35_05_40.14_10.pdf
PDF 181 KB Posted
- Attached to
- Stoney Gate Valve Repalcement Federal contract opportunity
- Solicitation number
- W912DW18R0012
About this file
Section 35 05 40 .14 10 - HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS STRUCTURES Note change at Paragraph 1.3.1d
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
St oney Gat e Val ve Repl acement 16033
HI RAM M. CHI TTENDEN LOCKS, SEATTLE, WA
SECTI ON TABLE OF CONTENTS
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
SECTI ON 35 05 40. 14 10
HYDRAULI C POWER SYSTEMS FOR CI VI L WORKS STRUCTURES
05/14
PART 1 GENERAL
1. 1 SUMMARY
1. 2 REFERENCES
1. 3 DESI GN AND PERFORMANCE REQUI REMENTS
1. 3. 1 Desi gn Par amet er s
1. 3. 2 Al l owabl e St r esses
1. 3. 2. 1 St r uct ur al I t ems
1. 3. 2. 2 Hydr aul i c Cyl i nder s
1. 3. 2. 3 St r ess Concent r at i on Fact or s
1. 3. 3 Connect i ons
1. 3. 3. 1 Pi nned Connect i ons
1. 3. 3. 2 Shop Connect i ons
1. 3. 3. 3 Wel ded Connect i ons
1. 3. 3. 4 St r uct ur al Bol t ed Connect i ons
1. 4 SUBMI TTALS
1. 5 SCHEMATI C DRAWI NGS AND DATA
1. 5. 1 Shop Dr awi ngs
1. 5. 2 Fabr i cat i on Dr awi ngs
1. 5. 3 Hydr aul i c Power Uni t Dr awi ngs
1. 5. 4 Mani f ol d Dr awi ngs
1. 5. 5 Pi pi ng Dr awi ngs
1. 5. 6 El ect r i cal Dr awi ngs
1. 5. 7 Modi f i cat i on t o Exi st i ng Mi t er Gat e Cyl i nder Shut t l e Val ves
Control
1. 5. 8 Shop Assembl y Dr awi ngs
1. 5. 9 Hydr aul i c Schemat i c
1. 5. 10 Pr oduct Dat a
1. 5. 11 Del i ver y Dr awi ngs
1. 5. 12 Shop Assembl y and Test i ng Pr ocedur es and Resul t s
1. 5. 13 Fi el d I nst al l at i on Pr ocedur es
1. 5. 14 Desi gn and Per f or mance Cal cul at i ons
1. 5. 15 Cl eani ng and Fl ushi ng Pr ocedur es and Resul t s
1. 5. 16 Er ect i ng Engi neer Qual i f i cat i ons
1. 6 DELI VERY, STORAGE, AND HANDLI NG
1. 6. 1 Packagi ng
1. 6. 2 Shi ppi ng, Pr eser vat i on, and St or age
1. 7 WARRANTY
1. 8 QUALI TY CONTROL
PART 2 PRODUCTS
2. 1 MATERI ALS AND MECHANI CAL EQUI PMENT
2. 1. 1 Gener al
2. 1. 2 Hydr aul i c Cyl i nder s
2. 1. 2. 1 Cyl i nder Tubes
SECTI ON 35 05 40. 14 10 Page 1
W912DW18R0012 R0003
2. 1. 2. 2 Cyl i nder Heads and Caps
2. 1. 2. 3 Pi st ons
2. 1. 2. 4 Pi st on Rods
2. 1. 2. 5 Cyl i nder Suppor t Assembl y and Tr unni on Mount
2. 1. 2. 6 Rod End Bear i ngs and Tr unni on Bear i ngs
2. 1. 2. 7 Connect i on Pi ns
2. 1. 2. 8 Bul khead Wat er Ti ght Seal
2. 1. 2. 9 Cyl i nder Mi scel l aneous Feat ur es
2. 1. 2. 10 Cyl i nder Nor mal Oper at i on St r oke and Bypass St r oke
2. 1. 2. 11 Cyl i nder Mai nt enance Sl i ngs
2. 1. 3 Hydr aul i c Power Uni t
2. 1. 4 Oi l Reser voi r s
2. 1. 4. 1 Reser voi r Heat er
2. 1. 4. 1. 1 Heat er Swi t ch
2. 1. 4. 1. 2 Hi gh Temper at ur e Swi t ch
2. 1. 4. 2 Magnet i c Separ at or s
2. 1. 4. 3 Low Level Fl oat Swi t ches
2. 1. 4. 4 Ai r Br eat her
2. 1. 4. 5 Oi l Level Gage
2. 1. 5 Pumps
2. 1. 6 Fi l t er s
2. 1. 7 Gauges
2. 1. 7. 1 Pr essur e Gauges
2. 1. 7. 2 Ther momet er
2. 1. 8 Mani f ol ds
2. 1. 9 Val ves
2. 1. 9. 1 Shut - Of f Val ves
2. 1. 9. 2 Sol enoi d Oper at ed Cont r ol Val ves
2. 1. 9. 2. 1 Pi l ot - Oper at ed, Sol enoi d- Cont r ol l ed Four - Way
Di r ect i onal Cont r ol Di r ect i onal
2. 1. 9. 3 Pr essur e Rel i ef Val ves
2. 1. 9. 4 Spr i ng Loaded Check Val ves
2. 1. 9. 5 Bl eeder Val ves
2. 1. 9. 6 Pr essur e Snubber s
2. 1. 9. 7 Load Hol di ng Val ves
2. 1. 10 Li mi t Swi t ches on Hydr aul i c Cyl i nder
2. 1. 11 Magnet ost r i ct i ve I nt egr al Cyl i nder Posi t i on Tr ansmi t t er
2. 1. 12 Pi pi ng
2. 1. 12. 1 Pi pe
2. 1. 12. 2 Pi pe Fi t t i ngs
2. 1. 12. 3 Pi pe and Tube Hanger s and Suppor t s
2. 1. 12. 4 Wal l Br acket s
2. 1. 12. 5 Uni ons
2. 1. 12. 6 Hydr aul i c Tubi ng
2. 1. 12. 7 Tube Fi t t i ngs
2. 1. 12. 8 Hose
2. 1. 13 Bol t s, Nut s, and Washer s
2. 1. 14 Hydr aul i c Fl ui d ( Pet r ol eum Based)
2. 1. 15 Housekeepi ng Pads
2. 1. 16 Dr i p Tr ays
2. 1. 17 Open Gr at i ng
2. 2 ELECTRI CAL EQUI PMENT
2. 2. 1 Cabi net s and Boxes
2. 2. 2 Pump Mot or s
2. 2. 2. 1 Rat i ng
2. 2. 2. 2 Wi ndi ng I nsul at i on
2. 2. 2. 3 Wi ndi ng Heat er s
2. 2. 2. 4 Ter mi nal Leads
2. 2. 3 Cont r ol Component s
SECTI ON 35 05 40. 14 10 Page 2
2. 2. 3. 1 Cont r ol Devi ces and Wi r i ng
2. 2. 3. 2 Pr essur e Swi t ches
2. 2. 3. 3 Pr essur e Tr ansducer s
2. 3 SHOP ASSEMBLY AND TESTI NG
2. 3. 1 Cyl i nder Test s
2. 3. 2 Hydr aul i c Power Uni t s
2. 4 MANUFACTURER PREPARATI ON BEFORE SHI PMENT
2. 4. 1 Fl ushi ng Hydr aul i c Cyl i nder s
2. 4. 2 Fl ushi ng Hydr aul i c Power Uni t
2. 5 PAI NTI NG
2. 6 SPECI AL TOOLS
2. 7 SPARE MECHANI CAL PARTS LI ST
PART 3 EXECUTI ON
3. 1 EXAMI NATI ON
3. 2 I NSTALLATI ON
3. 3 POWER PI PI NG
3. 3. 1 Pi pi ng I nst al l at i on
3. 3. 2 Pi pi ng Vent s and Dr ai ns
3. 3. 3 Mount i ng Suppor t f or Mani f ol ds
3. 4 CLEANI NG AND FLUSHI NG
3. 4. 1 Fl ushi ng Pi pi ng
3. 4. 2 Fl ushi ng Mani f ol ds and Hoses
3. 5 FI LLI NG AND BLEEDI NG THE SYSTEM
3. 6 ERECTI ON ENGI NEER
3. 7 FI ELD TESTS AND I NSPECTI ONS
3. 7. 1 Fi el d Test i ng
3. 7. 2 Pi pe Pr essur e Test
3. 7. 3 Pr epar at i on f or Fi el d Test s
3. 7. 3. 1 I ni t i al St ar t - Up
3. 7. 3. 2 Fi el d Test s
3. 7. 3. 2. 1 Manual Posi t i on Measur ement
3. 7. 3. 2. 2 Speed Schedul e Adj ust ment
3. 7. 3. 2. 3 Dr y Test
3. 7. 3. 2. 4 Lock Rewat er i ng Test
3. 7. 3. 2. 5 Nor mal Lock Navi gat i on Test
3. 7. 3. 2. 6 Mai nt enance Test
3. 7. 3. 2. 7 Fi l t er Car t r i dges
3. 7. 3. 3 Test Repor t s
3. 8 CLEAN- UP
3. 9 OPERATI ON AND MAI NTENANCE
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 35 05 40. 14 10 Page 3
SECTI ON 35 05 40. 14 10
HYDRAULI C POWER SYSTEMS FOR CI VI L WORKS STRUCTURES
05/14
PART 1 GENERAL
1. 1 SUMMARY
Pr ovi de and i nst al l t he i ndi v i dual hydr aul i c syst ems t hat shal l act uat e al l cul ver t gat e val ves at t he Lake Washi ngt on Shi p Canal Chi t t enden Lock.
