Amendment_R0005.pdf

PDF 433 KB Posted

Attached to
Chief Joseph Dam DC & Preferred AC Upgrades, Bridgeport, WA
Solicitation number
W912DW-17-R-0001
Issued by

About this file

Amendment 0005

View the file

Other files

File Type Posted
R0007.pdf PDF
Amendment_0006.pdf PDF
R0004.pdf PDF
W912DW-17-R-0001_Solicitation_&_Specs_(pdf_security_removed).pdf PDF
R0003.pdf PDF
00_24_00_Attachment_A.docx DOCX document
Amendment_0002.pdf PDF
R0001.pdf PDF
PN320900_CJDCAC-00-COMPILATION-100_.pdf PDF
PN320900_CJDCAC-18-REFERENCE_DRAWINGS-100_.pdf PDF
W912DW-17-R-0001.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68MD961321047 320900

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Chief Joseph Dam DC Preferred AC Upgrades

Please see Continuation Page for details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Dec-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW-17-R-0001

X 9B. DATED (SEE ITEM 11)

17-Nov-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Dec-2016

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CECT-NWS

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW-17-R-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of Amendment five (0005) is as follows:

Incorporate below items as indicated.

1. Specifications – revised specification section is as follows:

26 32 34.00 26

The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.

2. Evaluation Factors for Award (Criteria) Section 00 24 00 is revised and replaced in its entirety. Changes in red.

3. Proposal Submittal Proposal submittal date/time is extended to 28 December 2016 at 12:30:00 p.m. LOCAL TIME. The SF1442 Solicitation, Offer and Award is revised to reflect the date extension.

4. ProjNet Bidder Inquiry ProjNet Bidder Inquiry will close for comments on 22 December 2016 at 12:00:00 p.m. LOCAL TIME.

NOTICE TO OFFERORS: Offerors must acknowledge receipt of this amendment by number and date on offer.

Encl:

26 32 34.00 26 (revised) 00 24 00 (revised) SF1442 (revised)

(End of Summary of Changes)

CHIEF JOSEPH POWERHOUSE DC AND PREFERRED AC UPGRADES 16010

SECTION TABLE OF CONTENTS

DIVISION 26 - ELECTRICAL

SECTION 26 32 34.00 26

BATTERIES

PART 1 GENERAL

1.1 GENERAL INFORMATION

1.2 REFERENCED PUBLICATIONS

1.3 SUBMITTALS

PART 2 PRODUCTS

2.1 BATTERIES

2.1.1 General

2.1.2 Plate Construction

2.1.3 Cell Construction

2.1.4 Electrolyte

2.1.5 Accessories

2.1.6 Spill Barrier and Absorbent

2.1.7 Battery Terminal Shrouds

2.2 BATTERY MONITORING SYSTEM

2.2.1 General

2.2.2 Hardware

2.2.3 Software

2.2.4 Wiring and Equipment

2.2.5 Measurement Parameters

2.2.5.1 General

2.2.5.2 Accessories

2.3 HYDROGEN GAS DETECTOR

2.4 SMOKE DETECTOR

2.5 SEISMIC BATTERY RACKS AND BARRIERS

2.6 FANS

2.7 PLATFORM LIFT

2.8 BATTERY ROOM CRANES

PART 3 EXECUTION

3.1 EQUIPMENT REMOVAL

3.2 EQUIPMENT INSTALLATION

3.2.1 General

3.2.2 Battery and Rack Installation

3.2.3 Battery Monitoring System

3.2.4 Spill Barriers and Absorbent

3.2.5 Ventilation Fans

3.2.6 On-Site Maintenance Charging

3.3 INSPECTION AND TESTS

3.3.1 Battery Capacity Test

3.3.2 Inspection

3.3.3 Tests

3.3.4 Safety

3.3.5 Field Testing

3.3.6 Operating Tests

3.3.7 Acceptance

3.4 OPERATION AND MAINTENANCE MANUALS

SECTION 26 32 34.00 26 Page 1

W912DW-17-R-0001 R0005

3.5 TRAINING

-- End of Section Table of Contents --

SECTION 26 32 34.00 26 Page 2

SECTION 26 32 34.00 26

BATTERIES

PART 1 GENERAL

1.1 GENERAL INFORMATION

a. Remove and dispose of the following:

(1) Two(2) 58 cell 125VDC Battery Banks (Battery Banks #1 and #2)

(2) One(1) 116 cell 125/ 250VDC Battery Bank (Battery Bank #3)

(3) One(1) 24 cell 24/48VDC Battery Bank (Battery Bank #4, except that Battery Bank #4 shall be re-installed instead of disposed of)

b. Remove and dispose of all existing battery racks in Battery Room No. 1 on EL. 798 and in Battery Room No. 2 on EL. 798.

c. Remove and dispose the conductors from existing 125VDC and 125/250VDC Battery Banks #1 and #3, respectively, in Battery Room No.

