A.07.24_-_W912DW18R0004_Amendment_No._0007_MMDF_MAFB.pdf
PDF 420 KB Posted
- Attached to
- Missile Maintenance Dispatch Facility (MMDF), Malmstrom AFB Federal contract opportunity
- Solicitation number
- W912DW18R0004
About this file
W912DW18R0004 MMDF MAFB Amendment No. 0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DW18R0004_Amendment_No._0009_Offer_Extension.pdf | ||
| A.07.24_W912DW18R0004_Amendment_0006.pdf | ||
| A.07.24_-_W912DW18R0004_Amendment_No._0005_MMDF_MAFB.pdf | ||
| A.07.24_-_W912DW18R0004_Amendment_No._0004_MMDF_MAFB.pdf | ||
| A.07.24_-_W912DW18R0004_Amendment_No._0003_MMDF_MAFB.pdf | ||
| A.07.24_-_W912DW18R0004_Amendment_No._0002_MMDF_MAFB.pdf | ||
| Malmstrom_AFB_CEAL_template.xlsx | XLSX spreadsheet | |
| W912DW18R0004_MMDF_Amendment_0001_12JUN18.pdf | ||
| 18R0004_NZAS173001_MMDF_Drawings_-_Part_1_of_3.pdf | ||
| 18R0004_Attachment_1_for_Section_00_22_16.docx | DOCX document | |
| 18R0004_MMDF_Specs.pdf | ||
| 18R0004_NZAS173001_MMDF_Drawings_-_Part_2_of_3.pdf | ||
| 18R0004_MMDF_Contracting_Fronts.pdf | ||
| 18R0004_NZAS173001_MMDF_Drawings_-_Part_3_of_3.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Request for Proposal (RFP) No. W912DW18R0004, Missile Maintenance Dispatch Facility Amendment No. 0007
Please see continuation page for the Amendment details
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
17-Jul-2018
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW18R0004
X 9B. DATED (SEE ITEM 11)
01-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jul-2018
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW18R0004
Page 2 of 2 SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT NO. 0007
1. This Amendment No. 0007 provides for the following:
a. Incorporation of Section 02 61 13, Excavation and Handling of Contaminated Material
b. Incorporation of Section 02 82 13.00 10, Asbestos Abatement
c. Updated SF 1442 to reflect the extension of the proposal due date from 2:00:00 PM LOCAL TIME (Pacific
Time), 18 July 2018 to 2:00:00 PM LOCAL TIME (Pacific Time), 19 July 2018.
d. The proposal submittal time and date have been extended to 2:00:00 PM LOCAL TIME (Pacific Time), 19
July 2018.
2. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.
3. NOTICE TO OFFERORS: Offerors must acknowledge receipt of all amendments including this amendment by number and date. Offerors may acknowledge receipt of this Amendment No. 0007 electronically by emailing Shawna West at shawna.west@usace.army.mil with a copy to Susan Newby at susan.f.newby@usace.army.mil.
The Amendment acknowledgement shall include a reference to this solicitation (W912DW18R0004) and the Amendment number (0007).
4. All other terms and conditions remain unchanged.
Encl:
Section 02 61 13 Section 02 82 13.00 10 SF 1442 (Revised)
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 18-Jul-2018 02:00 PM to 19-Jul-2018 02:00 PM.
(End of Summary of Changes) mailto:shawna.west@usace.army.mil mailto:susan.f.newby@usace.army.mil
Provide all labor, materials, equipment, services, and incidentals required to perform all w ork for the project entitled: "Missile Maintenance
Dispatch Facility" at Malmstrom Air Force Base, Montana.
All offers submitted shall be in strict accordance w ith the solicitation documents and any amendments issued, as applicable.
In accordance w ith DFARS 236.204, the order of magnitude for this project is estimated to be in the range of $10,000,000.00 to $25,000,000.00.
A pre-proposal site-visit is scheduled on 26 June 2018 at 1000 AM MDT. Contractors are required to sign up in advance in order to gain access to the base. See Section 00 21 16 for more information.
This requirement is set-aside competitively for SBA Section 8(a) Certif ied Small Business concerns.
