A.07.24_-_W912DW18R0012_-__Amendment_0002.pdf

PDF 423 KB Posted

Attached to
Stoney Gate Valve Repalcement Federal contract opportunity
Solicitation number
W912DW18R0012
Issued by
Department of the Army Corps of Engineers Engineering District Seattle

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912DW18R0012 - Stoney Gate Valve Replacement at Hiram M. Chittenden Locks

The changes from Amendment 0001 to Amendment 0002 are as follow s:

a. Update to DFARS Clause 252.236-7001 - CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

b. Revision to Plans (PDF Draw ings uploaded to fbo.gov)

c. Revision to Specifications (PDF documents uploaded to fbo.gov)

d. Reference Draw ings (PDF documents uploaded to fbo.gov)

Please disregard all previous solicitation documents, specifications and draw ing and use those contained in this amendment.

1. CONTRACT ID CODE PAGE OF PAGES

1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Jul-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW18R0012

X 9B. DATED (SEE ITEM 11)

05-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Jul-2018

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW18R0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

DRAWING NO. C-2-4-330, DATED 25 MAY 2018

Sheet Number

Plate Number

Title Revision Number

Date

1 G-001 TITLE, LOCATION AND VICINITY MAPS R0002 07/10/2018

2 G-002 DRAWING INDEX R0002 07/10/2018

3 G-003 OVERALL SITE AND ACCESS PLAN R0002 07/10/2018

4 G-004 GENERAL PROJECT DESCRIPTION AND CULVERT

VALVE LOCATIONS

R0002 07/10/2018

5 MD101 DEMOLITION PLAN - #1 NORTH VALVE R0002 07/10/2018

6 MD102 DEMOLITION PLAN - #1 SOUTH VALVE R0002 07/10/2018

7 MD103 DEMOLITION PLAN - #2 NORTH VALVE R0002 07/10/2018

8 MD104 DEMOLITION PLAN - #2 SOUTH VALVE R0002 07/10/2018

9 MD105 DEMOLITION PLAN - #3 NORTH VALVE R0002 07/10/2018

10 MD106 DEMOLITION PLAN - #3 SOUTH VALVE R0002 07/10/2018

11 MD501 MECHANICAL DEMOLITION DETAILS R0002 07/10/2018

12 SD101 DEMOLITION - #3 NORTH AND #3 SOUTH VALVE

GUIDES

R0002 07/10/2018

13 SD102 DEMOLITION - #3 NORTH AND #3 SOUTH VALVE R0002 07/10/2018

14 ED101 LOCK MACHINERY RECESS #1 SOUTH ELECTRICAL

LAYOUT DEMOLITION

R0002 07/10/2018

15 ED102 LOCK MACHINERY RECESS #2 NORTH ELECTRICAL

LAYOUT DEMOLITION

R0002 07/10/2018

16 ED103 LOCK MACHINERY RECESS #2 SOUTH ELECTRICAL

LAYOUT DEMOLITION

R0002 07/10/2018

17 ED104 LOCK MACHINERY RECESS #3 NORTH ELECTRICAL

LAYOUT DEMOLITION

R0002 07/10/2018

18 ED105 LOCK MACHINERY RECESS #1 NORTH ELECTRICAL

LAYOUT DEMOLITION

R0002 07/10/2018

19 ED106 LOCK MACHINERY RECESS #3 SOUTH ELECTRICAL

LAYOUT DEMOLITION

R0002 07/10/2018