1 on EL. 798 to the DC switchboard SB on EL. 785.

d. Remove and dispose the conductors from existing 125VDC Battery Bank #2 in Battery Room No. 2 to the DC switchboard CE21 outside Battery Room No. 2 on EL. 798.

e. Remove and dispose the conductors from existing 24/48VDC Battery Bank #4 in Battery Room No. 1 on EL. 798 to the DC switchboard CD1 on EL. 785 in the cable gallery by the Station Service bay.

f. Remove and dispose exhaust fans at Battery Rooms No. 1 and No. 2.

g. Remove and dispose existing 125/250VDC Battery Bank #3 interconnection cable boxes in Battery Room No. 1.

h. Furnish and install two (2) new 58 cell 125VDC Battery Banks BE-1 and BE-2 with seismic racks as per this specification.

i. Furnish and install one (1) new 116 cell 125/250VDC Battery Bank BE-3 with seismic racks as per this specification.

j. Furnish and install one (1) new seismic rack and re-install existing 24 cell 24/48VDC Battery Bank BE-4 as per this specification.

k. Furnish and install four (4) new spill mitigation barriers with absorbent floors as per this specification.

l. Furnish and install four (4) new battery monitoring systems for each new battery bank complete with computers, diagnostic equipment, wiring, dry output contacts, and battery monitoring software packages.

m. Furnish and install battery room hydrogen gas detectors and smoke detectors in Battery Rooms No. 1 and No. 2.

n. Furnish and install replacement exhaust fans and new supply fans, complete with ducting, power, controls, and alarms at Battery Rooms No. 1 and No. 2.

SECTION 26 32 34.00 26 Page 3

o. Inspect and test the installed equipment to verify functionality and proper connection.

p. Furnish and install a junction box at each battery room required to distribute the 120VAC preferred AC power to the room monitors and detectors.

q. Furnish and install a junction box at each battery room required to gather all room monitors and detector alarms.

r. Provide on-site maintenance charging of all battery cells delivered to the site prior to installation of the batteries and cutover to the new battery chargers, in accordance with the battery manufacturer's requirements for warranty purposes.

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

INTERNATIONAL CODE COUNCIL (ICC)

ICC IBC (2015) International Building Code

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE 450 (2010) Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications

IEEE 484 (2002; R 2008) Recommended Practice for Installation Design and Installation of Vented Lead-Acid Storage Batteries for Stationary Applications

IEEE 1375 (1998; R 2003) Guide for the Protection of Stationary Battery Systems

IEEE 1491 (2012) Selection and Use of Battery Monitoring Equipment in Stationary Applications

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3-4 2014; AMD 4-6 2014) National Electrical Code

UNDERWRITERS LABORATORIES (UL)

UL 94 (1996; R2006) Tests for Flammability of Plastic Materials for Parts in Devices and Appliances

SECTION 26 32 34.00 26 Page 4

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. In addition to the submittals required by SECTION 26 05 00.00 26 , the following shall be submitted in accordance with SECTION 01 33 00 unless otherwise indicated below:

SD-02 Shop Drawings

Drawings of the Seismic Battery Racks and Barriers ; G, HDC

Coordination Drawings of the Seismic Battery Racks, Battery Cells, and Hoists ; G, HDC

SD-03 Product Data

Batteries ; G, HDC

Seismic Battery Racks and Barriers ; G, HDC

Battery Terminal Shrouds ; G, HDC

Battery Monitoring System ; G, HDC

Spill Barrier and Absorbent ; G, HDC

Hydrogen Gas Detector ; G, HDC

Smoke Detector ; G, HDC

Platform Lift ; G, HDC

SD-06 Test Reports

Within 30 calendar days before delivery, submit five copies of the following:

Battery Capacity Test Results ; G, HDC

SD-07 Certificates

Within 30 calendar days after notice to proceed, submit five copies of the following:

Battery Capacity Test Procedures ; G, HDC

Certification of Compliance for the Seismic Battery Racks ; G, HDC

SD-10 Operation and Maintenance Data

Operation and Maintenance Manuals ; G, HDC

SECTION 26 32 34.00 26 Page 5

PART 2 PRODUCTS

2.1 BATTERIES

2.1.1 General

a. The battery furnished under these specifications shall be the following make or approved equal:

Battery System Model Nominal Amp-hour capacity at 8 hour rate

125VDC BE-1 Enersys GC-35M 3085

125VDC BE-2 Enersys GC-27M 2360

125/250VDC BE-3 Enersys GC-35M 3085

24/48VDC BE-4 Existing to be re-installed

b. For the purpose of determining an approved equal, the following specifications shall apply:

The batteries shall be an ungrounded, lead-calcium, flooded cell, vented type station batteries for all systems and shall meet the nominal amp hour capacity (8 hour rate) requirement as specified above. The batteries shall be suitable for operation in a hydroelectric powerhouse. The two (2) 125VDC shall consist of 58 cells each, the one (1) 125/250VDC battery shall consist of 116 cells, and the 24/48VDC battery bank shall consist of 24 cells. The nominal cell voltage shall be 2.00VDC with a floating voltage of 2.25VDC.

