Amendment_0006.pdf
PDF 401 KB Posted
- Solicitation number
- W912DW-17-R-0001
About this file
Amendment 0006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| R0007.pdf | ||
| Amendment_R0005.pdf | ||
| R0004.pdf | ||
| W912DW-17-R-0001_Solicitation_&_Specs_(pdf_security_removed).pdf | ||
| R0003.pdf | ||
| 00_24_00_Attachment_A.docx | DOCX document | |
| Amendment_0002.pdf | ||
| R0001.pdf | ||
| PN320900_CJDCAC-00-COMPILATION-100_.pdf | ||
| PN320900_CJDCAC-18-REFERENCE_DRAWINGS-100_.pdf | ||
| W912DW-17-R-0001.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68MD961321047 320900
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Chief Joseph Dam DC Preferred AC Upgrades
Please see Continuation Page for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Dec-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW-17-R-0001
X 9B. DATED (SEE ITEM 11)
17-Nov-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Dec-2016
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CECT-NWS
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW-17-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of Amendment six (0006) is as follows:
1. Proposal Submittal Proposal submittal date/time is extended to 4 January 2017 at 12:30:00 p.m. LOCAL TIME. The SF1442 Solicitation, Offer and Award is revised to reflect the date extension.
2. ProjNet Bidder Inquiry ProjNet Bidder Inquiry will remain closed. For material technical questions please contact:
Caroline Mueller: Caroline.B.Mueller@usace.army.mil AND Bonilie (Bonnie) Lackey: Bonilie.L.Lackey@usace.army.mil
3. Wage Decision Revised Wage Determination updated to General Decision Number WA160034 12/16/2016 WA34 (with 9 modifications) – and replaces in its entirety WA160034 11/25/2016 (with 8 modifications).
NOTICE TO OFFERORS: Offerors must acknowledge receipt of this amendment by number and date on offer.
Encl:
SF1442 (revised) Wage Decision (revised)
(End of Summary of Changes)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE W912DW
Seattle District, Corps of Engineers
ATTN: CECT-NWS
PO Box 3755 Seattle, WA 98124-3755
8. ADDRESS OFFER TO
Seattle District, Corps of Engineers PO Box 3755 ATTN: CECT-NWS Seattle, WA 98124-3755
HAND CARRY: Federal Center South Building 1202 4735 East Marginal Way South Seattle, WA 98134-2388
9. FOR INFORMATION CALL
A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):
Furnish all labor, materials and equipment and perform all work for
11. The Contractor shall begin performance within calendar days and complete it with calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12B. CALENDAR DAYS
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 5 copies to perform the work required are due at the place specified in Item 8 by 12:30:00 PM (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
Designed using Perform Pro, WHS/DIOR, Oct 96
1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
W912DW-17-R-0001 x
Caroline Mueller 206-764-6741
Chief Joseph Powerhouse DC and Preferred AC Upgrades.
17 Nov 2016
4 January 2017
R0006
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text in accordance with the attached Contract Clauses, Special Clauses, Technical Specifications and Drawings.
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text 00 11 00 - 1
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
* See FAR 52.211-10
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text g3ctccbm Line g3ctccbm Line
OFFER (Must be fully completed by offeror)
STANDARD FORM 1442 BACK (REV. 4-85)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
Tax ID No: DUNS No:
email: Cage Code:
15. TELEPHONE NUMBER (Include area code) Fax No.:
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS See Schedule
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24.SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
US Army Corps of Engineers Finance Center
CEFC-AO-P
5722 Integrity Drive Millington, TN 38054-500
CODE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
30B. SIGNATURE 30C. DATE
31A. NAME OF CONTRACTING OFFICER (Type or print)
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
R0006
G3CT9BAW
Typewritten Text 00 11 00 - 2
G3CT9BAW
Typewritten Text
SEE ALTERATIONS IN CONTRACT, PAGE 00 11 00 - 3
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text United States Army Corps of Engineers Seattle District Northwest Area Office USAED-Seattle PO Box 610 DuPont, WA 98327-0610
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
BONILIE L. LACKEY
General Decision Number: WA160034 12/16/2016 WA34
Superseded General Decision Number: WA20150034
State: Washington
Construction Type: Building
County: Douglas County in Washington.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least
$10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/08/2016
1 02/19/2016
2 03/25/2016
3 06/03/2016
4 06/24/2016
5 07/15/2016
6 09/02/2016
7 11/04/2016
8 11/25/2016
9 12/16/2016
ASBE0007-004 06/01/2016
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 48.46 14.97
BRWA0003-002 06/01/2015
BRICKLAYER.......................$ 28.82 14.60
CARP0001-006 06/01/2015
DOUGLAS WHICH LIES EAST OF THE 120TH MERIDIAN
CARPENTER
Including Cabinet
Installation, Drywall
Hanging, Form Work and
Metal Stud Installation.....$ 27.61 14.00
ZONE PAY:
ZONE 1 0-40 MILES FREE
ZONE 2 41-65 MILES $2.25/PER HOUR
ZONE 3 66-100 MILES $3.25/PER HOUR
ZONE 4 OVER 100 MILES $4.75/PER HOUR
DISPATCH POINTS:
CARPENTERS/MILLWRIGHTS: PASCO (2819 W. SYLVESTER) or Main
Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main
Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
HAZMAT PROJECTS:
Anyone working on a HAZMAT job (task, where HAZMAT certification is required, shall be compensated at a premium, in addition to the classification working in as follows:
LEVEL D+ $.25 per hour - This is the lowest level of proection. No respirator is used and skin proection is minimal.
