Solicitation W912DW18R0012 - Stoney Gate Valve Replacement

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Furnish all labor, materials, eqipment and perform all w ork for the Stoney Gate Valve replacement at the Hiram M. Chitternden Locks, Lake Washington Ship Canal, Seattle, Washington in accordance w ith attached Contract Clauses, Special Clauses, Technical Specif ications and Draw ings.

Please see section 00 10 00 "Administrative Matters for Contact Information, Mailing and Street Address

DARRELL D HUTCHENS 206-316 -3877

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

05-Jul-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________910 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________4 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________03 Aug 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912DW18R0012 78

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912DW18R0012

Section 00 10 00 - Solicitation

RETURN THE FOLLOWING WITH YOUR PROPOSAL

SF1442, Solicitation, Offer and Award Section 00 45 00, Representations and Certifications to include the Pre-Award Information Form 20% Bid Bond -- Bid Bonds must be accompanied by a Power of Attorney containing the original signature from the surety. Powers of Attorney dated prior to the date of the bond will only be accepted if accompanied by certification from a current officer of the surety attesting to its authenticity and continuing validity. Electronic, mechanically – applied and printed signatures, seals and dates on the power of attorney shall be considered original signatures, seals and dates without regard to the order they were affixed.

Current SF24 forms are available at the following website http://www.gsa.gov/portal/forms/type/TOP Unless specified, the following information does not need to be submitted with your proposal, BUT it is required to be completed before the contract can be awarded:

Contractors are required, before receipt of contract award to ensure their firm is registered in the government web site entitled System for Award Management (SAM) and that all information required is current and up to date.

https://www.sam.gov/portal/public/SAM/

IMPORTANT NOTE FOR OTHER THAN U.S. SMALL BUSINESSES ONLY:

Small Business Subcontracting Plan is Required: In accordance with FAR 19.702(a)(2), the firm selected for award shall submit a subcontracting plan to be eligible for award. Submit subcontracting with your proposal. If the firm fails to submit a plan, the firm will be ineligible for award. For information on the evaluation of subcontracting plans, see Army Federal Acquisition Regulation Supplement (AFARS) Appendix DD.

Goals: U.S. Army Corps of Engineers considers the following subcontracting goals reasonable for the performance of the resultant contract:

Small Business Goals 15% - Small Business Concerns (inclucing ANCs and Indian Tribes) 5% - Veteran-owned small business concerns 3% - Service-disabled veteran-owned small business concerns 3% - HUBZone Small business concerns 5% - Small disadvantaged business concerns (inclucing ANCs and Indian Tribes) 3% - Women-owned small business concerns

THIS PROCUREMENT IS:

UNRESTRICTED, 100% full and open to both large and small businesses.

ADMINISTRATIVE MATTERS:

Contact: Darrell Hutchens, Contract Specialist, darrell.d.hutchens@usace.army.mil or 206-316-3877

Mail: Seattle District, U.S. Army Corps of Engineers, P.O. Box 3755, CENWS-CTC, Bldg 1202, Seattle, WA 98124-3755

Street: Seattle District, U.S. Army Corps of Engineers, 4735 E. Marginal Way S., Bldg 1202, Seattle, WA 98134-2388

TECHNICAL QUESTIONS:

All inquiries regarding this solicitation are to be submitted via ProjNet-BID. Telephone and email inquiries will not be accepted. ProjNet-BID is a web-based program that allows bidders to post questions regarding the solicitation and to view all questions by other bidders and answers by USACE. ProjNet-BID can be accessed at https://www.projnet.org To access the ProjNet-BID website the first time:

1) Click the Quick Add menu in the upper right.

2) Enter the following information for access:

2a) Select USACE as the Agency.

2b) Input BID Key: 9Q8P2P-46UHG8 2c) Your email address.

3) Enter valid business contact information (e.g. First and Last Name, Company name, city and state, phone number,email address). (Required on first project only.)

4) Establish Secret Question and Answer which will be used as a password (required on first project only).

5) For subsequent access use your email address, the Key and response to the Secret Question to access the ProjNet- BID Module.

6) Submit technical questions by clicking Post a New Inquiry. When an answer is posted to a question, the question and answer is then available for all other bidders to review.