Test al l hydr aul i c power uni t s pr i or t o del i ver y. Cur r ent l y, al l t hr ee mi t er gat es on t he nor t h s i de of t he l ar ge l ocks ar e act uat ed wi t h a hydr aul i c syst em t hat i s l ocat ed i n mi ddl e machi ner y r ecess #2N.
Si mi l ar l y, al l t hr ee mi t er gat es on t he sout h s i de of t he l ar ge l ocks ar e act uat ed wi t h a hydr aul i c syst em t hat i s l ocat ed i n mi ddl e machi ner y r ecess #2S ( l ocat ed beneat h t he cont r ol t ower ) . No wor k i s r equi r ed f or t he mi t er gat e hydr aul i c syst ems, except t o modi f y t he el ect r i cal cont r ol s t o t he cyl i nder shut t l e val ves t o al l ow cont i nuousl y var i abl e cont r ol .
The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of det ai l ed r equi r ement s f or t he desi gn, f abr i cat i on, shop assembl y, t est i ng, del i ver y, and i nst al l at i on of t he hydr aul i c power syst ems f or oper at i on of t he cul ver t val ves as speci f i ed and as shown.
1. 2 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN WELDI NG SOCI ETY ( AWS)
AWS D1. 1/ D1. 1M ( 2015; Er r at a 1 2015; Er r at a 2 2016) St r uct ur al Wel di ng Code - St eel
ASME I NTERNATI ONAL ( ASME)
ASME B16. 11 ( 2011) For ged Fi t t i ngs, Socket - Wel di ng and Threaded
ASME B31. 1 ( 2016) Power Pi pi ng
ASME B36. 19M ( 2004; R 2015) St ai nl ess St eel Pi pe
ASME B40. 100 ( 2013) Pr essur e Gauges and Gauge Attachments
ASME BPVC SEC I X ( 2010) BPVC Sect i on I X- Wel di ng and Br azi ng Qualifications
ASME BPVC SEC VI I I D1 ( 2010) BPVC Sect i on VI I I - Rul es f or Const r uct i on of Pr essur e Vessel s Di v i s i on 1
ASTM I NTERNATI ONAL ( ASTM)
ASTM A182/ A182M ( 2016a) St andar d Speci f i cat i on f or For ged or Rol l ed Al l oy- St eel Pi pe Fl anges, For ged
SECTI ON 35 05 40. 14 10 Page 4
Fi t t i ngs, and Val ves and Par t s f or Hi gh- Temper at ur e Ser vi ce
ASTM A269/ A269M ( 2015a) St andar d Speci f i cat i on f or Seaml ess and Wel ded Aust eni t i c St ai nl ess St eel Tubi ng f or Gener al Ser vi ce
ASTM A312/ A312M ( 2016a) St andar d Speci f i cat i on f or Seaml ess, Wel ded, and Heavi l y Col d Wor ked Aust eni t i c St ai nl ess St eel Pi pes
ASTM A516/ A516M ( 2010; R 2015) St andar d Speci f i cat i on f or Pr essur e Vessel Pl at es, Car bon St eel , f or Moder at e- and Lower - Temper at ur e Ser vi ce
ASTM A519 ( 2006) St andar d Speci f i cat i on f or Seaml ess Car bon and Al l oy St eel Mechani cal Tubi ng
ASTM A536 ( 1984; R 2014) St andar d Speci f i cat i on f or Duct i l e I r on Cast i ngs
ASTM A564/ A564M ( 2013) St andar d Speci f i cat i on f or Hot - Rol l ed and Col d- Fi ni shed Age- Har deni ng St ai nl ess St eel Bar s and Shapes
ASTM A576 ( 1990b; R 2012) St andar d Speci f i cat i on f or St eel Bar s, Car bon, Hot - Wr ought , Speci al Quality
ASTM A705/ A705M ( 2013) St andar d Speci f i cat i on f or Age- Har deni ng St ai nl ess St eel For gi ngs
ASTM D3951 ( 2015) Commer ci al Packagi ng
ASTM F3125/ F3125M ( 2015, R A) St andar d Speci f i cat i on f or Hi gh St r engt h St r uct ur al Bol t s, St eel and Al l oy St eel , Heat Tr eat ed, 120 ksi ( 830 MPa) and 150 ksi ( 1040 MPa) Mi ni mum Tensi l e St r engt h, I nch and Met r i c Dimensions
I NTERNATI ONAL ORGANI ZATI ON FOR STANDARDI ZATI ON ( I SO)
I SO 1219- 1 ( 2012; Amd 1 2016) Fl ui d Power Syst ems and Component s Gr aphi c Symbol s and Ci r cui t Di agr ams - Par t 1: Gr aphi c Symbol s f or Convent i onal Use and Dat a- Pr ocessi ng Applications
I SO 1219- 2 ( 2012) Fl ui d Power Syst ems and Component s Gr aphi c Symbol s and Ci r cui t Di agr ams - Par t 2: Ci r cui t Di agr ams
I SO 4021 ( 1992) Hydr aul i c Fl ui d Power - Par t i cul at e Cont ami nat i on Anal ysi s - Ext r act i on of Fl ui d Sampl es f r om Li nes of an Oper at i ng System
I SO 4406 ( 1999) Hydr aul i c Fl ui d Power - Fl ui ds -
SECTI ON 35 05 40. 14 10 Page 5
Met hod f or Codi ng t he Level of Cont ami nat i on by Sol i d Par t i c l es
I SO 4407 ( 2002) Hydr aul i c Fl ui d Power - Fl ui d Cont ami nat i on - Det er mi nat i on of Par t i cul at e Cont ami nat i on by t he Count i ng Met hod Usi ng an Opt i cal Mi cr oscope
I SO 4413 ( 2010) Hydr aul i c Fl ui d Power — Gener al Rul es and Saf et y Requi r ement s f or Syst ems and Thei r Component s
I SO 5598 ( 2008) Fl ui d Power Syst ems and Component s
- Vocabul ar y
MANUFACTURERS STANDARDI ZATI ON SOCI ETY OF THE VALVE AND FI TTI NGS
I NDUSTRY ( MSS)
MSS SP- 58 ( 1993; Reaf f i r med 2010) Pi pe Hanger s and Suppor t s - Mat er i al s, Desi gn and Manuf act ur e, Sel ect i on, Appl i cat i on, and Installation
NATI ONAL ELECTRI CAL MANUFACTURERS ASSOCI ATI ON ( NEMA)
NEMA MG 1 ( 2016) Mot or s and Gener at or s
SOCI ETY OF AUTOMOTI VE ENGI NEERS I NTERNATI ONAL ( SAE)
SAE J514 ( 2012) Hydr aul i c Tube Fi t t i ngs
SAE J517 ( 2016) Hydr aul i c Hose
SAE J518- 1 ( 2013) Hydr aul i c Fl anged Tube, Pi pe, and Hose Connect i ons, 4- Scr ew Fl ange Connect i on Par t 1: 3. 5 MPa t o 35 MPa ( Code 61)
UNDERWRI TERS LABORATORI ES ( UL)
UL 50 ( 2015) UL St andar d f or Saf et y Encl osur es f or El ect r i cal Equi pment , Non- Envi r onment al Consi der at i ons
1. 3 DESI GN AND PERFORMANCE REQUI REMENTS
The cont r act dr awi ngs i ndi cat e t he gener al ar r angement of t he hydr aul i c power syst em f or oper at i on of t he cul ver t val ves, c l ear ances necessi t at ed by t he st r uct ur e or ot her equi pment , maxi mum over al l di mensi ons, and ot her per t i nent f eat ur es. Fur ni sh t he det ai l ed desi gn i n conf or mi t y wi t h I SO 4413, and t he f ol l owi ng desi gn cr i t er i a. I dent i f y desi gn and di mensi onal changes necessar y t o sat i sf y t he pr i nci pal desi gn par amet er s i dent i f i ed i n t he par agr aph DESI GN PARAMETERS ( bel ow) as var i at i ons i n t he submi t t al s. Di mensi ons submi t t ed t hat di f f er f r om t hose i ndi cat ed and not ot her wi se const r ai ned by t he Desi gn Par amet er s and physi cal l i mi t at i ons of i nst al l at i on ar e subj ect t o appr oval . Al so submi t desi gn comput at i ons f or al l f abr i cat i on and assembl y of t he hydr aul i c cyl i nder , hydr aul i c cyl i nder suppor t assembl y, cyl i nder connect i on pi n and bear i ng t o t he gat e and hydr aul i c power uni t s.
