PN445134_LWCV-00-COMPILATION-R0002_(3_of_3).pdf

PDF 30 MB Posted

Attached to
Stoney Gate Valve Repalcement
Solicitation number
W912DW18R0012
Issued by

About this file

Plans R0002 (3 of 3)

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T M

P

N

L

W C

V -E -0

.d g n

E-001

D B

S

D

E L E

C T

R

IC

A L A

B B

R E

V

IA

T

IO

N S

A N

D L

E G

E N

D

LP-3

GENERATOR RECEPTACLE

4 WIRE-THREE PHASE WITH NEUTRAL

3 PHASE

PUSHBUTTON N.O.

PUSHBUTTON N.C.

EARTH GROUND

CONTROL RELAY

JUNCTION BOX

DUPLEX RECEPTACLE

ABBREVIATIONS

N. T. S.

GROUND ROD

HANDHOLE

ELECTRICAL

ABBREVIATIONS (CONT)

POTENTIAL TRANSFORMER

CURRENT TRANSFORMER

WATT HOUR METER

PM POWER METER

VOLT METER

MOTOR

PP - POWER

LP - LIGHTING

PANELBOARD

SWITCH

WITH DISCONNECT

WELDING RECEPTACLE

MONITOR

PHASE/VOLTAGE

GH GATE HEATER

WHM

VM

M

LP

PVM

H O

A

(XOO)

(OXO)

2P

SYMBOLS

DISCONNECT SWITCH

THREE PHASE

H1 H2H3 H4

X1X2

CR

ONE - LINE

DELTA - WYE CONNECTED

POWER TRANSFORMER

CONTROL TRANSFORMER

DUAL VOLTAGE

480V

120V

240V

120/240 VOLT SECONDARY

480 VOLT PRIMARY

DUAL VOLTAGE

POWER TRANSFORMER

THERMAL OVERLOADS

CIRCUIT BREAKER WITH

THREE PHASE

THERMAL OVERLOADS

MECHANICALLY INTERLOCKED

1P - ONE POLE

2P - TWO POLE

3P - THREE POLE

CIRCUIT BREAKERS

(OOX)

CLOSED CONTACT (STANDARD)

OPEN CONTACT (STANDARD)

C CONTACTOR

1 N.O. AND 1 N.C. CONTACT

DOUBLE CIRCUIT SWITCH

PUSHBUTTON

HELD OPEN

NORMALLY CLOSED

LIMIT SWITCH

NORMALLY CLOSED

LIMIT SWITCH

NORMALLY OPEN

LIMIT SWITCH

HELD CLOSED

NORMALLY OPEN

LIMIT SWITCH

T1

T2

T3

M1

480 VAC

4 HP

7 AMPS

480 VAC

7 AMPS, 4 HORSE POWER

3 PHASE MOTOR

AT - BREAKER TRIP SETTING

AF - BREAKER FRAME SIZE

INTERLOCKED

3 PHASE, MECHANICALLY

CIRCUIT BREAKER

5 kW - HEATER SIZE

HEATING ELEMENT

5 kW

30 AT

150 AF

5A - BREAKER TRIP SIZE

SINGLE PHASE

CIRCUIT BREAKER5A

1A

1A - FUSE SIZE

FUSE

TEMPERATURE

OPEN ON RISE OF

NORMALLY CLOSED

THERMAL SWITCH

CONNECTION

EXTERNAL

S WARNING STROBE

WARNING HORN

A - AMBER

G - GREEN

R - RED

PILOT LIGHT

EXTERIOR LIGHTS

BLOCK

POWER DISTRIBUTION

H. H1

S SWITCH, SINGLE POLE

S3 3-WAY SWITCH

WALL MOUNTED

THERMOSTATT

PP - POWER

LP - LIGHTING

PANELBOARD

LP

JB

TOGGLE SWITCH

DISCONNECT SWITCH

GENERAL NOTES

SYMBOLS (CONT) SYMBOLS (CONT)

CONDUIT UNLESS OTHERWISE NOTED.

4. ALL CONDUCTOR RUNS ARE CONCEALED AND INSTALLED IN

OVER THIS SHEET.

3. ITEMS CALLED OUT ON SPECIFIC DETAILS TAKE PRECEDENCE

SPECIFICATIONS.

UNLESS NOTED OTHERWISE ON THE DRAWINGS OR IN THE

FINISHED FLOOR, MOUNTING HEIGHTS SHOWN ARE TYPICAL,

2. ALL MOUNTING HEIGHTS ARE TO CENTER OF DEVICE ABOVE

SYMBOLS MAY APPEAR ON THIS PROJECT.

1. THESE SYMBOLS COMPRISE A STANDARD LIST, NOT ALL

S SMOKE DETECTOR

ELECTRICAL SYMBOLS AND ABBREVIATIONS

SURGE ARRESTOR

AUDIBLE ALARM

PANEL MOUNTED

CR

CR15

ALM 134

G

0.5A

FU52

CR25

CR15

HS72OP ST CL

(XOO)

(OOX)

SV

LT 132

O - OPEN CONTACT

X - CLOSED CONTACT

HAND-OFF-AUTO SWITCH

O - OPEN CONTACT

X - CLOSED CONTACT

PANEL SWITCH

OPEN-STOP-CLOSE

SOLENOID VALVE

INDICATE NUMBER OF PHASE

NUMBER OF ARROW HEADS

NUMBER.

CIRCUIT AND PANELBOARD

HOME RUM, "LP1-3" IS THE

ALM 134

- TRANSFER SWITCHXFSW

- TRANSFORMERXFMR

- WEATHER PROOFWP

- WHITEWHT

- WATT HOUR METERWHM

- WATTS/WIDTHW

- VOLT METERVM

- VOLTS DIRECT CURRENTVDC

- VOLTS ALTERNATING CURRENTVAC

- VOLT AMPEREVA

- VOLT/VERTICALV

- UNINTERRUPTED POWER SUPPLYUPS

- UNLESS OTHERWISE NOTEDUON

- UNDERWRITERS LABORATORYUL

- UNIT HEATERUH

- UNDER GROUNDUG

- TYPICALTYP

- TRANSMITTX

- TEMPERATURE SWITCHTS

- THERMOPLASTIC HIGH-HEAT RESISTANT NYLON COATEDTHHN

- TO BE DETERMINEDTBD

- SYMMETRICALSYM

- SWITCHEDSWD

- SWITCHBOARDSWB

- SWITCHSW

- STROBESTR

- SPARESP

- definition: A YOUNG SALMON FISHSMOLT

- SECONDARYSEC

- SURGE ARRESTORSA

- SOUTHS

- RECEIVERX

- ROOT MEAN SQUARERMS

- REDUCTED VOLTAGE STARTERRVS

- RIGID GALVANIZED STEELRGS

THE CENTRAL PLC)

- REMOTE INPUT - OUTPUT PANEL SYSTEM (CONTROLLED BY RIOPS

- REQUEST FOR INFORMATIONRFI

- RECEPTACLERECEPT

- RACEWAYR

- POLYVINYL CHLORIDEPVC

- PUSH-TO-TESTPTT

- POTENTIAL TRANSFORMERPT

- POWER SUPPLYPS

- PROXIMITYPROX

- PRIMARYPRI

- POWER PANELPP

- POSITIONPOS

- POWER OVER ETHERNETPOE

- PANELPNL

- POWER METERPM

- PROGRAMMABLE LOGIC CONTROLLERPLC

- PARKINGPKG

- PHASEPH

- POLYVINYL CHLORIDE GALVANIZED RIGID STEELPGRS

- POWER FACTOR CORRECTIONPF CORR

- POWER FACTOR CAPACITORPFC

- POWER DISTRIBUTION BLOCKPDB

- PHOTO CELLPC

- PUSHBUTTONPB

- POLEP

- UNLESS OTHERWISE NOTEDUON

- OVERLOADOL

- OPERATOR INTERFACE TERMINALOIT

- OVER HEADOH

- NOT TO SCALENTS

- NAME PLATENP

- NOMINALNOM

- NORMALLY OPENN.O.

- NUMBERNO.

- NON METALLIC CONDUITNMC

- NICKEL CADMIUMNI-CAD

ASSOCIATION

MANUFACTURERS

- NATIONAL ELECTRICAL NEMA

- NORTH DAKOTAND

- NORMALLY CLOSEDN.C.

- NEUTRAL/NORTHN

- MAIN STARTER RAISEMSR

- MAIN STARTER LOWERMSL

- MOTOR OPERATED DAMPERMOD

- MILLIMETERMM

- MISCELLANEOUSMISC

- MINIMUMMIN

- MOTOR CONTROL CENTERMCC

- LIGHTINGLTG

- LIGHTLT

- LIMIT SWITCHLS

- LIGHTING PANELLP

LINER FOOT

- LIGHTING FIXTURE/LF

- LIGHT EMITTING DIODELED

- LIGHTING CONTACTORLC

- LIGHTNING ARRESTORLA

- KILO-WATTkW

- KILO-VOLT-AMPERSkVA

- KILO-VOLTkV

- KEYED SWITCHKS

- THOUSAND CIRCULAR MILS (WIRE SIZE DESIGNATION)KCMIL

- JUNCTION BOXJB

- HEATERHTR

- HAND SWITCHHS

AND HYDRAULIC PUMP SYSTEM)

- HYDRAULIC POWER UNIT (ELECTRIC MOTORHPU

- HORSE POWERHP

- HANDS-OFF-AUTOHOA

- HAND HOLEH. H.