7) For questions about ProjNet-BID, please contact the Call Center help desk toll free at 1-800-428-HELP (4357), which operates from 8AM to 5PM (Central US time zone).

No response will be posted to inquiries after the Close of Business on the third business day preceding the solicitation due date. All bidders will be held to have reviewed the questions and responses in ProjNet-Bidsm prior to bid submission. Nothing in the solicitation is changed unless an amendment is issued.

IF THE CONTRACTOR IS A CORPORATION OR PARTNERSHIP, THE APPLICABLE PORTION OF THE

FORM LISTED BELOW MUST BE COMPLETED. IN THE ALTERNATIVE, OTHER EVIDENCE MUST

BE SUBMITTED TO SUBSTANTIATE THE AUTHORITY OF THE PERSON SIGNING THE CONTRACT.

IF A CORPORATION, THE SAME OFFICER SHALL NOT EXECUTE BOTH THE CONTRACT AND

THE CERTIFICATE.

CORPORATE CERTIFICATE

I, , certify that I am the Secretary of the Corporation named as Contractor herein; that , who signed this contract on behalf of the Contractor was then of said corporation; that said contract was duly signed for and on behalf of said corporation by authority of its governing body and is within the scope of its corporate powers.

(CORPORATE

(Secretary) SEAL)

AUTHORITY TO BIND PARTNERSHIP

This is to certify that the names and signatures of all partners are listed below and that the person signing the contract has authority actually to bind the partnership pursuant to its partnership agreements. Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership with the United States of America, except as follows: (state "none" or describe limitations, if any)

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to, and acknowledged by, the Contracting Officer.

(Names and Signatures of all Partners)

NAME SIGNATURE

BID SCHEDULE

PRICE SCHEDULE

Item Description Quantity Unit Unit Price Amount

All work for Spare Mechanical Parts as specified in 35

05 40.14 10 HYDRAULIC POWER SYSTEMS FOR

CIVIL WORKS STRUCTURES, from preparation to final approval.

1 JOB N/A

All work for Spare Electrical Parts as specified in Section 26 20 00 INTERIOR AND EXTERIOR

DISTRIBUTION SYSTEM, SECTION 27 21 10.00 40

FIBER OPTIC DATA TRANSMISSION SYSTEM,

and SECTION 40 95 00 PROCESS CONTROL, from preparation to final approval.

All work for Spare Structural Parts as specified in Section 35 20 16.53 VERTICAL LIFT CULVERT VALVES, from preparation to final approval.

All work for construction of the Main Control Panel, including all associated supply, distribution, and control as specified in Section 26 20 00 INTERIOR

AND EXTERIOR DISTRIBUTION SYSTEM,

SECTION 27 21 10.00 40 FIBER OPTIC DATA

TRANSMISSION SYSTEM, and SECTION 40 95 00 PROCESS CONTROL, from preparation to final approval.

All work for O&M Manuals as Specified in Section 01

78 23 OPERATIONS AND MAINTENANCE

MANUALS from preparation to final approval.

$ 60,000.00

All Work for As-Built Drawings as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.

$ 25,000.00

DEWATERING NO. 1 - 3N REPLACEMENT

All work for site preparation at 3N including demolition as specified in Section 02 41 00 DEMOLITION AND DECONSTRUCTION, and disposal of existing features as required for construction of ITEM #0008 thru ITEM #0011.

All work for construction of Machinery Pit Modifications at 3N, including all associated fabrication and installation of grating, ladders and grab bars, miscellaneous metals, and debris removal not paid for in ITEM #0007.

All work for construction of the Control Panel at 3N, including all associated supply, distribution, and control as required to control ITEM #0012.

All work for construction of Hydraulic Power Unit at 3N, including all associated design and fabrication, oil reservoir, electric motor, hydraulic pumps, directional control valves, relief valves, counterbalance valves, check valves, isolation valves, pressure gauges, reservoir temperature and level switches, pressure and return filters, manifold blocks, piping assemblies, control consoles, hydraulic oil, painting, and special tools and appurtenances, as required to operate ITEM #0012.

All work for construction of Hydraulic Cylinder at 3N, including all associated design and fabrication, cylinder support assembly, connection to culvert valve, pillow block bearings, bushings, cylinder support platform, bulkhead seal assembly, hydraulic oil, painting, special tools and appurtenances, as required to operate culvert valve ITEM #0012.