20 S-001 STRUCTURAL GENERAL NOTES AND TABLE R0002 07/10/2018

21 S-101 CULVERT VALVE GUIDES AND CYLINDER ASSEMBLY

PLAN VIEW AND SECTIONS

R0002 07/10/2018

22 S-102 CULVERT VALVE PLAN VIEW AND SECTIONS R0002 07/10/2018

23 S-103 CULVERT VALVE SECTIONS AND DETAILS R0002 07/10/2018

24 S-104 CULVERT VALVE AND CYLINDER ROD CONNECTION

EYES

R0002 07/10/2018

25 S-105 CULVERT VALVE UHMW DETAILS R0002 07/10/2018

26 S-106 CULVERT VALVE REMOVABLE BOTIOM LIP PLAN

VIEW AND SECTIONS

R0002 07/10/2018

27 S-107 CULVERT VALVE REMOVABLE BOTIOM LIP

ALTERNATIVE 1

R0002 07/10/2018

28 S-108 CULVERT VALVE REMOVABLE BOTIOM LIP

ALTERNATIVE 2

R0002 07/10/2018

29 S-109 CULVERT VALVE GUIDES PLAN VIEW AND SECTIONS R0002 07/10/2018

30 S-110 CULVERT VALVE UPPER AND LOWER RECESS IN

GALLERY AND IN CULVERT

R0002 07/10/2018

31 S-111 CULVERT VALVE GUIDE SECTION AND DETAIL R0002 07/10/2018

32 S-112 CULVERT VALVE CONTROL DIMENSIONS AND

TOLERENCES

R0002 07/10/2018

33 S-113 CULVERT VALVE BOTIOM SILL/SEAL PLAN VIEW AND

SECTIONS

R0002 07/10/2018

34 S-114 CULVERT VALVE BULKHEAD COVER PLAN

VIEW, SECTIONS AND DETAIL

R0002 07/10/2018

35 S-501 CULVERT VALVE DETAIL SHEET 1 R0002 07/10/2018

36 S-502 CULVERT VALVE DETAIL SHEET 2 R0002 07/10/2018

37 S-503 CULVERT VALVE GRATING DETAILS R0002 07/10/2018

38 S-504 CULVERT VALVE LADDER AND GRAB BAR DETAILS R0002 07/10/2018

39 M-101 OVERALL MECHANICAL PLAN R0002 07/10/2018

40 M-102 MECHANICAL PLAN - CULVERT VALVE MACHINERY -

#1 NORTH

R0002 07/10/2018

41 M-103 MECHANICAL PLAN - CULVERT VALVE MACHINERY -

#1 SOUTH

R0002 07/10/2018

42 M-104 MECHANICAL PLAN - CULVERT VALVE MACHINERY -

#2 NORTH

R0002 07/10/2018

43 M-105 MECHANICAL PLAN - CULVERT VALVE MACHINERY -

#2 SOUTH

R0002 07/10/2018

44 M-106 MECHANICAL PLAN - CULVERT VALVE MACHINERY -

#3 NORTH

R0002 07/10/2018

45 M-107 MECHANICAL PLAN - CULVERT VALVE MACHINERY -

#3 SOUTH

R0002 07/10/2018

46 M-501 CULVERT VALVE MECHANICAL CONNECTIONS PLAN

VIEW AND SECTION

R0002 07/10/2018

47 M-502 CYLINDER AND BRACKET ELEVATIONS R0002 07/10/2018

48 M-503 ACCESS DETAILS R0002 07/10/2018

49 M-504 ROD BULKHEAD DETAILS R0002 07/10/2018

50 M-505 ROD BULKHEAD DETAILS R0002 07/10/2018

51 M-506 CYLINDER YOKE DETAILS AND ASSEMBLY R0002 07/10/2018

52 M-601 HYDRAULIC SCHEMATIC R0002 07/10/2018

53 E-001 ELECTRICAL ABBREVIATIONS AND LEGEND R0002 07/10/2018

54 E-002 PLC SYSTEM GENERAL NOTES R0002 07/10/2018

55 E-003 MINIMUM LIST OF HMI SCREENS R0002 07/10/2018

56 E-010 PLC AND CONTROL SYSTEM OVERVIEW R0002 07/10/2018

57 E-015 CONDUIT AND CIRCUIT SCHEDULE R0002 07/10/2018

58 E-100 NEW CUL VERT MACHINERY ELECTRICAL KEY PLAN R0002 07/10/2018