Additionally, the end of duty cycle minimum cell voltage shall be 1.81

1.75 VDC/cell for Battery Banks BE-1, BE-2, and BE-3. If the

manufacturer only provides data based on 1.75Vpc, the manufacturer must convert that into data equivalent to 1.81Vpc and include that in the submittal.

c. The batteries shall be at least 95% charged at delivery and after installation.

d. The batteries shall be warranted for a minimum of 7 years have a pro-rated warranty to the end of life. An expectancy of design life shall be no less than 20 years.

e. Battery bank design, installation and protection shall meet or exceed the requirements within IEEE 484 and IEEE 1375 .

f. Battery banks shall be supplied with all necessary insulated inter-cell connectors and terminal lugs, bolts and plates necessary for the complete assembly. Terminal lugs for Battery Banks BE-1, BE-2 and BE-3 shall be capable of accepting a minimum of two (2) 500kcmil cables per polarity including the center tap for the 125/250VDC Battery System BE-3.

g. Inter-cell connectors shall be jacketed flexible conductors of adequate ampacity.

h. Each battery cell shall be supplied fitted with an adhesive

SECTION 26 32 34.00 26 Page 6 equipment nameplate.

i. Each battery bank shall be supplied with a set of large adhesive numbers which will be applied on site to identify each cell (sequentially) in the bank.

j. Cell containers shall be transparent.

2.1.2 Plate Construction

The batteries shall have grid plates of lead-calcium. Separator shall be of the low resistance type.

2.1.3 Cell Construction

The cell container shall be a flame retardant thermoplastic jar conforming to UL 94 .

2.1.4 Electrolyte

The electrolyte shall have a specific gravity within the range of 1.215 and 1.240 at 77 degrees F.

2.1.5 Accessories

The batteries shall be furnished with the manufacturer's standard recommended accessories including but not limited to the following:

a. All associated lead-plated copper intercell and terminal connectors

b. Acid-resistant cell numerals

c. Thermometer with holder

d. Cell lifting device

e. Special tools as required by the manufacturer for maintenance

f. Battery terminal shrouds, including twelve (12) extra shrouds for future replacement

g. One safety kit per battery room with a disposal capacity recommended by the manufacturer.

2.1.6 Spill Barrier and Absorbent

The spill barrier for each battery bank shall be minimum 12 gauge steel or as otherwise approved, minimum four inches in height, galvanized or PVC coated, and shall be designed to allow adjustment in the field. The contractor shall provide liners and absorbent that are UL recognized with a Class A fire rating or otherwise approved for battery acid. Absorbent material shall be UL Listed for use as a battery acid spill absorbent and placed within both spill barriers to cover the floor within the barriers to a depth of one to three inches or as recommended by the absorbent manufacturer for these installations.

2.1.7 Battery Terminal Shrouds

All battery terminals and posts shall be fitted with battery terminal shrouds to insulate the terminal or post from accidental contact with any other object. Shrouds shall be similar to RPC Ltd. BAX-003 series shrouds. Shrouds shall have meter probe holes or provisions to allow for passage of the battery monitoring system wiring through the shroud without having to cut openings in the shroud.

SECTION 26 32 34.00 26 Page 7

2.2 BATTERY MONITORING SYSTEM

2.2.1 General

The battery monitoring system for each battery bank shall monitor each cell. There shall be four battery monitoring systems, one for each battery bank. Battery monitoring shall be in accordance with Part 4 of

IEEE 1491 .

2.2.2 Hardware

The monitoring system, or each system, shall be PC-based, and shall include a computer, monitor, keyboard, mouse, and operating system (Windows 7 or later), all meeting the system requirements of Section 01 45 00.10 10 , QUALITY CONTROL SYSTEM. Only one computer need be provided of the Contractor can show that it can monitor all four systems separately without having to physically switch any connections. The system shall be capable of providing an external output (rated 125VDC) for at least one trouble indication, for the DC system annunciator panel.

Each battery system shall be powered by the preferred AC system and shall be hardwired, not powered by a convenience outlet.

2.2.3 Software

The system shall include a software package capable of receiving and recording the measured parameters and shall be the product of a firm specializing in providing software for this purpose, regularly engaged in that business for a minimum of five (5) years. The software package and version shall have been in commercial use for a minimum of the last three

(3) years. The user interface shall be such that parameters may be queried by the mouse from selections displayed on the monitor and shall not require the use or knowledge of a specialized computer programming language. The Contractor shall configure the software for the batteries, and perform testing and debugging to demonstrate proper operation.

2.2.4 Wiring and Equipment

Wiring conforming to Section 26 05 19.00 26 , INSULATED WIRE AND CABLE shall be run along the string of cells of each battery in plastic wireway. Data-gathering nodes shall be provided as required.

