A.07.23_-_W912DW-16-R-0008_45M_MATOC_SOLICITATION.pdf
PDF 775 KB Posted
- Solicitation number
- W912DW-16-R-0008
About this file
W912DW-16-R-0008 SDVOSB MATOC IDIQ for Electrical Construction and Repair Tasks in the Interior/Exterior Electrical Discipline for JBLM and Its Sub-Installations
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912DW-16-R-0008-AMND2_.pdf | ||
| Pre-Proposal_slides_16-R-0008.pptx | PPTX presentation | |
| PRE_PREPOSAL_SIGN_IN_SHEET.pdf | ||
| 16R00080001.pdf | ||
| A.07.23_-_W912DW-16-R-0008_ELECTRICAL_MATOC_BASE_CONTRACT_SPECIFICATIONS_FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68MD963230496
THE RESULTING CONTRACT WILL BE AN INDEFINITE DELIIVERY/INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR ELECTRICAL AND MINOR CONSTRUTION FOR JOINT BASE LEWIS MCCHORD (JBLM) LOCATED IN TACOMA, WASHINGTON , ITS SUBSTALLATIONS, AND FOR OTHER FACILITIES AT OTHER LOCATIONS IN THE STATES OF WASHINGTON, OREGON, IDAHO, AND
MONTANA SERVED BY THE CORPS OF ENGINEERS SEATTLE DISTRICT..
A. This acquisition is restricted to 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS CONCERNS ONLY.
B. The MATOC is to be based on a general Statement of Work (SOW) to be further defined in individual Task Orders.
C. The number of contracts that may be aw arded as a result of this solicitation shall not exceed f ive (5).
D. The estimated program value for all task orders to be placed over the f ive (5) year ordering period of the resulting contract w ill be $45,000,000.00. How ever, if the Government requirements do not meet the program amount, it shall not constitue the basis for an equitable adjustment under this contract.
E. The estimated Magnitude of the Seed Project is betw een $250,000 and $500,000.
F Blocks 11 and 12 are not applicable to this MATOC solicitation but w ill be included in the resulting Individual Task Orders.
KATE M SCHOLLARD 253-966-4369
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
09-Dec-2016
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Task Orders
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________09 Jan 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CECT-NWS
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912DW-16-R-0008 110
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912DW-16-R-0008
Section 00 10 00 - Solicitation/Contract Form
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 45,000,000 Job
BASE CLIN 0001
FFP
BASE PERIOD -SERVICE DISABLED VETERAN OWNED SMALL
BUSINESS (SDVOSB) MATOC for Electrical Construction and Repairs in the Interior/Exterior Elecrical Discipline at JBLM and its Sub-Installations and Other Customers Supported by the Seattle District Corps Of Engineers. The Task Orders may include construction and repair tasks in the interior/exterior electrical discipline. Interior work may include replacement, installation and relocation of circuits, panel boards, meter bases, main distribution panels, lighting and electrical equipment. Exterior work may include replacement, installation and relocation of underground and overhead distribution feeders and laterals (13.kV), transformers, disconnects, cutouts, lighting (including airfield lighting systems and components), poles and appurtenances, raceways, and electrical distribution substation components. Associated incidental carpentry, excavation, concrete & paving work, site restoration (e.g. landscaping, hydro-sampling, etc), painting, fencing, demolition, low voltage electrical (i.e. less than 50VAC, including fire alarm, Intrusion Detection Systems (IDS), Supervisory control and data acquisition (SCADA), and communications), ACM and LBP testing & abatement, and environmental clean-up may be required with the interior/exterior task orders.
The work will be comprised of approximately 90% construction & repair and 10% service over the duration of the five-year MATOC.
Note: Maximum capacity of $45M will be shared among all contract holders. It is NOT for each contract and does not subdivide that capacity into yearly or Option Period amounts.
