Amendment_R0003_Package.pdf

PDF 153 KB Posted

Attached to
Decentralize Heating Plants Federal contract opportunity
Solicitation number
W912DW-17-R-0007
Issued by
Department of the Army Corps of Engineers Engineering District Seattle

About this file

Amendment 0003 SF30 and updated Division 01 10 00

View the file

Other files for this federal contract opportunity

Other files attached to Decentralize Heating Plants, newest first.
File Type Posted
Amendment_0008.pdf PDF
Amendment_R0006.pdf PDF
W912DW-17-R-0007-0005.pdf PDF
SF1442__AMD_0004.pdf PDF
R0003_Amended_Pkg.pdf PDF
Amendment_R0002.pdf PDF
Amendment_R0001.pdf PDF
17R0007_Solicitation_18July2017_Part_3_of_5.pdf PDF
17R0007_Solicitation_18July2017_Part_5_of_5.pdf PDF
17R0007_Solicitation_18July2017_Part_2_of_5.pdf PDF
17R0007_Solicitation_18July2017_Part_4_of_5.pdf PDF
17R0007_Solicitation_18July2017_Part_1_of_5.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R0003

TABLE OF CONTENTS

BID SCHEDULE

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Solicitation, Offer, and Award

00 21 00 Instructions, Conditions, and Notices to Offeror

00 22 20 Evaluation Factors for Award

WA160038 Wage Rates

00 73 00 Special Clauses

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00 STATEMENT OF WORK

01 10 00-A Attachments to SOW

01 10 00-B PSE Estimate of Work

01 14 10 SUPPLEMENTARY REQUIREMENTS FOR JOINT BASE LEWIS-MCCHORD

01 22 01 MEASUREMENT AND PAYMENT

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

SUBMITTAL REGISTER

01 33 16.00 10 DESIGN AFTER AWARD

01 33 22 CONSTRUCTION PHASE CAD REQUIREMENTS

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 26-A IMMEDIATE REPORT OF ACCIDENT

01 35 45.00 10 CHEMICAL DATA QUALITY CONTROL

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.10 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 50 00-A PROJECT & SAFETY SIGN REQUIREMENTS

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 57 20-A COONSTRUCTION GENERAL PERMIT GUIDANCE

01 57 20-B JBLM IMMEDIATE ACTIONS FOR SPILLS

01 57 23 TEMPORARY STORM WATER POLLUION CONTROL

01 62 35 RECYCLED / RECOVERED MATERIALS

R0003

01 62 35-A Procurement Guide for Recovered Materials

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 74 19-A CONSTRUCTION & DEMOLITION DIVERSION-DISPOSAL FORM

01 78 00 CLOSEOUT SUBMITTALS

01 78 04 FORM 1354 CHECKLIST

01 78 05 INSTALLED BUILDING EQUIPMENT (REAL PROPERTY) AND EQUIPMENT-IN-PLACE LIST

01 78 23 OPERATION AND MAINTENANCE MANUALS

01 78 36 WARRANTY OF CONSTRUCTION

01 91 00.15 COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

02 83 13.00 20 LEAD IN CONSTRUCTION

APPENDICES

APPENDIX A.pdf APPENDIX A - TRACKING IN DR CHECKS

APPENDIX B.pdf APPENDIX B - DISTRIBUTION LIST

APPENDIX C.pdf APPENDIX C - AS-BUILT REFERENCE PLANS

APPENDIX D.PDF APPENDIX D - OUTLINE SPECIFICATIONS

APPENDIX E.PDF APPENDIX E - PHOTOS

APPENDIX F.PDF APPENDIX F - GEOTECHNICAL REPORTS

APPENDIX G.PDF APPENDIX G - ENVIRONMENTAL

File details come from the government source that posted it. Updated .