2.2.5 Measurement Parameters

2.2.5.1 General

Parameters to be monitored on all batteries shall be in accordance with Part 7 of IEEE 1491 , including but not limited to:

a. Float voltage (per battery)

b. Equalizing voltage (per battery)

c. Recharge Voltage (per battery)

d. Open-circuit voltage (per battery and per cell)

e. Discharge Voltage (per battery)

f. DC current (per battery)

g. Ripple voltage (per battery)

h. Ripple current (per battery)

i. Cell temperature (pilot cell)

j. Ambient temperature (Battery Room)

SECTION 26 32 34.00 26 Page 8

2.2.5.2 Accessories

The batteries monitoring system shall be furnished with the manufacturer's standard recommended accessories and spare parts, including but not limited to the following:

a. Two (2) spare data collecting nodes

b. One (1) spare float current monitor

c. One (1) spare controller

d. One (1) spare alarm output card

e. Special tools as required by the manufacturer for maintenance

2.3 HYDROGEN GAS DETECTOR

Provide hydrogen gas detecting modules (wall-mounted controller with remote sensor on ceiling) in the Battery Rooms (one (1) in Battery Room #1 and one (1) in Battery Room #2) for detecting and alarming upon detection of high concentrations of hydrogen gas. The detections modules shall include the following characteristics and features:

a. Alarm relay, SPDT, that operates at 1% concentration of hydrogen

b. Alarm relay, SPDT, that operates at 2% concentration of hydrogen

c. Pulsing alarm horn that activates at 2% concentration of hydrogen

d. Power on indicating light

e. 1% concentration alarm light

f. 2% concentration alarm light

g. 120VAC power supply

h. Test pushbutton

Alarm relays shall be rated for 125VDC, or rated 24VDC and provided with an interposing relay for 125VDC alarm signal. The alarm may be a wall-mounted conroller with remote sensor.

2.4 SMOKE DETECTOR

Provide smoke detectors for each battery room for detecting and alarming upon detection of smoke. Include the following characteristic and features for the detector:

a. Alarm relay, SPDT

b. The supply voltage shall be rated at 120VAC, 60Hz with a 9V battery backup.

c. The unit be photoelectric smoke sensor type.

d. The unit shall include a test button that will electronically simulate the presence of smoke and cause the unit to go into alarm.

Alarm relay shall be rated for 125VDC, or rated 24VDC and provided with an interposing relay for 125VDC alarm signal.

2.5 SEISMIC BATTERY RACKS AND BARRIERS

Battery racks, including anchors, and installation, shall be as per IEEE 484 paragraph 5.3 and shall be able to withstand the seismic criteria presented in Section 13 48 00.00 26 , SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT, paragraph DESIGN STANDARDS. Certification of compliance for the seismic battery racks shall be submitted. The battery racks shall be of the horizontal, double stepped tier assembly based on space availability as shown on the Contract drawings. The contractor shall submit drawings of the Seismic Battery Racks and Barriers .

SECTION 26 32 34.00 26 Page 9

2.6 FANS

Supply and exhaust fans shall be provided with air flow switches that will alarm locally and remotely with any loss of air flow condition. Provide a visual annunciation device above and outside each battery room door, match existing, field verify prior to demolition.

2.7 PLATFORM LIFT

Furnish two manually-operated hydraulic platform lifts for battery cell movement throughout the powerhouse. Lift shall have 1,000 lb capacity, lift height minimum 60", lowered height maximum 6", outside width maximum 26", and floor locks. Similar to Acran 5BTL0002 or Wesco 260044.

2.8 BATTERY ROOM CRANES

Battery Room No. 1 shall have two bridge crane/hoists, Battery Room No. 2 shall have one bridge crane/hoist. See Section 41 22 23.19 26 BATTERY ROOM CRANES. The Prime Contractor shall assume responsibilty for coordinating the various subcontractors for the seismic battery racks, battery cells, and cranes/hoists. The hoists shall be demonstrated as suitable for lifting any cell clear of the seismic rack and neighboring cells by submitting Coordination Drawings of the Seismic Battery Racks, Battery Cells, and Hoists for approval. The submittal shall include catalog cuts and procedural descriptions of how any cell is to be prepared for hoisting (straps, yokes, etc.) both for installing in a rack and for removing from a rack.

PART 3 EXECUTION

3.1 EQUIPMENT REMOVAL

a. Extra care shall be taken when removing the batteries to ensure that all hazardous materials are handled properly and in accordance with all Local, State, and Federal requirements.

b. The contractor shall remove the battery banks in stages as per the equipment replacement and cutover plan and shall coordinate the removal plan with the Government. Contractor is responsible for disconnecting intercell connections.

c. Contractor shall coordinate with the government before removal and subsequent disposal of existing batteries.

d. Contractor shall provide a Certificate of Disposal, which includes, but is not limited to the following:

(1) Model Number, Serial Number, and Quantity of batteries.