FOB: Destination
MILSTRIP: W68MD963230496
PURCHASE REQUEST NUMBER: W68MD963230496
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
1001 1 Job
OPTION PERIOD ONE
FFP
FIRST OPTION PERIOD -SERVICE DISABLED VETERAN OWNED
SMALL BUSINESS (SDVOSB) MATOC for Electrical Construction and Repairs in the Interior/Exterior Elecrical Discipline at JBLM and its Sub- Installations and Other Customers Supported by the Seattle District Corps Of Engineers. The Task Orders may include construction and repair tasks in the interior/exterior electrical discipline. Interior work may include replacement, installation and relocation of circuits, panel boards, meter bases, main distribution panels, lighting and electrical equipment. Exterior work may include replacement, installation and relocation of underground and overhead distribution feeders and laterals (13.kV), transformers, disconnects, cutouts, lighting (including airfield lighting systems and components), poles and appurtenances, raceways, and electrical distribution substation components. Associated incidental carpentry, excavation, concrete & paving work, site restoration (e.g.
landscaping, hydro-sampling, etc), painting, fencing, demolition, low voltage electrical (i.e. less than 50VAC, including fire alarm, Intrusion Detection Systems (IDS), Supervisory control and data acquisition (SCADA), and communications), ACM and LBP testing & abatement, and environmental clean-up may be required with the interior/exterior task orders. The work will be comprised of approximately 90% construction & repair and 10% service over the duration of the five-year MATOC.
Note: Maximum capacity of $45M will be shared among all contract holders. It is NOT for each contract and does not subdivide that capacity into yearly or Option Period amounts.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2001 1 Job
OPTION PERIOD TWO
FFP
SECOND OPTION PERIOD -SERVICE DISABLED VETERAN OWNED
SMALL BUSINESS (SDVOSB) MATOC for Electrical Construction and Repairs in the Interior/Exterior Elecrical Discipline at JBLM and its Sub- Installations and Other Customers Supported by the Seattle District Corps Of Engineers. The Task Orders may include construction and repair tasks in the interior/exterior electrical discipline. Interior work may include replacement, installation and relocation of circuits, panel boards, meter bases, main distribution panels, lighting and electrical equipment. Exterior work may include replacement, installation and relocation of underground and overhead distribution feeders and laterals (13.kV), transformers, disconnects, cutouts, lighting (including airfield lighting systems and components), poles and appurtenances, raceways, and electrical distribution substation components. Associated incidental carpentry, excavation, concrete & paving work, site restoration (e.g.
landscaping, hydro-sampling, etc), painting, fencing, demolition, low voltage electrical (i.e. less than 50VAC, including fire alarm, Intrusion Detection Systems (IDS), Supervisory control and data acquisition (SCADA), and communications), ACM and LBP testing & abatement, and environmental clean-up may be required with the interior/exterior task orders. The work will be comprised of approximately 90% construction & repair and 10% service over the duration of the five-year MATOC.
Note: Maximum capacity of $45M will be shared among all contract holders. It is NOT for each contract and does not subdivide that capacity into yearly or Option Period amounts.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3001 1 Job
OPTION PERIOD THREE
FFP
THIRD OPTION PERIOD -SERVICE DISABLED VETERAN OWNED
SMALL BUSINESS (SDVOSB) MATOC for Electrical Construction and Repairs in the Interior/Exterior Elecrical Discipline at JBLM and its Sub- Installations and Other Customers Supported by the Seattle District Corps Of Engineers. The Task Orders may include construction and repair tasks in the interior/exterior electrical discipline. Interior work may include replacement, installation and relocation of circuits, panel boards, meter bases, main distribution panels, lighting and electrical equipment. Exterior work may include replacement, installation and relocation of underground and overhead distribution feeders and laterals (13.kV), transformers, disconnects, cutouts, lighting (including airfield lighting systems and components), poles and appurtenances, raceways, and electrical distribution substation components. Associated incidental carpentry, excavation, concrete & paving work, site restoration (e.g.
landscaping, hydro-sampling, etc), painting, fencing, demolition, low voltage electrical (i.e. less than 50VAC, including fire alarm, Intrusion Detection Systems (IDS), Supervisory control and data acquisition (SCADA), and communications), ACM and LBP testing & abatement, and environmental clean-up may be required with the interior/exterior task orders. The work will be comprised of approximately 90% construction & repair and 10% service over the duration of the five-year MATOC.