- HIGH DENSITY POLYETHYLENE HDPE

- HEIGHTH

- GROUNDGRD

- GATE OPEN OVERTRAVELGOOT

- GROUNDGND

INTERRUPTER

- GROUND FAULT CIRCUIT GFCI

- GATE CLOSED OVERTRAVELGCOT

- GENERATORGEN

- GAUGEGA

- FUSEFU

- FEET/FOOTFT

- FUSED SWITCHFS

- FIBER OPTICFO

- FIBER NETWORK SWITCHFNSW

- ELECTRIC UNIT HEATEREUH

- ELECTRICAL TESTING LABETL

- ENCLOSUREENCL

- EXHAUST FANEF

- EASTE

- DRAWINGDWG

- DISCONNECT SWITCHDS

- DISTRIBUTIONDIST

SIZE, I.E., ⅛ DIN

DENOTE DEVICE MOUNTING STANDARD

- EUROPEAN STANDARDS, USED HERE TODIN

- DIAMETERDIA

- DEPTH D

- CONTROLLERCTLR

- CURRENT TRANSFORMERCT

STEEL

- CORROSION RESISTANCE CRS

- COLOR RENDERING INDEXCRI

- CONTROL RELAYCR

- CONTINUED CONT

- CONCRETECONC

- COMPARTMENTCOMP

- COMMUNICATION or COMPARTMENTCOM

- CONTRACTING OFFICERCO

- CIRCUITCKT

COOPERATIVE

- CASS COUNTY ELECTRICAL CECC

- CLOSED CIRCUITCC

- CABLECBL

- CIRCUIT BREAKERCB

- CATEGORYCAT

POWER SUPPLY

- BATTERY UNIT BUPS

- BLACKBLK

- BATTERYBAT

- AMERICAN WIRE GAUGEAWG

- AVENUEAVE

- AUXILIARYAUX

- AMPERE TRIPAT

- AMPEREAMPS

- ALARM MODULEALM

CURRENT

- AMPERE INTERRUPTING AIC

- AMPERE HOURSAH

- AMPERE FRAMEAF

ASSOCIATION

- AMERICAN DISABILITY ADA

- ALTERNATING CURRENTAC

- AMPEREA

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

A

S I

D

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S E

A T

T L E

W A

S H

IN

G T

O N

S E

A T

T L E D

IS

T R

IC

T

SEATTLE DISTRICT

:5

:4

P

M

P L

O T D

A T

E

P L

O T T

IM

E

/2

/2

DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-001 - ELECTRICAL ABBREVIATIONS AND LEGEND

F Y P

N L

W C

V

H

IR

A M M

C H

IT

T E

N D

E N L

O C

K S

W A

S H

IN

G T

O N

IDENTIFICATION

SHEET

SHEET OF 125

OF ENGINEERS

U.S. ARMY CORPS

C U

L V

E R

T G

A T

E V

A L

V E R

E P

L A

C E

M E

N T

B R

IA

N C

N E

L S

O N

M

A Y

RTA SUBMITTAL

C -2 -4 -3

R0002 (7/10/18)

L

W C

V -E -0

.d g n

E-002

D B

S

PLC SYSTEM GENERAL NOTES:

L

C S

Y S

T E

M G

E N

E R

A L N

O T

E S

ADDITIONAL COST TO THE GOVERNMENT.

FACTORY WITNESS TEST MAY BE REQUIRED AT NO

ARE MORE THAN 10% DEFECTS, AN ADDITIONAL

INSTALLING AND COMMISSIONING ON SITE. IF THERE

CORRECTED BY THE SYSTEM INTEGRATOR PRIOR TO

ANY FAULTS OR DISCREPANCIES SHALL BE NOTED AND 7.

DURING THE FACTORY WITNESS TEST.

GENERATED BY THE SYSTEM INTEGRATOR TO BE USED

A CHECKLIST OF ALL INPUTS AND OUTPUTS SHALL BE 6.

MUST DEMONSTRATE THE PLC LOGIC IN OPERATION.

TO BE PROVIDED AS PART OF THE CONTRACT AND

PROGRAMMING SOFTWARE RUNNING ON THE LAPTOP

THE SYSTEM INTEGRATOR SHALL HAVE PLC 5.

OUTPUT.

ANALOG OR DIGITAL METERS SHOWING 4-20 MA (0-100%)

RIOP ANALOG OUTPUTS SHALL BE MEASURED USING 4.

INDIVIDUAL 4-20 MA GENERATORS.

ANALOG INPUTS SHALL BE SIMULATED USING 3.

METHODS.

AND OUTPUTS BEING SIMULATED USING BEST PRACTICE

FACTORY WITNESS TEST WITH DISCRETE FIELD INPUTS

THE SYSTEM SHALL BE DEMONSTRATED DURING A 2.

TESTING.

COMPUTER, SIX RIOPS) ON A FIBER OPTIC LOOP FOR

CONTROL SYSTEM IN ITS ENTIRETY (MASTER PLC, HMI

THE CONTROL SYSTEM INTEGRATOR SHALL SET UP THE 1.

FACTORY SYSTEM INTEGRATION WITNESS TEST

NUMBER, AND THEIR P.O/F.O NUMBER.

THE PANEL SHOP NAME, ADDRESS, PHONE

THE PANEL SHALL CARRY THE UL 508 LABEL WITH C)

MACHINE PRINTED SELF-ADHESIVE TAPE LABEL

ALL COMPONENTS SHALL BE LABELED VIA A B)

SHRINK WIRE LABEL

ALL WIRES SHALL USE A MACHINE PRINTED HEAT A)

FOLLOWS:

THE SHOP SHALL USE GOOD LABELING PRACTICES AS 3.

RELATING TO THE RUNG NUMBER.

SYSTEM WITH COMPONENTS AND WIRE NUMBERS

BEST PRACTICES AND BE AN ORGANIZED RUNG BASED

ELECTRICAL DRAWINGS SHALL CONFORM TO INDUSTRY 2.

PRACTICES.

PANEL SHOP AND SHALL CONFORM TO INDUSTRY BEST

THE CONTROL PANEL SHALL BE BUILT BY A UL 508 1.

REQUIREMENTS

GENERAL CONTROL PANEL CONSTRUCTION

COMPUTER.

THE SAME HMI SOFTWARE FAMILY AS THE HMI

FUNCTIONALITY. THE OPERATOR DISPLAY SHALL HAVE

INDUSTRY STANDARD SOFTWARE TO ALLOW FULL HMI

THE SCREEN FOR THE OPERATOR. HMI WILL RUN

ARTICULATED ARM TO ALLOW OPTIMAL POSITIONING OF

COLOR, HAVE XGA RESOLUTION, AND ATTACHED TO AN

THE OPERATOR DISPLAY SCREEN (HMI) WILL BE FULL 5.

MESSAGING BUS.

CONNECTED USING A DEVICENET OR SERIAL

AND LEADING ZERO BLANKING. DISPLAYS WILL BE

READABLE, FOUR DIGIT WITH WRITABLE DECIMAL POINT,

DIGITAL DISPLAYS WILL BE 1/8 DIN, DAYLIGHT 4.

TO STEADY ON.

TRAVEL, THE OPEN/CLOSE INDICATOR LIGHT WILL GO

VALVE. ONCE THE GATE HAS REACHED THE END OF ITS

THE PLC SYSTEM IS ACTIVELY MOVING THE GATE OR

OPERATION TO VISUALLY CONFIRM TO THE OPERATOR

BLINK APPROXIMATELY EVERY SECOND DURING

GATE AND VALVE OPEN/CLOSE INDICATOR LIGHT WILL 3.

TESTING WILL BE DONE VIA THE PLC I/O.

LIGHTS WILL BE LED, NON-PUSH-TO-TEST, TYPE LIGHTS.

AND READING OPERATOR SWITCHES. INDICATOR

MASTER PLC I/O WILL BE USED FOR INDICATOR LIGHTS 2.

CONTAIN ALL PLC SYSTEM PROGRAMMING.

OPERATOR CONTROL PANEL. MASTER PLC WILL

THE MASTER PLC WILL BE HOUSED IN THE MAIN 1.

MAIN CONTROL PANEL:

ADDITIONAL FIBER OPTIC CABLING.

INTO THE NEW SYSTEM AND AUGMENTED WITH

EXISTING FIBER OPTIC CABLES WILL BE INCORPORATED 4.

LEVEL OF ROBUSTNESS AND FAILURE HANDLING.

RING NETWORK. THIS TOPOLOGY PROVIDES AN EXTRA

THE MASTER/RIOP SYSTEM WILL UTILIZE A FIBER OPTIC 3.

GATE OPERATIONS.

AND 2S WILL PROVIDE LOCALIZED CONTROL OF MITER

ASSOCIATED CULVERT VALVE, AND IN THE CASE OF 2N

RIOPS WILL PROVIDE LOCALIZED CONTROL OF THE 2.

GATE MACHINERY RECESS (1N, 2N, 3N, 1S, 2S, 3S).

REMOTE I/O PANELS (RIOPS) EACH LOCATED IN A MITER

THE NEW SYSTEM WILL UTILIZE A MASTER PLC AND SIX 1.

PROPOSED SYSTEM:

SYSTEM (I.E., LIGHTNING STRIKES)

ESPECIALLY VULNERABLE TO DISRUPTION IN THE

FEET IN LENGTH. THIS MAKES THE PLC SYSTEM

OF RUNS OF DATA CABLE UP TO SEVERAL HUNDRED

CURRENT PLC SYSTEM PHYSICAL TOPOLOGY CONSISTS 4.

READY FOR LIMIT SWITCHES.

MITER GATES. THE NEW SYSTEM SHALL BE FULLY

SYSTEM. NO LIMIT SWITCHES ARE UTILIZED ON THE

POTENTIOMETERS WILL BE UTILIZED WITH THE NEW

POTENTIOMETERS; CURRENT STRING

MITER GATE TRAVEL IS MEASURED USING STRING 3.

AND 2S MECHANICAL RECESSES.

HYDRAULIC CONTROL VALVES ARE LOCATED IN THE 2N

MITER GATE HYDRAULIC POWER UNITS (HPUS) AND 2.

GATE OPERATION.

INDICATORS. PLC SYSTEM PRIMARILY HANDLES MITER

WITH ADDITIONAL HARDWIRED CONTROLS AND

CURRENT CONTROL PANEL IS PARTIALLY PLC BASED 1.

BACKGROUND:

5-100 PERCENT BASELINE.

ACHIEVE AN EFFECTIVE CYLINDER SPEED RANGE OF

ENSURE THE PROPOSED CONTROL SCHEME CAN

SUPPLIER AND MANUFACTURER REPRESENTATIVES TO

INTEGRATOR SHALL WORK WITH THE APPROPRIATE 3.

AND VALVE POSITION.

DISPLAYS SHALL SHOW THE LOCAL VALUES OF GATE 2.

DIGITAL DISPLAYS.

INDICATOR LIGHTS, SWITCHES, PUSHBUTTONS, AND

ALL RIOPS SHALL HAVE THE SAME TYPE OF LED 1.

LOCK RIOP CONTROL PANELS

FAILURES, AND BATTERY ALARMS.

CONDITION, POWER LOSS EVENTS, 480V PHASE

RIOP COMMUNICATIONS MONITORING, PLC FAULT E)

EXPERIENCED.

VIBRATION OR CAVITATION COULD BE

OPERATION AVOIDANCE REGIONS WHERE EXCESS

VELOCITIES THROUGH LATERALS, AND GATE

HYDRAULIC DATA THAT: ATTEMPTS TO LIMIT FLOW

CULVERT VALVE POSITION PROFILES BASED ON D)

POINT.

TO THE OPENING PROFILE FOR THE POSITION SET

ALARMS, SPEED CONTROL, POSITION, AND A CALL

SHALL INCLUDE: HPU OPERATION, FAULTS AND

INDIVIDUAL CULVERT VALVE CONTROL MODULES C)

CYLINDER OPERATION.

HPU OPERATION, FAULTS AND ALARMS, AND GATE

MITER GATE CONTROL MODULES SHALL INCLUDE: B)

CONDITION DETECTION.

LEVELS, CALIBRATION, FILTERING, AND ALARM

GENERAL MODULES SHALL INCLUDE: LOCK A)

THE FOLLOWING MODULES AT MINIMUM:

ELEGANT, AND CONCISE MODULES, AND SHALL HAVE

PLC PROGRAMMING SHALL BE CODED IN SIMPLE, 7.