SHAWNA WEST 206-764-6575
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
01-Jun-2018
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________690 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________5 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________19 Jul 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912DW18R0004 72
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
MAFB Missile Maint Dispatch Facility 17004 Malmstrom AFB, Great Falls, MT W912DW18R0004
SECTION TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 61 13
EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02/10
PART 1 GENERAL
1.1 MEASUREMENT AND PAYMENT
1.1.1 Measurement
1.1.2 Payment
1.1.2.1 Excavation and Transportation
1.1.2.2 Backfilling
1.1.2.3 Stockpiling
1.2 REFERENCES
1.3 DESCRIPTION OF WORK
1.3.1 Scheduling
1.3.2 Work Plan
1.3.3 Other Submittal Requirements
1.4 SUBMITTALS
1.5 REGULATORY REQUIREMENTS
1.5.1 Permits and Licenses
1.5.2 Air Emissions
PART 2 PRODUCTS
2.1 SPILL RESPONSE MATERIALS
2.2 BACKFILL
PART 3 EXECUTION
3.1 SURVEYS
3.2 EXISTING STRUCTURES AND UTILITIES
3.3 CLEARING
3.4 CONTAMINATED MATERIAL REMOVAL
3.4.1 Excavation
3.4.2 Shoring
3.4.3 Dewatering
3.5 CONFIRMATION SAMPLING AND ANALYSIS
3.6 CONTAMINATED MATERIAL STORAGE
3.6.1 Stockpiles
3.6.2 Roll-Off Units
3.6.3 Liquid Storage
3.7 SAMPLING
3.7.1 Sampling of Stored Material
3.7.2 Sampling Liquid
3.8 SPILLS
3.9 BACKFILLING
3.9.1 Confirmation Test Results
3.9.2 Compaction
3.10 DISPOSAL REQUIREMENTS
3.11 CLOSURE REPORT
SECTION 02 61 13 Page 1
-- End of Section Table of Contents --
SECTION 02 61 13 Page 2
SECTION 02 61 13
EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02/10
PART 1 GENERAL
1.1 MEASUREMENT AND PAYMENT
1.1.1 Measurement
Measurement for excavation and onsite transportation shall be based on the actual number of cubic yards of contaminated material in-place prior to excavation. Determination of the volume of contaminated material excavated shall be based on cross-sectional volume determination reflecting the differential between the original elevations of the top of the contaminated material and the final elevations after removal of the contaminated material. Measurement for backfilling of excavated areas shall be based on in-place cubic yards of compacted fill. Measurement for construction of stockpile areas shall be based on the number of square yards of stockpile liner constructed.
1.1.2 Payment
1.1.2.1 Excavation and Transportation
Compensation for excavation and onsite transportation of contaminated material will be paid as a unit cost. This unit cost shall include any other items incidental to excavation and handling not defined as having a specific unit cost.
1.1.2.2 Backfilling
Compensation for backfill soil, transportation of backfill, backfill soil conditioning, backfilling, compaction, and geotechnical testing will be paid as a single unit cost.
1.1.2.3 Stockpiling
Compensation for construction of stockpile areas will be paid for as a unit cost. This unit cost shall include all aspects of grading, preparation, handling, placement, maintenance, removal, treatment, and disposal of stockpile cover materials and liner materials and all other items incidental to construction of stockpiles.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D1556/D1556M (2015; E 2016) Standard Test Method for Density and Unit Weight of Soil in Place by Sand-Cone Method
SECTION 02 61 13 Page 3
ASTM D2167 (2015) Density and Unit Weight of Soil in Place by the Rubber Balloon Method
ASTM D5434 (2012) Field Logging of Subsurface Explorations of Soil and Rock
ASTM D6938 (2017a) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926 Safety and Health Regulations for Construction
40 CFR 302 Designation, Reportable Quantities, and Notification
1.3 DESCRIPTION OF WORK
The work consists of excavation and temporary storage of approximately 250 cubic yards of contaminated material, if contaminated soil is identified in accordance with Section 01 35 45.00 10 CHEMICAL DATA QUALITY CONTROL.
If sample results exceed Montana Tier 1 Risk-Based Screening Levels (http://deq.mt.gov/land/statesuperfund/rbcaguide), submit a Work Plan as specified below. Notify the Contracting Officer within 24 hours, and before excavation, if contaminated material is discovered that has not been previously identified or if other discrepancies between data provided and actual field conditions are discovered. Backfill material is not available onsite . Ground water is approximately 35 feet below pre-excavation ground surface. Required sampling and chemical analysis shall be conducted in accordance with Section 01 35 45.00 10 CHEMICAL
DATA QUALITY CONTROL.
1.3.1 Scheduling
Notify the Contracting Officer 7 calendar days prior to the start of excavation of contaminated material. The Contractor shall be responsible for contacting regulatory agencies in accordance with the applicable reporting requirements.
1.3.2 Work Plan
Submit a Work Plan within 30 calendar days after notice to proceed. No work at the site, with the exception of site inspections and surveys, shall be performed until the Work Plan is approved. Allow 30 calendar days in the schedule for the Government's review. No adjustment for time or money will be made if resubmittals of the Work Plan are required due to deficiencies in the plan. At a minimum, the Work Plan shall include:
a. Schedule of activities.
SECTION 02 61 13 Page 4
b. Method of excavation and equipment to be used.
c. Shoring or side-wall slopes proposed.
d. Dewatering plan.
e. Storage methods and locations for liquid and solid contaminated material.
f. Borrow sources and haul routes.
g. Decontamination procedures.
h. Spill contingency plan.
1.3.3 Other Submittal Requirements
Submit separate cross-sections of each area before and after excavation and after backfilling, test results, and 3 copies of the Closure Report within 14 calendar days of work completion at the site.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Surveys
SD-03 Product Data
Work Plan; G Closure Report; G
SD-06 Test Reports
Backfill Surveys Confirmation Sampling and Analysis Sampling of Stored Material; G Sampling Liquid; G Compaction
1.5 REGULATORY REQUIREMENTS
1.5.1 Permits and Licenses
Obtain required federal, state, and local permits for excavation and storage of contaminated material. Permits shall be obtained at no additional cost to the Government.