LEVEL C+ $.50 per hour - This level uses an air purifying respirator or additional protective clothing.
LEVEL B+ $.75 per hour - Uses same respirator protection as
Level A. Supplied air line is provided in conjunction with a chemical "splash suit."
LEVEL A+ $1.00 per hour - This level utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line.
CARP0770-016 06/01/2015
CARPENTER (Including Cabinet
Installation, Drywall
Hanging, Form Work and Metal
Stud Installation)...............$ 27.61 14.00
(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL
CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS
Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:
Seattle Olympia Bellingham
Auburn Bremerton Anacortes
Renton Shelton Yakima
Aberdeen-Hoquiam Tacoma Wenatchee
Ellensburg Everett Port Angeles
Centralia Mount Vernon Sunnyside
Chelan Pt. Townsend
Zone Pay:
0 -25 radius miles Free
26-35 radius miles $1.00/hour
36-45 radius miles $1.15/hour
46-55 radius miles $1.35/hour
Over 55 radius miles $1.55/hour
(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT
AND PILEDRIVER ONLY)
Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center
Zone Pay:
0 -25 radius miles Free
26-45 radius miles $ .70/hour
Over 45 radius miles $1.50/hour
* ELEC0191-013 11/02/2016
ELECTRICIAN
DOUGLAS, CHELAN, and
OKANOGAN Counties...........$ 39.40 18.80
ISLAND, SAN JUAN, SKAGIT,
SNOHOMISH and WHATCOM
Counties....................$ 42.30 18.89
ENGI0302-016 06/01/2013
West of the 120th Meridian
Power equipment operators:
Group 1A...................$ 37.39 16.65
Group 1AA..................$ 37.96 16.65
Group 1AAA.................$ 38.52 16.65
Group 1.....................$ 36.84 16.65
Group 2.....................$ 36.35 16.65
Group 3.....................$ 35.93 16.65
Group 4.....................$ 33.57 16.65
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom
(including jib with attachments)
GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom
(including jib with attachments); Excavator/Trackhoe, Backhoes: Over 90 metric tons
GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom
(including jib with attachments); Loaders-overhead, 8 yards and over; excavator/Trackhoe, backhoes: over 50 metric tons to 90 metric tons
GROUP 1 - Cranes 45 tons thru 99 tons, under 150 ft of boom
(including jib with attachments); Excavator/Trackhoe, backhoes: over 30 metric tons to 50 metric tons; Loader-overhead 6 yards to, but not including 8 yards; Dozer D-10;
Screedman; Scrapers: 45 yards and over; Grader/Blade
GROUP 2 - Cranes, 20 tons thru 44 tons with attachments;
Drilling machine; Excavator/Trackhoe, backhoe: 15 to 30 metric tons; Horizontal/directional drill operator;
Loaders-overhead under 6 yards; Crane Oiler-100 Tons and
Over; Compactor; Scraper: under 45 tons
GROUP 3 - Cranes-thru 19 tons with attachments; Dozers-D-9 and under; Motor patrol grader-nonfinishing; Roller-Plant
Mix; Crane Oiler under 100 tons; Excavator/Trackhoe, backhoe: under 15 metric tons; Forklift: 3000 lbs and over with attachments; Service Oiler
GROUP 4 - Roller-other than plant mix; Forklift: under 3000 lbs with attachments