All work for construction of Culvert Valve 3N, including all associated design and fabrication, bracing, tracks, UHMW-PE slides and wear strips, embedded bottom sill plate, bottom lip assembly, structural embeds, connections, seals, concrete repair, painting, special tools and appurtenances, and debris removal not paid for in ITEM #0007.

All work for construction of Cathodic Protection System at 3N, including all associated design and fabrication, special tools and appurtenances, as required to protect ITEM #0012.

All work for construction of Machinery Recess Painting at 3N as specified in Section 09 97 02 PAINTING: HYDRAULIC STRUCTURES, and debris removal not paid for in ITEM #0007.

DEWATERING NO. 2 - 3S REPLACEMENT

All work for site preparation at 3S including demolition as specified in Section 02 41 00 DEMOLITION AND DECONSTRUCTION, and disposal of existing features as required for construction of ITEM #0016 thru ITEM #0019.

Modifications at 3S, including all associated fabrication and installation of grating, ladders and grab bars, miscellaneous metals, and debris removal not paid for in ITEM #0015.

All work for construction of the Control Panel at 3S, including all associated supply, distribution, and control as required to control ITEM #0020.

3S, including all associated design and fabrication, oil reservoir, electric motor, hydraulic pumps, directional control valves, relief valves, counterbalance valves, check valves, isolation valves, pressure gauges, reservoir temperature and level switches, pressure and return filters, manifold blocks, piping assemblies, control consoles, hydraulic oil, painting, and special tools and appurtenances, as required to operate ITEM #0020.

All work for construction of Hydraulic Cylinder Unit at 3S, including all associated design and fabrication, cylinder support assembly, connection to culvert valve, pillow block bearings, bushings, cylinder support platform, bulkhead seal assembly, hydraulic oil, painting, special tools and appurtenances, as required to operate ITEM #0020.

All work for construction of Culvert Valve 3S, including all associated design and fabrication, bracing, tracks, UHMW-PE slides and wear strips, embedded bottom sill plate, bottom lip assembly, structural embeds, connections, seals, concrete repair, painting, special tools and appurtenances, and debris removal not paid for in ITEM #0015.

System at 3S, including all associated design and fabrication, special tools and appurtenances, as required to protect ITEM #0020.

Painting at 3S as specified in Section 09 97 02 PAINTING: HYDRAULIC STRUCTURES, and debris removal not paid for in ITEM #0015.

DEWATERING NO. 3 - 1N and 2N REPLACEMENT

All work for site preparation at 1N and 2N including demolition as specified in Section 02 41 00 DEMOLITION AND DECONSTRUCTION, and disposal of existing features as required for construction of ITEM #0024 thru ITEM #0028.

Modification at 1N and 2N, including all associated fabrication and installation of grating, ladders and grab bars, miscellaneous metals, and debris removal not paid for in ITEM #0023.

All work for construction of the Control Panel at 1N and 2N, including all associated supply, distribution, and control as required to control ITEM #0028.

1N and 2N, including all associated design and fabrication, oil reservoir, electric motor, hydraulic pumps, directional control valves, relief valves, counterbalance valves, check valves, isolation valves, pressure gauges, reservoir temperature and level switches, pressure and return filters, manifold blocks, piping assemblies, control consoles, hydraulic oil, painting, and special tools and appurtenances, as required to operate ITEM #0028.

1N and 2N, including all associated design and fabrication, cylinder support assembly, connection to culvert valve, pillow block bearings, bushings, cylinder support platform, bulkhead seal assembly, hydraulic oil, painting, special tools and appurtenances, as required to operate ITEM #0028.

All work for construction of Culvert Valve 1N and 2N, including all associated design and fabrication, bracing, tracks, UHMW-PE slides and wear strips, embedded bottom sill plate, bottom lip assembly, structural embeds, connections, seals, concrete repair, painting, special tools and appurtenances, and debris removal not paid for in ITEM #0023.

System at 1N and 2N, including all associated design and fabrication, special tools and appurtenances, as required to protect ITEM #0028.