SECTION 02 61 13 Page 5
1.5.2 Air Emissions
Air emissions shall be monitored and controlled in accordance with Section
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS.
PART 2 PRODUCTS
2.1 SPILL RESPONSE MATERIALS
Provide appropriate spill response materials including, but not limited to the following: containers, adsorbents, shovels, and personal protective equipment. Spill response materials shall be available at all times when contaminated materials/wastes are being handled or transported. Spill response materials shall be compatible with the type of materials and contaminants being handled.
2.2 BACKFILL
Backfill material shall be obtained in accordance with Section 31 00 00
EARTHWORK.
Do not use material for backfill until borrow source chemical and physical test results have been submitted and approved.
PART 3 EXECUTION
3.1 SURVEYS
Perform surveys immediately prior to and after excavation of contaminated material to determine the volume of contaminated material removed. Also, perform surveys immediately after backfill of each excavation. Provide cross-sections on 25 foot intervals and at break points for all excavated areas. Locations of confirmation samples shall also be surveyed and shown on the drawings. Perform surveys in accordance with Section 00 73 00
SPECIAL CLAUSES.
3.2 EXISTING STRUCTURES AND UTILITIES
No excavation shall be performed until site utilities have been field located. Take the necessary precautions to ensure no damage occurs to existing structures and utilities. Damage to existing structures and utilities resulting from the Contractor's operations shall be repaired at no additional cost to the Government. Utilities encountered that were not previously shown or otherwise located shall not be disturbed without approval from the Contracting Officer.
3.3 CLEARING
Clearing shall be performed to the limits shown on the drawings in accordance with Section 31 11 00 CLEARING AND GRUBBING.
3.4 CONTAMINATED MATERIAL REMOVAL
3.4.1 Excavation
Areas of contamination shall be excavated to the depth and extent shown on the drawings and not more than 0.2 ft beyond the depth and extent shown on the drawings unless directed by the Contracting Officer. Excavation shall be performed in a manner that will limit spills and the potential for
SECTION 02 61 13 Page 6 contaminated material to be mixed with uncontaminated material. An excavation log describing visible signs of contamination encountered shall be maintained for each area of excavation. Excavation logs shall be prepared in accordance with ASTM D5434.
3.4.2 Shoring
If workers must enter the excavation, it shall be evaluated, shored, sloped or braced as required by EM 385-1-1 and 29 CFR 1926 section 650.
3.4.3 Dewatering
Surface water shall be diverted to prevent entry into the excavation.
Dewatering shall be limited to that necessary to assure adequate access, a safe excavation, prevent the spread of contamination, and to ensure that compaction requirements can be met. No dewatering shall be performed without prior approval of the Contracting Officer.
3.5 CONFIRMATION SAMPLING AND ANALYSIS
The Contracting Officer shall be present to inspect the removal of contaminated material from each site. After all material suspected of being contaminated has been removed, the excavation shall be examined for evidence of contamination. If the excavation appears to be free of contamination, field analysis shall be used to determine the presence of petroleum hydrocarbons, benzene, toluene, ethylbenzene and xylene, (BTEX), and Resource Conservation and Recovery Act (RCRA) 8 metals with zinc contamination using Photo-ionization detectors (PID). Excavation of additional material shall be as directed by the Contracting Officer.
After all suspected contaminated material is removed, confirmation samples shall be collected and analyzed for the following contaminants listed above.
The Enforcement Division (EFND) of the Montana Department of Environmental Quality (DEQ) Soil Sampling Guidance and the DEQ Montana Risk-Based Corrective Action Guidance for Petroleum Releases shall be followed for sampling frequency, general procedures for sample locations and analytical methods. Samples shall be collected by a qualified person as specified in Section 01 35 45.00 10 CHEMICAL DATA QUALITY CONTROL, Paragraph
ENVIRONMENTAL SAMPLER QUALIFICATIONS.
A minimum of one sample shall be collected from the bottom of the excavation. Based on test results, propose any additional excavation which may be required to remove material which is contaminated above action levels. Additional excavation shall be subject to approval by the Contracting Officer. Locations of samples shall be marked in the field and documented on the as-built drawings.
3.6 CONTAMINATED MATERIAL STORAGE
Material shall be placed in temporary storage immediately after excavation .
The following paragraphs describe acceptable methods of material storage.
Storage units shall be in good condition and constructed of materials that are compatible with the material or liquid to be stored. If multiple storage units are required, each unit shall be clearly labeled with an identification number and a written log shall be kept to track the source of contaminated material in each temporary storage unit.
SECTION 02 61 13 Page 7
3.6.1 Stockpiles
Stockpiles shall be constructed to isolate stored contaminated material from the environment. The maximum stockpile size shall be 15 cubic yards.