(2) Name of Approved EPA Battery Recycling Facility where contractor will dispose batteries.

e. Contractor shall provide a Certificate of Recycling from the EPA Approved Recycling Facility that certifies that the batteries have been disposed of properly.

f. Contractor shall plug or isolate existing drains in battery rooms

SECTION 26 32 34.00 26 Page 10 during battery installation.

3.2 EQUIPMENT INSTALLATION

3.2.1 General

Installation of the batteries and all systems described herein shall conform to IEEE 484 and the manufacturer's literature. The contractor shall install and make ready for operation the battery systems in accordance with this specification, the approved installation plan, the plan requited in paragraph EQUIPMENT REPLACEMENT AND CUTOVER PLAN in Section 26 05 00.00 26 , BASIC ELECTRICAL MATERIALS AND METHODS, and the contract drawings.

3.2.2 Battery and Rack Installation

Battery and rack installation shall conform to IEEE 484 and the manufacturer's literature. All new battery racks shall comply with the seismic requirements of Section 13 48 00.00 26 , SEISMIC RESTRAINT FOR

MECHANICAL AND ELECTRICAL EQUIPMENT.

3.2.3 Battery Monitoring System

The battery monitoring system wiring for the cells for each battery shall be installed along the length of the battery for each battery bank.

Wiring running to the data collection nodes and/or diagnostics boxes shall be in a wireway approved for the application. Wireway installation shall not interfere with access to the cell terminals or electrolyte openings.

Wireway installed such that conflicts of this nature have occurred during installation shall be removed and reinstalled properly. Data collection nodes and/or diagnostics boxes or similar equipment shall be installed at one end of each battery and may utilize the existing structural supports vacated by the existing nodes or shall be supported by new galvanized steel strut as required and complying with the requirements of SECTION 13 48 00.00 26 .

3.2.4 Spill Barriers and Absorbent

The barrier material shall be fixed to the floor by the approved acid-resistant adhesive gel applied the full length along the perimeter of each battery. The floor area under each battery and the legs of the battery racks shall be coated with the approved acid-resistant floor sealant. The approved absorbent material shall be placed over the area of the floor enclosed by each barrier to a depth of one inch below the top of the barrier.

3.2.5 Ventilation Fans

Ventilation fans shall be installed at the locations shown on the Contract drawings. Contractor shall provide all the duct, hardware, and supports required for the safe and reliable operation of the systems.

3.2.6 On-Site Maintenance Charging

Provide on-site maintenance charging of all battery cells delivered to the site prior to installation of the batteries and cutover to the new battery chargers, in accordance with the battery manufacturer's requirements for warranty purposes.

SECTION 26 32 34.00 26 Page 11

3.3 INSPECTION AND TESTS

3.3.1 Battery Capacity Test

The Contractor shall perform an 8-hour battery capacity test prior to shipment and again after the battery is installed in the field. The battery must have at least 95 percent capacity upon delivery. The capacity test shall conform to IEEE 450 . The test shall include the initial conditions, and 8-hour test length and discharge rate of a constant current load equal to the manufacturer's 8-hour rating for all cells. Five copies of the battery capacity test procedures and battery capacity test results shall be submitted for approval.

3.3.2 Inspection

All apparatus furnished and all work performed shall be subject to inspection and no apparatus shall be installed until all required tests or inspections have been made or certified copies of reports of tests have been accepted. Acceptance of apparatus or waiving of the inspection thereof shall in no way relieve the Contractor of the responsibility for furnishing apparatus meeting the requirements of these specifications.

3.3.3 Tests

Each item of equipment furnished shall be tested as required below to demonstrate the item is free from electrical and mechanical defects and conforms to the requirements of the contract specifications. All tests required herein shall be witnessed by the government, unless waived in writing, and no equipment shall be shipped until it has been approved for shipment. The Government shall be notified a minimum of 15 days in advance of the date of the tests, so that arrangements can be made for the government personnel to be present and witness the tests. The test equipment and the test methods used shall conform to the applicable requirements of ANSI, IEEE, and NEMA standards and shall be subject to approval. Five certified copies of the reports of all tests, recording all data obtained during the test shall be furnished. The cost of performing all tests shall be borne by the Contractor and shall be included in the price bid. Operational tests shall be made on the equipment in conjunction with the tests specified elsewhere.

3.3.4 Safety

The Contractor shall provide and use safety devices such as rubber gloves, protective barriers, and danger signs to protect and warn personnel in the test vicinity. The Contractor shall replace any devices or equipment which are damaged due to improper test procedures or handling. The contractor shall not reuse any damaged equipment without the written approval from the Government.