Painting at 1N and 2N as specified in Section 09 97 02 PAINTING: HYDRAULIC STRUCTURES, and debris removal not paid for in ITEM #0023.

DEWATERING NO. 4 - 1S and 2S REPLACEMENT

All work for site preparation at 1S and 2S including demolition as specified in Section 02 41 00 DEMOLITION AND DECONSTRUCTION, and disposal of existing features as required for construction of ITEM #0032 thru ITEM #0035.

Modification at 1S and 2S, including all associated fabrication and installation of grating, ladders and grab bars, miscellaneous metals, and debris removal not paid for in ITEM #0031.

All work for construction of the Control Panel at 1S and 2S, including all associated supply, distribution, and control as required to control ITEM #0036.

1S and 2S, including all associated design and fabrication, oil reservoir, electric motor, hydraulic pumps, directional control valves, relief valves, counterbalance valves, check valves, isolation valves, pressure gauges, reservoir temperature and level switches, pressure and return filters, manifold blocks, piping assemblies, control consoles, hydraulic oil, painting, and special tools and appurtenances, as required to operate ITEM #0036.

1S and 2S, including all associated design and fabrication, cylinder support assembly, connection to culvert valve, pillow block bearings, bushings, cylinder support platform, bulkhead seal assembly, hydraulic oil, painting, special tools and appurtenances, as required to operate ITEM #0036.

All work for construction of Culvert Valve 1S and 2S, including all associated design and fabrication, bracing, tracks, UHMW-PE slides and wear strips, embedded bottom sill plate, bottom lip assembly, structural embeds, connections, seals, concrete repair, painting, special tools and appurtenances, and debris removal not paid for in ITEM #0031.

System at 1S and 2S, including all associated design and fabrication, special tools and appurtenances, as required to protect ITEM #0036.

Painting at 1S and 2S as specified in Section 09 97 02 PAINTING: HYDRAULIC STRUCTURES, and debris removal not paid for in ITEM #0031.

1 JOB N/A

TOTAL BASE ITEMS (0001-0038)

NOTES:

1) 100% Design Projects cannot be altered, changed, or re-designed in any way. No alternate proposals will be accepted.

2) To better facilitate the receipt and proposal process, all modifications to proposals shall be submitted on copies of the latest Price Schedule as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

3) Offerors must insert a price on all entry amount lines of numbered items of the Price Schedule.

Failure to do so will result in the offer being unacceptable.

4) The dollar amount established in Item Nos. 0005 and 0006 shall not be revised by Offerors.

QTY = Quantity LF = Linear Feet CY = Cubic Yards EA = Each

END PRICE SCHEDULE

Section 00 21 00 - Instructions

INSTRUCTIONS TO OFFEROR

Section 00 21 00

INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFEROR

Introduction: Your firm is invited to submit a proposal in response to this Request for Proposal (RFP) No.

W912DW18R0012, titled Stoney Gate Valve Replacement, Hiram M. Chittenden Locks, located in Seattle, WA.

PROPOSAL COMPOSITION AND SUBMISSION

General Requirements: Proposals must set forth full, accurate, and complete information as required by this Request for Proposal (RFP). Absence of information demonstrates the lack of support for a criterion. Proposals shall contain only data essential for evaluation of proposals to expedite both the RFP proposal preparation and evaluation. Data submitted must reflect the Offeror’s interpretation of criteria contained in the RFP.

Submit your proposal in two parts:

(a) Technical proposal, and (b) Price proposal. Submit each part in a separate envelope or package with the type of proposal (e.g., technical or price) clearly printed on the outside of the envelope or package.

Proposals are to be on 8-1/2 x 11-inch paper, to the maximum extent practicable, and submitted in standard letter (8-1/2 x 11-inch) hardback loose-leaf binders. Contents of binders shall be appropriately tabbed and labeled corresponding to the proposal table of contents, affording ease of identification.

Reference FAR Clause 52.204-4(b) Printed or Copied Double-Sided on Recycled Paper. In accordance with Section 101 of Executive Order 13101 of September 14, 1998, Greening the Government through Waste Prevention, Recycling, and Federal Acquisition, the Contractor is encouraged to submit paper documents, such as offers, letters, or reports, that are printed or copied double-sided on recycled paper that meet minimum content standards specified in Section 505 of Executive Order 13101, when not using electronic commerce methods to submit information or data to the Government.