59 E-101 LOCK MACHINERY RECESS #1 NORTH ELECTRICAL

LAYOUT

R0002 07/10/2018

60 E-102 LOCK MACHINERY RECESS #1 SOUTH ELECTRICAL

LAYOUT

R0002 07/10/2018

61 E-103 LOCK MACHINERY RECESS #2 NORTH ELECTRICAL

LAYOUT

R0002 07/10/2018

62 E-104 LOCK MACHINERY RECESS #2 SOUTH ELECTRICAL

LAYOUT

R0002 07/10/2018

63 E-105 LOCK MACHINERY RECESS #3 NORTH ELECTRICAL

LAYOUT

R0002 07/10/2018

64 E-106 LOCK MACHINERY RECESS #3 SOUTH ELECTRICAL

LAYOUT

R0002 07/10/2018

65 E-107 LOCK LEVEL TRANSMITTERS ELECTRICAL SITE

LAYOUT

R0002 07/10/2018

66 E-108 FIBER OPTIC BACKBONE DETAIL AND MAIN PANEL

LOCATION

R0002 07/10/2018

67 E-109 MAIN PANEL SITE LAYOUT AND CUTOVER R0002 07/10/2018

68 E-110 LOCK MACHINERY RECESS GROUND RING R0002 07/10/2018

69 E-401 CONTROL HOUSE 1 - BASEMENT & FIRST FLOOR

PLANS

R0002 07/10/2018

70 E-402 CONTROL HOUSE 2 - BASEMENT & FIRST FLOOR

PLANS

R0002 07/10/2018

71 E-403 CONTROL HOUSE 3 - BASEMENT & FIRST FLOOR

PLANS

R0002 07/10/2018

72 E-501 ENCLOSURE DETAIL AND DIAGRAM R0002 07/10/2018

73 E-510 MITER GATE LIMIT SWITCH MOUNTING CONCEPTS R0002 07/10/2018

74 E-601 ONE-LINE DIAGRAM R0002 07/10/2018

75 E-602 MAIN CONTROL PANEL ENCLOSURE R0002 07/10/2018

76 E-603 MAIN CONTROL PANEL CONTROLS LAYOUT R0002 07/10/2018

77 E-604 MAIN CONTROL PANEL NAMEPLATE SCHEDULE R0002 07/10/2018

78 E-605 MAIN CONTROL PANEL PLC POWER AND FIBER

OPTICS

R0002 07/10/2018

79 E-606 MAIN CONTROL PANEL DISCRETE INPUTS 1 R0002 07/10/2018

80 E-607 MAIN CONTROL PANEL DISCRETE INPUTS 2 R0002 07/10/2018

81 E-608 MAIN CONTROL PANEL DISCRETE OUTPUTS 1 R0002 07/10/2018

82 E-609 MAIN CONTROL PANEL DISCRETE OUTPUTS 2 R0002 07/10/2018

83 E-610 MAIN CONTROL PANEL DIGITAL DISPLAYS R0002 07/10/2018

84 E-611 MAIN CONTROL PANEL INCOMING POWER R0002 07/10/2018

85 E-620 2N LOCK 10 PANEL CONTROLS LAYOUT R0002 07/10/2018

86 E-621 CONTROL HOUSE 2 PANEL LAYOUT R0002 07/10/2018

87 E-622 2N LOCK 10 PANEL NAMEPLATE SCHEDULES R0002 07/10/2018

88 E-623 2N LOCK 10 PANEL PLC POWER FIBER OPTICS R0002 07/10/2018

89 E-624 2N LOCK 10 PANEL PLC DISCRETE INPUTS 1 R0002 07/10/2018

90 E-625 2N LOCK 10 PANEL PLC DISCRETE INPUTS 2 R0002 07/10/2018

91 E-626 2N LOCK 10 PANEL PLC DISCRETE INPUTS 3 R0002 07/10/2018

92 E-627 2N LOCK 10 PANEL DISCRETE OUTPUTS 1 R0002 07/10/2018

93 E-628 2N LOCK 10 PANEL DISCRETE OUTPUTS 2 R0002 07/10/2018

94 E-629 2N LOCK REMOTE 10 PANEL ANALOG INPUTS R0002 07/10/2018

95 E-630 2N LOCK REMOTE 10 PANEL ANALOG OUTPUTS R0002 07/10/2018

96 E-631 2N LOCK REMOTE 10 PANEL INCOMING POWER R0002 07/10/2018

97 E-632 2N LOCK REMOTE 10 PANEL MITER GATES R0002 07/10/2018