SECTI ON 35 05 40. 14 10 Page 6
The hydr aul i c hoi st suppl i er r esponsi bl e f or desi gni ng, f ur ni shi ng and commi ssi oni ng t he hydr aul i c hoi st s shal l be i n t he busi ness of f ur ni shi ng and i nst al l i ng gat e hydr aul i c syst ems and el ect r i c cont r ol of such equi pment f or no l ess t han 10 year s f r om t he cont r act awar d dat e. The hydr aul i c hoi st suppl i er shal l have at l east 5 wor ki ng gat e hydr aul i c i nst al l at i ons wi t h s i mi l ar or l ar ger s i ze and capaci t y whi ch have been i n oper at i on f or not l ess t han 5 year s f r om cont r act awar d dat e. The hydr aul i c hoi st desi gner shal l be a r egi st er ed Pr of essi onal Engi neer wi t h at l east 10 year s of exper i ence desi gni ng such equi pment . The el ect r i cal cont r ol s suppl i er shal l be a subcont r act or of t he hydr aul i c hoi st suppl i er . Mechani cal and st r uct ur al desi gn cr i t er i a shal l f ol l ow USACE EM 1110- 2- 2610 and ETL 1110- 2- 584.
1. 3. 1 Desi gn Par amet er s
Desi gn, f abr i cat e, and i nst al l s i x ( 6) i dent i cal cul ver t val ve hoi st s ( hydr aul i c power syst ems, hydr aul i c cyl i nder s, and hydr aul i c cyl i nder suppor t assembl y) . The Cont r act or i s r esponsi bl e f or t he pr oper desi gn and f unct i oni ng of t he equi pment i ncl udi ng t he hoi st suppor t syst em ( cyl i nder suppor t syst em and t r unni on) and t he f i nal desi gn f or connect i on t o t he gat e i ncl udi ng t he bear i ng and pi n s i ze. Accept abl e hoi st l ayout and f eat ur es shal l be as i ndi cat ed on t he cont r act dr awi ngs and as specified.
The Cont r act or shal l det er mi ne t he desi gn l oads and desi gn t he hoi st .
Load est i mat es and par amet er s ar e pr ovi ded f or bi ddi ng pur poses but t he Cont r act or i s r esponsi bl e f or cal cul at i ng t he hoi st l oads. Load est i mat es and par amet er s ar e as f ol l ows:
a. cul ver t val ve est i mat ed wei ght 16, 200 pounds
b. UHMWPE est i mat ed sl i di ng coef f i c i ent of f r i c t i on 0. 167
c. J- seal est i mat ed f r i ct i on 3000 pounds
d. 96, 668 l bf est i mat ed r ai s i ng ( l i f t i ng) cyl i nder f or ce based on f ul l wat er hei ght on one si de of gat e and no wat er on ot her s i de of gat e ( a dewat er ed condi t i on) . Thi s assumed 59, 523 l b f r i c t i on l oads mul t i pl i ed by 1. 25 f act or . To accompl i sh t hi s l i f t i ng f or ce, ut i l i ze a 2000 psi g wor ki ng pr essur e and i ncr ease pi st on r od si ze as necessar y.
e. 58, 140 l bf est i mat ed l ower i ng cyl i nder f or ce based agai n on a dewat er ed l ock condi t i on wi t h f ul l wat er head on one si de of t he gat e and i ncl udi ng 59, 523 l b f r i c t i on l oads wi t h a 1. 25 f act or . Cyl i nder shal l have a f act or of saf et y of 2 agai nst buckl i ng.
f . The hoi st syst em shal l be desi gned f or a maxi mum out put of 100, 000 l bf i n ei t her di r ect i on t o not exceed st r uct ur al l i mi t s of t he gat e and t he cyl i nder suppor t assembl y. Under t hi s condi t i on, st r uct ur al component s i ncl udi ng suppor t s shal l not exceed 75% of y i el d.
g. appl y f act or of saf et y of 5 f or cyl i nder component s i ncl udi ng suppor t s and connect i on pi n t o gat e f or a nor mal l ower i ng ( ext endi ng) f or ce( wor ki ng l oad) of 35, 000 l bs. Cyl i nder shal l have a f act or of saf et y of 3 agai nst buckl i ng.
The maxi mum oper at i onal l oad f or t hi s cul ver t val ve syst em occur s when i ni t i al l y f i l l i ng t he l ock af t er t he annual l ock dewat er i ng exer ci se.
SECTI ON 35 05 40. 14 10 Page 7
W912DW18R0012 R0003
g3endnp9 Rectangle
For f i l l i ng t he l ock, t he cul ver t val ves ar e opened wi t h f ul l pool el evat i on on t he upst r eam si de and zer o wat er on t he downst r eam si de, 51 f eet of di f f er ent i al head. Est i mat ed l oads wer e cal cul at ed assumi ng wat er t o t he t op of t he l ock, or 55 f eet of di f f er ent i al head. Lock f i l l i ng may i ncl ude t he upper l ock, t he l ower l ock, or bot h t he upper and l ower l ocks. To f i l l t he upper l ock or bot h l ocks, wat er r out es f r om upst r eam of mi t er gat e 2 met er ed t hr ough t he cul ver t val ves 1N and 1S. To f i l l t he l ower l ock onl y, wat er r out es f r om upst r eam of mi t er gat e 3 t hr ough cul ver t val ves 2N and 2S. Nor mal oper at i onal l oads ar e due t o nor mal l ocki ng pr ocedur es bet ween upper pool and l ower pool el evat i ons. Nomi nal upper pool el evat i on i s 22 and nomi nal l ower pool r anges f r om el evat i on 14 ( hi gh wat er ) t o mi nus 4. 0 ( l ow wat er ) .
No component of t he hoi st equi pment shal l ext end above t he l ock wal l el evat i on 130. 0. No component shal l i nt er f er e wi t h t he r emovabl e deck pl at es on t he t op sur f ace of t he l ock wal l . Al l component s of t he hoi st equi pment shal l be i nst al l ed t hr ough exi st i ng r emovabl e deck pl at es i n t he t op sur f ace of t he l ock wal l .
