECESS #2 NORTH ELECTRICAL LAYOUT
P
N L
W C
V
H
IR
A M M
C H
IT
T E
N D
E N L
O C
K S
W A
S H
IN
G T
O N
IDENTIFICATION
SHEET
SHEET OF 125
OF ENGINEERS
U.S. ARMY CORPS
C U
L V
E R
T G
A T
E V
A L
V E R
E P
L A
C E
M E
N T
B R
IA
N C
N E
L S
O N
M
A Y
RTA SUBMITTAL
C -2 -4 -3
M
M
237'-97'-6""32
96'-5
"64 320'-510'-9"
L
W C
V -E -1
.d g n
ELEV=122.5
ELEV=122.5
ELEV=104.5
VALVE MANIFOLD
RESERVOIR
HYDRAULIC
PUMPS
HYDRAULIC
E-104
L O
C K M
A C
H
IN
E R
Y R
E C
E S
S
S
O U
H
E
C T
R
IC
A L L
A Y
O U
T
GENERAL NOTES:
KEYED NOTES:
D B
S
B R
S
CENTERLINE LOCK - MATCHLINE SHEET E-103
N
- " = 1'-0"8
3SCALE:
LOCK MACHINERY RECESS #2 SOUTH ELECTRICAL LAYOUT
HYDRAULIC CYLINDER
#2 SOUTH MITER GATE
NEW R10P-2S
EXISTING STRING POT WIRING
R89
R88
R87 R75,R87
R36, R85
R95
R86,R95
R79
R81
R77 R78
R80
R83
R82
JB4
JB5
P3 TS1 HPU1 HPU2
R93
R92
R91
KEYED NOTES (CONTINUED):
OPTIC PANEL 2S
EXIST FIBER
R36
R76
VALVE #2S
CYLINDER, CULVERT
NEW HYDRAULIC
CODE CLEARANCES IN LAYOUT AND INSTALLATION.
MAINTAIN EQUIPMENT AND ELECTRICAL
TRIP HAZARDS. SUBMIT ON CONDUIT/ CABLE ROUTING.
OF PATHWAYS, MAXIMIZE HEAD CLEARANCE, AND MINIMIZE
CONDUIT AND CABLE ROUTING SHALL BE OUT OF THE WAY 4.
COORDINATED TO ENSURE SCHEDULE IS MET.
PARTIAL WIRING AND CONDUIT INSTALLATION TO BE
INSTALLED PRIOR TO CULVERT VALVE 2S CUTOVER.
NEW REMOTE I/O (RIOP-2S) PANEL IS REQUIRED TO BE 3.
CUTOVER AND INSTALLATION.
REFER TO THE CONTRACT DOCUMENTS ABOUT STAGED 2.
REQUIRE CHANGES.
OTHER TRADES, AND THE INSTALLATION SEQUENCE MAY
THE EQUIPMENT MAY BE CHANGED, AND COORDINATION WITH
THIS LAYOUT IS A STARTING BASIS, ACTUAL LOCATIONS OF 1.
R95
R75, R96
JB
E-106
SHEET
SEE
EXIST CABLE WAY
R86
R86
R96
E-102
SHEET
SEE
TO LT 2SA, B
SEE SHEET E-107
R75,R85,R86,R87
GALLERY 1S AND GALLERY 3S.
FIBER OPTIC CABLE EXTENDED TO NEW FIBER OPTIC PANELS AT 11.
TO THE CULVERT VALVE CYLINDER.
REMOVABLE ROOF AREA. EXCEPT FLEXIBLE CONDUITS ROUTING
CONDUIT ROUTING IS EXCLUDED FROM THE CULVERT VALVE 10.
SYSTEM SUPPLIER.
TRANSMITTERS. THESE WILL BE SUPPLIED BY THE HYDRAULIC
POSITION TRANSMITTER, AND TWO TRAVEL PRESSURE
OPEN AND CLOSED LIMIT SWITCHES, BUILT-IN MAGNETOSTRICTIVE
THE DESIGN BASIS REQUIRES THE HYDRAULIC CYLINDER TO HAVE9.
BY THE HYDRAULIC SYSTEM SUPPLIER.
PHASE, AND 480V THREE PHASE. THE HP MAY VARY, AS DETERMINED
DUAL HPU PUMP MOTORS SHALL BE DUAL VOLTAGE 240V THREE 8.
FOR NORMAL SYSTEM OPERATION.
INTO EXISTING FIBER OPTIC CABLES. TWO ACTIVE PAIR REQUIRED
PROVIDE FIBER OPTIC EXTENSION CABLE TO RIOP-2S, AND TIE 7.