98 E-633 2N LOCK 10 PANEL MITER GATE CULVERT VALVE R0002 07/10/2018

99 E-634 2N LOCK 10 PANEL WIRING TO CONTROL HOUSE 2

PANEL

R0002 07/10/2018

100 E-635 2N LOCK 10 PANEL WIRING TO 2N CONTROL STATION

R0002 07/10/2018

101 E-636 2N LOCK 10 PANEL WIRING INCOMING POWER R0002 07/10/2018

102 E-640 2S LOCK 10 PANEL CONTROLS LAYOUT R0002 07/10/2018

103 E-641 2S LOCK 10 PANEL NAMEPLATE SCHEDULES R0002 07/10/2018

104 E-650 1N, 1S, 3N, 3S LOCK 10 PANELS CONTROLS LAYOUT R0002 07/10/2018

105 E-651 1N LOCK 10 PANEL NAMEPLATES - DETAILS R0002 07/10/2018

106 E-652 1S LOCK 10 PANEL NAMEPLATES - DETAILS R0002 07/10/2018

107 E-653 3N LOCK 10 PANEL NAMEPLATES - DETAILS R0002 07/10/2018

108 E-654 3S LOCK 10 PANEL NAMEPLATES - DETAILS R0002 07/10/2018

109 E-660 HMI OVERVIEW SCREEN - CONCEPT R0002 07/10/2018

110 E-661 HMIMENUSCREEN- CONCEPT R0002 07/10/2018

111 E-662 HMI OPERATOR LOGIN SCREEN - CONCEPT R0002 07/10/2018

112 E-663 HMI UPPER LOCK GATES AND VALVES SCREEN -

CONCEPT

R0002 07/10/2018

113 E-664 HMI LOCK LEVEL VS CULVERT VALVE TRENDS -

CONCEPT

R0002 07/10/2018

114 E-665 HMI INTERLOCK STATUS AND SETUP - CONCEPT R0002 07/10/2018

115 E-666 HMI CURRENT ALARMS – CONCEPT R0002 07/10/2018

116 E-667 HMI PLC CONTROL SYSTEM STATUS - CONCEPT R0002 07/10/2018

117 E-668 HMI SHORT TERM ALARM EVENT HISTORY -

CONCEPT

R0002 07/10/2018

118 E-669 HMI MITER GATES HPU SYSTEM STATUS - CONCEPT R0002 07/10/2018

119 E-670 HMI LOCK LEVELS NORMAL SETUP - CONCEPT R0002 07/10/2018

120 E-671 HMI MITER GATES SETUP – CONCEPT R0002 07/10/2018

121 E-672 HMI CULVERT VALVES BASIC SETUP -CONCEPT R0002 07/10/2018

122 E-673 HMI CULVERT VALVES CURRENT SELECTED

OPENING SCHEME – CONCEPT

123 E-674 HMI CULVERT VALVES OPENING SCENARIOS SETUP –

CONCEPT

R0002 07/10/2018

124 E-675 HMI LOCK LEVEL TRANSMITTERS CALIBRATION

SCREEN – CONCEPT

R0002 07/10/2018

125 E-676 HMI LOCK MITER GATES CALIBRATION SCREEN -

CONCEPT

INDEX OF REFERENCE DRAWINGS

DRAWING NO. C-2-4-330, DATED 25 MAY 2018

Sheet Number

Plate Number Title Revision Number

Date

0 G - 000 REFERENCE DRAWING TITLE AND DRAWING

INDEX

R0002 07/10/2018

1 LWC - 43 STONEY GATE CULVERT VALVES DETAILS OF

GUIDES, FLOOR PLATES, ETC

R0002 07/10/2018

2 LWC - 43-1 STONEY GATE VALVE UPPER GUIDE CASTINGS R0002 07/10/2018

3 LWC - 43-7 STONEY GATE VALVES FABRICATED TOP SEAL R0002 07/10/2018

4 LWC - 44 80' X 825' LOCK - STONEY GATE CULVERT

VALVES - DETAIL OF BULKHEADS, ROLLER

TRACK SUPPORTS, ETC

R0002 07/10/2018

5 LWC - 71 STONEY GATE CULVERT VALVES - ASSEMBLY

OF GATE, ROLLOR TRAIN, ETC

R0002 07/10/2018

6 LWC - 73 STONEY GATE CULVERT VALVES - DETAIL OF

BOTTOM SEAL CASTING, ETC.