Note: Maximum capacity of $45M will be shared among all contract holders. It is NOT for each contract and does not subdivide that capacity into yearly or Option Period amounts.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4001 1 Job
OPTION PERIOD FOUR
FFP
FOURTH OPTION PERIOD -SERVICE DISABLED VETERAN OWNED
SMALL BUSINESS (SDVOSB) MATOC for Electrical Construction and Repairs in the Interior/Exterior Elecrical Discipline at JBLM and its Sub- Installations and Other Customers Supported by the Seattle District Corps Of Engineers. The Task Orders may include construction and repair tasks in the interior/exterior electrical discipline. Interior work may include replacement, installation and relocation of circuits, panel boards, meter bases, main distribution panels, lighting and electrical equipment. Exterior work may include replacement, installation and relocation of underground and overhead distribution feeders and laterals (13.kV), transformers, disconnects, cutouts, lighting (including airfield lighting systems and components), poles and appurtenances, raceways, and electrical distribution substation components. Associated incidental carpentry, excavation, concrete & paving work, site restoration (e.g.
landscaping, hydro-sampling, etc), painting, fencing, demolition, low voltage electrical (i.e. less than 50VAC, including fire alarm, Intrusion Detection Systems (IDS), Supervisory control and data acquisition (SCADA), and communications), ACM and LBP testing & abatement, and environmental clean-up may be required with the interior/exterior task orders. The work will be comprised of approximately 90% construction & repair and 10% service over the duration of the five-year MATOC.
Note: Maximum capacity of $45M will be shared among all contract holders. It is NOT for each contract and does not subdivide that capacity into yearly or Option Period amounts.
FOB: Destination
TABLE OF CONTENTS FOR SOLICITATION W912DW-16-R-0008
CONTRACT LINE ITEMS (CLINS) ……………………………………………………….………………. 3
CAUTION TO OFFERORS………………………………………………………………………………… 10
SECTION 00 20 00 – IDC CONSTRAINTS…………………………………………………………………12
SECTION 00 21 00 – INSTRUCTIONS TO OFFERORS…………………………………………………. 13
SECTION 00 24 00 – EVALUATION FACTORS……………………………….………………………… 25
SECTION 00 45 00 – CORPORATE CERTIFICATE……………………………………………………… 39
SECTION 00 45 00 – ATTACHMENT A PRE-AWARD INFO……………………………………….……40
SECTION 00 45 00 – REPRESENTATIONS AND CERTIFICATIONS……………………………..…….41
SECTION 00 72 00 – CONTRACT CLAUSES………………………………………………………..…… 48
SECTION 00 73 00 – SPECIAL CONTRACT CLAUSES…………………………………………….…… 70
STATEMENT OF WORK FOR BASE CONTRACT………………………………………………………. 87
SEED PROJECT INFORMATION WITH SOW AND BID SCHEUDLE…………………………...….…96
ATTACHMENT A – RELEVANT EXPERIENCE FORMAT………………..Provided as Separate Attachment
ATTACHMENT B – PAST PERFORMANCE QUESTIONNAIRE (PPQ)…..Provided as Separate Attachment
MATOC TECHNICAL SPECIFICATIONS WITH INDEX…………………..Provided as Separate Attachment
LIGHTING BREAKDOWN FOR SEED PROJECT TASK ORDER….………Provided as Separate Attachment
RESERVED FOR ALTERATIONS PAGE
** CAUTION TO OFFERORS **
1. Business Hours for the Seattle District Corps of Engineers are from 8:00 A.M. to 4:30 P.M., Monday through Friday. Before signing and mailing your offer, please take note of the following, as failure to perform any one of these actions may cause your offer to be rejected:
2. Amendments: Have you acknowledged receipt of ALL amendments to this solicitation on the Standard Form 1442, Back, Block 19. If in doubt as to the number of amendments issued, please contact either Kate Schollard at (253) 966-4369 or via email at kathaleen.schollard@usace.army.mil, Amy Wooldridge at (253) 967-4237 at amy.a.wooldridge@usace.army.mil or the Contracting Officer, Elke Neal at 966-4359 or via email at elke.h.neal@usace.army.mil. If any of the amendments to this solicitation furnish amended sections, the amended sections must be used when submitting your offer.