3.3.5 Field Testing

a. Field Acceptance Testing and submittals shall be performed as described in Section 26 08 01.00 26 , SYSTEMS TESTING AND COMMISSIONING and as described herein. Where testing and/or submittals is duplicated between these Sections, the testing and /or submittals need not be duplicated; however, the more stringent of the two requirements shall apply.

b. Field testing shall be performed in the presence of the

SECTION 26 32 34.00 26 Page 12

Contracting Officer. The Contractor shall notify the Contracting Officer 14 days prior to conducting tests. The Contractor shall furnish all materials, labor, and equipment necessary to conduct field tests. The Contractor shall perform all tests and inspection recommended by the manufacturer unless specifically waived by the Government. The Contractor shall maintain a written record of all tests which includes date, test performed, personnel involved, devices tested, serial number and name of test equipment and test results.

All field test reports will be signed and dated by the Contractor.

c. The field tests shall include but not be limited to:

(1) Continuity and insulation resistance tests of wiring installed from the batteries to the DC switchboards as described in Section

26 05 19.00 26 , INSULATED WIRE AND CABLE.

(2) Post-to-post resistance tests to show that the average post-to-post resistance is within 10% of the minimum and maximum post-to-post reading.

(3) Battery monitor tests to verify accurate measurement of the parameters listed in PART 2.

d. Field test report shall be submitted in accordance with paragraph SUBMISSION OF TEST RESULTS in SECTION 26 05 00.00 26 , BASIC ELECTRICAL MATERIALS AND METHODS, and paragraph RESPONSIBILITIES OF THE CONTRACTOR'S COMMISSIONING ENGINEER in Section 26 08 01.00 26 , SYSTEMS

TESTING AND COMMISSIONING.

3.3.6 Operating Tests

After the installation is completed, and at such time as the Contracting Officer may direct, the Contractor shall conduct operating tests for approval. The equipment shall be demonstrated to operate in accordance with the specified requirements. An operating test report shall be submitted in accordance with paragraph SUBMISSION OF TEST RESULTS in SECTION 26 05 00.00 26 , BASIC ELECTRICAL MATERIALS AND METHODS, and paragraph RESPONSIBILITIES OF THE CONTRACTOR'S COMMISSIONING ENGINEER in Section 26 08 01.00 26 , SYSTEMS TESTING AND COMMISSIONING.

3.3.7 Acceptance

Final acceptance of the facility will not be given until the Contractor has successfully completed all tests and after all defects in installation, material or operation have been corrected.

3.4 OPERATION AND MAINTENANCE MANUALS

The Contractor shall submit an Operation and Maintenance (O&M) Manual for each battery type and for the battery monitoring systems. Separate manuals for each may be submitted. In addition to meeting the requirements of Section 01 78 23 , OPERATIONS AND MAINTENANCE DATA, the following shall be included:

a. Certified copies of the battery capacity test report.

b. Procedures for battery disposal.

c. Chemical data sheets for the batteries and data sheets for all

SECTION 26 32 34.00 26 Page 13 battery system components.

d. Detailed instructions on proper equalize and float charging procedures for the vented lead selenium batteries.

e. Battery monitor software configuration settings and instructions on using the program's user interface.

f. Wiring diagrams of the battery monitoring system and external connections to the Powerhouse annunciation system.

3.5 TRAINING

The Contractor shall provide three six-hour classes of instruction on the maintenance of the batteries, and the use of the battery monitoring system and its user interface, including the software, user input and output, settings, and operating parameters. All training manuals, slides, and other materials be submitted 30 days prior to the date training is scheduled to occurs.

-- End of Section --

SECTION 26 32 34.00 26 Page 14

W912DW-17-R-0001 1 R0005

SECTION 00 24 00

EVALUATION FACTORS FOR AWARD (CRITERIA)

1.0 BASIS FOR AWARD

Award of this Contract will be made to the responsible offeror submitting the Lowest Price Technically

Acceptable (LPTA) offer in accordance with FAR Part 15 procedures. This solicitation will result in the award of a firm-fixed price construction contract.

The evaluation of each proposal will be solely on the basis of evaluation factors found in this section

(00 24 00). The Government will evaluate each proposal on an Acceptable/Unacceptable basis only with respect to the evaluation factors (criteria) described herein. In order to be considered for award, a proposal must be rated Acceptable in every non-price factor. Award will be to the offeror who presents the Acceptable proposal (Factors A and B) with the overall total lowest price (based on the total of all line items on the Bid Schedule).

The offeror’s proposal shall contain a response to all factors and meet the minimum submittal requirements stated.

In accordance with FAR 15.306(a)(3) the Government intends to evaluate proposals and make award without discussions. An offeror’s initial proposal shall contain the offeror’s best offer/terms.

Penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.

2.0 FACTORS TO BE EVALUATED

The following Evaluation Factors will be used to evaluate each proposal:

FACTOR A – CORPORATE EXPERIENCE AND CAPABILITIES

FACTOR B – PAST PERFORMANCE OF THE PRIME OFFEROR

FACTOR C – PRICE

3.0 EVALUATION APPROACH

Proposals will be evaluated by the Source Selection Evaluation Board.