MITER GATE IS DETECTED AS BEING 120% OPEN)

ALARM IF OUTSIDE OF NORMAL PROCESS VALUES (I.E.

ALL ANALOG VALUES SHALL HAVE AN OUT OF LIMIT 6.

LEVEL.

ALERTING LOCK STAFF TO SUDDEN JUMPS OF POOL

TRANSMITTERS AND BE CAPABLE OF DETECTING AND

SHORT-TERM AVERAGING FOR THE POOL LEVEL

PLC PROGRAMMING SHALL HAVE USER DEFINABLE 5.

TO OPEN, YET NO TRAVEL DETECTED)

NON-STANDARD OUTCOMES (I.E. CALL FOR MITER GATE

PLC PROGRAMMING SHALL BE CAPABLE OF DETECTING 4.

FAILURE IN THE MASTER PLC

UPON A RIOPS COMMUNICATION FAILURE OR CRITICAL

PLC PROGRAMMING SHALL STOP ALL OPERATIONS 3.

HMI LANGUAGE SHALL BE AS SIMILAR AS IS POSSIBLE.

ALL PLC VARIABLE AND TAG NAMES SHARED WITH THE 2.

MITER_GATE_1N_POSITION_PCT).

STRUCTURE AND BE DESCRIPTIVE (I.E.,

ALL VARIABLE TAG NAMES SHALL BE CONSISTENT 1.

ITEMS:

CONSISTENT MANNER. THE FOLLOWING ARE SOME KEY

ALL PLC PROGRAMMING SHALL BE DONE IN A ROBUST

PLC PROGRAMMING REQUIREMENTS:

SPECIFICATIONS 40 95 00.

CYBERSECURITY IS PART OF THIS PROJECT, SEE 8.

TERMINAL AND HMI DESKTOP COMPUTER.

CAPABILITIES BETWEEN THE OPERATOR DISPLAY

E-003. THIS SHOWS THE DIFFERENCES AND

SEE THE MINIMUM LIST OF HMI SCREENS ON SHEET 7.

PUSHBUTTON.

CLICKING ON AN OPEN OR CLOSE SCREEN

SHALL PROPOSE A METHOD SUCH AS CONTINUED

OPENING AND CLOSING MITER GATES. THE SUPPLIER

“DEADMAN’S” OR OPERATOR SAFETY FEATURES WHEN

THE DESKTOP COMPUTER HMI SHALL HAVE A FORM OF 6.

AVAILABLE FOR LOCKING OPERATIONS.

PORTION OF THE MAIN CONTROL PANEL IS NOT

OPERATOR DISPLAY IS INOPERATIVE OR SOME

TO RUN THE LOCKING, BUT BE ONLY USED IF THE MAIN

THE DESKTOP COMPUTER HMI SHALL BE CONFIGURED 5.

SYMBOL.

THE CURSOR AND CLICKS ON THE DESIRED SCREEN

STANDARD MOUSE, WHERE THE OPERATOR MOVES

THE DESKTOP COMPUTER HMI SYSTEM SHALL USE A

FOR MAKING OPERATOR SETTINGS AND SELECTIONS.

MAIN CONTROL PANEL SHALL HAVE A TOUCH SCREEN

THE OPERATOR DISPLAY TERMINAL MOUNTED ON THE 4.

SYMBOLS, COLOR SCHEMES, AND ORGANIZATION.

WHERE POSSIBLE. USING THE SAME SET OF

COMPUTER SHALL HAVE THE SAME APPEARANCE

THE HMI DISPLAYS FOR THE PLC AND DESKTOP 3.

LIGHTS AND DISPLAYS.

DISPLAY NOT ON THE PANEL MOUNTED SWITCHES,

DESKTOP HMI. IT SHALL BE USED FOR SETTINGS AND

SOFTWARE FROM THE SAME MANUFACTURER AS THE

THE OPERATOR DISPLAY PANEL SHALL RUN HMI 2.

DATA CAPABILITIES.

SETUP, TRENDING, LOGGING AND HISTORICAL

AN HMI DESKTOP COMPUTER WITH ADDITIONAL B)

THE MAIN CONTROL PANEL, AND

THE OPERATOR DISPLAY TERMINAL MOUNTED ON A)

THE HMI SYSTEM WILL HAVE TWO MAIN COMPONENTS:1.

PLC HMI AND DESKTOP COMPUTER HMI:

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

S I

D

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S E

A T

T L E

W A

S H

IN

G T

O N

S E

A T

T L E D

IS

T R

IC

T

SEATTLE DISTRICT

:5

:4

P

M

P L

O T D

A T

E

P L

O T T

IM

E

/2

/2

DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-002 - PLC SYSTEM GENERAL NOTES

P

N L

W C

V

H

IR

A M M

C H

IT

T E

N D

E N L

O C

K S

W A

S H

IN

G T

O N

IDENTIFICATION

SHEET

SHEET OF 125

OF ENGINEERS

U.S. ARMY CORPS

C U

L V

E R

T G

A T

E V

A L

V E R

E P

L A

C E

M E

N T

B R

IA

N C

N E

L S

O N

M

A Y

RTA SUBMITTAL

C -2 -4 -3

L

W C

V -E -0

.d g n

E-003

D B

S

IN

IM

U M L

IS

T O

F H

M I S

C R

E E

N S

GENERAL NOTES:

REQUIREMENTS

GENERAL PLC PROGRAMMING

PROGRAMMING

LEVEL DIFFERENTIAL

CULVERT VALVE OPEN VERSUS

MITER GATES:

LIMIT SWITCH ADDITION TO

SYSTEM

EMERGENCY STOP (E-STOP)

PROCEDURE TO BE DETERMINED.

CONDITION. THE EXACT SEQUENCE OR

CONTROL PANEL TO CLEAR THE E-STOP

A SEQUENCE OF MULTIPLE ACTIONS ON THE MAIN 2)

NORMAL UP POSITION.

(IF) USED TO INITIATE THE E-STOP, BACK TO

PULLING THE SPECIFIC HARDWIRE PUSHBUTTON 1)

CLEARED SYSTEM WIDE BY:

THE EMERGENCY STOP CONDITION WILL ONLY BE 4.

SUCH AS: “REMOTE IO PANEL 1S E-STOP INITIATE”.

SHOW THE INITIATING SITE AS AN ALARM MESSAGE.

GATES AND VALVES. THE HMI ALARM SYSTEM SHALL

LOCK ON ANY OPERATIONS SUCH AS OPENING/CLOSING

THE EMERGENCY STOP WILL SHUT DOWN THE ENTIRE 3.

PANEL SHALL INITIATE THE PLC E-STOP CODE MODULE.

HIGH PRIORITY. ANY E-STOP COMMAND FROM ANY

THIS MODULE SHALL BE CONTINUOUS RUNNING WITH A

CODE MODULE HANDLING JUST EMERGENCY STOP.

THE PLC PROGRAMMING SHALL HAVE A SEPARATE 2.

E-STOP BUTTON SHOWING ON ALL SCREENS.

COMPUTER AND PLC HMI SCREENS SHALL HAVE AN

OPERATOR CONTROL STATIONS. IN ADDITION THE

PANELS AND THE THREE ASSOCIATED CONTROL HOUSE

BE ON THE MAIN CONTROL PANEL, ALL REMOTE IO

AN EMERGENCY STOP PUSHBUTTION (E-STOP), SHALL 1.

EXPERIENCE IS GAINED.

PROVIDE PLC CODE TUNE UP AS OPERATING

THE SIX CULVERT VALVES. THE SUPPLIER SHALL

COURSE OF THREE CUTOVER PERIODS OF INSTALLING

WILL BE IMPROVED AND TUNED UP DURING THE

IT IS EXPECTED THAT THE CULVERT VALVE PLC LOGIC 6.

REGIONS OF EXCESSIVE VIBRATION ARE OBSERVED.

“AVOIDANCE ZONES” SETTINGS AND CONTROL IF

EXCESSIVE VIBRATION. THE SUPPLIER SHALL PROVIDE

HAVE REGIONS OF OPEN POSITION THAT LEAD TO

IT IS POSSIBLE THAT THE CULVERT VALVE SYSTEM WILL 5.

COMMAND TO ZERO.

DEADBAND, IT WILL DROP THE CYLINDER SPEED

DETERMINES THAT THE CULVERT VALVE IS WITHIN THE

DUE TO THE HDPE VALVE GUIDES. WHEN THE PLC

THE VALVE MAY JUMP IN POSITION DUE TO “STICTION”

HAVE A MINIMUM CYLINDER SPEED CLAMP. OTHERWISE

VALVE POSITION ERROR TO “SETPOINT” AND PROBABLY

CALCULATE A CYLINDER SPEED DEPENDING UPON THE

DITHERING AND OVER SHOOT. THE PLC WILL

DEAD BAND SETTING MAY BE REQUIRED TO AVOID

THE PLC WILL CONTROL THE CULVERT VALVE AND A 4.

POSITION, (SETPOINT).

WILL CALCULATE THE REQUIRED CULVERT VALVE OPEN

THE LEVEL DIFFERENTIAL IS BETWEEN SETTINGS. THIS

INTERPOLATION BETWEEN ADJACENT SETTINGS WHEN

REQUIRED OPEN POSITION. THE PLC WILL DO A LINEAR

AND THEN POSITION THE CULVERT VALVE TO THE

CONTINUOUSLY MONITOR THE LEVEL DIFFERENTIAL

WHEN OPENING A CULVERT VALVE, THE PLC WILL 3.

ALLOW ADJACENT SETTINGS TO BE EQUAL.

CULVERT VALVE SETTINGS. THE PROGRAMMING WILL

AND CONVERSELY MONOTONICALLY INCREASING FOR

MONOTONICALLY DECREASING IN THE LEVEL SETTINGS

THE PLC WILL ENSURE THAT THE SETTINGS ARE

AND 0 -100% FOR CULVERT VALVE OPEN SETTING. AND

PROCESS VARIABLE RANGE, E.G., 0-27 FT FOR LEVELS.

SETTINGS. ALL SETTINGS SHALL BE WITHIN THE

SETTINGS. AND DO A REASONABLENESS CHECK ON THE

THE PLC WILL MONITOR THE OPERATOR ENTERED 2.

NOT DEFINED YET.

SCENARIOS. THE NAMES OF THESE SCENARIOS ARE

POSITION SETTINGS ARE INPUT INTO VARIOUS

DIFFERENTIAL VERSUS CULVERT VALVE REQUIRED

GOING TO THE CULVERT. A SET OF LEVEL

MINIMIZE THE FLOW VELOCITY IN THE LOCK LATERALS

DURING “SMOLT SEASON”, THE REQUIREMENT IS TO 1.

MITER GATES.

THE WATER LEVELS ON BOTH SIDES OF CLOSED

LEVEL DIFFERENTIAL IS THE DIFFERENCE BETWEEN NOTE:

BE NECESSARY.

ADJUSTABLE “MOVEMENT DETECTED” TIME DELAYS MAY

AND WITH LOW SPEED COMMAND SIGNALS.