R0002 07/10/2018

7 LWC - 128 LARGE LOCK PLAN AND SECTIONS R0002 07/10/2018

8 LWC - 149 LARGE LOCK LAND WALL AT UPPER LOCK

GATE - RECESSES FOR OPERATING MACHINERY

R0002 07/10/2018

9 LWC - 150 LARGE LOCK RIVER WALL AT UPPER GUARD

GATE

R0002 07/10/2018

10 LWC - 155 LARGE LOCK LAND WALL AT LOWER GATE -

RECESSES FOR OPERATING MACHINERY

R0002 07/10/2018

11 LWC - 157 LARGE LOCK RIVER WALL AT MIDDLE GATE -

RECESSES FOR OPERATING MACHINERY

R0002 07/10/2018

12 LWC - 158 LARGE LOCK RIVER WALL AT LOWER GUARD

GATE - RECESSES FOR OPERATING MACHINERY

R0002 07/10/2018

13 LWC - 160 LARGE LOCK LAND WALL AT MIDDLE GATE -

RECESSES FOR OPERATING MACHINERY

R0002 07/10/2018

14 LWC - 165 STONEY GATE CULVERT VALVES - ASSEMBLY -

OPERATING MACHINERY

R0002 07/10/2018

15 LWC - 287 STONEY GATE CULVERT VALVES - APPLIANCE

FOR OPERATING ROLLER TRAIN

R0002 07/10/2018

16 LWC - 292 ELECTRICAL WIRING DIAGRAMS - ELECTRIC

CONNECTIONS FOR OPERATION OF GATES AND

VALVES

R0002 07/10/2018

17 LWC - 399-1 STONEY GATE VALVE - ROLLER TRAIN R0002 07/10/2018

18 LWC - 400-2 STONEY GATE VALVES - ROLLER TRACK

CASTINGS

R0002 07/10/2018

19 LWC - 480 STONEY GATE VALVE BULKHEAD R0002 07/10/2018

20 LWC - 524 MIDDLE STONEY GATE RECESSES R0002 07/10/2018

21 LWC-C-2-3-144 ELECTRICAL DISTRIBUTION REHAB PLAN NEW

CABLE RUNS

R0002 07/10/2018

22 LWC-C-2-4-192-25 ELECTRICAL MISCELLANEOUS SIGNAL AND

CONTROL SCHEMATICS

R0002 07/10/2018

23 LWC-C-2-4-192-56 ELECTRICAL DIAGRAM - LARGE LOCK VALVE

AND GATE CONTROLS

R0002 07/10/2018

24 LWC-C-2-4-206-06 ELECTRICAL LARGE LOCK VALVE 3-S

ELECTRICAL CONTROLS

R0002 07/10/2018

25 LWC - S-1 SPARE STONEY GATE VALVE SET R0002 07/10/2018

26 LWC - M-10 HYDRAULIC SCHEMATIC R0002 07/10/2018

27 LWC - US-2-2 STONEY GATE CULVERT VALVE R0002 07/10/2018

28 LWC - US-5-1 ASSEMBLY DWG STONEY GATE

VALVE MACHINERY

R0002 07/10/2018

29 TSI - 1 DRAWING INDEX, LEGEND AND NOTES R0002 07/10/2018

30 TSI - 2 EXTERIOR PANEL LAYOUT R0002 07/10/2018

31 TSI - 3 INTERIOR PANEL LAYOUT AND DETAILS R0002 07/10/2018

32 TSI - 4 CONSOLE DEVICE LAYOUT R0002 07/10/2018

33 TSI - 4A CONSOLE CUTOUT DETAILS R0002 07/10/2018

34 TSI - 5 NAMEPLATE ENGRAVING SCHEDULE R0002 07/10/2018

35 TSI - 6 SCHEMATIC DIAGRAM - LOWER

GATE CONTROLS

R0002 07/10/2018

36 TSI - 7 SCHEMATIC DIAGRAM - MIDDLE

GATE CONTROLS

R0002 07/10/2018

37 TSI - 8 SCHEMATIC DIAGRAM - LOWER

UPPER CONTROLS

R0002 07/10/2018

38 TSI - 9 SCHEMATIC DIAGRAM - HYDRAULIC CONTROLS R0002 07/10/2018

39 TSI - 10 SCHEMATIC DIAGRAM - POWER DISTRIBUTION R0002 07/10/2018

40 TSI - 12 SCHEMATIC DIAGRAM - SLOTS 1 & 2

ANALOG INPUT

R0002 07/10/2018

41 TSI - 13 PLC WIRING DIAGRAM - SLOT 3 ANALOG INPUT R0002 07/10/2018

42 TSI - 14

PLC WIRING DIAGRAM - SLOT 4

ANALOG OUTPUT

R0002 07/10/2018

43 TSI - 15 SCHEMATIC DIAGRAM - GATE DRIVE CONTROLS R0002 07/10/2018

44 TSI - 16 SCHEMATIC DIAGRAM - GATE DRIVE CONTROLS R0002 07/10/2018

45 TSI - 17 PLC WIRING DIAGRAM - SLOT 8 DIGITAL INPUT R0002 07/10/2018

46 TSI - 17A PLC WIRING DIAGRAM - SLOT 9

DIGITAL OUTPUT

R0002 07/10/2018

47 TSI - 18 SCHEMATIC DIAGRAM - POWER

MONITORING SYSTEM

R0002 07/10/2018

48 TSI - 19 SUBMERSIBLE LEVEL TRANSMITTER -

DROP TUBE MOUNTED

R0002 07/10/2018

49 TSI - 20 POSITION TRANSDUCER INSTALLATION -

CABLE EXTENSION TYPE

R0002 07/10/2018

50 TSI - 21 TEMPERATURE TRANSMITTER -

THERMOWELL MOUNTED

R0002 07/10/2018

51 TSI - 22 PROCESS AND INSTRUMENTATION DIAGRAM

- HYDRAULIC GATE OPERATORS

R0002 07/10/2018

52 WI - 200011-1 UPPER LOCK INTERCONNECT AS-BUILT R0002 07/10/2018

53 WI - 200011-1A ENLARGED UPPER LOCK INTERCONNECT

AS- BUILT

R0002 07/10/2018

54 WI - 200011-2 UPPER LOCK SCHEMATIC AS- BUILT R0002 07/10/2018

55 WI - 200011-3 LOWER LOCK INTERCONNECT AS- BUILT R0002 07/10/2018

56 WI - 200011-4 24 VOLT CONTROL INTERCONNECT R0002 07/10/2018

57 WI - 200011-5 NORTH SOLENOID CABINET R0002 07/10/2018

58 WI - 200011-6 SOUTH SOLENOID CABINET R0002 07/10/2018

59 G-1 TITLE SHEET VICINITY AND AREA MAPS R0002 07/10/2018

60 G-2 DRAWING INDEX ABBREVIATIONS

AND LEGEND

R0002 07/10/2018

61 S-1 STRUCTURAL GENERAL NOTES AND DETAILS R0002 07/10/2018

` S-2 STANDARD DEMOLITION DETAILS R0002 07/10/2018

63 S-3 STANDARD CONSTRUCTION DETAILS R0002 07/10/2018

64 S-4 STANDARD CONSTRUCTION

LONGITUDINAL SECTIONS

R0002 07/10/2018

65 S-5 LAND WALL AT MIDDLE GATE

DEMOLITION PLAN AND SECTIONS