The pr i nci pal desi gn par amet er s f or t he hydr aul i c power syst em ar e as follows:
a. Rai se and l ower speed vi a a 4- 20 MA cont r ol s i gnal bet ween 0. 0 f eet per mi nut e ( f pm) and 5. 60 f pm.
b. 34- i nch ( t o be ver i f i ed by Cont r act or ) maxi mum hoi st equi pment wi dt h ( access openi ng l i mi t at i on) .
c. 15. 0 f oot cyl i nder st r oke; 10- i nch cyl i nder bor e; 7- i nch cyl i nder r od di amet er , or as appr oved; ( 2: 1 ar ea r at i o di f f er ent i al cyl i nder ) .
d. r egener at i on c i r cui t f or cyl i nder ext end. Cyl i nder out put f or ce shal l not exceed 100, 000 pounds i n ei t her di r ect i on.
e. 2000 psi hydr aul i c desi gn oper at i ng ( wor ki ng) pr essur e.
Desi gn f eat ur e i s pr eci se aut omat i c cul ver t val ve speed cont r ol and pr eci se cyl i nder posi t i on sensi ng f or use by t he cont r ol syst em.
1. 3. 2 Al l owabl e St r esses
1. 3. 2. 1 St r uct ur al I t ems
The Cont r act or i s r esponsi bl e t o desi gn t he st r uct ur al i t ems associ at ed wi t h t hi s equi pment . St r uct ur al i t ems shal l be desi gned f or t he maxi mum ef f ect i ve hydr aul i c act uat or pr essur e, wi t h a mi ni mum f act or of saf et y of f i ve ( 5. 0) , based on t he ul t i mat e t ensi l e st r engt h of t he mat er i al . Al l component s shal l be desi gned f or a uni t st r ess not t o exceed 75% of t he y i el d st r engt h of t he mat er i al , usi ng t he maxi mum hydr aul i c act uat or pr essur e and f or ce avai l abl e t hr ough t he cont r ol syst em.
1. 3. 2. 2 Hydr aul i c Cyl i nder s
Desi gn al l hydr aul i c cyl i nder s t o wi t hst and a maxi mum oper at i ng pr essur e of 3000 psi wi t h a f act or of saf et y of 5 based on t he ul t i mat e st r engt h of t he mat er i al or 2 based on t he yi el d st r engt h of t he mat er i al . Appl y a f act or of saf et y of 3 t o t he compr essi on l oad when desi gni ng t he hydr aul i c cyl i nder s t o r esi st buckl i ng.
SECTI ON 35 05 40. 14 10 Page 8
1. 3. 2. 3 St r ess Concent r at i on Fact or s
Use st r ess concent r at i on f act or s wher e appl i cabl e. Reduct i on of al l owabl e st r esses t o compensat e f or r epeat ed cycl es of l oadi ng i s not r equi r ed.
1. 3. 3 Connections
1. 3. 3. 1 Pi nned Connect i ons
Desi gn pi nned hydr aul i c cyl i nder connect i ons f or f i el d assembl y as shown.
1. 3. 3. 2 Shop Connect i ons
Desi gn shop connect i ons f or assembl y by means of wel di ng or by bol t i ng.
1. 3. 3. 3 Wel ded Connect i ons
Desi gn wel ded connect i ons i n accor dance wi t h t he appl i cabl e pr ovi s i ons of AWS D1. 1/ D1. 1M except t hat pr ovi s i ons f or r epeat ed st r ess wi l l not be r equi r ed. Wel d hydr aul i c cyl i nder s i n accor dance wi t h ASME BPVC SEC VI I I D1, Sect i on VI I I . Wel d pi pi ng i n accor dance wi t h ASME B31. 1. Qual i f y pr ocedur es and wel der s i n accor dance wi t h ASME BPVC SEC I X. Wel di ng pr ocedur es qual i f i ed by ot her s, and wel der s and wel di ng oper at or s qual i f i ed by anot her empl oyer may be accept ed as per mi t t ed by ASME B31. 1. Not i f y t he Cont r act i ng Of f i cer 24 hour s i n advance of t est s and per f or m t he t est s at t he wor k s i t e i f pr act i cabl e.
Appl y t he wel der ' s or wel di ng oper at or ' s assi gned symbol near each wel d made as a per manent r ecor d. Submi t a copy of qual i f i ed pr ocedur es and a l i s t of names and i dent i f i cat i on symbol s of qual i f i ed wel der s and wel di ng operators.
1. 3. 3. 4 St r uct ur al Bol t ed Connect i ons
Make st r uct ur al bol t ed connect i ons car r y i ng pr i mar y l oads wi t h ASTM F3125/ F3125M bol t s.
1. 4 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 02 Shop Dr awi ngs
Schemat i c Dr awi ngs and Dat a; G
SD- 03 Pr oduct Dat a
Mat er i al s and Mechani cal Equi pment ; G
St andar d Pr oduct s; G
El ect r i cal Equi pment ; G
Hydr aul i c Cyl i nder Li mi t Swi t ches; G
I nt egr al Cyl i nder Posi t i on Tr ansmi t t er ; G
Modi f i cat i on To Mi t er Gat e Cyl i nder Shut t l e Val ve El ect r i cal
SECTI ON 35 05 40. 14 10 Page 9
Cont r ol s; G, ELE
Desi gn and Per f or mance Cal cul at i ons; G
Shop Assembl y and Test i ng Pr ocedur es; G
I nst al l at i on Pr ocedur es; G
Pi pi ng I nst al l at i on; G
Er ect i ng Engi neer Qual i f i cat i ons; G
Cl eani ng and Fl ushi ng; G
Fi el d Test i ng; G
Spar e Mechani cal Par t s Li st
SD- 06 Test Repor t s
Oper at i onal Test Repor t s; G
Shop Test s; G
Fi el d Test s; G
Pi st on Rods; G
SD- 10 Oper at i on and Mai nt enance Dat a
Oper at i on and Mai nt enance; G
1. 5 SCHEMATI C DRAWI NGS AND DATA
1. 5. 1 Shop Dr awi ngs
I ncl ude f abr i cat i on, shop assembl y, del i ver y, and f i el d i nst al l at i on dr awi ngs i n t he det ai l ed shop dr awi ngs. Det ai l any component par t of f abr i cat ed i t ems omi t t ed on t he shop dr awi ngs. I f depar t ur es f r om t he cont r act dr awi ngs ar e deemed necessar y by t he Cont r act or , submi t det ai l s of such depar t ur es, i ncl udi ng changes i n r el at ed por t i ons of t he pr oj ect and r easons t her eof , wi t h t he shop dr awi ngs.
1. 5. 2 Fabr i cat i on Dr awi ngs
Pr ovi de f abr i cat i on dr awi ngs f or al l mechani cal and st r uct ur al par t s or component s i ncl udi ng cyl i nder suppor t assembl y and connect i on assembl y t o t he gat e, except t hose whi ch ar e of st andar d manuf act ur e. The dr awi ngs must show compl et e det ai l s of mat er i al s, t ol er ances, machi ned sur f ace f i ni shes, connect i ons, and pr oposed wel di ng sequences whi ch di f f er ent i at e shop wel ds and f i el d wel ds. Pr ovi de det ai l ed dr awi ngs of t he dr i l l ed passages i n t he mani f ol ds.
1. 5. 3 Hydr aul i c Power Uni t Dr awi ngs
Pr ovi de dr awi ngs f or hydr aul i c power uni t s showi ng gener al ar r angement of component s and out l i ne di mensi ons. I dent i f y al l component s on t he dr awi ngs and pr ovi de suf f i c i ent i nf or mat i on t o det er mi ne whet her t he component s pr oposed conf or m t o t he speci f i cat i ons.