Stockpiles shall be constructed to include:
a. A chemically resistant geomembrane liner free of holes and other damage. Non-reinforced geomembrane liners shall have a minimum thickness of 20 mils. Scrim reinforced geomembrane liners shall have a minimum weight of 40 lbs/1000 square feet. The ground surface on which the geomembrane is to be placed shall be free of rocks greater than 0.5 inches in diameter and any other object which could damage the membrane.
b. Geomembrane cover free of holes or other damage to prevent precipitation from entering the stockpile. Non-reinforced geomembrane covers shall have a minimum thickness of 10 mils. Scrim reinforced geomembrane covers shall have a minimum weight of 26 lbs/1000 square feet. The cover material shall be extended over the berms and anchored or ballasted to prevent it from being removed or damaged by wind.
c. Berms surrounding the stockpile, a minimum of 12 inches in height.
Vehicle access points shall also be bermed.
d. The liner system shall be sloped to allow collection of leachate.
Storage and removal of liquid which collects in the stockpile, in accordance with paragraph Liquid Storage.
3.6.2 Roll-Off Units
Roll-off units used to temporarily store contaminated material shall be water tight. A cover shall be placed over the units to prevent precipitation from contacting the stored material. Liquid which collects inside the units shall be removed and stored in accordance with paragraph Liquid Storage.
3.6.3 Liquid Storage
Liquid collected from excavations and stockpiles shall be temporarily stored in 55 gallon barrels. Liquid storage containers shall be water-tight and shall be located on-site during contaminated soil excavation.
3.7 SAMPLING
3.7.1 Sampling of Stored Material
Stored material with contaminant levels that exceed the action levels shall be treated offsite. Analyses for contaminated material to be taken to an offsite treatment facility shall conform to local, state, and federal criteria as well as to the requirements of the treatment facility. Documentation of all analyses performed shall be furnished to the Contracting Officer. Additional sampling and analyses to the extent required by the approved offsite treatment, storage or disposal (TSD) facility shall be the responsibility of the Contractor and shall be performed at no additional cost to the Government.
SECTION 02 61 13 Page 8
3.7.2 Sampling Liquid
Liquid collected from excavations and dewatering of groundwater shall be sampled at a frequency of once for every 500 gal of liquid collected.
Liquid with contaminant levels that exceed action levels shall be treated offsite. Analyses for contaminated liquid to be taken to an offsite treatment facility shall conform to local, state, and federal criteria as well as to the requirements of the treatment facility. Documentation of all analyses performed shall be furnished to the Contracting Officer.
Additional sampling and analysis to the extent required by the approved offsite treatment, storage or disposal (TSD) facility receiving the material shall be the responsibility of the Contractor and shall be performed at no additional cost to the Government.
3.8 SPILLS
In the event of a spill or release of a hazardous substance (as designated in 40 CFR 302 ), pollutant, contaminant, or oil (as governed by the Oil Pollution Act (OPA), 33 U.S.C. 2701 et seq.), notify the Contracting Officer immediately. If the spill exceeds the reporting threshold, follow the pre-established procedures as described in the Malmstrom Spill Prevention, control, and Countermeasure (SPCC) Plan for immediate reporting and containment. Immediate containment actions shall be taken to minimize the effect of any spill or leak. Cleanup shall be in accordance with applicable federal, state, and local regulations. As directed by the Contracting Officer, additional sampling and testing shall be performed to verify spills have been cleaned up. Spill cleanup and testing shall be done at no additional cost to the Government.
3.9 BACKFILLING
3.9.1 Confirmation Test Results
Excavations shall be backfilled immediately after all contaminated materials have been removed and confirmation test results have been approved. Backfill shall be placed and compacted to the lines and grades shown on the drawings.
3.9.2 Compaction
Place approved backfill in lifts in accordance with Section 31 00 00 EARTHWORK. Determine field in-place dry density in accordance with ASTM D1556/D1556M , ASTM D2167, or ASTM D6938. If ASTM D6938 is used, a minimum of one in ten tests shall be checked using ASTM D1556/D1556M or ASTM D2167. Test results from ASTM D1556/D1556M or ASTM D2167 shall govern if there is a discrepancy with the ASTM D6938 test results.
3.10 DISPOSAL REQUIREMENTS
Offsite disposal of contaminated material shall be in accordance with Section 02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS.
3.11 CLOSURE REPORT
Submit 3 copies of a Closure Report within 14 calendar days of completing work at the site. The report shall be labeled with the contract number, project name, location, date, name of general Contractor, and the Corps of Engineers District contracting for the work. The Closure Report shall include the following information as a minimum:
SECTION 02 61 13 Page 9
a. A cover letter signed by a responsible company official certifying that all services involved have been performed in accordance with the terms and conditions of the contract documents and regulatory requirements.
b. A narrative report including, but not limited to, the following:
(1) site conditions, ground water elevation, and cleanup criteria;
(2) excavation logs;
(3) field screening readings;
(4) quantity of materials removed from each area of contamination;
(5) quantity of water/product removed during dewatering;
(6) sampling locations and sampling methods;
(7) sample collection data such as time of collection and method of preservation;
(8) sample chain-of-custody forms; and
(9) source of backfill.
c. Copies of all chemical and physical test results.
d. Copies of all manifests and land disposal restriction notifications.
e. Copies of all certifications of final disposal signed by the responsible disposal facility official.
f. Waste profile sheets.
g. Scale drawings showing limits of each excavation, limits of contamination, known underground utilities within 50 feet of excavation, sample locations, and sample identification numbers.
