Chief Joseph Dam Intake Gate Repair Pit, Bridgeport, Washington
Solicitation number
W912DW-16-B-0001
Issued by

About this file

Amendment R0003 to solicitation W912DW-16-B-0001

View the file

Other files

File Type Posted
ABSTRACT.pdf PDF
R0010.pdf PDF
R0009.pdf PDF
R0008.pdf PDF
R0007.pdf PDF
R0006.pdf PDF
R0005.pdf PDF
R0004.pdf PDF
R0002.pdf PDF
R0001.pdf PDF
Plans.pdf PDF
16B0001.PDF PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68MD952458984

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912DW-16-B-0001 FY16 Chief Joseph Dam Intake Gate Repair Pit, Bridgeport, WA

(See continuation page)

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Jan-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW-16-B-0001

X 9B. DATED (SEE ITEM 11)

23-Dec-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Jan-2016

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CECT-NWS

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW-16-B-0001

CONTINUATION PAGE

1. This amendment three (0003) provides for the following:

a. The site visit roster and photographs for site visit number 1 are provided for informational purposes only.

b. A third site visit has been scheduled for Tuesday, 26 January 2016 at 1:00 p.m. local time.

c. The General Wage Determination WA150093 has been revised in its entirety. General Wage Determination WA160093, with 0 modifications, dated January 8, 2016 replaces in its entirety WA150093, with 6 modifications.

2. The date and time of bid opening, February 4, 2016 at 9:00:00 a.m. LOCAL TIME remains the same.

3. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.

4. NOTICE TO BIDDERS: Bidders must acknowledge receipt of this amendment by number and date on bid. Please mark outside of envelope in which your bid is enclosed to show amendment received.

Encl:

Site visit roster (new) Site visit photos (new) Site visit number 3 information (revised) Wage Determination WA160093 (new)

W912DW-16-B-0001 1 R0003

SITE VISIT

The purpose of the site visit is to familiarize Offerors with the scope of work and provide an opportunity to become familiar with the existing site conditions. It is the intent of the Government that all prospective Offerors visit the jobsite for the purpose of acquainting themselves with local conditions. Non-technical questions will be addressed; however, ALL technical questions regarding the solicitation will be submitted via ProjNet, a web-based program that allows Offerors to post questions regarding the solicitation and to view all questions by other Offerors and answers by USACE. Attendance at the site visit is strongly recommended.

Three Two organized site visits have been scheduled as follows:

Thursday, 14 January 2016, at 1:00 PM, local time Thursday, 21 January 2016, at 1:00 PM, local time Tuesday, 26 January 2016, at 1:00 PM, local time

Participants will meet at:

Chief Joseph Dam – Commons Building Highway 17 and Pearl Hill Road Bridgeport, WA

To obtain access to the Commons Building, site visit participants will need to use the call button at Security and indicate they are attending the solicitation site visit for Chief Joseph Dam Intake Gate Repair Pit. Once through the gate, participants will proceed straight ahead to the security guard station, where they will need to present valid ID to the security officer. When allowed, site visit participants shall proceed to the Commons Building and meet in a conference room, location to be provided upon arrival.

After the pre-site visit logistics briefing in the conference room, participants will be escorted to and from the project work area for the site visit.

Site Visit Registration:

Firms must register no later than 12:00 PM the day prior to each respective site visit date.

Confirm attendance by sending an email to: Daniel.S.Bennett@usace.army.mil and to Steve.Y.Kuan@usace.army.mil

Include the below information.

1) Solicitation Number

2) Project Title

3) Date of Attendance

4) Name of firm with complete mailing address and telephone number

5) Name, title and phone number of each representative

6) Are all individual(s) U.S. Citizens?

If not, please refer to ACCESS FOR FOREIGN NATIONALS below.

W912DW-16-B-0001 2 R0003

Site Visit Point of Contact: Scott Bennett, Chief Joseph Dam Email: Daniel.S.Bennett@usace.army.mil Office Phone: 509-686-2254

Alternate Point of Contact: Mr. Steve Kuan, Seattle District Email: Steve.Y.Kuan@usace.army.mil Office Phone: 206-764-3481

Requests for attendance received after 12:00 PM the day prior to each respective site visit date will not be accepted. Due to Security requirements and limited field staff available for site visits, only three two site visits will be offered. Individual requests for site visits will not be granted.