SECTI ON 35 05 40. 14 10 Page 10
1. 5. 4 Mani f ol d Dr awi ngs
Pr ovi de f abr i cat i on dr awi ngs f or al l mani f ol ds showi ng gener al ar r angement s out l i ne di mensi ons, and dr i l l i ng di mensi ons. I dent i f y al l component s on t he dr awi ngs and pr ovi de suf f i c i ent i nf or mat i on t o det er mi ne whet her t he component s pr oposed conf or m t o t he speci f i cat i ons. I dent i f y al l por t conf i gur at i ons and connect i ons.
1. 5. 5 Pi pi ng Dr awi ngs
Pr ovi de pi pi ng dr awi ngs showi ng t he compl et e hydr aul i c syst em i n schemat i c f or mat i dent i f y i ng al l i t ems of equi pment i ncor por at ed i n t he syst em.
I ncl ude det ai l s of al l pi pe suppor t s i ncl udi ng t hose f or mani f ol ds and on t he hydr aul i c power uni t .
1. 5. 6 El ect r i cal Dr awi ngs
Pr ovi de el ect r i cal dr awi ngs of al l el ect r i cal equi pment . On el ect r i cal dr awi ngs i ncl ude compl et e schemat i c di agr ams and connect i on di agr ams. On connect i on di agr ams show el ect r i cal connect i ons ( by l i nes) f or each conduct or bet ween t er mi nal poi nt s. I dent i f y t er mi nal poi nt s.
1. 5. 7 Modi f i cat i on t o Exi st i ng Mi t er Gat e Cyl i nder Shut t l e Val ves Cont r ol
The exi st i ng Bosch/ Rexr ot h mi t er gat e hydr aul i cs has a t wo st age st epped speed cont r ol t o t he cyl i nder shut t l e val ves. Thi s exi st i ng cont r ol shal l be modi f i ed usi ng r eadi l y avai l abl e el ect r i cal modul es f r om Bosch/ Rexr ot h t o al l ow cont i nuous speed cont r ol f r om a 4- 20 MA i nput s i gnal . Submi t on t he el ect r i cal modul es r equi r ed and wi r i ng di agr ams. The new cont r ol s shal l be abl e t o cont r ol t he cyl i nder speed f r om 5% t o 100%.
1. 5. 8 Shop Assembl y Dr awi ngs
Pr ovi de shop assembl y dr awi ngs wi t h det ai l s f or connect i ng t he adj oi ni ng f abr i cat ed component s i n t he shop t o ensur e sat i sf act or y f i el d installation.
1. 5. 9 Hydr aul i c Schemat i c
Pr ovi de a compl et e hydr aul i c schemat i c i n accor dance wi t h I SO 1219- 1 and I SO 1219- 2. Show al l hydr aul i c component s on t he schemat i c, and i ndi cat e al l set poi nt and si ze par amet er s f or each component .
1. 5. 10 Pr oduct Dat a
I ncl ude per f or mance dat a and cur ves f or pumps, mot or s and val ves. Pr ovi de cat al og cut s and out l i ne di mensi ons f or t he pumps, mot or s, f i l t er s, heat er s, t her most at s, f l oat swi t ches, pr essur e t r ansducer , swi t ches, br eat her s, and al l val ves, val ve cont r ol s and ot her accessories.
1. 5. 11 Del i ver y Dr awi ngs
Pr ovi de del i ver y dr awi ngs wi t h descr i pt i ons of met hods of del i ver i ng component s t o t he s i t e, i ncl udi ng det ai l s f or suppor t i ng f abr i cat ed component s dur i ng shi ppi ng t o pr event di st or t i on or ot her damage.
SECTI ON 35 05 40. 14 10 Page 11
1. 5. 12 Shop Assembl y and Test i ng Pr ocedur es and Resul t s
Pr ovi de pr ocedur es f or shop t est i ng and oper at i ng t est f or al l t est i ng out l i ned i n par agr aphs SHOP ASSEMBLY AND TESTI NG and FI ELD TESTS AND I NSPECTI ONS. Submi t oper at i onal t est r epor t s f or al l r equi r ed shop t est i ng and t est i ng of equi pment af t er i nst al l at i on. Pr ovi de r ecor ds of al l adj ust ment s and f i nal set t i ngs f or al l hydr aul i c component s i n t he syst em. Thi s i ncl udes pump f l ow r at es, oper at i ng t i mes, r el i ef set t i ngs, count er bal ance val ve adj ust ment s, oper at i ng pr essur es at bot h t he hydr aul i c power uni t s and cyl i nder mani f ol ds, f l ow l evel adj ust ment s, f i l t er di f f er ent i al swi t ch set t i ngs, and ot her par amet er s as out l i ned i n t he par agr aph TEST REPORTS.
1. 5. 13 Fi el d I nst al l at i on Pr ocedur es
Pr ovi de f i el d i nst al l at i on dr awi ngs wi t h a det ai l ed descr i pt i on of t he f i el d i nst al l at i on pr ocedur es. I ncl ude t he l ocat i on and met hod of suppor t of i nst al l at i on and handl i ng equi pment , t he pr ovi s i ons t o be t aken t o pr ot ect concr et e and ot her wor k dur i ng i nst al l at i on, t he met hod of mai nt ai ni ng component s i n cor r ect al i gnment , and t he met hods f or i nst al l i ng ot her appur t enant i t ems. I ncl ude dat es and schedul e of wor k.
Submi t met hods and pr ocedur es t o accel er at e t he sequence of wor k f or approval.
1. 5. 14 Desi gn and Per f or mance Cal cul at i ons
Pr ovi de desi gn cal cul at i ons f or al l i t ems whi ch ar e f ur ni shed by t he Cont r act or . Cal cul at i ons shal l i l l ust r at e pr oduct sel ect i ons f or al l hydr aul i c cyl i nder out put f or ces and speeds. Cal cul at i ons shal l i ncl ude:
oper at i ng pr essur e, el ect r i c power i nput , hydr aul i c syst em ef f i c i ency, seal f r i c t i on, UHMWPE sl i di ng f r i c t i on, l oads i n r ai se and l ower di r ect i ons, and ot her assumpt i ons. I ncl ude expect ed hydr aul i c power f l ow r at es and pr essur e r anges. I ncl ude hydr aul i c component model number s, and cat al og cut s. I ncl ude hydr aul i c schemat i c dr awi ng wi t h t ubi ng si zes and expect ed set poi nt s f or pr essur e r el i ef val ves and l oad hol di ng val ves.
I ncl ude hydr aul i c cyl i nder suppor t assembl y and t r unni on desi gn cal cul at i ons and t r unni on l ocat i on cal cul at i ons. Desi gn cal cul at i ons shal l be st amped by a r egi st er ed pr of essi onal engi neer . Pr ovi de t hr ee copi es of desi gn document at i on i n one compl et e document . Submi t as di gi t al and har dcopy f or mat . Pr ovi de t hr ee har dcopi es i n 3- r i ng bi nder
8. 5x11- i nch f or mat wi t h 11x17- i nch schemat i cs and dr awi ngs.
1. 5. 15 Cl eani ng and Fl ushi ng Pr ocedur es and Resul t s
Pr ovi de det ai l ed pr ocedur e f or t he c l eani ng and f l ushi ng of hydr aul i c cyl i nder s, pi pi ng, and power uni t as out l i ned i n par agr aph CLEANI NG AND FLUSHI NG, not l ess t han 30 days bef or e st ar t of oper at i ons. Pr ovi de t est r epor t s of t he r esul t s of t he f l ushi ng and of t he oi l used t o f i l l t he system.
1. 5. 16 Er ect i ng Engi neer Qual i f i cat i ons
Pr ovi de a r esume f or t he on- si t e er ect i ng engi neer wi t h det ai l s on exper i ence and backgr ound i n s i mi l ar i nst al l at i ons.