On-site stockpile, storage, treatment, loading, and disposal areas shall also be shown on the drawings.
h. Progress Photographs. Color photographs shall be used to document progress of the work. A minimum of four views of the site showing the location of the area of contamination, entrance/exit road, and any other notable site conditions shall be taken before work begins.
After work has been started, activities at each work location shall be photographically recorded daily . Photographs shall be a minimum of 3 by 5 inches and shall include:
(1) Soil removal and sampling.
(2) Dewatering operations.
(3) Unanticipated events such as spills and the discovery of additional contaminated material.
(4) Contaminated material/water storage, handling, treatment, and transport.
SECTION 02 61 13 Page 10
(5) Site or task-specific employee respiratory and personal protection.
(6) Fill placement and grading.
(7) Post-construction photographs. After completion of work at each site, take a minimum of four views of each excavation site.
A digital version of all photos shown in the report shall be included with the Closure Report. Photographs shall be a minimum of 3 inches by 5 inches and shall be mounted back-to-back in double face plastic sleeves punched to fit standard three ring binders. Each print shall have an information box attached. The box shall be typewritten and arranged as follows:
Project Name: Direction of View:
Location: Date/Time:
Photograph No.: Description of View:
-- End of Section --
SECTION 02 61 13 Page 11
SECTION TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 82 13.00 10
ASBESTOS ABATEMENT
02/10
PART 1 GENERAL
1.1 PAYMENT PROCEDURES
1.2 REFERENCES
1.3 DEFINITIONS
1.3.1 Amended Water
1.3.2 Asbestos-Containing Material (ACM)
1.3.3 Authorized Person
1.3.4 Building Inspector
1.3.5 Class I Asbestos Work
1.3.6 Class II Asbestos Work
1.3.7 Class III Asbestos Work
1.3.8 Class IV Asbestos Work
1.3.9 Clean Room
1.3.10 Competent Person
1.3.11 Contractor/Supervisor
1.3.12 Critical Barrier
1.3.13 Decontamination Area
1.3.14 Demolition
1.3.15 Disposal Bag
1.3.16 Disturbance
1.3.17 Equipment Room or Area
1.3.18 Fiber
1.3.19 Friable ACM
1.3.20 Glovebag
1.3.21 High-Efficiency Particulate Air (HEPA) Filter
1.3.22 Intact
1.3.23 Model Accreditation Plan (MAP)
1.3.24 Negative Initial Exposure Assessment
1.3.25 NESHAP
1.3.26 Nonfriable ACM
1.3.27 Nonfriable ACM (Category I)
1.3.28 Nonfriable ACM (Category II)
1.3.29 Permissible Exposure Limits (PELs)
1.3.29.1 PEL-Time Weighted Average(TWA)
1.3.29.2 PEL-Excursion Limit
1.3.30 Regulated Area
1.3.31 Removal
1.3.32 Repair
1.3.33 Surfacing ACM
1.3.34 Thermal System Insulation (TSI) ACM
1.3.35 Transite
1.3.36 Worker
1.4 SYSTEM DESCRIPTION
1.4.1 Unexpected Discovery of Asbestos
1.4.2 Wallboard/Joint Compound
SECTION 02 82 13.00 10 Page 1
1.5 SUBMITTALS
1.6 QUALITY ASSURANCE
1.6.1 Written Qualifications and Organization Report
1.6.2 Specific Requirements
1.6.3 Federal, State or Local Citations on Previous Projects
1.6.4 Preconstruction Conference
1.7 SAFETY
1.7.1 Asbestos Hazard Abatement Plan Appendix
1.7.2 Activity Hazard Analyses Appendix
1.7.3 Local Exhaust System
1.8 SECURITY
1.8.1 Licenses, Permits and Notifications
1.8.2 Regulated Areas
1.8.3 Warning Signs and Tape
1.8.4 Warning Labels
1.9 MEDICAL SURVEILLANCE REQUIREMENTS
1.9.1 Respiratory Protection Program
1.9.2 Respiratory Fit Testing
1.9.3 Respirator Selection and Use Requirements
1.9.4 Personal Protective Equipment
1.9.5 Whole Body Protection
1.9.5.1 Coveralls
1.9.5.2 Gloves
1.9.5.3 Foot Coverings
1.9.5.4 Head Covering
1.9.5.5 Protective Eye Wear
1.10 HYGIENE
1.10.1 3-Stage Decontamination Area
1.10.2 Load-Out Unit
1.10.3 Single Stage Decontamination Area
1.10.4 Decontamination Area Exit Procedures
1.10.5 Smoking
1.11 TRAINING PROGRAM
PART 2 PRODUCTS
2.1 ENCAPSULANTS
2.2 ENCASEMENT PRODUCTS
2.3 EXPENDABLE SUPPLIES
2.3.1 Glovebag
2.3.2 Duct Tape
2.3.3 Disposal Containers
2.3.4 Sheet Plastic
2.3.4.1 Flame Resistant
2.3.4.2 Reinforced
2.3.5 Mastic Removing Solvent
2.3.6 Leak-tight Wrapping
2.3.7 Viewing Inspection Window
2.3.8 Wetting Agents
2.3.9 Strippable Coating
2.4 EQUIPMENT
2.4.1 Scales
2.4.2 Tools
2.4.3 Rental Equipment
2.4.4 Air Monitoring Equipment
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
SECTION 02 82 13.00 10 Page 2