Offerors should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the work or the cost thereof. Failure to do so shall not relieve Offerors from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Government shall assume no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the Solicitation, specifications/plans, or related documents. In no event, will a failure to inspect the site constitute grounds for withdrawal of an offer after closing or for a claim after award of the contract.

Each individual must have valid government picture identification on his/her person while at the project site. There can be no substitutions of one individual for another. If an individual arrives at the site visit without having RSVP’d ahead of time and/or without picture identification, that individual may not be allowed on the project.

Hardhats, hard toed boots, and safety reflective vests are required. Cameras will not be allowed.

However, the Government will bring a camera and take pictures as requested, to be reviewed and approved by the security officer prior to release. All participants will be required to sign an attendance list.

Due to foreign disclosure requirements, non U.S. citizens will only be able to attend the 21 January 2016 site visit. Non U.S. Citizen(s) must complete the attached request for visitation authority (RVA) form and submit it with required documents no later than 14 days prior to the site visit, by 12:00 p.m. PDT.

Please submit required documentation to Scott Bennett, Daniel.S.Bennett@usace.army.mil, 509-686-2254.

W912DW-16-B-0001 WA160093 - 1 R0003

General Decision Number: WA160093 01/08/2016 WA93

Superseded General Decision Number: WA20150093

State: Washington

Construction Type: Heavy including water and sewer line construction

County: Douglas County in Washington.

HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016

* CARP0001-018 06/01/2015

DOUGLAS WHICH LIES EAST OF THE 120TH MERIDIAN

Rates Fringes

Carpenters: (Including Form Work)............................$ 31.94 14.00

MILLWRIGHT.......................$ 41.86 14.00

ZONE PAY:

ZONE 1 0-40 MILES FREE

ZONE 2 41-65 MILES $2.25/PER HOUR

ZONE 3 66-100 MILES $3.25/PER HOUR

ZONE 4 OVER 100 MILES $4.75/PER HOUR

DISPATCH POINTS:

CARPENTERS/MILLWRIGHTS: PASCO (515 N. Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

W912DW-16-B-0001 WA160093 - 2 R0003

CARPENTERS: MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

HAZMAT PROJECTS:

Anyone working on a HAZMAT job (task, where HAZMAT certification is required, shall be compensated at a premium, in addition to the classification working in as follows:

LEVEL D+ $.25 per hour - This is the lowest level of proection. No respirator is used and skin proection is minimal.

LEVEL C+ $.50 per hour - This level uses an air purifying respirator or additional protective clothing.

LEVEL B+ $.75 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit."

LEVEL A+ $1.00 per hour - This level utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line.

* CARP0770-029 06/01/2015

DOUGLAS WHICH LIES WEST OF THE 120TH MERIDIAN

Rates Fringes

CARPENTER (Including Formwork)...$ 31.94 14.00

MILLWRIGHT.......................$ 41.86 14.49

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL

CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS

Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:

Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend

Zone Pay:

0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT

AND PILEDRIVER ONLY)

Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center

W912DW-16-B-0001 WA160093 - 3 R0003

Zone Pay:

0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour

ELEC0191-013 06/01/2014

Rates Fringes

ELECTRICIAN

DOUGLAS, CHELAN, and OKANOGAN Counties...........$ 37.11 17.63

ISLAND, SAN JUAN, SKAGIT,

SNOHOMISH and WHATCOM Counties....................$ 40.21 17.73

ENGI0302-025 06/01/2013

WEST OF THE 120TH MERIDIAN

Rates Fringes

Power equipment operators:

Group 1A...................$ 37.39 16.65 Group 1AA..................$ 37.96 16.65 Group 1AAA.................$ 38.52 16.65 Group 1.....................$ 36.84 16.65 Group 2.....................$ 36.35 16.65 Group 3.....................$ 35.93 16.65 Group 4.....................$ 33.57 16.65

Zone Differential (Add to Zone 1 rates):