ENGI0370-017 06/01/2015
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 26.16 13.55
GROUP 2.....................$ 26.48 13.55
GROUP 3.....................$ 27.09 13.55
GROUP 4.....................$ 27.25 13.55
GROUP 5.....................$ 27.41 13.55
GROUP 6.....................$ 27.69 13.55
GROUP 7.....................$ 27.96 13.55
GROUP 8.....................$ 29.06 13.55
ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00
Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;
Lewiston, Idaho
Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Compactor; Drill Oiler; Rollers, all types on subgrade, including seal and chip coatings
GROUP 2: Fork Lift
GROUP 3: Bulldozer (up to D-6 or equivalent)
GROUP 4: Drills (churn, core, calyx or diamond); Oiler;
Loaders (overhead & front-end, under 4 yds. R/T); Vacuum
Drill (reverse circulation drill under 8 inch bit)
GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (hoe
Ram) (under 3/4 yd.); Cranes (25 tons & under), Drilling
Equipment(8 inch bit & over) (Robbins, reverse circulation
& similar)
GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to
110,000 gw); Trackhoe/Excavator (Hoe Ram) (3/4 yd. to 3 yd.); Compactor (self-propelled with blade); Cranes (over
25 tons, to and including 45 tons), Bulldozer, 834 R/T & similar; Loader Operator (front-end & overhead, 4 yds.
incl. 8 yds.); Scrapers, all, rubber-tired; Screed Operator
GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (Hoe Ram)
(3 yds & over); Cranes (over 45 tons to but not including
85 tons); Loaders (overhead & front-end, over 8 yds. to 10 yds.); Rubber-tired Scrapers (multiple engine with three or more scrapers); Blade
GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower); Loaders (overhead and front-end, 10 yards and over)
BOOM PAY: (All Cranes, Including Tower)
180 ft to 250 ft $ .50 over scale
Over 250 ft $ .80 over scale
NOTE:
In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.
HAZMAT:
Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.
IRON0014-013 07/01/2016
IRONWORKER (Ornamental, Reinforcing and Structural)......$ 32.89 24.56
LABO0238-014 06/01/2016
LABORER: Mason Tender - Brick...$ 25.61 11.40
LABO0238-022 06/01/2016
LABORER
GROUP 1.....................$ 23.51 11.40
GROUP 2.....................$ 25.61 11.40
GROUP 3.....................$ 25.88 11.40
GROUP 4.....................$ 26.15 11.40
Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00
BASE POINTS: Pasco
Zone 1: 0-45 radius miles from the main post office.
Zone 2: 45 radius miles and over from the main post office
LABORERS CLASSIFICATIONS
GROUP 1: Flagman
GROUP 2: Form-Stripping; General or Commom Laborer
GROUP 3: Chipping Guns; Concrete Saw; Pipelayer; Mason
Tender-Cement/Concrete
GROUP 4: Grade Checker; Gunite; Vibrating Plate
LABO0348-005 06/01/2016
West of the 120th Meridian
LABORER
GROUP 2....................$ 23.42 10.80
GROUP 3....................$ 25.64 10.80
GROUP 4....................$ 26.71 10.80
BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT,
TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT.