3.2 PROTECTION OF ADJACENT WORK OR AREAS TO REMAIN
3.3 METHODS OF COMPLIANCE
3.3.1 Mandated Practices
3.3.2 Control Methods
3.3.3 Unacceptable Practices
3.3.4 Class I Work Procedures
3.3.5 Specific Control Methods for Class I Work
3.3.5.1 Negative Pressure Enclosure (NPE) System
3.3.5.2 Glovebag Systems
3.3.5.3 Wrap and Cut Operation
3.3.6 Asbestos Handling Procedures
3.3.7 Specific Control Methods for Class III Work
3.4 FINAL CLEANING AND VISUAL INSPECTION
3.5 LOCKDOWN
3.6 EXPOSURE ASSESSMENT AND AIR MONITORING
3.6.1 General Requirements
3.6.2 Initial Exposure Assessment
3.6.3 Negative Exposure Assessment
3.6.4 Preabatement Environmental Air Monitoring
3.6.5 Environmental Air Monitoring During Abatement
3.6.6 Final Clearance Air Monitoring
3.6.6.1 Final Clearance Requirements, NIOSH PCM Method
3.6.6.2 Final Clearance Requirements, EPA TEM Method
3.6.6.3 Air Clearance Failure
3.6.7 Air-Monitoring Results and Documentation
3.7 CLEARANCE CERTIFICATION
3.8 CLEANUP AND DISPOSAL
3.8.1 Title to ACM Materials
3.8.2 Collection and Disposal of Asbestos
3.8.3 Records and Management Plan
3.8.3.1 Asbestos Waste Shipment Records
3.8.3.2 Asbestos Management Plan
3.8.3.3 Re-Establishment Of Objects and Systems
ATTACHMENTS:
"Certificate of Workers Acknowledgment"
Training course completion certificates
Table 3
Table 2
Table 4
-- End of Section Table of Contents --
SECTION 02 82 13.00 10 Page 3
SECTION 02 82 13.00 10
ASBESTOS ABATEMENT
02/10
PART 1 GENERAL
1.1 PAYMENT PROCEDURES
Submit copies of weight bills and delivery tickets for payment to the Contracting Officer during the progress of the work. Furnish scale tickets for each load of ACM weighed and certified. These tickets must include tare weight; identification mark for each vehicle weighed; and date, time and location of loading and unloading. Tickets must be furnished at the point and time individual trucks arrive at the worksite.
A master log of all vehicle loading must be furnished for each day of loading operations. Before the final statement is allowed, file with the Contracting Officer certified weigh bills and/or certified tickets and manifests of all ACM actually disposed by the Contractor for this contract.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE Z9.2 (2012) Fundamentals Governing the Design and Operation of Local Exhaust Ventilation Systems
ASTM INTERNATIONAL (ASTM)
ASTM D4397 (2016) Standard Specification for Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications
ASTM E1368 (2014) Visual Inspection of Asbestos Abatement Projects
COMPRESSED GAS ASSOCIATION (CGA)
CGA G-7 (2014) Compressed Air for Human Respiration; 6th Edition
INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)
ANSI/ISEA Z87.1 (2015) Occupational and Educational Personal Eye and Face Protection Devices
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 701 (2015) Standard Methods of Fire Tests for Flame Propagation of Textiles and Films
SECTION 02 82 13.00 10 Page 4
NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)
NIOSH NMAM (2016; 5th Ed) NIOSH Manual of Analytical Methods
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
EP 1110-1-11 (1992; Change 1 1997) Engineering and Design -- Asbestos Abatement Guideline Detail Sheets
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 340/1-90/018 (1990) Asbestos/NESHAP Regulated Asbestos Containing Materials Guidance
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.134 Respiratory Protection
29 CFR 1910.141 Sanitation
29 CFR 1910.147 The Control of Hazardous Energy (Lock Out/Tag Out)
29 CFR 1926.1101 Asbestos
29 CFR 1926.32 Safety and Health Regulations for Construction - Definition
40 CFR 61 National Emission Standards for Hazardous Air Pollutants
40 CFR 763 Asbestos
42 CFR 84 Approval of Respiratory Protective Devices
49 CFR 107 Hazardous Materials Program Procedures
49 CFR 171 General Information, Regulations, and Definitions
49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements
49 CFR 173 Shippers - General Requirements for Shipments and Packagings
UNDERWRITERS LABORATORIES (UL)
UL 586 (2009; Reprint Dec 2017) Standard for High-Efficiency Particulate, Air Filter Units
SECTION 02 82 13.00 10 Page 5
1.3 DEFINITIONS
1.3.1 Amended Water
Water containing a wetting agent or surfactant with a surface tension of at least 29 dynes per square centimeter.