POTENTIALLY VERY SLOW MOVING CULVERT VALVES

ALARM. THIS MAY BE A BIT TRICKY FOR THE

OCCURS WITHIN A SET TIME, THEN IT GOES INTO

OPEN AND NO MOVEMENT IN THE OPEN DIRECTION

CHECK. SUCH AS IF THE MITER GATE IS COMMANDED TO

CULVERT VALVES, SHALL HAVE A NORMAL OPERATION

ANYTHING THAT IS SUPPOSED TO MOVE, GATES, 4.

THEY ARE ATTEMPTING AN UNSAFE LOCK SEQUENCE.

OPERATOR STILL SHALL BE WARNED BY THE ALARM, IF

WHEN THE INTERLOCKS ARE BYPASSED, THE

PREVENTED FROM DOING A PROHIBITED OPERATION.

OPERATOR SHALL BE WARNED BY AN ALARM AND

INCORPORATED INTO THE PLC PROGRAMMING. THE

SYSTEM PERFORMANCE REQUIREMENTS SHALL BE

SPECIFICATIONS. THIS STANDARD, MINIMUM INTERLOCK

STANDARD, OCT 2014. SEE ATTACHMENT IN

INTERLOCKED ACCORDING TO THE IMTS INTERLOCK

LOCK GATE, VALVE OPERATION SHALL NORMALLY BE 3.

WILL BE A LOGGED ALARM.

INTERLOCKS AND CONTINUE. BYPASSING INTERLOCKS

OPERATOR CAN THEN INTENTIONALLY BYPASS

DOING ANY FURTHER LOCKING OPERATIONS. THE

WILL BE ALARMED AND PREVENT THE OPERATOR FROM

WHEN ANY PROCESS VARIABLE IS OUT OF LIMITS, IT 2.

ALARM.

PRESSURES SHALL HAVE AN OUT OF LIMITS CHECK AND

ALL PROCESS VARIABLES, LEVELS, PERCENT OPEN, 1.

STRING POT GATE POSITION SENSORS.

GATE POSITION USING THE EXISTING SCHEME WITH THE

THE PLC WILL STILL ATTEMPT TO VERIFY THE MITER 6.

BYPASS”.

INTERLOCK SCREEN AND SELECTING, “INTERLOCK

PROXIMITY LIMIT SWITCHES BY GOING TO THE

THE OPERATOR CAN BYPASS THE USE OF THESE 5.

SENSING IS IN FAULT, (BOTH NO-NC ON OR BOTH OFF).

WILL SHOW A FLASHING RED DOT IF THE SWITCH

OR FULLY CLOSED RESPECTIVELY). THE HMI SCREENS

GREEN DOT WHEN THEY ARE MADE, (GATE FULLY OPEN

THE HMI SCREENS WILL SHOW THESE SWITCHES AS A 4.

(MITERED).

DETERMINE THAT THE GATE IS FULLY CLOSED,

SENSING PROXIMITY SWITCH ON THE OTHER LEAF TO

WILL BE A MAGNET ON THE TIP OF ONE LEAF AND

GATE LEAF IS FULLY OPEN (RETRACTED). AND THERE

OF THE LOCK TO SENSE THAT THE RESPECTIVE MITER

A PROXIMITY SWITCH WILL BE MOUNTED ON EACH SIDE 3.

FAULT.

BOTH ON OR BOTH OFF, THE PLC WILL ALARM A SWITCH

WHERE THE PLC SENSE THAT BOTH NO NC PAIR ARE

OPENED OR CLOSED. IF THERE IS A DISCREPANCY,

NC CONTACT TO DETERMINE THAT THE CONTACT HAS

PAIR. THE PLC SYSTEM WILL READ BOTH THE NO AND

THESE LIMIT SWITCHES SHALL BE FORM C, (NO-NC) 2.

AND THE CONTACTS CHANGE.

APPROACH EACH OTHER THE LIMIT SWITCH SENSES

AND A MAGNET. AS THE SWITCH AND MAGNET

MAGNETIC PROXIMITY TYPE WITH A SENSING SWITCH

PER THE DRAWINGS. THESE LIMIT SWITCHES ARE

LIMIT SWITCHES SHALL BE ADDED TO THE MITER GATES 1.

SYSTEM DESIGNER TO ADD SCREENS.

THIS SCREEN LIST DOES NOT PRECLUDE THE HMI 4.

CONCEPTS.

SEE SHEETS E-660 THROUGH E-676 FOR HMI SCREEN 3.

COMPUTER HMI SYSTEM, AS NOTED IN THE TABLE.

THESE SCREENS SHALL ONLY BE ON THE DESKTOP

AS SUMMARIZED IN THE TABLE BELOW. SOME OF

A MINIMUM LIST OF HMI SCREENS SHALL BE PROVIDED 2.

DETERMINE THE SYMBOL SET AND COLOR SCHEME.

SUBMIT OR MEET WITH THE CONTRACTING OFFICER TO

BY THE CONTRACTING OFFICER. THE SUPPLIER SHALL

WITH A SYMBOL SET AND COLOR SCHEME APPROVED

THE SUPPLIER SHALL PROVIDE A MODERN HMI SYSTEM 1.

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

S I

D

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S E

A T

T L E

W A

S H

IN

G T

O N

S E

A T

T L E D

IS

T R

IC

T

SEATTLE DISTRICT

:5

:5

P

M

P L

O T D

A T

E

P L

O T T

IM

E

/2

/2

DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-003 - MINIMUM LIST OF HMI SCREENS

P

N L

W C

V

H

IR

A M M

C H

IT

T E

N D

E N L

O C

K S

W A

S H

IN

G T

O N

IDENTIFICATION

SHEET

SHEET OF 125

OF ENGINEERS

U.S. ARMY CORPS

C U

L V

E R

T G

A T

E V

A L

V E R

E P

L A

C E

M E

N T

B R

IA

N C

N E

L S

O N

M

A Y

RTA SUBMITTAL

C -2 -4 -3

C A

N D C

O N

T R

O L S

Y S

T E

M O

V E

R V

IE

W

P N

L

W C

V -E -0

.d g n

E-010

KEYED NOTES:

GENERAL NOTES:

(TYP.)3

(TYP.)1

3 5

N

D B

S

D D

SEE SHEET E-602, E-603

(TYP.)

(TYP.)

(TYP.)

SEE SHEETS E-621, E-653 SEE SHEETS E-621, E-622 SEE SHEETS E-621, E-651

(TYP.)8

SEE SHEETS E-620, E-622SEE SHEETS E-650, E-653 SEE SHEETS E-650, E-651

SEE SHEETS E-650, E-652SEE SHEETS E-640, E-641SEE SHEETS E-650, E-654

WIRING LINES LEGEND

CAT 6 ETHERNET CABLE

SINGLE MODE FIBER OPTIC PAIR

CONTROL STATION

IO PANEL AND LANDWALL

CABLES BETWEEN RECESS LOCK

FIELD WIRING

T M

P

THE RESPECTIVE HOUSE PANELS.

WITHIN THE PANEL AND FROM THE 1N, 2N, 3N PANELS TO

USED TO COMMUNICATE TO DIGITAL DISPLAYS. BOTH

A DEVICE NET OR EQUIVALENT SERIAL DATA SCHEME IS 8.

FIELD WIRING TO LOCAL EQUIPMENT7.

PANEL

CABLES BETWEEN LOCK IO PANEL AND CONTROL HOUSE 6.

TROUBLESHOOT THE PLC SYSTEM.

LOOP SWITCH AND BE OPERATIONAL TO PROGRAM AND

SHALL BE ABLE TO BE PLUGGED IN AT ANY ETHERNET

THE MAINTENANCE/PROGRAMMING LAPTOP COMPUTER 5.

CABLE WITH USB KEYBOARD AND USB MOUSE.

HMI COMPUTER CONNECTED VIA LOCAL CAT 6 ETHERNET 4.

CAT 6 ETHERNET COPPER CABLE TYPICAL.3.

OPTIC LOOP SYSTEM.

ACTUAL TOPOLOGY BUT SHOWS THE INTENT OF THE FIBER

THE FIBER OPTIC REPRESENTATION MAY NOT BE THE 2.

CONNECTORS.

FIBER OPTIC PAIR, SINGLE MODE TYPE WITH SC 1.

SPECIFICATIONS 40 95 00.

CYBERSECURITY IS PART OF THIS PROJECT, SEE 4.

SEE SHEET E-108 FOR SITE FIBER OPTIC LAYOUT.3.

SEE SHEET E-015 FOR CONDUIT AND CIRCUIT SCHEDULE.2.

THE DETAILS OF THE CONTROL DEVICES.

THIS DRAWING IS AN OVERVIEW AND DOES NOT SHOW ALL 1.

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

S I

D

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S E

A T

T L E

W A

S H

IN

G T

O N

S E

A T

T L E D

IS

T R

IC

T

SEATTLE DISTRICT

:5

:0

P

M

P L

O T D

A T

E

P L

O T T

IM

E

/2

/2

DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-010 - PLC AND CONTROL SYSTEM OVERVIEW

P

N L

W C

V

H

IR

A M M

C H

IT

T E

N D

E N L

O C

K S

W A

S H

IN

G T

O N

IDENTIFICATION

SHEET

SHEET OF 125

OF ENGINEERS

U.S. ARMY CORPS

C U

L V

E R

T G

A T

E V

A L

V E R

E P

L A

C E

M E

N T

B R

IA

N C

N E

L S

O N

M

A Y

RTA SUBMITTAL

C -2 -4 -3

CONTROL HOUSE 3 CONTROL HOUSE 2 CONTROL HOUSE 1

3N LOCK IO PANEL 2N LOCK IO PANEL 1N LOCK IO PANEL

PLC REMOTE IO PLC REMOTE IO PLC REMOTE IO

ETHERNET

FIBER OPTIC

ETHERNET

FIBER OPTIC

ETHERNET

FIBER OPTIC

CULVERT VALVE 3N MITER GATES CTRL 1N, 2N, 3N CULVERT VALVE 2N CULVERT VALVE 1N

PLC CPU

ETHERNET

FIBER OPTIC

MAIN OPERATOR PANEL IN LOCK TOWER

3S LOCK IO PANEL 2S LOCK IO PANEL 1S LOCK IO PANEL

PLC REMOTE IO PLC REMOTE IO PLC REMOTE IO

ETHERNET

FIBER OPTIC

ETHERNET

FIBER OPTIC

ETHERNET

FIBER OPTIC

LAPTOP

PROGRAMMING

MAINTENANCE/

CULVERT VALVE 3S MITER GATES CTRL 1S, 2S, 3S CULVERT VALVE 2S CULVERT VALVE 1S

CONTROL HOUSE 3 PANEL CONTROL HOUSE 2 PANEL CONTROL HOUSE 1 PANEL

L

W C

V -E -0

.d g

E-015

B

S

D D

C O

N D

U

IT

A

N D C

IR

C U

IT

S

C H

E D

U L E

OPTIC

FIBER FXX

CAMERACATXX

CONTROLCXX

LIGHTINGLXX

POWERSPXX

CIRCUIT TYPES:1.