SECTI ON 35 05 40. 14 10 Page 12
1. 6 DELI VERY, STORAGE, AND HANDLI NG
1. 6. 1 Packaging
Do not pr epar e t he hydr aul i c power syst ems f or shi pment unt i l t hey have been i nspect ed and accept ed f or shi pment at or i gi n by t he Cont r act i ng Of f i cer , unl ess i nspect i on has been wai ved i n wr i t i ng. Shi p each hydr aul i c power syst em or subassembl y compl et el y assembl ed. The subassembl i es ar e def i ned as t he f ol l owi ng:
a. Hydr aul i c cyl i nder s. Each hydr aul i c cyl i nder subassembl y consi st s of t he hydr aul i c cyl i nder , cyl i nder suppor t assembl y and t r unni on, pi l l ow bl ock bear i ngs, bushi ngs, and cyl i nder suppor t pl at f or m.
b. Hydr aul i c power uni t s. Each hydr aul i c power uni t ( HPU) consi st s of r eser voi r , el ect r i c mot or , hydr aul i c pumps, di r ect i onal cont r ol val ves, r el i ef val ves, count er bal ance val ves, check val ves, i sol at i on val ves, pr essur e gauges, r eser voi r t emper at ur e and l evel swi t ches, pr essur e and r et ur n f i l t er s,
c. Pi pi ng assembl i es
d. Cont r ol consol es
Pr ovi de t he subassembl i es wi t h adequat e pr ot ect i ve pads, suppor t s, and bl ocki ng and secur el y r est r ai ned t o pr event di st or t i on or damage t o t he pai nt ed sur f aces i n t r ansi t . Any l oss or damage dur i ng shi pment , i ncl udi ng damage t o t he pai nt ed sur f aces, i s t he Cont r act or ' s r esponsi bi l i t y ; r epl ace or r epai r wi t hout cost t o t he Gover nment . Pack al l accessor i es and spar e par t s separ at el y i n cont ai ner s pl ai nl y mar ked " ACCESSORI ES ONLY, " or " SPARE PARTS ONLY. " Pl ace a packi ng l i s t , l i s t i ng t he cont ent s of each cont ai ner , i n a moi st ur e- pr oof envel ope and secur el y f ast en t o t he out si de of t he cont ai ner . St andar d commer ci al packagi ng i n accor dance wi t h ASTM D3951 wi l l be accept abl e except wher e a di f f er ent met hod or st andar d of packagi ng i s speci f i ed.
1. 6. 2 Shi ppi ng, Pr eser vat i on, and St or age
Packi ng, cr at i ng, cr adl es, et c. , necessar y t o ensur e saf e shi pment ar e t he r esponsi bi l i t y of t he Cont r act or and become t he pr oper t y of t he Gover nment upon del i ver y of t he equi pment . Submi t f or appr oval a pr ocedur e f or cont r ol l i ng movement of t he pi st on r od and t o pr event pi st on and cyl i nder damage dur i ng shi pment and handl i ng. Adequat el y pr ot ect machi ned sur f aces f r om cor r osi on and physi cal damage. Pr ot ect equi pment del i ver ed and pl aced i n st or age f r om t he weat her , humi di t y, t emper at ur e var i at i on, di r t and dust , or ot her cont ami nant s. Fur ni sh spar e cyl i nder wi t h a por t abl e pump, hose and connect i ons t o st r oke t he cyl i nder i n and out a shor t di st ance dur i ng st or age t o l ubr i cat e seal s and pr event damage.
1. 7 WARRANTY
Al l equi pment pr ovi ded shal l be guar ant eed wi t h an i ndust r y st andar d war r ant y. Pr ovi de War r ant y agai nst def ect i ve mat er i al s, desi gn, and wor kmanshi p. Upon r ecei pt of not i ce f r om t he Gover nment of f ai l ur e of any of t he par t s dur i ng t he war r ant y per i od, pr ovi de new r epl acement par t s pr ompt l y at no addi t i onal cost t o t he Gover nment .
SECTI ON 35 05 40. 14 10 Page 13
1. 8 QUALI TY CONTROL
Est abl i sh and mai nt ai n qual i t y cont r ol f or oper at i ons under t hi s sect i on t o assur e compl i ance wi t h cont r act r equi r ement s and mai nt ai n r ecor ds of qual i t y cont r ol f or al l mat er i al s, f abr i cat ed par t s, equi pment , and const r uct i on oper at i ons. I n addi t i on, est abl i sh and mai nt ai n sur vei l l ance f or qual i t y cont r ol over sub- cont r act or s, suppl i er s, or manuf act ur er s. The qual i t y cont r ol must i ncl ude a mi ni mum of t wo shop i nspect i ons dur i ng manuf act ur e and assembl y of t he hydr aul i c cyl i nder assembl i es power uni t s and mani f ol ds. The qual i t y cont r ol i ncl udes but i s not be l i mi t ed t o t he following:
a. Mat er i al s and wor kmanshi p.
b. Manuf act ur e and i nst al l at i on of t he pi pi ng, hydr aul i c cyl i nder assembl i es power uni t s and mani f ol ds, compl et e.
c. Cl eani ng and f l ushi ng.
d. Shop assembl y and t est s.
e. Fi el d er ect i on and t est s.
f . Damage and def ect s.
Fur ni sh a copy of t hese r ecor ds and t est s, as wel l as t he r ecor ds of cor r ect i ve act i on t aken, t o t he Gover nment .
PART 2 PRODUCTS
2. 1 MATERI ALS AND MECHANI CAL EQUI PMENT
2. 1. 1 General
Submi t dat a speci f i cat i ons and assembl y dr awi ngs showi ng si zes, r at i ngs, par t s and mat er i al l i s t s, over al l di mensi ons, and mount i ng di mensi ons wi t h t he pr oduct dat a. Al l syst em component s shal l have r at ed wor ki ng pr essur e at l east 2000 psi and r at ed maxi mum pr essur e at l east 3000 psi .
2. 1. 2 Hydr aul i c Cyl i nder s
Pr ovi de t he hydr aul i c cyl i nder t ypes l i s t ed i n I SO 5598, and speci f i ed or i ndi cat ed, of mi l l t ype desi gn, st andar d wel ded const r uct i on. Cyl i nder r od shal l be desi gned wi t h a mi ni mum f act or of saf et y of 3. 0 t o r esi st i ng buckl i ng under compr essi on. Pr ovi de evi dence t hat each cyl i nder was hydr ost at i cal l y t est ed by t he manuf act ur er t o 200 per cent of t he sever est ser vi ce r at i ng and t hat dynami c seal s ar e sui t abl e f or bot h f r equent and i nf r equent oper at i on and ar e capabl e of not l ess t han 500, 000 cycl es of oper at i on i n syst ems pr oper l y mai nt ai ned. Cont r act or shal l desi gn i nt er nal st op t ubes t o accommodat e s i de l oads due t o r equi r ed pi st on st r oke and ext end/ r et r act l oads.
Pr ovi de adj ust abl e cushi ons wi t h r ever se f r ee f l ow check val ves on bot h ends of t he cyl i nder s. Pr ovi de ai r bl eeds and oi l dr ai ns at bot h ends of t he cyl i nder s. Pr ovi de SAE Code 61 4 bol t hydr aul i c f l ange por t s.
Pr ovi de end st op el ect r i c l i mi t swi t ches and i nt er nal l y mount ed posi t i on t r acki ng sensor .
SECTI ON 35 05 40. 14 10 Page 14
2. 1. 2. 1 Cyl i nder Tubes
Machi ne t he cyl i nder t ube f r om ASTM A519, Gr ade 1018, heavy wal l seaml ess st eel t ubi ng and hone t he bor e t o a sur f ace f i ni sh compat i bl e wi t h t he seal s bei ng used so as t o r esul t i n zer o l eakage past t he seal s.
2. 1. 2. 2 Cyl i nder Heads and Caps
Fabr i cat e t he cyl i nder head and cap f r om ASTM A576, Gr ade 1018, st eel bar st ock or ASTM A516/ A516M, Gr ade 60 pl at e and machi ne f i ni sh on al l sur f aces. Al l cyl i nder s shal l be mi l l t ype. Equi p t he cyl i nder head wi t h a r od seal and ext er nal di r t wi per and a r od bushi ng pi l ot ed i nt o t he head t o ensur e concent r i c i t y. Rod bushi ngs must be r emovabl e wi t hout t he use of speci al t ool s and wi t hout r emovi ng t he cyl i nder head. Removabl e at t achment s must have t he cyl i nder t ube end seal s ar r anged t o seal wi t h pr essur e and be desi gned t o pr event shear i ng and ext r usi on and t o pr ovi de axi al met al backup.