3. Proposal Submission: Have you provided both Volume 1 (Non-Cost Proposal) and Volume 2 (Price Proposal), including all documents as specified in Section 00 24 00?
4. Bid Guarantee: Sufficient bid guarantee in proper form and amount must be furnished with your offer. See Section 00 21 00, FAR 52.228-1.
5. Bonding Capability: Have you provided a letter from your surety identifying that you have minimum project bonding of $5,000,000 and aggregate bonding of $12,000,000.
6. Mistake in Offer: Have you reviewed your offer price for the Seed Project for possible errors in calculation or work left out?
7. Offer Acceptance Period: The minimum offer acceptance period is specified in Block 13D of the SF1442, Solicitation, Offer and Award. Please ensure that you allow at least the stated number of calendar days for the Government to accept your offer.
8. Submitting Offers: Block 13A specifies the due date/time for submission of your offer.
Section 00 21 00, paragraph 1.8 specifies the location to which offers shall be submitted.
Offers must arrive at the designated location by the exact time and date as specified in this solicitation, or they will be considered "late" and will not be considered except in accordance with the limitations in FAR 52.215-1(c)(3). Proposals may be either hand delivered, or submitted through a common carrier such as FedEx, UPS, etc.
NOTE A: THE U.S. POSTAL SERVICE DOES NOT DELIVER TO THIS OFFICE.
NOTE B: On 1 May 2016, JBLM began enforcing the provision of the Real ID Act of 2005.
Under provisions of this act, a standard driver’s license or ID card issued by any of the following states is not accepted for unescorted access to JBLM: Minnesota, Missouri and Washington.
Persons requesting unescorted access to JBLM and who present a standard license or ID from one of those states will be required to present additional documentation to verify their identity prior to being allowed access to JBLM. The list of acceptable documents to present along with a
Standard driver’s license or ID card issued by one of those states include: DoD CAC, DoD Uniformed Services Identification and Privileges Cards, U.S. Passport or U.S. Passport Card, VA Issued Health Card, U.S. Coast Guard Merchant Mariner Card, Transportation Worker ID Card (TWIC) issued by DHS, U.S. Government issued, authenticated Federal PIV credentials.
US Military or Draft Record containing name and DOB. A full list can be found http://www.lewis-mcchord.army.mil/ under Access to JBLM. The Washington State enhanced driver license is acceptable. (See Section 2100, paragraph 1.6 for additional information.)
9. RFP Results: A Request for Proposals (RFP) is a competed procurement. Participants will be notified via letter as to the status of their offer.
10. System for Award Management (SAM): Registration within the SAM database is required prior to award of any contract. If the Offeror does not become registered in the SAM database prior to award of any contract, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror. Offerors may obtain information on registration and annual confirmation requirements via the internet at http://www.sam.gov.
11. Representations and Certifications: Please note the requirements of Section 00 45 00.
Offerors shall complete electronic annual representations and certifications online at http://www.sam.gov/ in conjunction with required registration in the System for Award Management (SAM) database. Representations & Certifications must be completed and/or updated by the date and time offers are due. Offerors should take note that there are other provisions in Section 00 45 00 that require a response to be furnished with your offer. NOTE: In May 2012 the System for Award Management (SAM) replaced the Central Contractor Registration (CCR) database. Several of the clauses and provisions in this solicitation still reference CCR rather than SAM. Any reference to “Central Contractor Registration” shall be read to mean “System for Award Management.
12. VETS-100: Offerors must ensure they comply with FAR Provision 52.222-38, Compliance with Veteran's Employment Reporting, prior to submission of their proposals. The Contracting Officer will check with the Department of Labor prior to award to ensure reporting is current.
Award cannot be made to an Offeror who is not in compliance with this requirement.
Section 00 20 00 - Bidding Schedule/Instruction to Offerors
MAX VALUE/MINIMUM GUARANTEE
MAX VALUE & MINIMUM GUARANTEE
The total Multiple Award Task Order Contract maximum value is $45,000,000.00. If the Government's requirements set forth in the solicitation do not result in orders in the amount described as "maximum, " it shall not constitute the basis for an equitable price adjustment under this contract. The minimum guaranteed value under this contract is $2,500.00 (base year plus all four one-year options periods, if exercised). The Government will meet the contract minimum by the issuance of individual task orders. Each task order will have funds obligated on an individual basis. In no event will the Government’s liability under this circumstance exceed $2,500.00.