1.3.2 Asbestos-Containing Material (ACM)
Any materials containing more than one percent asbestos.
1.3.3 Authorized Person
Any person authorized by the Contractor and required by work duties to be present in the regulated areas.
1.3.4 Building Inspector
Individual who inspects buildings for asbestos and has EPA Model Accreditation Plan (MAP) "Building Inspector" training; accreditation required by 40 CFR 763 , Subpart E, Appendix C, has EPA/State certification/license as a "Building Inspector".
1.3.5 Class I Asbestos Work
Activities defined by OSHA involving the removal of thermal system insulation (TSI) and surfacing ACM.
1.3.6 Class II Asbestos Work
Activities defined by OSHA involving the removal of ACM which is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos - containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastic.
Certain "incidental" roofing materials such as mastic, flashing and cements when they are still intact are excluded from Class II asbestos work. Removal of small amounts of these materials which would fit into a glovebag may be classified as a Class III job.
1.3.7 Class III Asbestos Work
Activities defined by OSHA that involve repair and maintenance operations, where ACM, including TSI and surfacing ACM, is likely to be disturbed.
Operations may include drilling, abrading, cutting a hole, cable pulling, crawling through tunnels or attics and spaces above the ceiling, where asbestos is actively disturbed or asbestos-containing debris is actively disturbed.
1.3.8 Class IV Asbestos Work
Maintenance and custodial construction activities during which employees contact but do not disturb ACM and activities to clean-up dust, waste and debris resulting from Class I, II, and III activities. This may include dusting surfaces where ACM waste and debris and accompanying dust exists and cleaning up loose ACM debris from TSI or surfacing ACM following construction
SECTION 02 82 13.00 10 Page 6
1.3.9 Clean Room
An uncontaminated room having facilities for the storage of employees' street clothing and uncontaminated materials and equipment.
1.3.10 Competent Person
In addition to the definition in 29 CFR 1926.32 (f), a person who is capable of identifying existing asbestos hazards as defined in 29 CFR 1926.1101 , selecting the appropriate control strategy, has the authority to take prompt corrective measures to eliminate them and has EPA Model Accreditation Plan (MAP) "Contractor/Supervisor" training; has EPA/State certification/license as a "Contractor/Supervisor".
1.3.11 Contractor/Supervisor
Individual who supervises asbestos abatement work and has EPA Model Accreditation Plan "Contractor/Supervisor" training; has EPA/State certification as a "Contractor/Supervisor".
1.3.12 Critical Barrier
One or more layers of plastic sealed over all openings into a regulated area or any other similarly placed physical barrier sufficient to prevent airborne asbestos in a regulated area from migrating to an adjacent area.
1.3.13 Decontamination Area
An enclosed area adjacent and connected to the regulated area and consisting of an equipment room, shower area, and clean room, which is used for the decontamination of workers, materials, and equipment that are contaminated with asbestos.
1.3.14 Demolition
The wrecking or taking out of any load-supporting structural member and any related razing, removing, or stripping of asbestos products.
1.3.15 Disposal Bag
A 6 mil thick, leak-tight plastic bag, pre-labeled in accordance with 29 CFR 1926.1101 , used for transporting asbestos waste from containment to disposal site.
1.3.16 Disturbance
Activities that disrupt the matrix of ACM, crumble or pulverize ACM, or generate visible debris from ACM. Disturbance includes cutting away small amounts of ACM, no greater than the amount which can be contained in 1 standard sized glovebag or waste bag, not larger than 60 inches in length and width in order to access a building component.
1.3.17 Equipment Room or Area
An area adjacent to the regulated area used for the decontamination of employees and their equipment.
SECTION 02 82 13.00 10 Page 7
1.3.18 Fiber
A fibrous particulate, 5 micrometers or longer, with a length to width ratio of at least 3 to 1.
1.3.19 Friable ACM
A term defined in 40 CFR 61 , Subpart M and EPA 340/1-90/018 meaning any material which contains more than 1 percent asbestos, as determined using the method specified in 40 CFR 763 , Polarized Light Microscopy (PLM), that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
1.3.20 Glovebag
Not more than a 60 by 60 inch impervious plastic bag-like enclosure affixed around an asbestos-containing material, with glove-like appendages through which material and tools may be handled.
1.3.21 High-Efficiency Particulate Air (HEPA) Filter
A filter capable of trapping and retaining at least 99.97 percent of all mono-dispersed particles of 0.3 micrometers in diameter.
1.3.22 Intact
ACM which has not crumbled, been pulverized, or otherwise deteriorated so that the asbestos is no longer likely to be bound with its matrix.
Removal of "intact" asphaltic, resinous, cementitious products does not render the ACM non-intact simply by being separated into smaller pieces.
1.3.23 Model Accreditation Plan (MAP)
USEPA training accreditation requirements for persons who work with asbestos as specified in 40 CFR 763 .
1.3.24 Negative Initial Exposure Assessment
A demonstration by the Contractor to show that employee exposure during an operation is expected to be consistently below the OSHA Permissible Exposure Limits (PELs).