T M

P

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

S I

D

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S E

A T

T L E

W A

S H

IN

G T

O N

S E

A T

T L E D

IS

T R

IC

T

SEATTLE DISTRICT

:5

:1

P

M

P L

O T D

A T

E

P L

O T T

IM

E

/2

/2

DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-015 - CONDUIT AND CIRCUIT SCHEDULE

P

N L

W C

V

H

IR

A M M

C H

IT

T E

N D

E N L

O C

K S

W A

S H

IN

G T

O N

IDENTIFICATION

SHEET

SHEET OF 125

OF ENGINEERS

U.S. ARMY CORPS

C U

L V

E R

T G

A T

E V

A L

V E R

E P

L A

C E

M E

N T

B R

IA

N C

N E

L S

O N

M

A Y

RTA SUBMITTAL

C -2 -4 -3

L

W C

V -E -1

.d g

E-100

B

S

D D

E L E

C T

R

IC

A L K

E Y P

L A

N

N E

W C

U L

V E

R T M

A C

H

IN

E R

Y

CULVERT VALVE #1 NORTH

NTS

E-101

#1N

CULVERT VALVE

UPSTREAM LANDWALL

DRAINAGE TUNNEL

FLOW

CULVERT VALVE #2 NORTH

NTS

E-103

CULVERT VALVE #3 NORTH

NTS

E-105

CULVERT VALVE #1 SOUTH

NTS

E-102

CULVERT VALVE #2 SOUTH

NTS

E-104

CULVERT VALVE #3 SOUTH

NTS

E-106

N

#2N

CULVERT VALVE

#3N

CULVERT VALVE

DRAINAGE TUNNEL

D/S LANDWALL MIDDLE LANDWALL

DRAINAGE TUNNEL

#1S

CULVERT VALVE

DRAINAGE TUNNEL

UPSTREAM RIVERWALL

#2S

CULVERT VALVE

MIDDLE RIVERWALL

DRAINAGE TUNNEL

D/S RIVERWALL

#3S

CULVERT VALVE

DRAINAGE TUNNEL

FLOWFLOW

FLOW FLOW FLOW

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

S I

D

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S E

A T

T L E

W A

S H

IN

G T

O N

S E

A T

T L E D

IS

T R

IC

T

SEATTLE DISTRICT

:5

:4

P

M

P L

O T D

A T

E

P L

O T T

IM

E

/2

/2

DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-100 - NEW CULVERT MACHINERY ELECTRICAL KEY PLAN

P

N L

W C

V

H

IR

A M M

C H

IT

T E

N D

E N L

O C

K S

W A

S H

IN

G T

O N

IDENTIFICATION

SHEET

SHEET OF 125

OF ENGINEERS

U.S. ARMY CORPS

C U

L V

E R

T G

A T

E V

A L

V E R

E P

L A

C E

M E

N T

B R

IA

N C

N E

L S

O N

M

A Y

RTA SUBMITTAL

C -2 -4 -3

L

W C

V -E -1

.d g n

SCALE: 3/8" = 1'-0"

E-101

O

C K M

A C

H

IN

E R

Y R

E C

E S

S

N

O R

T H

E L E

C T

R

IC

A L L

A Y

O U

T

GENERAL NOTES:

KEYED NOTES:

D B

S

B R

S

LOCK MACHINERY RECESS #1 NORTH ELECTRICAL LAYOUT

N

ELEV=104.5

R E

S E

R V

O

IR

9JB

JB

HYDRAULIC CYLINDER

MITER GATE

EXISTING #1 NORTH

VALVE #1N

CYLINDER, CULVERT

NEW HYDRAULIC

PUMPS

DUAL HPU

P2

PANEL

EXIST

NEW RIOP 1N

BOXES

EXIST JUNCTION

R1

R8

R3

R3

R2

R8

R6

"64 331'-20""32

237'-97'-6""32 96'-5

"64 352'-11

CENTERLINE LOCK - MATCHLINE SHEET E-102

R16

R17

R18

R9

R5

R11

R13,R14,R15

R12

R2

R7

R19

R4

CODE CLEARANCES IN LAYOUT AND INSTALLATION.

MAINTAIN EQUIPMENT AND ELECTRICAL

IMPEDE ACCESS TO OR REMOVAL OF THE MACHINERY.

AND CABLE SHALL BE INSTALLED SO THAT THEY DO NOT

HAZARDS. SUBMIT ON CONDUIT/ CABLE ROUTING. CONDUIT

PATHWAYS, MAXIMIZE HEAD CLEARANCE, AND MINIMIZE TRIP

CONDUIT AND CABLE ROUTING SHALL BE OUT OF THE WAY OF 4.

COORDINATED TO ENSURE SCHEDULE IS MET.

PARTIAL WIRING AND CONDUIT INSTALLATION TO BE

INSTALLED PRIOR TO STONEY VALVE 1N CUTOVER.

NEW REMOTE I/O (RIOP-1N) PANEL IS REQUIRED TO BE 3.

CUTOVER AND INSTALLATION.

REFER TO THE CONTRACT DOCUMENTS ABOUT STAGED 2.

REQUIRE CHANGES.

OTHER TRADES, AND THE INSTALLATION SEQUENCE MAY

THE EQUIPMENT MAY BE CHANGED, AND COORDINATION WITH

THIS LAYOUT IS A STARTING BASIS, ACTUAL LOCATIONS OF 1.

TRENCH

CABLE

EXIST

STARTER PANEL

DUAL HPU

SEAL TIGHT

R22

PGRS

R22

LS144 (TYP) 16

SEE SHEET E-107.

EXISTING LEVEL TRANSMITTER LOCATION IN CRANE HOUSE,

TO NEW DUAL LASER LEVEL TRANSMITTERS LOCATED AT 13.

ROUTING TO THE CULVERT VALVE CYLINDER.

REMOVABLE ROOF AREA. EXCEPT FLEXIBLE CONDUITS

CONDUIT ROUTING IS EXCLUDED FROM THE CULVERT VALVE12.

MOTOR STARTER. USE JUNCTION BOX AT SPLICE.

STONEY GATE VALVE MOTOR AND EXTEND TO DUAL HPU

SPLICE EXISTING CONDUCTORS REMAINING FROM THE 11.

BE SUPPLIED BY THE HYDRAULIC SYSTEM SUPPLIER.

TRAVEL PRESSURE TRANSMITTERS. THESE WILL

MAGNETOSTRICTIVE POSITION TRANSMITTER, AND TWO

HAVE OPEN AND CLOSED LIMIT SWITCHES, BUILT-IN

THE DESIGN BASIS REQUIRES THE HYDRAULIC CYLINDER TO 10.

AS DETERMINED BY THE HYDRAULIC SYSTEM SUPPLIER.

THREE PHASE, AND 480V THREE PHASE. THE HP MAY VARY,

DUAL HPU PUMP MOTORS SHALL BE DUAL VOLTAGE 240V 9.

CONSOLE IN LAND WALL CONTROL HOUSE 1.

ROUTE TRAY CABLES AND SIGNAL CABLES TO NEW CONTROL 8.

REQUIRED FOR NORMAL SYSTEM OPERATION.

INTO EXISTING FIBER OPTIC CABLES. TWO ACTIVE PAIR

PROVIDE FIBER OPTIC EXTENSION CABLE TO RIOP-1N, AND TIE 7.

WIRING. PROVIDE READILY ACCESSIBLE JUNCTION BOX.

TIE INTO EXISTING STRING POT GATE POSITION TRANSMITTER 6.

BE TYPE 4X STAINLESS STEEL. MINIMUM 6" X 6" X 4" SIZE.

SHALL BE READILY ACCESSIBLE. JUNCTION BOXES SHALL

CONDUIT AND FLEXIBLE CONDUIT. THE JUNCTION BOXES

PROVIDE AND INSTALL JUNCTION BOXES BETWEEN HARD 5.

WITH HYDRAULIC SYSTEM SUPPLIER.

HYDRAULIC SYSTEM ALARMS AND STATUS INPUTS MAY VARY 4.

VARY WITH HYDRAULIC SYSTEM SUPPLIER.

ASSEMBLY. CONNECTIONS, VOLTAGE, AND LOCATION MAY

HYDRAULIC CYLINDER SPEED(FLOW) CONTROL VALVE 3.

LATER AT 480V THREE PHASE.

AND ABLE TO BE USED AND COORDINATED WITH HPU PUMPS

CONTROL TRANSFORMER. INITIALLY WIRED FOR 240V 3 PHASE,

NEW DUAL HPU STARTER PANEL, WITH DUAL INPUT VOLTAGE 2.

COMMUNICATION TO PLC SYSTEM.

NEW REMOTE IO PANEL RIOP-1N, CONNECTS VIA FIBER OPTIC 1.

SEE SPECIFICATIONS 40 95 00.

TO AVOID REPEATED USE WEAR. SUBMIT LAYOUT DETAILS.

HYDRAULIC CYLINDER OPERATION. PROVIDE SWEEP BENDS

CONDUIT TO ENSURE CLEARANCE WITH GATE AND

FOR MOUNTING DETAILS AND CONCEPTS. ROUTE ALL

(RECESSED) AND FULL CLOSED, (MITERED). SEE SHEET E-110

MAGNETIC PROXIMITY SWITCHES FOR MITER GATE OPEN, 16.

BREAKERS.

IS SQUARE D. VERIFY MATCHING TYPE AND RATING

CIRCUIT BREAKERS (1 SPARE) IN PANEL P2. EXISTING PANEL

THE CONTRACTOR TO PROVIDE AND INSTALL FOUR (4) 15 AMP 15.

REQUIREMENTS WITH HYDRAULIC SUPPLIER.

COORDINATE HPU OIL RESERVOIR HEATER ELECTRICAL 14.