Number pages consecutively. There shall be no consideration of information incorporated by reference or reiteration of the RFP. Proposal presentation shall be in a manner which allows it to “STAND ALONE” without need for evaluators to reference other documents. It is allowable to combine arrangements, layout plans, and notes on single sheets in order to simplify presentation, so long as there is maintenance of clarity.

Elaborate brochures or other presentation materials beyond those sufficient to present complete and effective responses are unnecessary. Elaborate artwork, expensive paper and bindings, and expensive/extensive visual aids and other presentation aids are neither necessary nor wanted. Penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.

Offerors are required to meet ALL solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors. The Offeror shall submit in the proposal all requested information specified in this section and Section 00 24 00 of the solicitation at or before the exact time specified in the solicitation. There will be no public opening of the proposals received as a result of this solicitation. Failure to meet a requirement may result in an offer being ineligible for award.

PROPOSAL SUBMITTALS

Proposals must be received no later than the date and time listed in Block 13(A) of the SF 1442. Plainly mark the proposal package “Proposals for Solicitation Number: W912DW-18-R-0012, DO NOT OPEN”

Hand-delivery / Fed-Ex / UPS or other commercial carrier:

Darrell Hutchens - Contract Specialist, Building 1202 U.S. Army Corps of Engineers, Seattle District

CENWS-CTC

4735 E. Marginal Way S, Building 1202 Seattle, WA 98134-2388

Mail:

Darrell Hutchens – Contract Specialist U.S. Army Corps of Engineers, Seattle District CENWS-CTC PO Box 3755 Seattle, WA 98124-3755

Note: Commercial carriers will not deliver proposals to P.O. Boxes.

ATTENTION: Please allow sufficient time to allow for heightened security at Government installations and to get to Building #1202. Allow time to park, pass through a metal detector, sign in, and receive a building pass at the Federal Center South Building. From there, you will be directed to the USACE Oxbow Building (#1202) which sits behind the Federal Center South Building.

Report to the Security Desk in the lobby of the USACE Oxbow Building and call Darrell Hutchens, Contract Specialist, at 206-316-3877, Sara Deyermond, Contracting Officer, at 206-764-6952, or Sonia Frees, Procurement Technician, at 206-764-3516. A Contracting representative will come down and accept your Proposal.

Note: If delivery is by any means other than Hand Delivery, please check prior to the due date and time to ensure that your Proposal has arrived on time.

The clock located in the lobby of the USACE Oxbow Building, across the guard desk will establish official time.

A proposal is not received by the Government until it is in the physical possession of a representative of the Contracting office. Security guards and other non-contracting personnel are NOT authorized to accept proposals on behalf of the Government. See FAR 52.215-1 for rules concerning late proposals.

TECHNICAL PROPOSAL FORMAT:

Technical Proposal:

Submit One (1) Original (marked “ORIGINAL”) and Three (3) Copies (marked “COPY)”.

Additionally, submit One (1) Electronic Copy in PDF on a CD.

Number pages consecutively, from beginning to end. Do not repeat numbering for new sections.

The technical proposal should include (1) a cover letter, (2) a table of contents, and (3) required technical data for evaluation. A description of each is as follows:

1.) Cover Letter: The technical proposal cover letter should be the first page of the technical proposal and should contain the following:

a) Solicitation Number

b) Vendor Legal Name

c) Listing of any alternate business names or d/b/a (doing business as)

d) CAGE Code and DUNS Number

e) Mailing Address

f) Physical Street Address

g) Principal Office Location (City, State and Zip)

h) Acknowledgement of all “amendments” by number and date of issue.

i) Statement the Offer is acceptable for a period of 90 calendar days from the date of submission.

j) Person(s) authorized to negotiate on Offeror’s behalf with the Government for this solicitation:

a. Name

b. Title

c. Phone Number (also include mobile number if applicable)

d. Email address

2.) Table of Contents: The Table of Contents should list all sections contained in the technical proposal.

Provide a separate section for each evaluation factor.