2. 1. 2. 3 Pistons
Pr eci s i on f i t t he pi st on t o t he cyl i nder body bor e. The pi st on must be f i ne- gr ai ned cast i r on, desi gned and equi pped wi t h zer o l eakage cup- t ype seal s, or br onze- f i l l ed pol yt et r af l uor oet hyl ene seal s wi t h phenol i c wear r i ngs. The desi gn must pr ot ect t he pi st on r i ngs f r om bl ow- out and over squeezi ng. Cup- t ype seal s ( i f used) shal l be desi gned t o aut omat i cal l y compensat e f or wear .
2. 1. 2. 4 Pi st on Rods
Cyl i nder r ods shal l be chr ome- pl at ed st ai nl ess st eel . I f t he pi st on r od i s composed of t wo or mor e pi eces, r adi ogr aph al l wel ds. Conf or m t he st ai nl ess st eel t o ASTM A564/ A564M or ASTM A705/ A705M, Type 630 or Type XM- 12. Heat t r eat t o a condi t i on of H- 1150 bef or e f i nal machi ni ng. The f i nal r od sur f ace af t er chr ome pl at i ng must have a r oughness hei ght of not mor e t han 8 mi cr oi nch RMS wi t h chr ome pl at e t hi ckness 0. 003 i nch mi ni mum. Fur ni sh r od wi t h machi ned f l at s, or ot her det ai l ed met hod as appr oved t o r est r ai n r ot at i on dur i ng t hr eadi ng or unt hr eadi ng t he r od end bear i ng assembl y.
2. 1. 2. 5 Cyl i nder Suppor t Assembl y and Tr unni on Mount
The cyl i nder manuf act ur er i s r esponsi bl e t o desi gn t he cyl i nder suppor t assembl y and t r unni on mount , i ncl udi ng i t s l ocat i on on t he cyl i nder body and i ncl udi ng i t s bear i ngs as speci f i ed. Cont r act dr awi ngs i ndi cat e assembl y det ai l s f or a t ypi cal assembl y mount wi t h a l ocat i on t hat al l ows f or r od end access at t he bul khead seal , but assembl y mount has not been ot her wi se desi gned. Not e t hat t he cyl i nder t r unni on assembl y mount l ocat i on may be moved upwar d or downwar d f r om i t s i ndi cat ed l ocat i on as approved.
2. 1. 2. 6 Rod End Bear i ngs and Tr unni on Bear i ngs
Cont r act or shal l desi gn and f ur ni sh hydr aul i c cyl i nder r od end wi t h sel f - l ubr i cat i ng spher i cal pl ai n bear i ng and housi ng at t he cul ver t val ve connect i on. Fur ni sh cyl i nder t r unni on bear i ngs and cyl i nder mount pi l l owbl ock bear i ngs wi t h sel f - l ubr i cat i ng cyl i ndr i cal pl ai n bear i ng and axi al t hr ust bear i ngs. Dr awi ngs i ndi cat e f or bi ddi ng pur poses a spher i cal pl ai n bear i ng at r od end shal l have 5- i nch di amet er bor e, st at i c l oad capaci t y at l east 800, 000 pounds and dynami c l oad capaci t y at l east
SECTI ON 35 05 40. 14 10 Page 15
400, 000 pounds. Cont r act or shal l r evi ew and pr ovi de f i nal desi gn of t hese component s. Bear i ng mount s and pi ns shal l be s i zed and conf i gur ed t o f i t t he appr oved bear i ng i n accor dance wi t h t he bear i ng manuf act ur er ' s r ecommendat i ons. Spher i cal pl ai n bear i ngs, t r unni on bear i ngs, pi l l owbl ock bear i ngs, and t hr ust bear i ngs shal l be sel ect ed as speci f i ed i n 35 05 40. 17
SELF- LUBRI CATED MATERI ALS, FABRI CATI ON, HANDLI NG, AND ASSEMBLY.
2. 1. 2. 7 Connect i on Pi ns
Fabr i cat e cul ver t val ve connect i on pi ns f r om ASTM A564/ A564M, Type 630, Condi t i on H- 1150, st ai nl ess st eel . Pr ovi de 1. 0- UNC t hr eaded t hr eaded bor es 2. 0- i nches deep on each end of t he connect i on pi n t o ai d i n r emoval .
2. 1. 2. 8 Bul khead Wat er Ti ght Seal
Desi gn and f ur ni sh f l exi bl e wat er seal syst em t o f i t over cyl i nder r od.
Bul khead seal syst em shal l be desi gned t o mi ni mi ze l ock chamber wat er l eakage i nt o t he oper at i ng machi ner y r oom. The bul khead seal syst em at t he hydr aul i c cyl i nder shal l i ncl ude t he desi gn f eat ur es i ndi cat ed on t he cont r act dr awi ngs. Bul khead seal syst em i ncl udes mul t i pl e f l exi bl e f l anged pi pi ng connect i ons wi t h l at er al compl i ance t o accommodat e cul ver t val ve mot i ons and not i mpar t damagi ng si de l oads t o t he t r unni on mount ed hydr aul i c cyl i nder . The bul khead seal syst em i s al so desi gned t o pr ovi de a secondar y cont ai nment f or acci dent al f l ui d l eaks f r om t he hydr aul i c cyl i nder r od seal s. The bul khead seal i s al so desi gned so i t can be r ai sed up t o pr ovi de access t o t he cul ver t val ve connect i on pi n. Syst em shal l i ncl ude st uf f i ng box assembl y wi t h adj ust abl e seal packi ng mount ed on t he mul t i pl e f l exi bl e f l anged pi pi ng expansi on j oi nt s. St uf f i ng box packi ng seal mat er i al shal l be l ubr i cat ed PTFE- i mpr egnat ed ar ami d f i ber as appr oved.
2. 1. 2. 9 Cyl i nder Mi scel l aneous Feat ur es
Hydr aul i c component s schemat i cal l y i ndi cat ed on t he cyl i nder s i de of t he f l exi bl e hoses shal l be mount ed at t he cap end of t he cyl i nder ( above el evat i on 123. 0 as i nst al l ed) t o be accessi bl e at el evat i on 123. 0.
Cyl i nder posi t i on sensi ng shal l i ncor por at e i nt er nal pr obe i nst al l ed t hr ough t he r od end of t he cyl i nder . Cyl i nder adj ust abl e end cushi ons shal l i ncor por at e el ect r i c end st op l i mi t swi t ches r edundant t o ot her posi t i on sensi ng mechani sms.
Pr ovi de l i f t eye at cyl i nder cap end f or hoi st i ng hydr aul i c cyl i nder assembl y dur i ng i nst al l at i on and r emoval . Li f t eye shal l be desi gned so i t s use does not i nt er f er e wi t h t he posi t i on sensi ng pr obe al so i nst al l ed t hr ough t he cyl i nder cap end.
2. 1. 2. 10 Cyl i nder Nor mal Oper at i on St r oke and Bypass St r oke
For nor mal l ock oper at i on, cul ver t val ve r ai sed posi t i on i s 168- i nches above cul ver t val ve c l osed posi t i on. Cyl i nder st r oke f or nor mal l ock oper at i on shal l be 168- i nches. Nor mal oper at i on up and down posi t i ons wi l l be cont r ol l ed by t he cul ver t val ve posi t i on sensi ng syst em.
Cyl i nder bypass mode st r oke shal l exceed t he nor mal oper at i on st r oke i n bot h di r ect i ons. Cyl i nder shal l be l ess t han f ul l y ext ended i n cul ver t val ve nor mal oper at i on c l osed posi t i on. Cyl i nder shal l be l ess t han f ul l y r et r act ed i n cul ver t val ve nor mal oper at i on open posi t i on. Pr ovi de bypass mode cyl i nder st r oke at l east 180- i nches f or access t o cul ver t val ve
SECTI ON 35 05 40. 14 10 Page 16 connect i on pi n above bul khead st r uct ur e.