R12,R20

R10,R11, R10,R20

JB

PGRS

R22

JB22

JB

R22

R21, JB20

POT

TO STRING

EXIST WIRING

SEAL TIGHT

R21 PGRS

LS142 (TYP)

R22 SEAL TIGHT

CYLINDER

OPENING FOR

1' 5'2'3'4'5' 0

LEGEND:

EXISTING

NEW

LT IN A, LT IN B

TO LEVEL TRANSMITTERS,

DUCT BANK

VIA EXIST

HOUSE 1N

TO CONTROL

R13,R14,R15

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

S I

D

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S E

A T

T L E

W A

S H

IN

G T

O N

S E

A T

T L E D

IS

T R

IC

T

SEATTLE DISTRICT

:5

:4

P

M

P L

O T D

A T

E

P L

O T T

IM

E

/2

/2

DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-101 - LOCK MACHINERY RECESS #1 NORTH ELECTRICAL LAYOUT

P

N L

W C

V

H

IR

A M M

C H

IT

T E

N D

E N L

O C

K S

W A

S H

IN

G T

O N

IDENTIFICATION

SHEET

SHEET OF 125

OF ENGINEERS

U.S. ARMY CORPS

C U

L V

E R

T G

A T

E V

A L

V E R

E P

L A

C E

M E

N T

B R

IA

N C

N E

L S

O N

M

A Y

RTA SUBMITTAL

C -2 -4 -3

M

M

"64 342'-2

"32 237'-97'-6""32

96'-5

ELEV=104.5

ELEV=122.5

P N

L

W C

V -E -1

.d g

E-102

KEYED NOTES:

D B

S

B R

S

L O

C K M

A C

H

IN

E R

Y R

E C

E S

S

S

O U

T H

E L E

C T

R

IC

A L L

A Y

O U

T

EXISTING "JB"

LOCATION (NTS)

MITER GATE APPROX

R25

R27

R28 R29

R31 R30

JB5

JB4

R33

R32

- " = 1'-0"8

3SCALE:

LOCK MACHINERY RECESS #1 SOUTH ELECTRICAL LAYOUT

VALVE #1S

CYLINDER, CULVERT

NEW HYDRAULIC

N

PANEL P3

EXIST POWER

R41

R40

R39

CENTERLINE LOCK - MATCHLINE SHEET E-101

TO STRING POT

EXISTING WIRING

CYLINDER

HYDRAULIC

MITER GATE

#1 SOUTH

EXISTING

R38

OPTIC PANEL

NEW FIBER

R36

CODE CLEARANCES IN LAYOUT AND INSTALLATION.

MAINTAIN EQUIPMENT AND ELECTRICAL

HAZARDS. SUBMIT ON CONDUIT/ CABLE ROUTING.

PATHWAYS, MAXIMIZE HEAD CLEARANCE, AND MINIMIZE TRIP

CONDUIT AND CABLE ROUTING SHALL BE OUT OF THE WAY OF 4.

COORDINATED TO ENSURE SCHEDULE IS MET.

PARTIAL WIRING AND CONDUIT INSTALLATION TO BE

INSTALLED PRIOR TO CULVERT VALVE 1S CUTOVER.

NEW REMOTE I/O (RIOP-1S) PANEL IS REQUIRED TO BE 3.

CUTOVER AND INSTALLATION.

REFER TO THE CONTRACT DOCUMENTS ABOUT STAGED 2.

REQUIRE CHANGES.

OTHER TRADES, AND THE INSTALLATION SEQUENCE MAY

THE EQUIPMENT MAY BE CHANGED, AND COORDINATION WITH

THIS LAYOUT IS A STARTING BASIS, ACTUAL LOCATIONS OF 1.

R42

O

IL

R

E S

E R

V O

IR

R37

R26

R26,R38

R35,R36

R43

R35, R34, R34,R43

R43

R34, CYLINDER

OPENING FOR

R44 (PGRS)

R43

R44 SEALTIGHT

14.

REQUIREMENTS WITH HYDRAULIC SUPPLIER.

COORDINATE HPU OIL RESERVOIR HEATER ELECTRICAL13.

CABLE WAY.

LOCK RECESS SHAFT, SEE SHEET E-107. VIA EXISTING

TO NEW DUAL LASER LEVEL TRANSMITTERS LOCATED AT12.

HPU STARTER. USE JUNCTION BOX AT SPLICE.

STONEY GATE VALVE MOTOR AND EXTEND TO THE DUAL

SPLICE EXISTING CONDUCTORS REMAINING FROM THE 11.

ROUTING TO THE CULVERT VALVE CYLINDER.

REMOVABLE ROOF AREA. EXCEPT FLEXIBLE CONDUITS

CONDUIT ROUTING IS EXCLUDED FROM THE CULVERT VALVE 10.

BE SUPPLIED BY THE HYDRAULIC SYSTEM SUPPLIER.

TRAVEL PRESSURE TRANSMITTERS. THESE WILL

MAGNETOSTRICTIVE POSITION TRANSMITTER, AND TWO

HAVE OPEN AND CLOSED LIMIT SWITCHES, BUILT-IN

THE DESIGN BASIS REQUIRES THE HYDRAULIC CYLINDER TO 9.

AS DETERMINED BY THE HYDRAULIC SYSTEM SUPPLIER.

THREE PHASE, AND 480V THREE PHASE. THE HP MAY VARY,

DUAL HPU PUMP MOTORS SHALL BE DUAL VOLTAGE 240V 8.

FIBER OPTIC BACKBONE CABLE, SEE SHEET E-108.

PROVIDE NEW FIBER OPTIC PATCH PANEL. PROVIDE NEW7.

WIRING. PROVIDE READILY ACCESSIBLE JUNCTION BOX.

TIE INTO EXISTING STRING POT GATE POSITION TRANSMITTER 6.

SHALL BE READILY ACCESSIBLE.

CONDUIT AND FLEXIBLE CONDUIT. THE JUNCTION BOXES

PROVIDE AND INSTALL JUNCTION BOXES BETWEEN HARD5.

WITH HYDRAULIC SYSTEM SUPPLIER.

HYDRAULIC SYSTEM ALARMS AND STATUS INPUTS MAY VARY 4.

MAY VARY WITH HYDRAULIC SYSTEM SUPPLIER.

ASSEMBLY. CONNECTIONS, VOLTAGE, AND LOCATION

HYDRAULIC CYLINDER SPEED(FLOW) CONTROL VALVE 3.

LATER AT 480V THREE PHASE.

AND ABLE TO BE USED AND COORDINATED WITH HPU PUMPS

CONTROL TRANSFORMER. INITIALLY WIRED FOR 240V 3 PHASE,

NEW DUAL HPU STARTER PANEL, WITH DUAL INPUT VOLTAGE 2.

COMMUNICATION TO PLC SYSTEM.

NEW REMOTE IO PANEL RIOP-1S, CONNECTS VIA FIBER OPTIC 1.

SEE SPECIFICATIONS 40 95 00.

OPERATION. SUBMIT LAYOUT DETAILS.

CLEARANCE WITH GATE AND HYDRAULIC CYLINDER

AND CONCEPTS. ROUTE ALL CONDUIT TO ENSURE

(RECESSED). SEE SHEET E-110 FOR MOUNTING DETAILS

MAGNETIC PROXIMITY SWITCHES FOR MITER GATE OPEN, 15.

BREAKERS.

PANEL IS SQUARE D. VERIFY MATCHING TYPE AND RATING

AMP CIRCUIT BREAKERS (1 SPARE) IN PANEL P3. EXISTING

THE CONTRACTOR TO PROVIDE AND INSTALL FOUR (4) 15

LS142 (TYP)

JB43

1' 5'2'3'4'5' 0

LEGEND:

EXISTING

NEW

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

S I

D

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S E

A T

T L E

W A

S H

IN

G T

O N

S E

A T

T L E D

IS

T R

IC

T

SEATTLE DISTRICT

:5

:5

P

M

P L

O T D

A T

E

P L

O T T

IM

E

/2

/2

DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-102 - LOCK MACHINERY RECESS #1 SOUTH ELECTRICAL LAYOUT

P

N L

W C

V

H

IR

A M M

C H

IT

T E

N D

E N L

O C

K S

W A

S H

IN

G T

O N

IDENTIFICATION

SHEET

SHEET OF 125

OF ENGINEERS

U.S. ARMY CORPS

C U

L V

E R

T G

A T

E V

A L

V E R

E P

L A

C E

M E

N T

B R

IA

N C

N E

L S

O N

M

A Y

RTA SUBMITTAL

C -2 -4 -3

M

M

"32 96'-57'-6""32

237'-9"64 320'-510'-9"

"64 352'-11

L

W C

V -E -1

.d g n

ELEV=122.5

RESERVOIR

HYDRAULIC

PUMPS

HYDRAULIC

E-103

L O

C K M

A C

H

IN

E R

Y R

E C

E S

S

N

O R

H

E

C T

R

IC

A L L

A Y

O U

T

GENERAL NOTES:

D B

S

B R

S

HYDRAULIC CYLINDER

#2 NORTH MITER GATE

LOCATION (NTS)

APPROXIMATE

MITER GATE

ELEV=104.5

CENTERLINE LOCK - MATCHLINE SHEET E-104

N

ELEV=122.5

JB2A

JB2

P2 HPU2HPU1TS1

JB4

JB5

7 11

R57

R64

R63

R58

R50

R53

R51

R55

R56

R54

R52

R58

R59,R60,R61

NEW R10P-2N

R66

R67

R58

TO STRING POT

EXISTING WIRING

R62

R63,R64

R48,R57,R62, R49

- " = 1'-0"8

3SCALE:

LOCK MACHINERY RECESS #2 NORTH ELECTRICAL LAYOUT

JB

R48,R69

R69

R48, R62

TO CONTROL HOUSE 2

EXIST DUCT BANK

R69

ELECTRICAL CODE CLEARANCES IN LAYOUT AND INSTALLATION.

MAINTAIN EQUIPMENT AND

ROUTING.

MINIMIZE TRIP HAZARDS. SUBMIT ON CONDUIT/ CABLE

WAY OF PATHWAYS, MAXIMIZE HEAD CLEARANCE, AND

CONDUIT AND CABLE ROUTING SHALL BE OUT OF THE 4.

COORDINATED TO ENSURE SCHEDULE IS MET.

PARTIAL WIRING AND CONDUIT INSTALLATION TO BE

INSTALLED PRIOR TO CULVERT VALVE 2N CUTOVER.

NEW REMOTE I/O (RIOP-2N) PANEL IS REQUIRED TO BE 3.

CUTOVER AND INSTALLATION.

REFER TO THE CONTRACT DOCUMENTS ABOUT STAGED 2.

MAY REQUIRE CHANGES.

WITH OTHER TRADES, AND THE INSTALLATION SEQUENCE

THE EQUIPMENT MAY BE CHANGED, AND COORDINATION

THIS LAYOUT IS A STARTING BASIS, ACTUAL LOCATIONS OF 1.

KEYED NOTES:

KEYED NOTES (CONTINUED):

HPU STARTER

DUAL

R70

JB70

CYLINDER

OPENING FOR

LS142 (TYP)

SEALTIGHT

R71 PGRS

SEALTIGHT

JB

R72 PGRS

PGRS

R72

SEALTIGHT

LS144 (TYP)

WITH HYDRAULIC SYSTEM SUPPLIER.

HYDRAULIC SYSTEM ALARMS AND STATUS INPUTS MAY VARY 4.

VARY WITH HYDRAULIC SYSTEM SUPPLIER.

ASSEMBLY. CONNECTIONS, VOLTAGE, AND LOCATION MAY

HYDRAULIC CYLINDER SPEED(FLOW) CONTROL VALVE 3.

PUMPS LATER AT 480V THREE PHASE.

PHASE, AND ABLE TO BE USED AND COORDINATED WITH HPU

CONTROL TRANSFORMER. INITIALLY WIRED FOR 240V 3

NEW DUAL HPU STARTER PANEL, WITH DUAL INPUT VOLTAGE 2.

COMMUNICATION TO PLC SYSTEM.

NEW REMOTE IO PANEL RIOP-2N, CONNECTS VIA FIBER OPTIC 1.