3.) Evaluation Factors for Award: The Evaluation Factors for Award (Section 00 24 00) shall be specific and complete, demonstrating a thorough understanding of the requirements. It shall include, where applicable, diagrams and/or charts. It shall include complete explanations of procedures and proposed programs, as well as the demonstration of the merit of the offered technical approach, if applicable. It shall demonstrate all criteria requirements. It shall be an orderly, specific, and complete document in every detail. Award of this contract will be made to the responsible Offeror submitting the Lowest Price Technically Acceptable (LPTA) offer in accordance with FAR Part 15 procedures.

PRICE PROPOSAL FORMAT:

Price Proposal:

Submit One (1) Original (marked “ORIGINAL”) and One (1) Copy (marked “COPY”).

Additionally, submit One (1) Electronic Copy in PDF on a SEPARATE CD.

An official authorized to bind your firm must sign the price proposal. Note that Standard Form 1442, Block 13A, provides the number of calendar days after the date of the offer for which the proposal is firm.

Submit the price proposal at the same time as, but separate from, the technical proposal.

The price proposal and requisite forms should include the following:

a) SF 1442 – Solicitation, Offer and Award Document Complete in its entirety, the “offeror” portion of the SF 1442. An official having the authority to contractually bind the offeror’s firm shall sign the SF 1442, blocks 20B and 20C in accordance with FAR 4.102. If the offeror is a Joint Venture, all parties to the Joint Venture shall sign the offer (Acknowledge all amendments (if any) by number of amendment and date in Block 19).

b) Pricing Schedule.

Include pricing information for ALL line items and totaled where applicable Offerors must submit Contract Line Item Numbers (CLINs) with unit price, quantity and extended price where applicable.

All extensions of unit prices shown will be subject to verification by the Government.

In case of discrepancy between the unit price and the extended price, the unit price will govern.

c) Pre-award Information Form.

d) Corporate Certificate.

e) Representations, Certifications and Other Statements of Offerors.

(Contractors are required, before receipt of contract award to ensure that their firm is registered in the government web site entitled “System for Award Management” (SAM) and that all information required is current and up to date. https://www.sam.gov/portal/public/SAM/)

f) Bid Bond (Bid Bond must be accompanied by a Power of Attorney containing an original signature from the surety, which must be affixed to the Power of Attorney after the Power of Attorney has been generated. Computer generated and signed Powers of Attorney will only be accepted if accompanied by an original certification from a current officer of the surety attesting to its authenticity and continuing validity).

g) Small Business Subcontracting Plan – Other than U.S. Small Businesses Only.

RELEASE OF INFORMATION: After receipt of proposals, no source selection information will be available to any Offeror until contract award. This includes, but is not limited to, the relative standing of the Offeror’s proposal or the number or identity of the participating Offerors.

PROPOSAL EXPENSES AND PRE-CONTRACT COSTS: The Government is in no way responsible for costs incurred in the preparation and submission of a proposal or for any other costs incurred prior to the execution of a formal contract.

AWARD AND POST AWARD PROCEDURES

Technical Evaluation: There will be an evaluation of all technical proposals by a Source Selection Evaluation Board. The Board’s duty is the assignment of a fair, unbiased technical rating for each proposal based solely on the merits of the proposal. Proposals that do not conform to the terms and conditions contained in the Solicitation, or those that include stipulations or qualifying conditions unacceptable to the Government, are not eligible for award. There will be no consideration of pricing data during the technical evaluation.

Selection and Award without Discussions: It is the intent of the Government to make award based upon initial offers, without further discussions or additional information. Therefore, submit your proposal on the most favorable terms from a technical standpoint. Do not assume you will have an opportunity to clarify, discuss or revise your proposal.

If award is not possible from initial offers, the Contracting Officer may establish a competitive range prior to either written and/or oral (i.e. telephonic) discussions with all Offerors in the competitive range. As a result, Offerors may be asked to revise their initial offers. If an Offeror’s proposal is eliminated or otherwise removed from the competitive range during discussions, further revisions to that Offeror’s proposal will neither be accepted nor considered. Discussions will culminate in a request for a Final Proposal Revision (FPR), the date and time of which will be provided to all Offerors.

After discussions and the subsequent receipt of FPRs, the Source Selection Evaluation Board will evaluate supplemental information provided by Offerors and adjust previously assigned technical ratings.