Section 00 21 00 - Instructions, Conditions and Notices to Offeror
NOTICE TO OFFERORS
SECTION 00 21 00
Instructions, Conditions, and Notices to Offerors
Solicitation No. W912DW-16-R-0008
1.0 GENERAL INFORMATION
Competition for this solicitation is set aside at 100% eligible Small Business Service Disabled Veteran Owned (SDVOSB) concerns only.
1.1 GENERAL DESCIPTION OF WORK
The Seattle District Corps of Engineers – Special Project Branch, has a competitive SDVOSB Set-aside requirement for a $45,000,000, Indefinite-Delivery, Indefinite-Quantity (IDIQ) Multiple Award Task Order Contract (MATOC), consisting of a one-year base period with four one-year option periods (5 years). Up to five IDIQ Base Contracts will be awarded as a result of this solicitation. The $45,000,000 capacity will be shared amongst all contractors of the MATOC pool. Task Orders (TO) will range from $2,500 to $5,000,000, however; the majority of the awarded TOs will fall under $3,000,000. All contract holders will be required to submit a proposal response for the majority of TO solicitations; not less than 90%. Failure to do so, may affect the contractor during the exercising of yearly options.
The work is required in support of the Directorate of Public Works (DPW) activities headquartered at Joint Base Lewis-McChord (JBLM), its sub-installations and various locations within the states of Washington, Idaho, Montana, & Oregon. During the contract period, the Government will identify tasks required to complete each specific job and will issue Requests for Proposals (RFPs) to all the Contractors. The Contractor shall be required to furnish all materials, equipment and personnel necessary to manage and accomplish the TOs. Projects will range from $2.5K to $5M, however; most TOs will fall under $3M. TOs awards, will include minor construction and repair tasks in the interior/exterior electrical discipline. Interior work may include replacement, installation and relocation of circuits, panel boards, meter bases, main distribution panels, lighting and electrical equipment. Exterior work may include replacement, installation and relocation of underground and overhead distribution feeders and laterals (13.kV), transformers, disconnects, cutouts, lighting (including airfield lighting systems and components), poles and appurtenances, raceways, and electrical distribution substation components.
Associated incidental carpentry, excavation, concrete & paving work, site restoration (e.g.
landscaping, hydro-sampling, etc.), painting, fencing, demolition, low voltage electrical (i.e. less than 50VAC, including fire alarm, Intrusion Detection Systems (IDS), Supervisory control and data acquisition (SCADA), and communications, ACM and LBP testing & abatement, and environmental clean-up may be required with the interior/exterior task orders. The work will comprise of approximately 90% construction & repair and 10% service over the duration of the five-year MATOC IDIQ.
1.2 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and amendments will be available by INTERNET ACCESS ONLY.
All solicitation documents will be posted to the Federal Business Opportunities website at http://www.fbo.gov under solicitation number W912DW-16-R-0008. Registration is required to download documents from the Federal Business Opportunities website.
It shall be the Contractor’s responsibility to check the website for any amendments. The Offeror shall submit all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
A list of interested vendors (potential Offerors and Sub-Contractors) is available on the Federal Business Opportunities web site.
1.3 OFFEROR’S QUESTIONS AND COMMENTS
All inquiries regarding this solicitation are to be submitted via ProjNet-BID. Telephone and email inquiries will not be accepted. ProjNet-BID is a web-based program that allows bidders to post questions regarding the solicitation and to view all questions by other bidders and answer by USACE. ProjNet-BID can be accessed at https://www.projnet.org. To access the ProjNet-BID website for the first time:
1. Click the Quick Add menu in the upper right
2. Enter the following information for access;
(a) Select USACE as the Agency
(b) Input BID Key FRB9N4‐IHQRYA
(c) Your email address
3. Enter valid business contact information (e.g. First and Last Name, Company name, City and State, phone number, email address). (Required on first project only.)
4. Establish Secret Questions and Answer which will be used as a password (required on first project only)
5. For subsequent access use your email address, the Key and response to the Secret Question to access the ProjNet-BID module.