WIRING. PROVIDE READILY ACCESSIBLE JUNCTION BOX.
TIE INTO EXISTING STRING POT GATE POSITION TRANSMITTER 6.
ACCESSIBLE.
AND FLEXIBLE CONDUIT. THE JUNCTION BOXES SHALL BE READILY
PROVIDE AND INSTALL JUNCTION BOXES BETWEEN HARD CONDUIT 5.
HYDRAULIC SYSTEM SUPPLIER.
HYDRAULIC SYSTEM ALARMS AND STATUS INPUTS MAY VARY WITH 4.
HYDRAULIC SYSTEM SUPPLIER.
CONNECTIONS, VOLTAGE, AND LOCATION MAY VARY WITH
HYDRAULIC CYLINDER SPEED(FLOW) CONTROL VALVE ASSEMBLY. 3.
LATER AT 480V THREE PHASE.
AND ABLE TO BE USED AND COORDINATED WITH HPU PUMPS
CONTROL TRANSFORMER. INITIALLY WIRED FOR 240V 3 PHASE,
NEW DUAL HPU STARTER PANEL, WITH DUAL INPUT VOLTAGE 2.
COMMUNICATION TO PLC SYSTEM.
NEW REMOTE IO PANEL RIOP-2S, CONNECTS VIA FIBER OPTIC 1.
HPU STARTER
DUAL
SEE SPECIFICATIONS 40 95 00.
CYLINDER OPERATION. SUBMIT LAYOUT DETAILS.
ALL CONDUIT TO ENSURE CLEARANCE WITH GATE AND HYDRAULIC
SEE SHEET E-110 FOR MOUNTING DETAILS AND CONCEPTS. ROUTE
MAGNETIC PROXIMITY SWITCH FOR MITER GATE OPEN, (RECESSED). 16.
IS SQUARE D. VERIFY MATCHING TYPE AND RATING BREAKERS.
CIRCUIT BREAKERS (1 SPARE) IN PANEL P3. EXISTING PANEL
THE CONTRACTOR TO PROVIDE AND INSTALL FOUR (4) 15 AMP 15.
REQUIREMENTS WITH HYDRAULIC SUPPLIER.
COORDINATE HPU OIL RESERVOIR HEATER ELECTRICAL 14.
HPU STARTER. USE JUNCTION BOX AT SPLICE.
STONEY GATE VALVE MOTOR AND EXTEND TO DUAL
SPLICE EXISTING CONDUCTORS REMAINING FROM THE 13.
TO DUAL LASER LEVEL TRANSMITTERS, SEE SHEET E-107.12.
LS142 (TYP)
R98
PGRS
R98 SEALTIGHT
CYLINDER
OPENING FOR
R97
JB97 R84,R97
R84,R88,R89,R97
LEGEND:
EXISTING
NEW
1' 5'2'3'4'5' 0
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:5
:0
P
M
P L
O T D
A T
E
P L
O T T
IM
E
/2
/2
DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-104 - LOCK MACHINERY RECESS #2 SOUTH ELECTRICAL LAYOUT
P
N L
W C
V
H
IR
A M M
C H
IT
T E
N D
E N L
O C
K S
W A
S H
IN
G T
O N
IDENTIFICATION
SHEET
SHEET OF 125
OF ENGINEERS
U.S. ARMY CORPS
C U
L V
E R
T G
A T
E V
A L
V E R
E P
L A
C E
M E
N T
B R
IA
N C
N E
L S
O N
M
A Y
RTA SUBMITTAL
C -2 -4 -3
M
M
237'-97'-6""16
526'-10"64 320'-5"64
331'-2
L
W C
V -E -1
.d
ELEV=122.5
E-105
C K M
A C
H
IN
E R
Y R
E C
E S
S
N
O R
T H
E L E
C T
R
IC
A L L
A Y
O U
T
D B
S
B R
S
SCALE: 3/8" = 1'-0"-
N
LOCATION (NTS)
APPROXIMATE
MITER GATE
CENTERLINE LOCK - MATCHLINE SHEET E-106
LOCK MACHINERY RECESS #3 NORTH ELECTRICAL LAYOUT
EXIST POWER PANEL
HYDRAULIC CYLINDER
#3 NORTH MITER GATE
R111
R112
JB4
JB5
R E
S E
R V
O
IR
H Y
D R
A U
L
IC
ELEV=104.5
ELEV=122.5
R104
R107
R109
R102
R106
R108
EXIST FIBER OPTIC PANEL
KEYED NOTES:
P2
EXISTING PANEL
R119
R117
R118
R103
9 3
R110
JB
R113,R114,R115
R105
R120
R120
EXIST DUCT BANK
TO CONTROL HOUSE 3
CODE CLEARANCES IN LAYOUT AND INSTALLATION.