STARTER. USE JUNCTION BOX AT SPLICE.

STONEY GATE VALVE MOTOR AND EXTEND TO DUAL HPU

SPLICE EXISTING CONDUCTORS REMAINING FROM THE 13.

CONSOLE SYSTEM.

EXISTING JUNCTION BOXES FOR EXISTING PLC AND 12.

ROUTING TO THE CULVERT VALVE CYLINDER.

REMOVABLE ROOF AREA. EXCEPT FLEXIBLE CONDUITS

CONDUIT ROUTING IS EXCLUDED FROM THE CULVERT VALVE 11.

CONSOLE IN LAND WALL CONTROL HOUSE 2.

ROUTE TRAY CABLES AND SIGNAL CABLES TO NEW CONTROL 10.

SUPPLIED BY THE HYDRAULIC SYSTEM SUPPLIER.

TRAVEL PRESSURE TRANSMITTERS. THESE WILL BE

MAGNETOSTRICTIVE POSITION TRANSMITTER, AND TWO

HAVE OPEN AND CLOSED LIMIT SWITCHES, BUILT-IN

THE DESIGN BASIS REQUIRES THE HYDRAULIC CYLINDER TO 9.

AS DETERMINED BY THE HYDRAULIC SYSTEM SUPPLIER.

THREE PHASE, AND 480V THREE PHASE. THE HP MAY VARY,

DUAL HPU PUMP MOTORS SHALL BE DUAL VOLTAGE 240V 8.

REQUIRED FOR NORMAL SYSTEM OPERATION.

TIE INTO EXISTING FIBER OPTIC CABLES. TWO ACTIVE PAIR

PROVIDE FIBER OPTIC EXTENSION CABLE TO RIOP-2N, AND 7.

JUNCTION BOX.

TRANSMITTER WIRING. PROVIDE READILY ACCESSIBLE

TIE INTO EXISTING STRING POT GATE POSITION 6.

SHALL BE READILY ACCESSIBLE.

CONDUIT AND FLEXIBLE CONDUIT. THE JUNCTION BOXES

PROVIDE AND INSTALL JUNCTION BOXES BETWEEN HARD 5.

WEAR. SUBMIT LAYOUT DETAILS SEE SPECIFICATIONS 40 95 00.

OPERATION. PROVIDE SWEEP BENDS TO AVOID REPEATED USE

TO ENSURE CLEARANCE WITH GATE AND HYDRAULIC CYLINDER

FOR MOUNTING DETAILS AND CONCEPTS. ROUTE ALL CONDUIT

(RECESSED) AND FULL CLOSED, (MITERED). SEE SHEET E-110

MAGNETIC PROXIMITY SWITCHES FOR MITER GATE OPEN, 16.

BREAKERS.

IS SQUARE D. VERIFY MATCHING TYPE AND RATING

CIRCUIT BREAKERS (1 SPARE) IN PANEL P2. EXISTING PANEL

THE CONTRACTOR TO PROVIDE AND INSTALL FOUR (4) 15 AMP 15.

REQUIREMENTS WITH HYDRAULIC SUPPLIER.

COORDINATE HPU OIL RESERVOIR HEATER ELECTRICAL 14.

1' 5'2'3'4'5' 0

LEGEND:

EXISTING

NEW

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

S I

D

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S E

A T

T L E

W A

S H

IN

G T

O N

S E

A T

T L E D

IS

T R

IC

T

SEATTLE DISTRICT

:5

:5

P

M

P L

O T D

A T

E

P L

O T T

IM

E

/2

/2

DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-103 - LOCK MACHINERY RECESS #2 NORTH ELECTRICAL LAYOUT

P

N L

W C

V

H

IR

A M M

C H

IT

T E

N D

E N L

O C

K S

W A

S H

IN

G T

O N

IDENTIFICATION

SHEET

SHEET OF 125

OF ENGINEERS

U.S. ARMY CORPS

C U

L V

E R

T G

A T

E V

A L

V E R

E P

L A

C E

M E

N T

B R

IA

N C

N E

L S

O N

M

A Y

RTA SUBMITTAL

C -2 -4 -3

M

M

237'-97'-6""32

96'-5

"64 320'-510'-9"

L

W C

V -E -1

.d g n

ELEV=122.5

ELEV=122.5

ELEV=104.5

VALVE MANIFOLD

RESERVOIR

HYDRAULIC

PUMPS

HYDRAULIC

E-104

L O

C K M

A C

H

IN

E R

Y R

E C

E S

S

S

O U

H

E

C T

R

IC

A L L

A Y

O U

T

GENERAL NOTES:

KEYED NOTES:

D B

S

B R

S

CENTERLINE LOCK - MATCHLINE SHEET E-103

N

- " = 1'-0"8

3SCALE:

LOCK MACHINERY RECESS #2 SOUTH ELECTRICAL LAYOUT

HYDRAULIC CYLINDER

#2 SOUTH MITER GATE

NEW R10P-2S

EXISTING STRING POT WIRING

R89

R88

R87 R75,R87

R36, R85

R95

R86,R95

R79

R81

R77 R78

R80

R83

R82

JB4

JB5

P3 TS1 HPU1 HPU2

R93

R92

R91

KEYED NOTES (CONTINUED):

OPTIC PANEL 2S

EXIST FIBER

R36

R76

VALVE #2S

CYLINDER, CULVERT

NEW HYDRAULIC

CODE CLEARANCES IN LAYOUT AND INSTALLATION.

MAINTAIN EQUIPMENT AND ELECTRICAL

TRIP HAZARDS. SUBMIT ON CONDUIT/ CABLE ROUTING.

OF PATHWAYS, MAXIMIZE HEAD CLEARANCE, AND MINIMIZE

CONDUIT AND CABLE ROUTING SHALL BE OUT OF THE WAY 4.

COORDINATED TO ENSURE SCHEDULE IS MET.

PARTIAL WIRING AND CONDUIT INSTALLATION TO BE

INSTALLED PRIOR TO CULVERT VALVE 2S CUTOVER.

NEW REMOTE I/O (RIOP-2S) PANEL IS REQUIRED TO BE 3.

CUTOVER AND INSTALLATION.

REFER TO THE CONTRACT DOCUMENTS ABOUT STAGED 2.

REQUIRE CHANGES.

OTHER TRADES, AND THE INSTALLATION SEQUENCE MAY

THE EQUIPMENT MAY BE CHANGED, AND COORDINATION WITH

THIS LAYOUT IS A STARTING BASIS, ACTUAL LOCATIONS OF 1.

R95

R75, R96

JB

E-106

SHEET

SEE

EXIST CABLE WAY

R86

R86

R96

E-102

SHEET

SEE

TO LT 2SA, B

SEE SHEET E-107

R75,R85,R86,R87

GALLERY 1S AND GALLERY 3S.

FIBER OPTIC CABLE EXTENDED TO NEW FIBER OPTIC PANELS AT 11.

TO THE CULVERT VALVE CYLINDER.

REMOVABLE ROOF AREA. EXCEPT FLEXIBLE CONDUITS ROUTING

CONDUIT ROUTING IS EXCLUDED FROM THE CULVERT VALVE 10.

SYSTEM SUPPLIER.

TRANSMITTERS. THESE WILL BE SUPPLIED BY THE HYDRAULIC

POSITION TRANSMITTER, AND TWO TRAVEL PRESSURE

OPEN AND CLOSED LIMIT SWITCHES, BUILT-IN MAGNETOSTRICTIVE

THE DESIGN BASIS REQUIRES THE HYDRAULIC CYLINDER TO HAVE9.

BY THE HYDRAULIC SYSTEM SUPPLIER.

PHASE, AND 480V THREE PHASE. THE HP MAY VARY, AS DETERMINED

DUAL HPU PUMP MOTORS SHALL BE DUAL VOLTAGE 240V THREE 8.

FOR NORMAL SYSTEM OPERATION.

INTO EXISTING FIBER OPTIC CABLES. TWO ACTIVE PAIR REQUIRED

PROVIDE FIBER OPTIC EXTENSION CABLE TO RIOP-2S, AND TIE 7.

WIRING. PROVIDE READILY ACCESSIBLE JUNCTION BOX.

TIE INTO EXISTING STRING POT GATE POSITION TRANSMITTER 6.

ACCESSIBLE.

AND FLEXIBLE CONDUIT. THE JUNCTION BOXES SHALL BE READILY

PROVIDE AND INSTALL JUNCTION BOXES BETWEEN HARD CONDUIT 5.

HYDRAULIC SYSTEM SUPPLIER.

HYDRAULIC SYSTEM ALARMS AND STATUS INPUTS MAY VARY WITH 4.

HYDRAULIC SYSTEM SUPPLIER.

CONNECTIONS, VOLTAGE, AND LOCATION MAY VARY WITH

HYDRAULIC CYLINDER SPEED(FLOW) CONTROL VALVE ASSEMBLY. 3.

LATER AT 480V THREE PHASE.

AND ABLE TO BE USED AND COORDINATED WITH HPU PUMPS

CONTROL TRANSFORMER. INITIALLY WIRED FOR 240V 3 PHASE,

NEW DUAL HPU STARTER PANEL, WITH DUAL INPUT VOLTAGE 2.

COMMUNICATION TO PLC SYSTEM.

NEW REMOTE IO PANEL RIOP-2S, CONNECTS VIA FIBER OPTIC 1.

HPU STARTER

DUAL

SEE SPECIFICATIONS 40 95 00.

CYLINDER OPERATION. SUBMIT LAYOUT DETAILS.

ALL CONDUIT TO ENSURE CLEARANCE WITH GATE AND HYDRAULIC

SEE SHEET E-110 FOR MOUNTING DETAILS AND CONCEPTS. ROUTE

MAGNETIC PROXIMITY SWITCH FOR MITER GATE OPEN, (RECESSED). 16.

IS SQUARE D. VERIFY MATCHING TYPE AND RATING BREAKERS.

CIRCUIT BREAKERS (1 SPARE) IN PANEL P3. EXISTING PANEL

THE CONTRACTOR TO PROVIDE AND INSTALL FOUR (4) 15 AMP 15.

REQUIREMENTS WITH HYDRAULIC SUPPLIER.

COORDINATE HPU OIL RESERVOIR HEATER ELECTRICAL 14.

HPU STARTER. USE JUNCTION BOX AT SPLICE.

STONEY GATE VALVE MOTOR AND EXTEND TO DUAL

SPLICE EXISTING CONDUCTORS REMAINING FROM THE 13.

TO DUAL LASER LEVEL TRANSMITTERS, SEE SHEET E-107.12.