TOWNSEND, PT. ANGELES, AND BREMERTON
ZONE 1 - Projects within 25 radius miles of the respective city hall
ZONE 2 - More than 25 but less than 45 radius miles from the respective city hall
ZONE 3 - More than 45 radius miles from the respective city hall
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):
ZONE 2 - $1.00
ZONE 3 - $1.30
BASE POINTS: CHELAN, SUNNYSIDE, WENATCHEE, AND YAKIMA
ZONE 1 - Projects within 25 radius miles of the respective city hall
ZONE 2 - More than 25 radius miles from the respective city hall
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):
ZONE 2 - $2.25
LABORERS CLASSIFICATIONS
GROUP 2: Flagman
GROUP 3: General Laborer; Mason Tender-Cement/Concrete;
Chipping Gun (under 30 lbs.); Form Stripping
GROUP 4: Chipping Gun (over 30 lbs.); Concrete Saw Operator;
Grade Checker; Gunite; Pipe Layer; Vibrating Plate
PAIN0005-025 04/15/2013
Painters:
BRUSH AND ROLLER ONLY.......$ 21.23 10.23
PLUM0032-008 06/01/2016
DOUGLAS COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN
Plumbers and Pipefitters.........$ 39.00 24.27
PLUM0598-016 06/01/2015
PLUMBER/PIPEFITTER...............$ 49.24 28.79
ROOF0189-012 07/01/2016
ROOFER (Includes Roof Tear
Off, Waterproofing, and
Installation of Metal Roofs).....$ 26.61 10.48
SHEE0066-020 08/01/2011
Sheet Metal Worker (Excluding
HVAC Duct Installation)..........$ 27.51 16.90
TEAM0690-008 07/01/2016
Truck drivers: (ANYONE
WORKING ON HAZMAT JOBS SEE
FOOTNOTE A BELOW)
ZONE 1: LEWISTON ZONE
CENTER
GROUP 3....................$ 25.22 16.79
GROUP 4....................$ 25.55 16.79
GROUP 5....................$ 25.66 16.79
GROUP 6....................$ 25.82 16.79
GROUP 7....................$ 26.36 16.79
GROUP 8....................$ 26.68 16.79
ZONE 1: PASCO ZONE CENTER
GROUP 3....................$ 24.42 16.69
GROUP 4....................$ 24.75 16.69
GROUP 5....................$ 24.86 16.69
GROUP 6....................$ 25.02 16.69
GROUP 7....................$ 25.56 16.69
GROUP 8....................$ 25.88 16.69
ZONE 1: SPOKANE ZONE CENTER
GROUP 3....................$ 22.94 16.69
GROUP 4....................$ 23.27 16.69
GROUP 5....................$ 23.38 16.69
GROUP 6....................$ 23.55 16.69
GROUP 7....................$ 24.08 16.69
GROUP 8....................$ 24.44 16.69
Zone Differential For ZONE 2: ( Zone 1 +$2.00)
BASE POINTS: Spokane, Moses Lake, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office
Zone 2: Outside a 45 mile radius from the main post office
TRUCK DRIVERS CLASSIFICATIONS
GROUP 3: Trucks, side, end, bottom and articulated end dump
(3 yards to and including 6 yds.)
GROUP 4: Trucks, side, end, bottom and articulated end dump
(over 6 yds. to & including 12 yds.)
GROUP 5: Trucks, side, end, bottom and articulated end dump
(over 12 yds. to & including 20 yds.)
GROUP 6: Trucks, side, end, bottom and articulated end dump
(over 20 yds. to & including 40 yds.)
GROUP 7: Truck, side, end, bottom and articulated end dump
(over 40 yds. to & including 100 yds.)
GROUP 8: Trucks, side, end, bottom and articulated end dump
(over 100 yds.)
FOOTNOTE A - Anyone working on a HAZMAT job, where HAZMAT cerfification is required, shall be compensated as a premium, in addition to the classification working in as follows:
LEVEL C-D: - $.50 PER HOUR - This level may use an air purifying respirator or additional protective clothing.
LEVEL A-B: - $1.00 PER HOUR - Uses supplied air in conjunction with a chemical splash suit or fully encapsulated suit with a self-contained breathing apparatus.
Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours.
SUWA2009-022 05/22/2009
CEMENT MASON/CONCRETE FINISHER...$ 16.33 1.32
FLOOR LAYER: Carpet.............$ 23.72 1.98
LABORER: Handheld Drill.........$ 17.17 5.36
LABORER: Irrigation.............$ 11.58 0.00
LABORER: Landscape..............$ 11.08 0.00
OPERATOR: Bobcat/Skid
Steer/Skid Loader................$ 22.05 7.35
OPERATOR: Concrete Pumper.......$ 22.30 5.27
OPERATOR: Mechanic..............$ 24.33 4.33
PAINTER: Spray..................$ 24.80 0.00
SHEET METAL WORKER (HVAC Duct
Installation Only)...............$ 17.85 3.75
SPRINKLER FITTER (Fire
Sprinklers)......................$ 18.02 1.57
TILE SETTER......................$ 18.39 4.26
TRUCK DRIVER: Semi-Trailer
Truck............................$ 20.59 5.56
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or
"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION