R0004.pdf

PDF 23 MB Posted

Attached to
Chief Joseph Dam Intake Gate Repair Pit, Bridgeport, Washington
Solicitation number
W912DW-16-B-0001
Issued by

About this file

Amendment R0004 to solicitation W912DW-16-B-0001

View the file

Other files

File Type Posted
ABSTRACT.pdf PDF
R0010.pdf PDF
R0009.pdf PDF
R0008.pdf PDF
R0007.pdf PDF
R0006.pdf PDF
R0005.pdf PDF
R0003.pdf PDF
R0002.pdf PDF
R0001.pdf PDF
Plans.pdf PDF
16B0001.PDF PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68MD952458984

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912DW-16-B-0001 FY16 Chief Joseph Dam Intake Gate Repair Pit, Bridgeport, WA

1.This amendment four (0004) provides for the follow ing: The site visit roster and photographs for site visit number 2 are provided for informational purposes only.

2. The date and time of bid opening, February 4, 2016 at 9:00:00 a.m. LOCAL TIME remains the same.

3. NOTICE TO BIDDERS: Bidders must acknow ledge receipt of this amendment by number and date on bid.

Please mark outside of envelope in w hich your bid is enclosed to show amendment received.

Encl:

Site visit roster (new ) Site visit photos (new )

1. CONTRACT ID CODE PAGE OF PAGES

1 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Jan-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW-16-B-0001

X 9B. DATED (SEE ITEM 11)

23-Dec-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Jan-2016

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CECT-NWS

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

This page intentionally blank

This page intentionally blank

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT
Site Visit Roster
Site Visit Photos
20160121 Pics Set 1.pdf
1st Deck Column View
1st Deck Cylinder View
1st Deck Hand Railing
1st Deck West Hand Railing
2nd Deck Column Bottom View
2nd Deck North Wall
910 South Wall Looking East
910 Cylinder Pedestal
910 North Wall Electric
910 North Wall Looking East
910 North Wall Scaffold Mount
910 Scaffolding Base
910 SW Corner
910 SW Ladder Access
20160121 Pics Set 2.pdf
3rd Deck Cylinder Platform 2
3rd Deck Cylinder Platform Connection
3rd Deck Cylinder Platform
3rd Deck Hand Railing Wall Connection
3rd Deck old Wall Anchors
3rd Deck View of Upper Cylinder Platform
4th Deck Gate Brace mid
4th Deck Gate Brace Mount
4th Deck Gate Brace OpenEnd
946 Water Line SW Corner 2
946 Water Line SW Corner 3
946 Water Line SW Corner
20160121 Pics Set 3.pdf
946 SE Cylinder Deck
946 View of Gate Slot West
946 View West
948 Access
948 Current Vent Fan
948 Hall Electric Supply Area
948 View to SE Corner
970 Deck Pit Opening
970 Deck Power Lines

File details come from the government source that posted it. Updated .