Zone 2 (26-45 radius miles) - $1.00 Zone 3 (Over 45 radius miles) - $1.30

BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent, Mount Vernon, Port Angeles, Port Townsend, Seattle, Shelton, Wenatchee, Yakima

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments)

GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Tower crane over 175 ft in height, base to boom; Excavator/Trackhoe: Over 90 metric tons

GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Excavator/Trackhoe: over 50 metric tons to 90 metric tons

GROUP 1 - Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work;;

Excavator/Trackhoe: over 30 metric tons to 50 metric tons;

Dozer D-10; Paver; Scraper-self propelled 45 yards and over

GROUP 2 - Cranes, 20 tons thru 44 tons with attachments;

W912DW-16-B-0001 WA160093 - 4 R0003

Crane-overhead, bridge type-20 tons through 44 tons;;

Excavator/Trackhoe: 15 to 30 metric tons; Drilling Machine;

Screed; Piledriver; Scraper-self propelled under 45 yards;

Boring Machine

GROUP 3 - Cranes-thru 19 tons with attachments; A-frame crane over 10 tons;; Dozers-D-9 and under; Excavator/Trackhoe:

under 15 metric tons; Forklift: 3000 lbs and over with attachments; Oiler; Drill Assistant; Boom Truck over 10 tons

GROUP 4 - Cranes-A frame-10 tons and under; Forklift: under 3000 lbs with attachments; Boom Truck 10 tons and under

ENGI0370-024 06/01/2015

EAST OF THE 120TH MERIDIAN

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 26.16 13.55

GROUP 2.....................$ 26.48 13.55

GROUP 3.....................$ 27.09 13.55

GROUP 4.....................$ 27.25 13.55

GROUP 5.....................$ 27.41 13.55

GROUP 6.....................$ 27.69 13.55

GROUP 7.....................$ 27.96 13.55

GROUP 8.....................$ 29.06 13.55

ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00

Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;

Lewiston, Idaho

Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Drill Assistant

GROUP 2: Fork Lift

GROUP 3: Boring Machine

GROUP 4: Oiler; Drill (churn, core, calyx or diamond)

GROUP 5: Trackhoe/Excavator (under 3/4 yd.); Drilling equipment (8 unch bit and over) (robbins, reverse circulation and similar); Piledriver; Cranes (25 tons & under); Boom Truck (Under 25 tons)

GROUP 6: Trackhoe/Excavator (3/4 yd. to 3 yd.), Bulldozer, 834 R/T & similar; Paver; Scraper; Screed; Cranes (over 25 tons, to and including 45 tons)

GROUP 7: Trackhoe/Excavator (3 yds & over); Cranes (over 45 tons to but not including 85 tons)

GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower)

BOOM PAY: (All Cranes, Including Tower)

W912DW-16-B-0001 WA160093 - 5 R0003

180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale

NOTE:

In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.

HAZMAT:

Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.

IRON0014-013 07/01/2015

Rates Fringes

IRONWORKER (Ornamental, Reinforcing and Structural)......$ 32.76 23.19

LABO0238-010 06/01/2013

EAST OF THE 120TH MERIDIAN

Rates Fringes

LABORER

GROUP 1.....................$ 22.00 10.65

GROUP 2.....................$ 24.10 10.65

GROUP 3.....................$ 24.37 10.65

GROUP 4.....................$ 24.64 10.65

Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00

BASE POINTS: Pasco

Zone 1: 0-45 radius miles from the main post office.

Zone 2: 45 radius miles and over from the main post office

LABORERS CLASSIFICATIONS

GROUP 1: Flagger

GROUP 2: Common or General Laborer; Form-Stripping

GROUP 3: Mason Tender-Cement/Concrete; Handheld Drill

GROUP 4: Grade Checker; High Scaler; Pipelayer

LABO0238-014 06/01/2013

Rates Fringes

LABORER: Mason Tender - Brick...$ 24.10 10.65

LABO0348-009 06/01/2015

WEST OF THE 120TH MERIDIAN

Rates Fringes

LABORER

GROUP 2.....................$ 22.62 10.45

W912DW-16-B-0001 WA160093 - 6 R0003

GROUP 3.....................$ 24.78 10.45

GROUP 4.....................$ 25.38 10.45

GROUP 5.....................$ 25.81 10.45

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):

ZONE 2 - $1.00

ZONE 3 - $1.30

BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT,

TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT.