MAINTAIN EQUIPMENT AND ELECTRICAL
HAZARDS. SUBMIT ON CONDUIT/ CABLE ROUTING.
PATHWAYS, MAXIMIZE HEAD CLEARANCE, AND MINIMIZE TRIP
CONDUIT AND CABLE ROUTING SHALL BE OUT OF THE WAY OF 4.
COORDINATED TO ENSURE SCHEDULE IS MET.
PARTIAL WIRING AND CONDUIT INSTALLATION TO BE
INSTALLED PRIOR TO CULVERT VALVE 3N CUTOVER.
NEW REMOTE I/O (RIOP-3N) PANEL IS REQUIRED TO BE 3.
CUTOVER AND INSTALLATION.
REFER TO THE CONTRACT DOCUMENTS ABOUT STAGED 2.
REQUIRE CHANGES.
OTHER TRADES, AND THE INSTALLATION SEQUENCE MAY
THE EQUIPMENT MAY BE CHANGED, AND COORDINATION WITH
THIS LAYOUT IS A STARTING BASIS, ACTUAL LOCATIONS OF 1.
GENERAL NOTES:
KEYED NOTES (CONTINUED):
TO THE CULVERT VALVE CYLINDER.
REMOVABLE ROOF AREA. EXCEPT FLEXIBLE CONDUITS ROUTING
CONDUIT ROUTING IS EXCLUDED FROM THE CULVERT VALVE 11.
CONSOLE IN LAND WALL CONTROL HOUSE 3.
ROUTE TRAY CABLES AND SIGNAL CABLES TO NEW CONTROL 10.
BE SUPPLIED BY THE HYDRAULIC SYSTEM SUPPLIER.
TRAVEL PRESSURE TRANSMITTERS. THESE WILL
MAGNETOSTRICTIVE POSITION TRANSMITTER, AND TWO
HAVE OPEN AND CLOSED LIMIT SWITCHES, BUILT-IN
THE DESIGN BASIS REQUIRES THE HYDRAULIC CYLINDER TO 9.
AS DETERMINED BY THE HYDRAULIC SYSTEM SUPPLIER.
THREE PHASE, AND 480V THREE PHASE. THE HP MAY VARY,
DUAL HPU PUMP MOTORS SHALL BE DUAL VOLTAGE 240V
USE JUNCTION BOX AT SPLICE.
GATE VALVE MOTOR AND EXTEND TO DUAL HPU STARTER.
12. SPLICE EXISTING CONDUCTORS REMAINING FROM THE STONEY
8.
REQUIRED FOR NORMAL SYSTEM OPERATION.
INTO EXISTING FIBER OPTIC CABLES. TWO ACTIVE PAIR
PROVIDE FIBER OPTIC EXTENSION CABLE TO RIOP-3N, AND TIE 7.
WIRING. PROVIDE READILY ACCESSIBLE JUNCTION BOX.
TIE INTO EXISTING STRING POT GATE POSITION TRANSMITTER 6.
SHALL BE READILY ACCESSIBLE.
CONDUIT AND FLEXIBLE CONDUIT. THE JUNCTION BOXES
PROVIDE AND INSTALL JUNCTION BOXES BETWEEN HARD 5.
WITH HYDRAULIC SYSTEM SUPPLIER.
HYDRAULIC SYSTEM ALARMS AND STATUS INPUTS MAY VARY 4.
VARY WITH HYDRAULIC SYSTEM SUPPLIER.
ASSEMBLY. CONNECTIONS, VOLTAGE, AND LOCATION MAY
HYDRAULIC CYLINDER SPEED(FLOW) CONTROL VALVE 3.
LATER AT 480V THREE PHASE.
AND ABLE TO BE USED AND COORDINATED WITH HPU PUMPS
CONTROL TRANSFORMER. INITIALLY WIRED FOR 240V 3 PHASE,
NEW DUAL HPU STARTER PANEL, WITH DUAL INPUT VOLTAGE 2.
COMMUNICATION TO PLC SYSTEM.
NEW REMOTE IO PANEL RIOP-3N, CONNECTS VIA FIBER OPTIC 1.
SEE SPECIFICATIONS 40 95 00.
TO AVOID REPEATED USE WEAR. SUBMIT LAYOUT DETAILS.