4.0 DEFINITIONS:

Past Performance: Assessment of the offeror’s probability of meeting the minimum past performance solicitation requirements)

Relevant: “Relevant” means having a logical connection with the requirements in this Request for Proposals (RFP); that is, featuring work that is similar in Scope, Magnitude and

Complexity to what is required in the solicitation. For the purposes of this RFP, relevant shall include projects with a total construction dollar value of a minimum of $2.0 million.

Team: The offeror’s “team” is the prime contractor and its subcontracting firms, taken as a whole.

Technical: The term “technical,” as used herein, refers to non-price factors other than past performance.

W912DW-17-R-0001 2 R0005

FACTOR A: CORPORATE EXPERIENCE AND CAPABILITIES

Submittal Requirements for Evaluation:

The offeror shall submit project experience information for at least two (2) and no more than four (4) projects, demonstrating relevant experience of the team. If more than four projects are submitted, only the first four projects will be evaluated in the order they are presented in the proposal. All projects submitted shall be complete, or at least 50% complete, within the past ten (10) years from the solicitation response due date.

Each submitted project shall use Attachment A – Offeror Experience Form to describe the projects in which the team has relevant experience. Submit one form per project.

If the offeror proposes self-performing the experience, ensure the proposal is clear that the offeror will perform an experience area(s).

If the offeror submits a project(s) demonstrating experience by a subcontractor, i.e. a firm that is not the prime contractor or part of a joint venture, the offeror shall submit a letter of commitment signed by both the subcontractor and the prime contractor. If a letter of commitment is not submitted, the experience will not be considered or evaluated. Reference Attachment B – Letter of Commitment of Key Subcontractor.

The submitted projects, when combined, must meet the two specific experience areas listed below. Note that the two areas do not necessarily need to be present in any one project.

Offeror shall demonstrate specific minimum experience in the following two areas:

A.1. Electrical Installation.

Demonstrate the Team has relevant experience by providing a detailed narrative of how the team:

a) replaced existing 125 volt DC station battery banks with chargers AND

b) replaced existing 125 volt DC switchboards and/or 120 volt or higher AC switchboards.

At least two (2) of the project summaries submitted shall clearly demonstrate the team’s relevant experience with Factor A.1 – Electrical Installation. The relevant experience may be spread across more than one project summary or combined in the same project summary at least one of the project summaries. For the purposes of this RFP, relevant may include projects in a dam, powerhouse or other industrial environment.

Offerors shall explain their team members’ roles and responsibilities for each project summary submitted.

A.2. Energized Cutover.

Demonstrate the Team has relevant experience by providing a detailed narrative of how the team performed and coordinated the cutover during construction which allowed critical systems to stay energized. Offerors shall explain their team members’ roles and responsibilities for each project summary submitted.

Of the projects submitted, at least one (1) of the project summaries submitted shall clearly demonstrate the team’s relevant experience with Factor A.2 – Energized Cutover. For the purposes of this RFP, relevant may include projects outside of dams and powerhouses at other industrial facilities with critical infrastructure which must stay energized throughout construction, for example: electricity transmission or distribution facilities, hospitals and emergency services. Offerors shall explain their team members’ roles and responsibilities for each project summary submitted.

W912DW-17-R-0001 3 R0005

Factor A Rating Methodology and Standard.

Table 1 will be used to evaluate Factor A.

Table 1: Technical Acceptable/Unacceptable Rating Method

Rating Description

Acceptable Proposal meets the requirements of the solicitation.

Unacceptable Proposal does not meet the requirements of the solicitation.

A rating of Acceptable will be given if all of the criteria for Factor A are met.

A rating of Unacceptable will be given if any of the criteria for Factor A is not met.

W912DW-17-R-0001 4 R0005

FACTOR B: PAST PERFORMANCE OF THE PRIME OFFEROR

The past performance evaluation is an assessment of the offeror’s probability of meeting the minimum past performance solicitation requirements. This assessment is based on the offeror’s record of relevant and recent past and current performance information that pertain to the scope of work as outlined in the solicitation requirements.

Each offeror’s past and current performance will be evaluated to determine recency and relevance. Past performance will initially be evaluated to determine whether the offeror’s current/past performance is recent, and then relevant or not relevant to the solicitation. Recent and relevant projects are those projects completed, or at least 75% complete, within the past ten (10) years from the solicitation response due date featuring work that is similar in Scope, Magnitude and Complexity to what is required in the solicitation.

Next, the past performance evaluation will determine how well the offeror performed.

At a minimum, the prime offeror shall provide past performance information for each project performed as a Prime Contractor and listed by the prime offeror under Factor A: Corporate Experience and

Capabilities. If the proposal is from a Joint Venture or Partnership, Past Performance information for each partner must be submitted. The Government will review performance on the projects submitted under Factor A, in addition to other sources.

Sources of Past Performance Information for Evaluation include, but are not limited to, the following:

As indicated above, at a minimum, the prime offeror shall provide past performance information for each project performed as a Prime Contractor and listed by the prime offeror under Factor A:

Corporate Experience and Capabilities.