LS142 (TYP)

R98

PGRS

R98 SEALTIGHT

CYLINDER

OPENING FOR

R97

JB97 R84,R97

R84,R88,R89,R97

LEGEND:

EXISTING

NEW

1' 5'2'3'4'5' 0

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

S I

D

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S E

A T

T L E

W A

S H

IN

G T

O N

S E

A T

T L E D

IS

T R

IC

T

SEATTLE DISTRICT

:5

:0

P

M

P L

O T D

A T

E

P L

O T T

IM

E

/2

/2

DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-104 - LOCK MACHINERY RECESS #2 SOUTH ELECTRICAL LAYOUT

P

N L

W C

V

H

IR

A M M

C H

IT

T E

N D

E N L

O C

K S

W A

S H

IN

G T

O N

IDENTIFICATION

SHEET

SHEET OF 125

OF ENGINEERS

U.S. ARMY CORPS

C U

L V

E R

T G

A T

E V

A L

V E R

E P

L A

C E

M E

N T

B R

IA

N C

N E

L S

O N

M

A Y

RTA SUBMITTAL

C -2 -4 -3

M

M

237'-97'-6""16

526'-10"64 320'-5"64

331'-2

L

W C

V -E -1

.d

ELEV=122.5

E-105

C K M

A C

H

IN

E R

Y R

E C

E S

S

N

O R

T H

E L E

C T

R

IC

A L L

A Y

O U

T

D B

S

B R

S

SCALE: 3/8" = 1'-0"-

N

LOCATION (NTS)

APPROXIMATE

MITER GATE

CENTERLINE LOCK - MATCHLINE SHEET E-106

LOCK MACHINERY RECESS #3 NORTH ELECTRICAL LAYOUT

EXIST POWER PANEL

HYDRAULIC CYLINDER

#3 NORTH MITER GATE

R111

R112

JB4

JB5

R E

S E

R V

O

IR

H Y

D R

A U

L

IC

ELEV=104.5

ELEV=122.5

R104

R107

R109

R102

R106

R108

EXIST FIBER OPTIC PANEL

KEYED NOTES:

P2

EXISTING PANEL

R119

R117

R118

R103

9 3

R110

JB

R113,R114,R115

R105

R120

R120

EXIST DUCT BANK

TO CONTROL HOUSE 3

CODE CLEARANCES IN LAYOUT AND INSTALLATION.

MAINTAIN EQUIPMENT AND ELECTRICAL

HAZARDS. SUBMIT ON CONDUIT/ CABLE ROUTING.

PATHWAYS, MAXIMIZE HEAD CLEARANCE, AND MINIMIZE TRIP

CONDUIT AND CABLE ROUTING SHALL BE OUT OF THE WAY OF 4.

COORDINATED TO ENSURE SCHEDULE IS MET.

PARTIAL WIRING AND CONDUIT INSTALLATION TO BE

INSTALLED PRIOR TO CULVERT VALVE 3N CUTOVER.

NEW REMOTE I/O (RIOP-3N) PANEL IS REQUIRED TO BE 3.

CUTOVER AND INSTALLATION.

REFER TO THE CONTRACT DOCUMENTS ABOUT STAGED 2.

REQUIRE CHANGES.

OTHER TRADES, AND THE INSTALLATION SEQUENCE MAY

THE EQUIPMENT MAY BE CHANGED, AND COORDINATION WITH

THIS LAYOUT IS A STARTING BASIS, ACTUAL LOCATIONS OF 1.

GENERAL NOTES:

KEYED NOTES (CONTINUED):

TO THE CULVERT VALVE CYLINDER.

REMOVABLE ROOF AREA. EXCEPT FLEXIBLE CONDUITS ROUTING

CONDUIT ROUTING IS EXCLUDED FROM THE CULVERT VALVE 11.

CONSOLE IN LAND WALL CONTROL HOUSE 3.

ROUTE TRAY CABLES AND SIGNAL CABLES TO NEW CONTROL 10.

BE SUPPLIED BY THE HYDRAULIC SYSTEM SUPPLIER.

TRAVEL PRESSURE TRANSMITTERS. THESE WILL

MAGNETOSTRICTIVE POSITION TRANSMITTER, AND TWO

HAVE OPEN AND CLOSED LIMIT SWITCHES, BUILT-IN

THE DESIGN BASIS REQUIRES THE HYDRAULIC CYLINDER TO 9.

AS DETERMINED BY THE HYDRAULIC SYSTEM SUPPLIER.

THREE PHASE, AND 480V THREE PHASE. THE HP MAY VARY,

DUAL HPU PUMP MOTORS SHALL BE DUAL VOLTAGE 240V

USE JUNCTION BOX AT SPLICE.

GATE VALVE MOTOR AND EXTEND TO DUAL HPU STARTER.

12. SPLICE EXISTING CONDUCTORS REMAINING FROM THE STONEY

8.

REQUIRED FOR NORMAL SYSTEM OPERATION.

INTO EXISTING FIBER OPTIC CABLES. TWO ACTIVE PAIR

PROVIDE FIBER OPTIC EXTENSION CABLE TO RIOP-3N, AND TIE 7.

WIRING. PROVIDE READILY ACCESSIBLE JUNCTION BOX.

TIE INTO EXISTING STRING POT GATE POSITION TRANSMITTER 6.

SHALL BE READILY ACCESSIBLE.

CONDUIT AND FLEXIBLE CONDUIT. THE JUNCTION BOXES

PROVIDE AND INSTALL JUNCTION BOXES BETWEEN HARD 5.

WITH HYDRAULIC SYSTEM SUPPLIER.

HYDRAULIC SYSTEM ALARMS AND STATUS INPUTS MAY VARY 4.

VARY WITH HYDRAULIC SYSTEM SUPPLIER.

ASSEMBLY. CONNECTIONS, VOLTAGE, AND LOCATION MAY

HYDRAULIC CYLINDER SPEED(FLOW) CONTROL VALVE 3.

LATER AT 480V THREE PHASE.

AND ABLE TO BE USED AND COORDINATED WITH HPU PUMPS

CONTROL TRANSFORMER. INITIALLY WIRED FOR 240V 3 PHASE,

NEW DUAL HPU STARTER PANEL, WITH DUAL INPUT VOLTAGE 2.

COMMUNICATION TO PLC SYSTEM.

NEW REMOTE IO PANEL RIOP-3N, CONNECTS VIA FIBER OPTIC 1.

SEE SPECIFICATIONS 40 95 00.

TO AVOID REPEATED USE WEAR. SUBMIT LAYOUT DETAILS.

HYDRAULIC CYLINDER OPERATION. PROVIDE SWEEP BENDS

CONDUIT TO ENSURE CLEARANCE WITH GATE AND

FOR MOUNTING DETAILS AND CONCEPTS. ROUTE ALL

(RECESSED) AND FULL CLOSED, (MITERED). SEE SHEET E-110

MAGNETIC PROXIMITY SWITCHES FOR MITER GATE OPEN, 15.

BREAKERS.

IS SQUARE D. VERIFY MATCHING TYPE AND RATING

CIRCUIT BREAKERS (1 SPARE) IN PANEL P2. EXISTING PANEL

THE CONTRACTOR TO PROVIDE AND INSTALL FOUR (4) 15 AMP 14.

REQUIREMENTS WITH HYDRAULIC SUPPLIER.

COORDINATE HPU OIL RESERVOIR HEATER ELECTRICAL 13.

JB

JB121

LS142

R122 SEALTIGHT

R122 PGRS

R121

R123 PGRS

R123 SEALTIGHT CYLINDER

OPENING FOR

R123 PGRS

R111,R121 R111,R112,R121

R114,R115,R121

R111,R112,R113

R123 SEALTIGHT

LS144 (TYP)

LEGEND:

EXISTING

NEW

1' 5'2'3'4'5' 0

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

S I

D

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S E

A T

T L E

W A

S H

IN

G T

O N

S E

A T

T L E D

IS

T R

IC

T

SEATTLE DISTRICT

:5

:1

P

M

P L

O T D

A T

E

P L

O T T

IM

E

/2

/2

DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY18_PN445134_LWCV\Current_Phase\Con_Docs\CAD_Sheets\Electrical\E-105 - LOCK MACHINERY RECESS #3 NORTH ELECTRICAL LAYOUT

P

N L

W C

V

H

IR

A M M

C H

IT

T E

N D

E N L

O C

K S

W A

S H

IN

G T

O N

IDENTIFICATION

SHEET

SHEET OF 125

OF ENGINEERS

U.S. ARMY CORPS

C U

L V

E R

T G

A T

E V

A L

V E R

E P

L A

C E

M E

N T

B R

IA

N C

N E

L S

O N

M

A Y

RTA SUBMITTAL

C -2 -4 -3

M

M

96'-57'-6""64

4928'-2"64 320'-5"64

331'-2

L

W C

V -E -1

.d

E-106

C K M

A C

H

IN

E R

Y R

E C

E S

S

S

O U

T H

E L E

C T

R

IC

A L L

A Y

O U

T

D B

S

B R

S

- " = 1'-0"8

3SCALE:

N

CENTERLINE LOCK - MATCHLINE SHEET E-105

AND WIRING

EXIST STRING POT

LOCK MACHINERY RECESS #3 SOUTH ELECTRICAL LAYOUT

HYDRAULIC CYLINDER

#3 SOUTH MITER GATE

ELEV=122.5

ELEV=122.5

ELEV=104.5

R136

PATCH PANEL

NEW FIBER OPTIC

JB4

JB5 NEW R10P-3S

R E

S E

R V

O

IR

H Y

D R

A U

L

IC

R135

R134

R130

R132

R142

R141

R143

GENERAL NOTES:

R95

R129

R133

R131

E-107

SHEET

SEE

R137

EXIST CABLE WAY

JB

EXIST POWER PANEL P3

R127,R144

R95,R138

CODE CLEARANCES IN LAYOUT AND INSTALLATION.

MAINTAIN EQUIPMENT AND ELECTRICAL

HAZARDS. SUBMIT ON CONDUIT/ CABLE ROUTING.

PATHWAYS, MAXIMIZE HEAD CLEARANCE, AND MINIMIZE TRIP

CONDUIT AND CABLE ROUTING SHALL BE OUT OF THE WAY OF 4.

COORDINATED TO ENSURE SCHEDULE IS MET.

PARTIAL WIRING AND CONDUIT INSTALLATION TO BE

INSTALLED PRIOR TO CULVERT VALVE 3S CUTOVER.

NEW REMOTE I/O (RIOP-3S) PANEL IS REQUIRED TO BE 3.

CUTOVER AND INSTALLATION.

REFER TO THE CONTRACT DOCUMENTS ABOUT STAGED 2.

REQUIRE CHANGES.

OTHER TRADES, AND THE INSTALLATION SEQUENCE MAY

THE EQUIPMENT MAY BE CHANGED, AND COORDINATION WITH

THIS LAYOUT IS A STARTING BASIS, ACTUAL LOCATIONS OF 1.

R144

KEYED NOTES:

KEYED NOTES (CONTINUED):

WIRING. PROVIDE READILY ACCESSIBLE JUNCTION BOX.

TIE INTO EXISTING STRING POT GATE POSITION TRANSMITTER 6.

SHALL BE READILY ACCESSIBLE.

CONDUIT AND FLEXIBLE CONDUIT. THE JUNCTION BOXES

PROVIDE AND INSTALL JUNCTION BOXES BETWEEN HARD5.

WITH…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.