TOWNSEND, PT. ANGELES, AND BREMERTON

ZONE 1 - Projects within 25 radius miles of the respective city hall ZONE 2 - More than 25 but less than 45 radius miles from the respective city hall ZONE 3 - More than 45 radius miles from the respective city hall

LABORERS CLASSIFICATIONS

GROUP 2: Flagger

GROUP 3: General or Common Laborer; Mason Tender-Cement/Concrete; Form-Stripping

GROUP 4: Grade Checker; Pipelayer; high Scaler; Handheld Drill

GROUP 5: Mason Tender-Brick

* PAIN0005-003 07/01/2015

Rates Fringes

PAINTER (Brush, Roller, and Spray.)..........................$ 23.05 10.85

TEAM0690-006 01/01/2014

Rates Fringes

Truck drivers: (ANYONE

WORKING ON HAZMAT JOBS SEE

FOOTNOTE A BELOW)

ZONE 1:SPOKANE ZONE CENTER

GROUP 5....................$ 23.38 15.19

Zone Differential (Add to Zone 1 rate: Zone 1 + $2.00)

BASE POINTS: Spokane, Moses Lake, Pasco, Lewiston

Zone 1: 0-45 radius miles from the main post office Zone 2: Outside a 45 mile radius from the main post office

TRUCK DRIVERS CLASSIFICATIONS

GROUP 5: Semi-Trailer Truck

FOOTNOTE A - Anyone working on a HAZMAT job, where HAZMAT cerfification is required, shall be compensated as a premium, in addition to the classification working in as

W912DW-16-B-0001 WA160093 - 7 R0003

follows:

LEVEL C-D: - $.50 PER HOUR - This level may use an air purifying respirator or additional protective clothing.

LEVEL A-B: - $1.00 PER HOUR - Uses supplied air in conjunction with a chemical splash suit or fully encapsulated suit with a self-contained breathing apparatus.

Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours.

SUWA2009-059 08/07/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 24.50 6.30

LABORER: Common or General (Water and Sewer Lines)..........$ 20.79 4.63

LABORER: Landscape & Irrigation.......................$ 12.27 2.73

OPERATOR: Asphalt Plant.........$ 34.14 0.68

OPERATOR: Backhoe...............$ 28.46 6.04

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 10.63 0.00

OPERATOR: Broom/Sweeper.........$ 27.03 4.67

OPERATOR: Grader/Blade..........$ 27.56 5.53

OPERATOR: Loader................$ 26.90 7.65

OPERATOR: Mechanic..............$ 27.09 7.30

OPERATOR: Power Shovel..........$ 25.12 7.83

OPERATOR: Roller................$ 29.18 4.14

TRUCK DRIVER, Includes Dump Truck............................$ 13.00 0.26

TRUCK DRIVER: Flatbed Truck.....$ 22.74 6.29

TRUCK DRIVER: Lowboy Truck......$ 22.89 5.72

TRUCK DRIVER: Water Truck.......$ 23.46 6.06 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage

W912DW-16-B-0001 WA160093 - 8 R0003

determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

W912DW-16-B-0001 WA160093 - 9 R0003

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

This page intentionally blank

This page intentionally blank

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT
SITE VISIT
General Decision Number: WA160093
Site Visit Roster
Site Visit Photos
14Jan2016 Site Visit Pictures.pdf
2nd level View to NW Corner
3rd Level SE corner
3rd Level West End view up
4th Level Gate Brace North Wall
4th Level Gate Brace South Wall
4th Level View of Access to Pit
4th Level view SE corner
5ht Level view of East Wall
5th Level view to NW corner
Bottom of Pit north wall
Bottom of Pit South wall
Cylinder Pedestal looking SE
Gate Pit Mono S1
Top of Intake access to gate pit East view
Top of Intake access to gate pit West view
View up the SE corner