R0002 07/10/2018

66 S-6

RIVER WALL AT MIDDLE GATE DEMOLITION

PLAN AND SECTIONS

R0002 07/10/2018

67 S-7 LAND WALL AT DOWNSTREAM GATE

DEMOLITION PLAN AND SECTIONS

R0002 07/10/2018

68 S-8 RIVER WALL AT DOWNSTREAM GATE

DEMOLITION PLAN AND SECTIONS

R0002 07/10/2018

69 S-9 LAND WALL AT UPSTREAM GATE DEMOLITION

PLAN AND SECTIONS

R0002 07/10/2018

70 S-10 RIVER WALL AT UPSTREAM GATE DEMOLITION

PLAN AND SECTIONS

R0002 07/10/2018

71 S-11 SERVICE GATE LEVEL MODIFICATION PLAN

AND SECTIONS

R0002 07/10/2018

72 S-12 LAND WALL AT MIDDLE GATE CONSTRUCTION

PLAN AND SECTIONS

R0002 07/10/2018

73 S-13 RIVER WALL AT MIDDLE GATE CONSTRUCTION

PLAN AND SECTIONS

R0002 07/10/2018

74 S-14 RIVER WALL AT MIDDLE GATE CONSTRUCTION

SECTIONS

R0002 07/10/2018

75 S-15 LAND WALL AT DOWNSTREAM GATE

CONSTRUCTION PLAN AND SECTIONS

R0002 07/10/2018

76 S-16 RIVER WALL AT DOWNSTREAM GATE

CONSTRUCTION PLAN AND SECTIONS

R0002 07/10/2018

77 S-17 LAND WALL AT UPSTREAM GATE

CONSTRUCTION PLAN AND SECTIONS

R0002 07/10/2018

78 S-18 RIVER WALL AT UPSTREAM GATE

CONSTRUCTION PLAN AND SECTIONS

R0002 07/10/2018

79 M-1 MECHANICA L SCHEDULES AND GENERAL

NOTES

R0002 07/10/2018

80 M-2 MACHINERY / GATE LAYOUT R0002 07/10/2018

81 M-3 MECHANICAL EQUIPMENT LAYOUT R0002 07/10/2018

82 M-4 MECHANICAL EQUIPMENT DETAILS R0002 07/10/2018

83 M-5 GIMBAL BRACKET R0002 07/10/2018

84 M-6 GIMBAL BRACKET COMPONENTS R0002 07/10/2018

85 M-7 CYLINDER TRUNNION R0002 07/10/2018

86 M-8 ROD CONNECTION ASSEMBLY 1 R0002 07/10/2018

87 M-9 ROD CONNECTION ASSEMBLY 2 R0002 07/10/2018

88 M-10

WELD DETAILS

89 M-11 HYDRAULIC SCHEMATIC R0002 07/10/2018

90 M-12 CONTROLS 1 R0002 07/10/2018

91 M-13 CONTROLS 2 R0002 07/10/2018

92 M-14 CONTROL PANELS R0002 07/10/2018

93 M-15 CONTROL WIRING R0002 07/10/2018

94 E-1 LEGEND AND FIXTURE SCHEDULE R0002 07/10/2018

95 E-2 OPERATING HOUSE DEMOLITION PLAN R0002 07/10/2018

96 E-3 MACHINERY PITS DEMOLITION PLAN R0002 07/10/2018

97 E-4 OPERATING HOUSE PLAN R0002 07/10/2018

98 E-5 MACHINERY PITS PLAN R0002 07/10/2018

99 E-6 ONE LINE DIAGRAM AND DETAILS R0002 07/10/2018

100 E-7 PANEL SCHEDULES R0002 07/10/2018

(End of Summary of Changes)