1.3.25 NESHAP
National Emission Standards for Hazardous Air Pollutants. The USEPA NESHAP regulation for asbestos is at 40 CFR 61 , Subpart M.
1.3.26 Nonfriable ACM
A NESHAP term defined in 40 CFR 61 , Subpart M and EPA 340/1-90/018 meaning any material containing more than 1 percent asbestos that, when dry, cannot be crumbled, pulverized or reduced to powder by hand pressure.
1.3.27 Nonfriable ACM (Category I)
A NESHAP term defined in 40 CFR 61 , Subpart E and EPA 340/1-90/018 meaning asbestos-containing packings, gaskets, resilient floor covering, and asphalt roofing products containing more than 1 percent asbestos.
SECTION 02 82 13.00 10 Page 8
1.3.28 Nonfriable ACM (Category II)
A NESHAP term defined in 40 CFR 61 , Subpart E and EPA 340/1-90/018 meaning any material, excluding Category I nonfriable ACM, containing more than 1 percent asbestos.
1.3.29 Permissible Exposure Limits (PELs)
1.3.29.1 PEL-Time Weighted Average(TWA)
Concentration of asbestos not in excess of 0.1 fibers per cubic centimeter of air (f/cc) as an 8 hour time weighted average (TWA).
1.3.29.2 PEL-Excursion Limit
An airborne concentration of asbestos not in excess of 1.0 f/cc of air as averaged over a sampling period of 30 minutes.
1.3.30 Regulated Area
An OSHA term defined in 29 CFR 1926.1101 meaning an area established by the Contractor to demarcate areas where Class I, II, and III asbestos work is conducted; also any adjoining area where debris and waste from such asbestos work accumulate; and an area within which airborne concentrations of asbestos exceed, or there is a reasonable possibility they may exceed, the permissible exposure limit.
1.3.31 Removal
All operations where ACM is taken out or stripped from structures or substrates, and includes demolition operations.
1.3.32 Repair
Overhauling, rebuilding, reconstructing, or reconditioning of structures or substrates, including encapsulation or other repair of ACM attached to structures or substrates.
1.3.33 Surfacing ACM
Asbestos-containing material which contains more than 1 percent asbestos and is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.
1.3.34 Thermal System Insulation (TSI) ACM
ACM which contains more than 1 percent asbestos and is applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain or water condensation.
1.3.35 Transite
A generic name for asbestos cement wallboard and pipe.
1.3.36 Worker
Individual (not designated as the Competent Person or a supervisor) who
SECTION 02 82 13.00 10 Page 9 performs asbestos work and has completed asbestos worker training required by 29 CFR 1926.1101 , to include EPA Model Accreditation Plan (MAP) "Worker" training; accreditation if required by the OSHA Class of work to be performed or by the state where the work is to be performed.
1.4 SYSTEM DESCRIPTION
This section covers all operations in which asbestos-containing materials (ACM) are encountered. These procedures and equipment are required to protect workers and building occupants from airborne asbestos fibers and ACM dust and debris. Activities include OSHA Class II and Class III work operations. This section also includes containment, storage, transportation and disposal of the generated ACM wastes. Submit Detailed Drawings in accordance with EP 1110-1-11 and containing descriptions, and site layout to include worksite containment area(s), local exhaust systems locations, decontamination units and load-out units, other temporary waste storage facility, access tunnels, location of temporary utilities (electrical, water, sewer) and boundaries of each regulated area. When the detail sheets are not attached to this specification, the Contractor can get them from the web at:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerPamphlets/EP_1110-1-11.pdf
1.4.1 Unexpected Discovery of Asbestos
For any previously untested building components suspected to contain asbestos and located in areas impacted by the work, notify the Contracting Officer (KO) who will have the option of ordering up to 20 bulk samples to be obtained at the Contractor's expense and delivered to a laboratory accredited under the National Institute of Standards and Technology (NIST) "National Voluntary Laboratory Accreditation Program (NVLAP)" and analyzed by PLM. If the asbestos content is less than 10 percent, as determined by a method other than point counting, the asbestos content must be verified by point counting. Any additional components identified as ACM that have been approved by the KO for removal must be removed and will be paid for by an equitable adjustment to the contract price under FAR 52.243-4 Changes. Sampling must be conducted by personnel who have successfully completed the EPA Model Accreditation Plan (MAP) "Building Inspector" training course and is EPA/State certified/licensed as a "Building Inspector".
1.4.2 Wallboard/Joint Compound
Both composite samples of the wallboard and discrete samples of the components (wallboard and joint compound) have been tested. Composite samples of the wallboard system were tested and found to contain less than one percent asbestos. Discrete samples of the wallboard were tested and found to contain less than one percent asbestos . Discrete samples of the joint compound were tested and found to contain greater than one percent asbestos.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SECTION 02 82 13.00 10 Page 10
SD-02 Shop Drawings
Detailed Drawings; G
SD-03 Product Data
Asbestos Waste Shipment Records; G
Weight Bills and Delivery Tickets
Encapsulants; G
Respiratory Protection Program; G
Cleanup and Disposal; G
Qualifications; G
Training Program
Licenses, Permits and Notifications
As…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.