Selection and Award: Contract award will be made to the responsible Offeror submitting the Lowest Price Technically Acceptable (LPTA) offer in accordance with FAR Part 15 procedures. The Government reserves the right to reject all offers.

Debriefings:

Pre-award: Offerors excluded from the competition before award will receive a notice and may request a debriefing before award by submitting a written request for a debriefing to the Contracting Officer within three

(3) calendar days after receipt of the notice of exclusion from the competition. (FAR 15.505)

Post-award: Unsuccessful Offerors may request a post-award debriefing within three (3) calendar days after the date on which the Offeror received notification of contract award. There will be no point-by- point comparisons with other Offerors’ proposals and debriefings will not reveal any information that is not releasable under the Freedom of Information Act (FOIA). (FAR 15.506)

MAGNITUDE OF CONSTRUCTION

MAGNITUDE OF CONSTRUCTION

The magnitude of construction is estimated between $10 million and $25 million.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2016 52.204-16 Commercial and Government Entity Code Reporting JUL 2016

52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 252.204-7004 Alt A System for Award Management Alternate A FEB 2014

CLAUSES INCORPORATED BY FULL TEXT

52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (JUL 2016)

(a) Definitions. As used in this provision--

Commercial and Government Entity (CAGE) code means—

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;

or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

Highest-level owner means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

Immediate owner means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.

(b) The Offeror represents that it [ ___ ] has or [ ___ ] does not have an immediate owner. If the Offeror has more than one immediate owner (such as a joint venture), then the Offeror shall respond to paragraph (c) and if applicable, paragraph (d) of this provision for each participant in the joint venture.

(c) If the Offeror indicates ``has'' in paragraph (b) of this provision, enter the following information:

Immediate owner CAGE code:

Immediate owner legal name: ___

(Do not use a ``doing business as'' name)

Is the immediate owner owned or controlled by another entity?:

[ ___ ] Yes or [ ___ ] No.

(d) If the Offeror indicates ``yes'' in paragraph (c) of this provision, indicating that the immediate owner is owned or controlled by another entity, then enter the following information:

Highest-level owner CAGE code:

Highest-level owner legal name:

(Do not use a ``doing business as'' name)

(End of provision)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation.

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

7.2% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Washington State, King County, City of Seattle.

52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

(End of clause)

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3 Million, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

Contracting Officer 4735 East Marginal Way S.

Bldg 1202 Seattle, WA 98134-2388

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

The purpose of the site visit is to familiarize Offerors with the scope of work and provide an opportunity to become familiar with the existing site conditions. It is the intent of the Government that all prospective Offerors visit the jobsite for the purpose of acquainting themselves with local conditions. Non-technical questions will be addressed;

however, ALL technical questions regarding the solicitation will be submitted via ProjNet, a web-based program that allows Offerors to post questions regarding the solicitation and to view all questions by other Offerors and answers by USACE. Attendance at the site visit is strongly recommended.

(b) An organized site visit has been scheduled for-- Monday, 16 July 2018, at 10:00 a.m., local time

(c) Participants will meet at— Hiram M. Chittenden Locks – Admin Building (BLDG# 15724) Common Area 3015 NW 54th St

Seattle, WA 98107

Site visit participants shall proceed to the Admin Building, BLDG# 15724, and meet in a conference room, location to be provided upon arrival. After the pre-site visit logistics briefing in the conference room, participants will receive a tour of the project work area. The tour will include access to the hoist machinery rooms, and existing equipment;

however, the large lock will be in use and there will be no access to the valve bodies and guides.

(d) Site Visit Registration -- Firms must register no later than 12:00 PM the day prior to the site visit date. Confirm attendance by sending an email to: Brian.C.Nelson@usace.army.mil Include the below information.

1) Solicitation Number

2) Project Title

3) Name of firm with complete mailing address and telephone number

4) Name, title and phone number of each representative

Site Visit Point of Contact: Brian C. Nelson Email: Brian.C.Nelson@usace.army.mil Office Phone: (206) 316-3929

Alternate Site Visit POC: Mr John Hofstra Email: Jonathan.C.Hofstra@usace.army.mil Office Phone: (206) 789-2622 x201

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

If applicable, the solicitation will be altered via Amendment.

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The…