6. Submit technical questions by clicking post a New Inquiry. When an answer is posted to a question, the question and answer is then available for all other bidders to review.
7. For questions about ProjNet-BID, please contact the Call Center Help Desk toll free at 1-800- 428-HELP (4357), which operates from 8 a.m. to 5 p.m. (Central US Time zone).
Questions may be submitted up to 2:00 p.m. on the fifth business day prior to the closing date. Questions submitted after that time will NOT be answered. It will be the responsibility of interested offeror’s, to review questions and responses in ProjNet-BID prior to submission of proposals. Any revisions/changes to subject solicitation will be done via amendment. It is the responsibility of all offerors to ensure acknowledgement of all amendments issued for this solicitation. .
1.4 SMALL BUSINESS SIZE STANDARD/NAICS CODE
The North American Industry Classification System (NAICS) code for this acquisition is 237130 (Power and Communication Line and Related Structures Construction). The Small Business standard is $36,500,000.00.
1.5 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal
1.6 PRE-PROPOSAL CONFERENCE AND SITE VISIT (FAR 52.236-27)
A one-time pre-proposal conference will be conducted on December 15th 2016 at 10:00 a.m. at Building 2015, in the third floor conference room, (Room 343), North 4th & Pendleton, Joint Base Lewis-McChord, Washington. Site visit for the Seed Project TO will immediately follow.
A temporary 1-day vehicle pass is required to drive on Joint Base Lewis-McChord (JBLM) and may be obtained from the Visitor’s Center at the JBLM Main Gate. Contractors that have privately-owned vehicles (POVs) must have proof of vehicle insurance and vehicle registration. In the case of a rental vehicle, contractors must have rental agreement. Due to heightened security, the following procedures will describe how to gain access to the site visit for yourself and any subcontractors attending (if they or you do not have current access to the military installation):
All attendees must have valid picture identification.
On 1 May 2016, JBLM began enforcing the provision of the Real ID Act of 2005. Under provisions of this act, a standard driver’s license or ID card issued by any of the following states is not accepted for unescorted access to JBLM: Illinois, Minnesota, Missouri and Washington.
Persons requesting unescorted access to JBLM and who present a standard license or ID from one of those states will be required to present additional documentation to verify their identity prior to being allowed access to JBLM. The list of acceptable documents to present along with a Standard driver’s license or ID card issued by one of those states include: DoD CAC, DoD Uniformed Services Identification and Privileges Cards, U.S. Passport or U.S. Passport Card, VA Issued Health Card, U.S. Coast Guard Merchant Mariner Card, Transportation Worker ID Card (TWIC) issued by DHS, U.S. Government issued, authenticated Federal PIV credentials.
US Military or Draft Record containing name and DOB. A full list can be found http://www.lewis-mcchord.army.mil/ under Access to JBLM. The Washington State enhanced driver license is acceptable.
DIRECTIONS TO BUILDINGS 2015: From I-5 take exit 120 (Joint Base Lewis-McChord) and proceed to the Visitor’s Center just before the JBLM Main Gate. Once through the gate, turn right on Pendleton Avenue and drive to the corner of 4th and Pendleton. To your right is available parking area across the street and kitty corner to building 2015. There is also parking on 4th Street (a one-way street) and also at the back of building 2015. It is important to note that these two parking areas are very limited.
Offerors ARE URGED AND EXPECTED to inspect the site for the Seed Project Task Order project where construction is to be performed and to satisfy themselves as to all general and local conditions which may affect the cost of performance of the contract to the extent such information as is reasonably obtainable. In no event will a failure to inspect the site constitute grounds for withdrawal of an offer after opening or for a claim after award of the contract.
1.7 ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP.
(Including attachments). The penalty for making false statements is prescribed in 18 U.S.C.
1001.
1.8 PROPOSAL SUBMITTALS
Proposals may be either hand delivered, or submitted through a common carrier such as FedEx, UPS, etc. NOTE: THE U.S. POSTAL SERVICE DOES NOT DELIVER TO THIS OFFICE. Proposals must be received no later than the time specified on the Standard Form (SF) 1442, Page 1, and Item 13a or as amended under an amendment to the solicitation. The Packaging that contains the Proposals shall be marked: “Proposals for Solicitation Number:
W912DW-16-R-0008, DO NOT OPEN”.