Offeror may also submit past performance information using the attached Past Performance

Questionnaire (PPQ).

The Government may obtain past performance information from established systems such as the

Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and

Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; and may be obtained from other sources available to the Government, such as the

Defense Contract Management Agency; and interviews with Program Managers, Contracting

Officers, Fee Determining Officials.

More relevant and more recent project(s) will be given commensurately greater weight in the evaluation of past performance.

The Government may consider a wide array of information from a variety of sources, but is not compelled to rely on all of the information available.

Factor B Rating Methodology and Standard.

Table 2 will be used to evaluate Factor B.

W912DW-17-R-0001 5 R0005

Table 2: Past Performance Acceptable/Unacceptable Rating Method

Rating Description

Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. *See Note below.

Unacceptable Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.

* NOTE: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see

FAR 15.305(a)(2)(iv)). Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered

“acceptable.”

W912DW-17-R-0001 6 R0005

FACTOR C: PRICE

The contract will be a firm fixed-price contract. The Government will evaluate offers for award purposes by totaling all line items of the Bid Schedule.

Submittal Requirements for Evaluation

The offeror shall provide the following:

1. Signed and dated Standard Form (SF) 1442.

Complete in its entirety, the “offeror” portion of the SF 1442. An official having the authority to contractually bind the offeror’s firm shall sign the SF 1442, blocks 20B and 20C in accordance with FAR 4.102. If the offeror is a Joint Venture, all parties to the Joint Venture shall sign the offer.

2. Bid/Pricing Schedule.

Include pricing information for ALL line items and totaled where applicable.

Offerors must submit Contract Line Item Numbers (CLINs) with unit price, quantity and extended price where applicable.

All extensions of unit prices shown will be subject to verification by the Government.

In case of discrepancy between the unit price and the extended price, the unit price will govern.

3. Acknowledgement of Amendment(s), if applicable

4. Representations, Certifications and Other Statements of Offerors

5. Bid bond

Factor C Rating Methodology and Standard.

Award will be to the offeror who presents the Acceptable proposal (Factors A and B) with the overall total lowest price (based on the total of all line items on the Bid Schedule).

This Source Selection is conducted with the expectation of adequate price competition – normally competition establishes price reasonableness and a comparison of proposed prices will satisfy the requirement to perform a price analysis. A price reasonableness approach will be utilized by the

Government to determine that the proposed prices are fair and reasonable as described in FAR

15.305(a)(1).

All offers with separately priced line items or subline items will be analyzed to determine if the prices are unbalanced (FAR 15.404-1(g)). Offers may be rejected if the Source Selection Authority determines the lack of balance poses an unacceptable risk to the Government.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE W912DW

Seattle District, Corps of Engineers

ATTN: CECT-NWS

PO Box 3755 Seattle, WA 98124-3755

8. ADDRESS OFFER TO

Seattle District, Corps of Engineers PO Box 3755 ATTN: CECT-NWS Seattle, WA 98124-3755

HAND CARRY: Federal Center South Building 1202 4735 East Marginal Way South Seattle, WA 98134-2388

9. FOR INFORMATION CALL

A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):

Furnish all labor, materials and equipment and perform all work for

11. The Contractor shall begin performance within calendar days and complete it with calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12B. CALENDAR DAYS

YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 5 copies to perform the work required are due at the place specified in Item 8 by 12:30:00 PM (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

Designed using Perform Pro, WHS/DIOR, Oct 96

1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

W912DW-17-R-0001 x

Caroline Mueller 206-764-6741

Chief Joseph Powerhouse DC and Preferred AC Upgrades.

17 Nov 2016

28 December 2016

Amendment 0005

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text in accordance with the attached Contract Clauses, Special Clauses, Technical Specifications and Drawings.

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text 00 11 00 - 1

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

* See FAR 52.211-10

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text g3ctccbm Line g3ctccbm Line

OFFER (Must be fully completed by offeror)

STANDARD FORM 1442 BACK (REV. 4-85)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

Tax ID No: DUNS No:

email: Cage Code:

15. TELEPHONE NUMBER (Include area code) Fax No.:

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS See Schedule

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24.SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

US Army Corps of Engineers Finance Center

CEFC-AO-P

5722 Integrity Drive Millington, TN 38054-500

CODE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN

(Type or print)

30B. SIGNATURE 30C. DATE

31A. NAME OF CONTRACTING OFFICER (Type or print)

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

Amendment 0003

G3CT9BAW

Typewritten Text 00 11 00 - 2

G3CT9BAW

Typewritten Text

SEE ALTERATIONS IN CONTRACT, PAGE 00 11 00 - 3

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text United States Army Corps of Engineers Seattle District Northwest Area Office USAED-Seattle PO Box 610 DuPont, WA 98327-0610

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

G3CT9BAW

Typewritten Text

BONILIE L. LACKEY