Cyl i nder maxi mum r et r act posi t i on shal l be enabl ed i n bypass oper at i on mode t o hoi st t he cul ver t val ve connect i on pi n cent er l i ne t o at l east el evat i on 105. 5. Cyl i nder maxi mum r et r act posi t i on as i nst al l ed shal l not r esul t i n cont act bet ween t he cul ver t val ve and t he bul khead st r uct ur e.
2. 1. 2. 11 Cyl i nder Mai nt enance Sl i ngs
The cul ver t val ve desi gn i ncl udes t wo mai nt enance l i f t eyes on cul ver t val ve t op sur f ace and t wo mai nt enance l i f t eyes anchor ed t o t he concr et e wal l s. The mai nt enance l i f t eyes ar e i nt ended t o suspend t he cul ver t val ve wi t h t he cyl i nder r emoved and wi t h t he cul ver t val ve cyl i nder r od end l i f t eyes r ai sed compl et el y above t he bul khead pl at e t op sur f ace.
Fur ni sh t wo l i nk chai n s i ngl e l eg s l i ngs usi ng Gr ade 70 l i nk chai n and wi t h sui t abl e end at t achment s and l engt hs as appr oved t o at t ach t o t he mai nt enance l i f t eyes and suspend t he cul ver t val ve. Each sl i ng shal l i ncor por at e an eye and j aw r at chet t ur nbuckl e ( Pat t er son model number 1- 3/ 8 x 12 Type DJ or as appr oved) at t he cul ver t val ve end at t achment t o al l ow at l east ( +/ - ) 3- i nch l engt h adj ust ment f r om t he appr oved sl i ng l engt h. Each sl i ng assembl y saf e wor ki ng l oad shal l be at l east 17000 pounds. Requi r ed el evat i ons ar e i ndi cat ed on t he cont r act dr awi ngs.
2. 1. 3 Hydr aul i c Power Uni t
Fur ni sh and i nst al l s i x ( 6) i dent i cal i nt er changeabl e hydr aul i c power uni t s each mount ed i ndoor s at el evat i on 123. 0 f eet adj acent t o t he r espect i ve cyl i nder s as i ndi cat ed on t he cont r act dr awi ngs. Pr ovi de hydr aul i c power uni t s desi gned by t he Cont r act or t o oper at e t he hydr aul i c cyl i nder s i n accor dance wi t h t he cr i t er i a st at ed i n par agr aph DESI GN PARAMETERS. Desi gn t he power uni t t o meet t he space l i mi t at i ons shown and conf i gur e as speci f i ed. Al l equi pment shal l be r emoved and i nst al l ed t hr ough t he r emovabl e f l oor pl at es at out door s t op of l ock el evat i on
130. 0. The openi ngs at t he f l oor pl at es ar e appr oxi mat el y 34- i nches wi de. The Cont r act or i s r esponsi bl e t o i dent i f y l i mi t i ng di mensi ons t o ensur e al l equi pment can be i nst al l ed t hr ough t hese f l oor pl at e openi ngs.
To ai d i nst al l at i on and f ut ur e mai nt enance, desi gn t he hydr aul i c power uni t r eser voi r and at t ached equi pment wi t h over head l i f t i ng eyes on t op and f or kl i f t t ubes under neat h. The st r uct ur e of t he uni t bot h i nt er nal l y and ext er nal l y must be adequat e f or t he uni t t o be f r ee st andi ng and capabl e of bei ng l i f t ed or moved wi t hout st r uct ur al damage. Secur el y at t ach al l component s i ncl udi ng pi pi ng, mot or s, pumps and mani f ol ds t o t he power uni t i n a manner t o be f r ee of damagi ng vi br at i on dur i ng oper at i on.
The hydr aul i c cont r ol c i r cui t i ndi cat ed i ncl udes r egener at i on check val ve and a 2: 1 cyl i nder bor e ar ea t o pi st on r od ar ea r at i o. These i t ems al l ow t hat t he di r ect i onal f l ow cont r ol val ve f l ow r ange i s t he same bot h di r ect i ons and l i mi t s maxi mum syst em pr essur e dur i ng cyl i nder ext end motion.
2. 1. 4 Oi l Reser voi r s
Si ze t he oi l r eser voi r t o hol d at l east 50 gal l ons and al so t o meet t he space l i mi t at i ons i ndi cat ed. Make t he r eser voi r of st ai nl ess st eel wi t h wel ded j oi nt s and conf or m t o t he r equi r ement s as shown. The r eser voi r s must conf or m t o t he r equi r ement s of I SO 4413. Pr ovi de a mount i ng base on t he r eser voi r whi ch suppor t s t he associ at ed val ves and accessor i es f or desi gn l oads and speeds. To f aci l i t at e dr ai nage, t he bot t om of t he r eser voi r must have a mi ni mum cl ear ance f r om t he f l oor of not l ess t han 12
SECTI ON 35 05 40. 14 10 Page 17 i nches. Sl ope t he r eser voi r bot t om sur f aces downwar ds t owar ds dr ai n por t ( s) t o al l ow compl et e dr ai ni ng of t he r eser voi r t hr ough t he dr ai n por t s. The pump i nl et l i ne shal l i ncl ude a f oot val ve or check t o pr ovi de f l ooded pump suct i on. Pr ovi de each si de of t he r eser voi r wi t h a c l eanout openi ng of not l ess t han 400 squar e i nches cl ear ance wi t h a bol t ed, gasket ed cover . Pr ovi de each r eser voi r wi t h a dr ai n wi t h shut - of f val ve;
a magnet i c t r ap; l ow oi l f l oat l evel swi t ches; and ot her appur t enances as i ndi cat ed and as speci f i ed her ei n. Equi p t he r eser voi r wi t h a f l ui d l evel i ndi cat or and f i l l er wi t h bui l t - i n st r ai ner . Pr ovi de a baf f l e bet ween t he i nt ake and r et ur n l i nes t o f aci l i t at e t he separ at i on of ai r and f or ei gn mat t er f r om t he hydr aul i c f l ui d. The connect i on bet ween t he t wo chamber s of t he r eser voi r must be hi gh enough f r om t he bot t om t o f or m a set t l i ng chamber . Br i ng bot h t he i nt ake and r et ur n pi pes down t o a di st ance of 1- 1/ 2 pi pe di amet er s above t he t ank bot t om. Wel ded j oi nt s of t he r eser voi r shal l be smoot h and f r ee f r om i r r egul ar i t i es. Unt i l f i nal i nst al l at i on of t he hydr aul i c equi pment , seal al l openi ngs wi t h pl ast i c c l osur es. Cont r act or i s r esponsi bl e t o det er mi ne t he r eser voi r f l ui d capaci t y as appr oved. Anchor t he r eser voi r s t o t he concr et e by sui t abl e anchor bol t s. Fur ni sh al l pi pi ng, f i t t i ngs, hose, mani f ol d bl ocks, f ast ener s and appur t enances r equi r ed t o connect equi pment t o t he r eser voi r .
2. 1. 4. 1 Reser voi r Heat er
Pr ovi de r eser voi r s wi t h one or mor e dr y wel l t ype i mmer si on heat er s wi t h f l exi bl e heat i ng el ement s wi t h a wat t densi t y not t o exceed 11 wat t s per squar e i nch. I ncl ude a t her most at set t o mai nt ai n t he hydr aul i c oi l at 40 degr ees F. The desi gn shal l f aci l i t at e easy r emoval of t he heat er wi t hout dr ai ni ng t he t ank cont ent s. Fabr i cat e t he heat er sheat h and scr ew pl ug f r om st ai nl ess st eel . Heat er el ement s and j unct i on box shal l be wat er t i ght expl osi on r esi st ant st ai nl ess st eel , NEMA 4X. Pr ovi de a weat her pr oof j unct i on box wi t h a s i ngl e phase, 120 vol t , cont r ol t r ansf or mer f or t he t her most at and hi gh t emper at ur e c i r cui t .
2. 1. 4. 1. 1 Heat er Swi t ch
Pr ovi de a t her most at t o sense t he oi l t emper at…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.