Hand Delivery Instructions: Proposals may be hand-delivered to the U.S. Army Corps of Engineers, Specials Projects Branch, North 4th & Pendleton, Bldg. 2015, Room 337, Joint Base Lewis-McChord. Due to heightened security at Government installations, Offerors are encouraged to allow themselves EXTRA time when hand-delivering their proposals. If you arrive and Contracting Personnel are not on site, contact Amy Wooldridge, Contract Specialist at 253‐967‐4237 or Elke Neal, Contracting Officer, at 253-966-4359. It is your responsibility to ensure that your proposal is submitted in a timely fashion. See FAR 52.215-1 for rules concerning late proposals.
LATE OFFEROR SUBMISSIONS WILL NOT BE CONSIDERED.
Common Carrier Delivery Instructions: Proposals may be delivered by means of a common carrier such as FedEx, UPS, etc. to the following address. DO NOT ATTEMPT TO SUBMIT
YOUR PROPOSAL THROUGH THE U.S. POSTAL SERVICE.
U.S. Army Corps of Engineer Special Projects Branch Bldg. 2015, Room 337 North 4th & Pendleton Attn: Amy Wooldridge
JBLM, WA 98433
1.9 SUBMITTAL REQUIREMENTS
See Section 00 24 00 of the solicitation, Paragraph 4, regarding General Submittal Requirements, Paragraph 4.3 regarding Non-Cost Proposal Submittal Requirements and Paragraph 8 regarding Price Proposal Submittal Requirements.
1.10 JOINT VENTURE PROPOSAL REQUIREMENTS
When proposing as a Joint Venture, all members of the Joint Venture shall sign the SF 1442, Corporate Certificate, and the Bid Bond unless a written agreement by the Joint Venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the Joint Venture. In addition, a copy of the Joint Venture Agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. See also Paragraph 10 under Section 00 24 00 of the solicitation for information pertaining to proposal submission requirements for Joint Ventures.
See CFR 125.8 for further information regarding Joint Ventures.
1.11 BID GUARANTEE
In accordance with FAR 52.228-1 in section 00 72 00 of the solicitation, a Bid Guarantee is required for this solicitation. The penal sum of the bond shall be for $180,000.00. See also Paragraph 10 under section 00 24 00 for additional information pertaining to Bid Bond submission requirements.
1.12 PROPOSAL SUBMISSION
There will be two volumes required for the Offeror’s proposal submission for this solicitation.
Volume I will contain the Non-Cost (Technical) l Proposal and Volume II will contain a price proposal. *Please also note that a single disc (CD or DVD) containing both the Technical Proposal and the Price Proposal is also required with your submission. (See proposal requirements Section 00 24 00 of this solicitation) Price will be based on a Seed Project Task Order. Funds are currently available for this Project.
-END-
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2016 52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.223-4 Recovered Material Certification MAY 2008 52.225-12 Notice of Buy American Requirement - Construction
Materials Under Trade Agreements
MAY 2014
CLAUSES INCORPORATED BY FULL TEXT
52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)
(a) Definitions. As used in this provision--
“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.
“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.
Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.
(2) The first page of the proposal must show--
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
(3) Submission, modification, or revision, of proposals.
(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.
(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.
(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.
(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.
(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.
(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).
(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall--
(1) Mark the title page with the following legend: This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed--in whole or in part--for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of--or in connection with-- the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
(2) Mark each sheet of data it wishes to restrict with the following legend: Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
(f) Contract award. (1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.
(2) The Government may reject any or all proposals if such action is in the Government's interest.
(3) The Government may waive informalities and minor irregularities in proposals received.
(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.
(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government's best interest to do so.
(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.
(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.
(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.
(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(i) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.
(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(iv) A summary of the rationale for award.
(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.
(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Multiple Award Task Order (MATOC) Indefinite-Delivery, Indefinite- Quantity (IDIQ) contract resulting from this solicitation.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
6.2% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Joint Base Lewis-McChord, Pierce County, Washington. Additional “covered areas” will be identified in individual Task Orders.
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the…