Amendment R0006 is to revise Section 01 10 00 - Statement of Work and Bid Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0008.pdf | ||
| W912DW-17-R-0007-0005.pdf | ||
| SF1442__AMD_0004.pdf | ||
| R0003_Amended_Pkg.pdf | ||
| Amendment_R0003_Package.pdf | ||
| Amendment_R0002.pdf | ||
| Amendment_R0001.pdf | ||
| 17R0007_Solicitation_18July2017_Part_3_of_5.pdf | ||
| 17R0007_Solicitation_18July2017_Part_5_of_5.pdf | ||
| 17R0007_Solicitation_18July2017_Part_2_of_5.pdf | ||
| 17R0007_Solicitation_18July2017_Part_4_of_5.pdf | ||
| 17R0007_Solicitation_18July2017_Part_1_of_5.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to reflect additions and changes made to the Solicitation.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Sep-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW-17-R-0007
X 9B. DATED (SEE ITEM 11)
18-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Sep-2017
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW-17-R-0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION/CONTRACT FORM
The following have been added by full text:
SUMMARY AMENDMENT 0006
SUMMARY OF CHANGES
1. This amendment six (0006) is issued to replace the Bid Schedule and Section 01 10 00 in its entirety.
2. All other information remains unchanged.
3. The current proposal due date remains unchanged: 15 September 2017 at 2:00PM PST
4. NOTICE TO OFFERORS: Offerors must acknowledge receipt of this amendment by number and date on proposal. Please mark outside of envelope in which your offer is enclosed to show amendment received.
Encl:
Section 01 10 00 – Statement of Work Bid Schedule
(End of Summary of Changes)
FY16 JBLM Decentralize Heating Plants W912DW-17-R-0007 Joint Base Lewis-McChord, WA
Section 01 10 00 - STATEMENT OF WORK 3 R0006
PART 1 - DESIGN AND CONSTRUCTION OBJECTIVES
1.1. GENERAL
The objective of this project is to convert 58 buildings in the East Division area from central plant heating systems to individual, local heat sources. Most buildings will be fitted with new natural gas fired boilers.
This requires removal of existing heating equipment and installing new natural gas service lines, boilers, radiant heaters, heat pumps, and ancillary equipment. Motor pool and hangar work bays shall be fitted with infrared radiant heat systems. Additionally, a small number of buildings shall be fitted with heat pump based HVAC systems. Where necessary, new mechanical space shall be constructed to accommodate the new equipment.
Work for this project shall include decentralizing all buildings connected to Central Plants 9, 10, and 11;
decommissioning and “mothballing” the central plants; demolishing and backfilling 37 utility vaults; and infilling of approximately 5,944 linear feet of steam pipe utility corridor.
Design and construction shall comply with the specifications and requirements contained in this Performance Work Statement (PWS). The criteria contained in this PWS establish minimum standards for design and construction quality.
The Contractor is responsible for providing all labor and materials to design and construct complete and functional heating systems for all buildings according to the work described in this Project Work Statement.
1.1.1. Site Area
This project is located in the East Division area of Joint Base Lewis-McChord, just east of Gray Army Airfield. The following buildings are included in the scope of work: 03101, 03110, 03131, 03132, 03134, 03146, 03148, 03152, 03168, 03170, 03171, 03172, 03173, 03174, 03175, 03176, 03177, 03227, 03228, 03229, 03230, 03231, 03232, 03233, 03234, 03236, 03238, 03242, 03243, 03245, 03271, 03275, 03277, 03278, 03279, 03280, 03281, 03283, 03284, 03286, 03287, 03288, 03289, 03291, 03292, 03298, 03299, 03306, 03328, 03405, 03441, 03442, 03444, 03445, 03446, 03447, 03481, and 03482.
1.1.2. Special Utilities and Supplementary Construction
The installation of a natural gas network pipelines must be coordinated with Puget Sound Energy.
There will be zero cost associated with Puget Sound Energy’s installation of gas mains, service lines, and meters. All work for providing gas service to appliances downstream of the meters shall be performed by the Contractor. Additional details can be found in Paragraph GAS DISTRIBUTION SYSTEM below.
1.1.3. Demolition Considerations and Requirements
Demolish and backfill 37 existing 10-foot by 10-foot steam vaults associated with the distribution network for Central Plants 9, 10, and 11 to a minimum depth of two and one-half feet (optional bid item; see Attachment 01 10 00 – Item 1 for vault locations). Additionally, remove all steam and condensate pipe and infill the existing utility corridor such that the existing removable concrete sidewalk panels will bear directly on suitable fill material (optional bid item; see paragraph SUITABLE
FY16 JBLM Decentralize Heating Plants Joint Base Lewis-McChord, WA W912DW-17-R-0007
BID SCHEDULE
CLIN
Item #
Description of Item
Quantity
Unit
Unit Price
Amount
OPTIONAL ITEMS
0008 All work associated with demolition and backfilling of thirty-seven utility vaults.
1 JOB N/A $____________________
0009 All work associated with removal of approximately 5,944 linear feet of steam and approximately 5,944 linear feet of condensate pipe, and infilling of utility corridors.
1 JOB N/A $____________________
0010 All work associated with providing DDC control systems with connection to base-wide EMCS system in buildings 03110, 03275, 03131, 03132, 03134, 03146, 03170, 03171, 03172, 03173, 03174, 03175, 03176, 03177, 03227, 03228, 03229, 03230, 03231, 03232, 03233, 03234, 03242, 03243, 03245, 03277, 03289, 03298, 03299, 03442, and 03447.
1 JOB N/A $____________________
TOTAL ALL OPTIONAL ITEMS 0008-0010 $____________________
TOTAL ALL ITEMS 0001-0010 $____________________
NOTES:
1) To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Bid Schedule as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
2) Offerors must insert a price on all numbered items of the Bid Schedule. Failure to do so will result in the offer being unacceptable.
3) The dollar amount established in Item Nos. 0005, 0006, and 0007 shall not be revised by bidders.
4) There will be zero cost associated with Puget Sound Energy’s installation of gas mains, service lines, and meters. The Bidder’s work shall include all pipeline trenching provisions including routing, trenching and backfilling, bedding, and meter locations.