HYDRAULIC CYLINDER OPERATION. PROVIDE SWEEP BENDS
CONDUIT TO ENSURE CLEARANCE WITH GATE AND
FOR MOUNTING DETAILS AND CONCEPTS. ROUTE ALL
(RECESSED) AND FULL CLOSED, (MITERED). SEE SHEET E-110
MAGNETIC PROXIMITY SWITCHES FOR MITER GATE OPEN, 15.
BREAKERS.
IS SQUARE D. VERIFY MATCHING TYPE AND RATING
CIRCUIT BREAKERS (1 SPARE) IN PANEL P2. EXISTING PANEL
THE CONTRACTOR TO PROVIDE AND INSTALL FOUR (4) 15 AMP 14.
REQUIREMENTS WITH HYDRAULIC SUPPLIER.
COORDINATE HPU OIL RESERVOIR HEATER ELECTRICAL 13.
JB
JB121
LS142
R122 SEALTIGHT
R122 PGRS
R121
R123 PGRS
R123 SEALTIGHT CYLINDER
OPENING FOR
R123 PGRS
R111,R121 R111,R112,R121
R114,R115,R121
R111,R112,R113
R123 SEALTIGHT
LS144 (TYP)
LEGEND:
EXISTING
NEW
1' 5'2'3'4'5' 0
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:5
:1
P
M
P L
O T D
A T
E
P L
O T T
IM
E
/2
/2
DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-105 - LOCK MACHINERY RECESS #3 NORTH ELECTRICAL LAYOUT
P
N L
W C
V
H
IR
A M M
C H
IT
T E
N D
E N L
O C
K S
W A
S H
IN
G T
O N
IDENTIFICATION
SHEET
SHEET OF 125
OF ENGINEERS
U.S. ARMY CORPS
C U
L V
E R
T G
A T
E V
A L
V E R
E P
L A
C E
M E
N T
B R
IA
N C
N E
L S
O N
M
A Y
RTA SUBMITTAL
C -2 -4 -3
M
M
96'-57'-6""64
4928'-2"64 320'-5"64
331'-2
L
W C
V -E -1
.d
E-106
C K M
A C
H
IN
E R
Y R
E C
E S
S
S
O U
T H
E L E
C T
R
IC
A L L
A Y
O U
T
D B
S
B R
S
- " = 1'-0"8
3SCALE:
N
CENTERLINE LOCK - MATCHLINE SHEET E-105
AND WIRING
EXIST STRING POT
LOCK MACHINERY RECESS #3 SOUTH ELECTRICAL LAYOUT
HYDRAULIC CYLINDER
#3 SOUTH MITER GATE
ELEV=122.5
ELEV=122.5
ELEV=104.5
R136
PATCH PANEL
NEW FIBER OPTIC
JB4
JB5 NEW R10P-3S
R E
S E
R V
O
IR
H Y
D R
A U
L
IC
R135
R134
R130
R132
R142
R141
R143
GENERAL NOTES:
R95
R129
R133
R131
E-107
SHEET
SEE
R137
EXIST CABLE WAY
JB
EXIST POWER PANEL P3
R127,R144
R95,R138
CODE CLEARANCES IN LAYOUT AND INSTALLATION.
MAINTAIN EQUIPMENT AND ELECTRICAL
HAZARDS. SUBMIT ON CONDUIT/ CABLE ROUTING.
PATHWAYS, MAXIMIZE HEAD CLEARANCE, AND MINIMIZE TRIP
CONDUIT AND CABLE ROUTING SHALL BE OUT OF THE WAY OF 4.
COORDINATED TO ENSURE SCHEDULE IS MET.
PARTIAL WIRING AND CONDUIT INSTALLATION TO BE
INSTALLED PRIOR TO CULVERT VALVE 3S CUTOVER.
NEW REMOTE I/O (RIOP-3S) PANEL IS REQUIRED TO BE 3.
CUTOVER AND INSTALLATION.
REFER TO THE CONTRACT DOCUMENTS ABOUT STAGED 2.
REQUIRE CHANGES.
OTHER TRADES, AND THE INSTALLATION SEQUENCE MAY
THE EQUIPMENT MAY BE CHANGED, AND COORDINATION WITH
THIS LAYOUT IS A STARTING BASIS, ACTUAL LOCATIONS OF 1.
R144
KEYED NOTES:
KEYED NOTES (CONTINUED):
WIRING. PROVIDE READILY ACCESSIBLE JUNCTION BOX.
TIE INTO EXISTING STRING POT GATE POSITION TRANSMITTER 6.
SHALL BE READILY ACCESSIBLE.
CONDUIT AND FLEXIBLE CONDUIT. THE JUNCTION BOXES
PROVIDE AND INSTALL JUNCTION BOXES BETWEEN HARD5.
WITH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.